disaster recovery an integrated approach
DESCRIPTION
Disaster Recovery An Integrated Approach. Sharad Sharma General Manager – India, and Vice President – Product Operations Symantec Corporation. Think Disaster. DATA CORRUPTION. COMPONENT FAILURE. APPLICATION FAILURE. HUMAN ERROR. MAINTENANCE. SITE OUTAGE. - PowerPoint PPT PresentationTRANSCRIPT
Disaster RecoveryAn Integrated Approach
Sharad SharmaGeneral Manager – India, and Vice President – Product Operations Symantec Corporation
2Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Think Disaster
DATA CORRUPTION COMPONENT FAILURE APPLICATION FAILURE
HUMAN ERROR MAINTENANCE SITE OUTAGE
3Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
But there is more… Security Threats!
4Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Disaster Recovery is not just Data Recovery
Complete Operations Recovery is complex and process intensive
One can’t “think” when disaster strikes
5Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Today’s approach
Activity How is it done today Risks
DR Planning Printed Unwieldy manuals Difficult to create and maintain
Coordinate processes Manual and haphazard Impact on RTO
Integrate multiple point products
Consultant creates plan, administered individually
Impact on RTO
Change Management Using phone calls Duplication of effort
DR SLA Tracking Either ignored or done in an ad-hoc fashion
RTO & RPO can suffer without knowledge
DR Reports Not Available No way to track things
DR Readiness Testing
Manually done: Irregular Recovery may not work when necessary
6Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Example: DR for Shared StandbyPrimary Site
Remote (DR) Site
App2App1 Standby
Primary HA Cluster
Dual Use Servers
Remote HA Cluster
OS & Application
Images
App2App1 Standby
Re
pro
vis
ion
Data Replication
7Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Activities during DR
EXECUTIVES
STORAGE ADMIN
NETWORK ADMIN
SERVER ADMIN
DATABASE ADMIN
• Setup Remote Backup Policy
• Create Remote Snapshot
• Select Servers to reprovision
• Migrate remote applications
• Provision Servers with correct Images
• Start Application(s)
• Setup Remote Network
• Setup cluster link• Reroute traffic to
remote data center
• Setup Remote SAN• Associate Remote
Data Set to appropriate server
• Access Disaster Situation
• Declare Disaster
8Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Instead…..
9Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Create an automated DR Platform
Complete data center recovery Coordinate recovery of data, server, network and non-IT
resources …
DR Plan updated automatically at both sites
Enables easy Fire Drill, Fail Over, Fail Back
Enables measurable RTO, RPO
Customizable
Spans across multiple point products
Plan against newer threats Security threats (virus attacks, worms etc.)
10Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Holistic Solution!
APPLICATIONS
INFRASTRUCTUREPEOPLE
DATA
PROCESSESDRCC
(Disaster Recovery Control Center)Common platform to orchestrate all DR aspects
11Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Shared Standby using DRCCPrimary Site
Remote (DR) Site
App2App1 Standby
Primary HA Cluster
Dual Use Servers
Remote HA Cluster
OS & Application
Images
App2App1 Standby
Re
pro
vis
ion
Data Replication
DRCC
Site Disaster Event
DR
Practice
12Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
DRCC Orchestrates DR Practice
Disaster Happens
Executives assess situation
Disaster Declared
Create remote data snapshot
Select servers to be reprovisioned
Migrate remote applications
Provision selected servers
Network setup for App servers
Associate correct data set to server
Route Incoming data traffic
Setup remote backup policy
DRCC Start
DRCC End
Manual Semi-Automated Automated
DRCC Receives
Event.
Exec Task
Exec Task
DBA Task
Server Admin Task
Server Admin Task
Server Admin Task
N/W Admin Task
Storage Admin Task
N/W Admin Task
DBA Task
13Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
More Use Cases
DR Activity Examples
Change Management OS Upgrade
Application patch
Change storage size/attributes
Fire Drill For Shared Standby
For backup based (no standby)
For Dedicated Standby
Fail Back Complete Site fail back
Application fail back
Planned downtime reduction
DR Reports Difference between primary and remote
DR SLA tracking (RTO, RPO etc.)
14Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Summary
Centralized DR Operations Management Platform
Automates as much of DR plan as possible
Mechanism to walk through the DR practices
Integrates IT and people processes
Umbrella across participating point products
Reporting of DR SLAs
Monitoring of DR SLAs
15Symantec ConfidentialStorage Networking Summit 4 Nov 28-30, 2004
Thank You!
Q&A