Direct TOLLROAD ACCESS TO JIIPE
RAILWAY ACCESS 11 KM FROM “DUDUK
SAMPEYAN” STATION, TARGET OPERATION IN 2020
MANYAR TOLLGATE
“DUDUK SAMPEYAN” RAIL
STATION - LAMONGAN
TOLL KRIAN-LEGUNDI-BUNDER-MANYAR
39 KM, OPERATION IN JUNE 2019
First jetty, 250 m length and 30 m wide, 2 side function, already in operation for dry bulk and general cargo.
Natural -14 LWS for loading and unloading, capacity 60,000 DWT.
In 2017, equipments-cranes installment, 1000 m jetty extension for multipurpose and oil&gas In 2018, dredging project until -16 LWS
Reclamation
80 Ha in 2014