dis projects report hormoz kazemzadeh

10
ABB Ltd. - 1 - DIS Projects Report Hormoz Kazemzadeh ABB Annual Users’ Group Meeting August 27 – 31, 2006

Upload: jersey

Post on 03-Feb-2016

51 views

Category:

Documents


0 download

DESCRIPTION

DIS Projects Report Hormoz Kazemzadeh. ABB Annual Users’ Group Meeting August 27 – 31, 2006. Network Manager DMS Projects. Network Manager Projects. ComEd Project Highlights Chicago Live as of 5/10 – Now Live System-Wide Large Single Database – 2.2M Nodes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Ltd

. -

1 -

DIS Projects ReportHormoz Kazemzadeh

ABB

Annual Users’ Group Meeting

August 27 – 31, 2006

Page 2: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

2 -

Network Manager DMS Projects

Name LocationNo. of

CustomersProduction

Date

Commonwealth Edison Chicago, IL 3,700,000 2004

CPS Energy San Antonio, TX 650,000 2006

Ergon Energy Brisbane, Australia 600,000 2006

Jackson EMC Jackson, GA 190,000 2006

Arizona Public Service (APS) Phoenix, AZ 1,200,000 2007

DTE Energy Detroit, MI 2,200,000 2007

New Hampshire Electric Coop. Plymouth, NH 77,000 2007

Page 3: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

3 -

Network Manager Projects

ComEd Project Highlights Chicago Live as of 5/10 – Now

Live System-Wide

Large Single Database – 2.2M Nodes

Use of CADOPS Remote in Regional Offices

Integration with ABB SCADA

CIM XML Based Interfaces

GIS CIM interface with SmallWorld GIS

Page 4: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

4 -

Network Manager Projects

CPS Energy Project Highlights Parallel Implementation of GIS, Data

Conversion, and OMS in Phase 1 Going Live Next Month ABB Prime for GIS Electric/Land/Gas, Data

Conversion, OMS, GIS Design, and Mobile GIS

Integration between ABB Network Manager DMS, MDSI Advantex, and SAP

ICCP Interface to SCADA netCADOPS Call Entry Screen Embedded

in SAP Network Analysis Applications for Phase 2

(Balanced Load Flow and Fault Location) Plans for Notification and WebMap

Modules

Page 5: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

5 -

Network Manager Projects

APS Project Highlights Phase 1 FAT Starting Next Month

TIBCO Based EAI

ICCP Interface to SCADA

AMI Integration

netCADOPS Call Entry Enhancements

Notification, WebMaps, and Crew Callout

Network Analysis Applications for Phase 2 (RSA, Unbalanced Load Flow, Fault Location, Simulation Mode, Auto-Schematic, Line Unloading, Capacitor Control Integration)

Page 6: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

6 -

Network Manager Projects

DTE Project Highlights FAT near completion

DTE implementing new ESRI GIS in parallel

Not implementing OMS at this point

Integration with ABB SCADA

Integration with Dispatcher Training Simulator

DMS applications (Unbalanced Power Flow, RSA, Line Unloading, Auto-schematic, Fault Location, Simulation Mode, Phase Angle Security Check, Dispatcher Training Simulator)

Page 7: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

7 -

Network Manager Projects

Ergon Energy Project Highlights ABB EMS/DMS Integrated system DMS Pilot / No OMS at this point Split Mode SmallWorld GIS Interface

Jackson EMC Project Highlights Tagging and Referral Enhancement Going live in October ESRI GIS interface

New Hampshire Electric Coop. Project Highlights Starting October ESRI GIS Interface 4 Month Project

Page 8: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

8 -

ABB Project Implementation Approach

Scope of Work (SOW)

Software Task Spec. (STS)

Configuration Guide

As-Is/To-Be Workflows

Code Development

Test & Acceptance Plan

Test Procedure (TPR)

Program Development System (PDS)

Initial Project Team Training

Factory Acceptance Testing (FAT)

Site Acceptance Testing (SAT)

Site System Integration

Cutover/ Rollout

Knowledge Transfer

System Architecture Guide

Define Scope

Detail Requirements

Develop System

Deploy System

Requirements Review

Page 9: DIS Projects Report Hormoz Kazemzadeh

© A

BB

Inc

. -

9 -

Business Process Change Management

Change Management Goals User Acceptance

Realization of Benefits

Process Based Communication/Training/Support

Process Change Management As-Is/To-Be Workflow

Gap Analysis / Impact Analysis

Communication, Training, & Support Project Team / Core Team / SME’s

Super Users (Tier 1 Support)

End Users (Roles Based Security)

Page 10: DIS Projects Report Hormoz Kazemzadeh