direct tollroad access -...

16

Upload: phungkien

Post on 23-Mar-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Direct TOLLROAD ACCESS TO JIIPE

RAILWAY ACCESS 11 KM FROM “DUDUK

SAMPEYAN” STATION, TARGET OPERATION IN 2020

MANYAR TOLLGATE

“DUDUK SAMPEYAN” RAIL

STATION - LAMONGAN

TOLL KRIAN-LEGUNDI-BUNDER-MANYAR

39 KM, OPERATION IN JUNE 2019

PT. BERKAH KAWASAN MANYAR SEJAHTERA

First jetty, 250 m length and 30 m wide, 2 side function, already in operation for dry bulk and general cargo.

Natural -14 LWS for loading and unloading, capacity 60,000 DWT.

In 2017, equipments-cranes installment, 1000 m jetty extension for multipurpose and oil&gas In 2018, dredging project until -16 LWS

Reclamation

80 Ha in 2014

11

12

Thank You