  • SISTEMA DE AIRE ACONDICIONADO EN SALAS DE OPERACIONES.ING. MANUEL AZAHUANCHE ASMAT

  • INDICE1.- INTRODUCCION.2.- CLASIFICACION DE LAS AREAS DE CIRUGIA.3.- RECOMENDACIONES DE DISEO ASHRAE.4.- FUENTES DE CALOR.5.- NUMERO DE RENOVACIONES-TEMPERATURA Y HUMEDAD RELATIVA.6.- EJEMPLO DE CALCULO7.- ELECCION DEL SISTEMA DE DISTRIBUCION DE AIRE.8.- CONCLUSIONES.

  • 1.- INTRODUCCIONConsideraciones Inciales:La cantidad de Operaciones que se realizan en los Hospitales Nacionales, requieren de un ambiente SEPTICO, por lo que El Sistema de Aire Acondicionado debe contar con las Caractersticas Tcnicas apropiadas para mantener la presin positiva, la Humedad Relativa, La Temperatura, Filtrado de Aire de Alta Eficiencia y equipos 100% Aire Exterior. De esta manera se ha comprobado que se reducir la contaminacin biolgica del Quirfano..

  • Un reciente estudio realizado en Inglaterra estima que cada ao mueren alrededor de 5000 personas debido a infecciones adquiridas en los hospitales.

    Generalmente se asocian al contacto entre los pacientes y el personal, pero existe evidencia que muchas de las infecciones se transmiten por va area y un mal filtrado del sistema de aire acondicionado.En una sala de Operaciones el paciente esta Literalmente Abierto lo cual los expone a contraer infecciones si es que el aire acondicionado no esta correctamente filtrado, es decir : llega a la Sala de Operaciones con una Enfermedad A y puede salir de ella con enfermedades B, C o ms.

    Esta es la Razn por la que debemos poner mucho cuidado en el diseo de los sistemas de aire acondicionado, ya que son Vidas Humanas las que de alguna manera estn en nuestras manos y ya sea por DESCONOCIMIENTO o NEGLIGENCIA podemos AFECTARLA irreparablemente.

  • 2.- CLASIFICACION DE LAS AREAS DE CIRUGIA.

  • 3.- RECOMENDACIONES DE DISEO - ASHRAE.* The temperature and relative humidity set points should be adjustable by surgical staff. Systems should be capable of maintaining the space temperature in the lower end of the range (62F) for specialized procedures such as cardiac surgery. Table 3 lists tolerable temperature ranges; however, these are not intended to be dynamic control ranges. Special or supplemental cooling equipment should be considered if this lower temperature negatively affects energy use for surrounding areas.* Air pressure should be kept positive with respect to any adjoining rooms by supplying excess air.* A differential-pressure-indicating device should be installed to permit air pressure readings in the rooms. Thorough sealing of all wall, ceiling, and floor penetrations, and tight-fitting doors are essential to maintaining readable pressure.*Humidity and temperature indicators should be located for easy observation.

  • * Filter efficiencies should be in accordance with Table 1.* The entire installation should conform to requirements of NFPA Standard 99.* Air should be supplied at the ceiling with exhaust/return from at least two locations near the floor, with consideration given to having at least two high exhaust/return openings opposite from the low outlets. Endoscopic, laparoscopic, or thoracoscopic surgery procedures aided by camera, and robotic or robot-assisted surgery procedures, require heat-producing equipment in the operating room. Exhaust/return openings located above this equipment can capture the more buoyant heated air and prevent it from being reentrained in the ceiling supply airstream. The bottom of low openings should be at least 3 in. above the floor. Supply diffusers should be unidirectional (laminar-flow). High-induction ceiling or sidewall diffusers should be avoided

  • 4.- FUENTES DE CALOR.

  • FCSE (30C 80%)S (22C-50%)I (11c 95%)XPivotRecta de ReferenciaRecta de Condiciones

  • 5.- Numero de Renovaciones Temperatura y Humedad Relativa.

  • 6.- EJEMPLO DE CALCULO.

  • CAPACIDAD DEL EQUIPO POR CARGA TERMICA ( 3.2 tons).Recordar que la carga trmica sensible es 7,610 btuh.

  • CAPACIDAD DEL EQUIPO POR # de RENOVACIONES ( 17 tons).

  • 7.- ELECCION DEL SISTEMA DE DISTRIBUCION DE AIRE

  • Laminar Diffuser System

  • Air Curtain System

  • FALSO TECHO EN UN SISTEMA DE DISTRIBUCION DE AIRE

  • CONCLUSIONES.Es nuestra responsabilidad como tcnicos y especialistas consientes de la importancia que tiene nuestro trabajo sobre la salud de las personas a quienes damos servicios exigir como mnimo los siguiente en un proyecto de salas de operaciones.1.- Que los diseos y recomendaciones se basen en la norma ASHRAE y que sigan sus recomendaciones.2.- Que los proyectistas presente el calculo Psicrometrico para determinar la capacidad de los equipos, que el calculo se realice tanto por carga trmica como por numero mnimo de renovaciones y se tome el mayor valor.3.- Que se utilicen equipos especialmente diseados de FABRICA de 100% de aire exterior, donde todo este contenido, ventilador y sistema de filtrado.

  • GRACIAS.