diseño hidráulico ancobamba.xls

30
CALCULO DE AFORAMIENTO - ANCOBAMBA, (CAPTACION - 1) PROYECTO: COLOCAR NOMBRE DEL PROYECTO UBICACIÓN: Localidad: ANCOABAMBA Distrito : CHAPIMARCA Provincia: AYMARAES Departamento: Apurímac DETERMINACION DEL CAUDAL (LT/SEG) POR MANANTE

Upload: yury-rai-carrion-acuna

Post on 09-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

CALCULO DE AFORAMIENTO - ANCOBAMBA, (CAPTACION - 1)

PROYECTO: COLOCAR NOMBRE DEL PROYECTO

UBICACIÓN: Localidad: ANCOABAMBADistrito : CHAPIMARCA Provincia: AYMARAES Departamento: Apurímac

DETERMINACION DEL CAUDAL (LT/SEG) POR MANANTE

CALCULO DE CAMARA DE CAPTACION - 1, (AYAPATA ALTA)

PROYECTO: COLOCAR NOMBRE DEL PROYECTO

UBICACIÓN: Localidad: ANCOABAMBA Manantial: #REF!Distrito : CHAPIMARCA Coordenadas UTM: #REF!Provincia: AYMARAES #REF!Departamento: Apurímac Elevación: #REF!

1.1 CALCULO DE DISTANCIA ENTRE AFLORAMIENTO Y CAMARA HUMEDADATOSVelocidad asumida 0.60 m/seg

Altura (H) 0.40 m

RESULTADOS

2G hf H

0.03 m

Hf = H-HoHf 0.37 mL 1.00 m

= 1.00

1.2 CALCULO DE CAMARA ORIFICIOSDATOSCaudal máximo de la fuente #REF! Lit/segVelocidad asumida (v) 0.50 m/segCoeficiente de descarga (Cd) 0.80Diámetro 2.54

RESULTADOS Cálculo del diámetro de tubería de entrada (D) * Valor del área de será:

A= Qmáx/CdxVA= #REF!

* Diámetro del orificioD=D= #REF! mD= #REF!

D= 2 CONSIDERAR PARA EL DISEÑO D D D

D= 2.5 CONSIDERAR PARA EL CALCULO Ø = 2

* Calculo de Número de orificios (NA) 5.08 cm

NA=

NA= 3 1.64

HO= 1.56 V2

HO

ho

(4A/¶)^1/2

(D2(2 1/2")/D2

(2 "))+1

1.3 DIMENSIONAMIENTO DE CAMARAB= 110.00 cm

PLANTA 6D 3D 3D 6DDIMENSIONAMOS DE ACUERDO A LA SIGUIENTE CONDICION D D D

B= 2(6D)+NAD+3D(NA-1)B= 106.68 cmB= 110.00 cm CAMARA HUMEDA

110.00

ELEVACIONE = 40.0DATOS Qmd= 2.067 Lit/seg

Altura de sedimentación A 10.00 cm tubo de ingresoBorde libre E 40.00 cm D = 5.0Desnivel D 5.00 cm

H = 50.0Tubería de salida B 2.54 cmAltura de agua H 50.00 cm

ht= 107.5 cmht= 110.00 cm B= 2.54 tubería de salida

A= 10.00

CALCULO DE CARGA REQUERIDAVELOCIDAD DE LINEA DE CONDUCCION #REF! m/segACELERACION D ELA GRAVEDAD 9.810

H= 1.56(V2/2G)H= #REF! cm

1.4 RESULTADO FINAL

110.00 110.00

110.

00 110.00

PLANTA ELEVACION

NOTA AMBAS MEDIDAS SON MEDIDAS INTERIORES

1.5 DIMENSIONAMIENTO DE LA CANASTILLA

Diámetro de línea de conducción= #REF! "Dcanastilla= 2xDc= #REF! "

Longitud de CanastillaL= 3xDc #REF! cmL= 6xDc #REF! cmL= asumida 30.00 cm

CALCULO DEL AREA TOTAL DE RANURAS

Ancho de ranura 5 mm 0.005

Largo de ranura 7 mm 0.007

área de ranura (Ar) 35 0.000035

AC=

AC= #REF!

At= 2Ac

At= #REF!

El valor de At no debe ser mayor al 50% del área toral del área lateral de la granada (Ag)Ag= 0.50 x Dg x L

para Dg= #REF! "

L= 0.30 mAg= #REF! m2

Por consiguiente: At < Ag #REF!

Nº de ranuras Área total de ranurasÁrea de ranuras

Nº de ranuras #REF!

1.6 REBOCE Y LIMPIEZAD=

Hf= 0.015 m/m (valor recomendable)

D= #REF! " Resultado del calculoD= 3 " Diámetro asumido

m2

m2

mm2 m2

(¶Dc2)/4

m2

m2

0.71xQ 0.38

hf0.21

CALCULO DE CAMARA DE CAPTACION - 2, (AYAPATA ALTA)

PROYECTO: COLOCAR NOMBRE DEL PROYECTO

UBICACIÓN: Localidad: ANCOABAMBA Manantial: #REF!Distrito : CHAPIMARCA Coordenadas UTM: #REF!Provincia: AYMARAES #REF!Departamento: Apurímac Elevación: #REF!

1.1 CALCULO DE DISTANCIA ENTRE AFLORAMIENTO Y CAMARA HUMEDADATOSVelocidad asumida 0.60 m/seg

Altura (H) 0.40 m

RESULTADOS

2G hf H

0.03 m

Hf = H-HoHf 0.37 mL 1.00 m

= 1.00

1.2 CALCULO DE CAMARA ORIFICIOSDATOSCaudal máximo de la fuente #REF! Lit/segVelocidad asumida (v) 0.50 m/segCoeficiente de descarga (Cd) 0.80Diámetro 2.54

RESULTADOS Cálculo del diámetro de tubería de entrada (D) * Valor del área de será:

A= Qmáx/CdxVA= #REF!

* Diámetro del orificioD=D= #REF! mD= #REF!

D= 2 CONSIDERAR PARA EL DISEÑO D D D

D= 2.5 CONSIDERAR PARA EL CALCULO Ø = 2

* Calculo de Número de orificios (NA) 5.08 cm

NA=

NA= 3 1.64

HO= 1.56 V2

HO

ho

(4A/¶)^1/2

(D2(2 1/2")/D2

(2 "))+1

1.3 DIMENSIONAMIENTO DE CAMARAB= 110.00 cm

PLANTA 6D 3D 3D 6DDIMENSIONAMOS DE ACUERDO A LA SIGUIENTE CONDICION D D D

B= 2(6D)+NAD+3D(NA-1)B= 106.68 cmB= 110.00 cm CAMARA HUMEDA

110.00

ELEVACIONE = 40.0DATOS Qmd= 2.067 Lit/seg

Altura de sedimentación A 10.00 cm tubo de ingresoBorde libre E 40.00 cm D = 5.0Desnivel D 5.00 cm

H = 50.0Tubería de salida B 2.54 cmAltura de agua H 50.00 cm

ht= 107.5 cmht= 110.00 cm B= 2.54 tubería de salida

A= 10.00

CALCULO DE CARGA REQUERIDAVELOCIDAD DE LINEA DE CONDUCCION #REF! m/segACELERACION D ELA GRAVEDAD 9.810

H= 1.56(V2/2G)H= #REF! cm

1.4 RESULTADO FINAL

110.00 110.00

110.

00 110.00

PLANTA ELEVACION

NOTA AMBAS MEDIDAS SON MEDIDAS INTERIORES

1.5 DIMENSIONAMIENTO DE LA CANASTILLA

Diámetro de línea de conducción= #REF! "Dcanastilla= 2xDc= #REF! "

Longitud de CanastillaL= 3xDc #REF! cmL= 6xDc #REF! cmL= asumida 30.00 cm

CALCULO DEL AREA TOTAL DE RANURAS

Ancho de ranura 5 mm 0.005

Largo de ranura 7 mm 0.007

área de ranura (Ar) 35 0.000035

AC=

AC= #REF!

At= 2Ac

At= #REF!

El valor de At no debe ser mayor al 50% del área toral del área lateral de la granada (Ag)Ag= 0.50 x Dg x L

para Dg= #REF! "

L= 0.30 mAg= #REF! m2

Por consiguiente: At < Ag #REF!

Nº de ranuras Área total de ranurasÁrea de ranuras

Nº de ranuras #REF!

1.6 REBOCE Y LIMPIEZAD=

Hf= 0.015 m/m (valor recomendable)

D= #REF! " Resultado del calculoD= 3 " Diámetro asumido

m2

m2

mm2 m2

(¶Dc2)/4

m2

m2

0.71xQ 0.38

hf0.21

PROYECTO: COLOCAR NOMBRE DEL PROYECTO

UBICACIÓN:

Localidad: ANCOABAMBA Provincia: AYMARAES

Distrito : CHAPIMARCA Departamento: Apurímac

01.00 DATOS:

- Nº de Familias 300

- N° Personas/familia 4.11

- Población actual Pa = 1,233.000 Habitantes

- Tasa de crecimiento r = 0.8%

- Periodo de diseño t = 20 Años

- Dotación de agua D = 95 Lit/Hab/Dia

- Coeficiente de consumo máximo diario K1 = 1.30

- Coeficiente de consumo máximo horario K2 = 2.50

- Coeficiente de regulación del reservorio K3 = 0.25

02.00 RESULTADOS:

02.01 POBLACION DE DISEÑO: Pf = 1,446.000 Habitantes

02.02 DEMANDA DE AGUA:

- Consumo promedio anual Qm = 1.59 Lit/seg

- Consumo máximo diario Qmd = 2.07 Lit/seg

- Consumo máximo horario Qmh = 3.97 Lit/seg

02.03 RESERVORIO:

- Volúmen de almacenamiento neto de Valm. = 44.65 m3.

CALCULO POBLACION DE DISEÑO, DEMANDA DE AGUA Y VOLUMEN DE RESERVORIO - ANCOBAMBA

Qm=Pf .D86400

Qmd=k 1Qm

Qmh=k 2Qm

Valm .=0 . 25 .Qmd . 24Horas1000

Pf=Pa(1+r

100)t

- Volúmen Contra Incendio VCI = 0.000 m3.

- Volúmen Contra Percances VCP = 15.90 m3.

- Volumen total de Almacenamiento Vtotal = 60.54 m3.

Vtotal= Valm.+VCI+VCP

Se asume 60.00 m3.

.

VCI=2 .(2 . 00 lts/ seg .36000 seg )1000

VCP=0 .25 .Valm

CÁLCULO DEMANDA POR NODO PARA WATERCAD - ANCOBAMBA

PROYECTO:

01.00 DISEÑO HIDRAULICO POR SISTEMA CERRADO, CON TUBERIA PVC

01.01 DATOS:

- Población futura Pf = 1 446.000 Habitantes- Dotación de agua Dot = 95.000 Lit/día/persona- Coefeciente por consumo máximo horario K2 = 2.500

01.02 RESULTADOS:- Caudal promedio diario anual Qm = 1.59 Lit/seg- Caudal máximo horario Qmh = 3.97 Lit/seg- Consumo unitario Qunit = 0.0027 Lit/seg/hab.

01.03 CONDICION:- Velocidad mínima Vmín = 0.600 mt/seg- Velocidad máxima admisible Vmáx = 3.000 mt/seg- Presión estática mínima Pmin = 10.000 mt- Presión estática máxima Pmáx = 50.000 mt

01.04 CUADRO DE RESUMEN DE CALCULO POR NODOTRAMO

N° FAM.

POBLAC. DEMANDA

(m) FUT. POR POR NODO 0

NODO (Lit/seg)

P-1 1 5.00 0.014P-2 7 34.00 0.093P-3 6 29.00 0.080P-4 7 34.00 0.093P-5 6 29.00 0.080P-6 8 39.00 0.107P-7 6 29.00 0.080P-8 8 39.00 0.107P-9 7 34.00 0.093P-10 6 29.00 0.080P-11 6 29.00 0.080P-12 2 10.00 0.027P-13 2 10.00 0.027P-14 10 48.00 0.132P-15 8 39.00 0.107P-16 8 39.00 0.107P-17 7 34.00 0.093P-18 6 29.00 0.080P-19 8 39.00 0.107P-20 7 34.00 0.093P-21 7 34.00 0.093P-22 8 39.00 0.107P-23 8 39.00 0.107P-24 6 29.00 0.080P-25 6 29.00 0.080P-26 4 19.00 0.052P-27 6 29.00 0.080P-28 4 19.00 0.052P-29 6 29.00 0.080P-30 6 29.00 0.080P-31 7 34.00 0.093P-32 8 39.00 0.107P-33 8 39.00 0.107P-34 9 43.00 0.118P-35 6 29.00 0.080P-36 8 39.00 0.107P-37 7 34.00 0.093P-38 7 34.00 0.093P-39 8 39.00 0.107P-40 4 19.00 0.052P-41 6 29.00 0.080P-42 4 19.00 0.052P-43 8 39.00 0.107P-44 6 29.00 0.080P-45 7 34.00 0.093P-46 5 24.00 0.066

P-47 3 14.00 0.038P-48 2 10.00 0.03

PROYECTO:

COLOCAR NOMBRE DEL PROYECTO

Label

VRP-1 3669.500 3679.520 10.000 3717.690 38.170

RESULTADO EN VALVULAS REDUCTORAS DE PRESIONES LINEA DE ADUCCION Y RED DE DISTRIBUCION - ANCOBAMBA

Elevation (m)

Hydraulic Grade Initial (m)

Pressure Setting (Initial) (m H2O)

Hydraulic Grade (From) (m)

Pressure (From) (m H2O)

PROYECTO:

COLOCAR NOMBRE DEL PROYECTO

Label

1 3649.850 0.014 3667.690 17.8002 3649.800 0.093 3666.040 16.2003 3632.420 0.080 3665.470 33.0004 3617.910 0.093 3653.110 35.1005 3626.840 0.080 3653.610 26.7006 3630.400 0.107 3654.040 23.6007 3612.520 0.080 3650.930 38.3008 3603.300 0.107 3646.010 42.6009 3597.600 0.093 3644.990 47.300

10 3618.800 0.080 3650.920 32.10011 3607.500 0.080 3646.000 38.40012 3621.600 0.027 3651.330 29.70013 3620.520 0.027 3651.250 30.70014 3609.950 0.132 3645.710 35.70015 3601.800 0.107 3644.960 43.10016 3597.750 0.107 3643.840 46.00017 3595.200 0.093 3643.840 48.50018 3585.100 0.080 3643.480 58.30019 3594.450 0.107 3643.470 48.90020 3600.760 0.093 3643.660 42.80021 3604.300 0.093 3643.660 39.30022 3623.750 0.107 3651.250 27.40023 3623.010 0.107 3651.120 28.10024 3614.460 0.080 3643.590 29.10025 3613.800 0.080 3643.630 29.80026 3606.350 0.052 3643.520 37.10027 3603.350 0.080 3643.470 40.00028 3604.500 0.052 3643.450 38.90029 3628.700 0.080 3651.180 22.40030 3633.100 0.080 3650.500 17.40031 3611.250 0.093 3643.690 32.40032 3604.150 0.107 3643.450 39.20033 3598.820 0.107 3643.390 44.50034 3595.750 0.118 3643.390 47.50035 3595.450 0.080 3643.380 47.80036 3625.100 0.107 3651.000 25.80037 3612.150 0.093 3643.590 31.40038 3607.600 0.093 3643.450 35.80039 3604.990 0.107 3643.390 38.30040 3601.380 0.052 3643.390 41.90041 3601.800 0.080 3643.400 41.50042 3610.990 0.052 3643.530 32.50043 3609.910 0.107 3643.440 33.50044 3609.200 0.080 3643.420 34.20045 3602.300 0.093 3643.390 41.000

RESULTADO EN NODO LINEA DE ADUCCION Y RED DE DISTRIBUCION - ANCOBAMBA

Elevation (m)

Demand (L/s)

Hydraulic Grade (m)

Pressure (m H2O)

46 3626.350 0.066 3643.450 17.10047 3625.860 0.038 3643.450 17.50048 3625.100 0.027 3650.120 25.000

PROYECTO:

COLOCAR NOMBRE DEL PROYECTO

Length (m) Diameter (") Material Velocity (m/s)

R-1 PRV-1 405.220 90.000 3" PVC 151.000 3.994 0.630 0.004

PRV-1 J-1 405.270 90.000 3" PVC 152.000 3.994 0.630 0.004J-1 J-2 53.250 63.000 2" PVC 150.000 3.041 0.980 0.015J-2 J-3 64.810 63.000 2" PVC 150.000 2.487 0.800 0.011J-3 J-4 90.690 63.000 2" PVC 150.000 2.407 0.770 0.010J-4 J-5 60.820 26.500 3/4" PVC 150.000 0.393 0.710 0.023J-5 J-6 52.870 33.000 1" PVC 150.000 0.304 0.600 0.005J-1 J-6 100.900 33.000 1" PVC 150.000 0.939 1.100 0.041J-2 J-5 95.310 26.500 1" PVC 150.000 0.461 0.840 0.032J-4 J-7 37.090 48.000 11/2" PVC 150.000 1.921 1.060 0.025J-7 J-8 79.930 48.000 11/2" PVC 150.000 1.278 0.710 0.012J-8 J-9 83.830 26.500 3/4" PVC 150.000 0.420 0.760 0.027J-7 J-10 35.170 26.500 3/4" PVC 150.000 0.563 1.020 0.046

J-10 J-11 80.840 26.500 3/4" PVC 150.000 0.191 0.600 0.006

J-5 J-12 43.170 26.500 3/4" PVC 150.000 0.470 0.850 0.033

J-12 J-10 23.400 26.500 3/4" PVC 150.000 -0.292 0.530 0.014

J-12 J-13 3.200 33.000 1" PVC 150.000 0.735 0.600 0.026

J-13 J-14 77.690 33.000 1" PVC 150.000 0.442 0.600 0.010

J-11 J-14 40.790 33.000 1" PVC 150.000 0.582 0.680 0.017

J-8 J-11 44.210 33.000 1" PVC 150.000 0.751 0.880 0.027J-9 J-15 47.600 33.000 1" PVC 150.000 0.077 0.600 0.000J-15 J-16 87.150 26.500 3/4" PVC 150.000 0.250 0.600 0.010J-17 J-16 38.960 26.500 3/4" PVC 150.000 0.002 0.600 0.000J-9 J-17 89.230 26.500 3/4" PVC 150.000 0.250 0.600 0.010J-17 J-18 57.150 26.500 3/4" PVC 150.000 0.154 0.600 0.004J-18 J-19 80.430 26.500 3/4" PVC 150.000 0.074 0.610 0.001J-20 J-19 62.040 26.500 3/4" PVC 150.000 0.132 0.620 0.003J-16 J-20 35.120 26.500 3/4" PVC 150.000 0.145 0.620 0.004J-11 J-15 84.600 26.500 3/4" PVC 150.000 0.280 0.600 0.013J-14 J-21 84.470 33.000 1" PVC 150.000 0.517 0.600 0.013J-21 J-20 84.720 33.000 1" PVC 150.000 0.235 0.610 0.003J-6 J-22 37.590 26.500 1" PVC 150.000 0.582 1.060 0.049J-22 J-23 6.970 33.000 1" PVC 150.000 0.741 0.870 0.026J-24 J-25 5.650 33.000 1" PVC 150.000 0.004 0.610 0.000J-25 J-26 83.790 33.000 1" PVC 150.000 0.299 0.600 0.005J-26 J-27 87.810 33.000 1" PVC 150.000 0.209 0.600 0.003J-27 J-28 65.510 33.000 1" PVC 150.000 0.112 0.610 0.001J-19 J-28 70.970 26.500 3/4" PVC 150.000 0.099 0.610 0.002J-6 J-29 61.960 26.500 3/4" PVC 150.000 0.554 1.000 0.044J-29 J-30 44.920 33.000 1" PVC 150.000 0.287 0.610 0.005J-31 J-32 46.990 33.000 1" PVC 150.000 0.220 0.610 0.003J-32 J-33 48.670 26.500 3/4" PVC 150.000 0.094 0.610 0.002J-33 J-34 78.740 33.000 1" PVC 150.000 0.039 0.600 0.000J-34 J-35 67.230 26.500 3/4" PVC 150.000 0.006 0.610 0.000J-29 J-36 34.560 26.500 3/4" PVC 150.000 0.187 0.600 0.006J-37 J-38 44.350 26.500 3/4" PVC 150.000 0.218 0.600 0.008J-38 J-39 39.930 26.500 3/4" PVC 150.000 0.038 0.610 0.000J-39 J-40 86.950 26.500 3/4" PVC 150.000 0.015 0.610 0.000J-40 J-41 71.120 26.500 3/4" PVC 150.000 -0.005 0.610 0.000J-41 J-35 109.790 26.500 3/4" PVC 150.000 0.074 0.600 0.001J-38 J-32 90.910 33.000 1" PVC 150.000 0.086 0.600 0.000J-39 J-33 89.320 33.000 1" PVC 150.000 0.144 0.600 0.001J-40 J-34 96.030 33.000 1" PVC 150.000 0.141 0.620 0.001J-31 J-42 35.930 26.500 3/4" PVC 150.000 0.183 0.600 0.006J-42 J-43 40.300 26.500 3/4" PVC 150.000 0.071 0.620 0.001J-43 J-44 68.770 26.500 3/4" PVC 150.000 0.026 0.620 0.001J-44 J-45 80.490 33.000 1" PVC 150.000 0.037 0.610 0.001J-42 J-46 97.760 26.500 3/4" PVC 150.000 0.060 0.600 0.001J-46 J-47 5.730 33.000 1" PVC 150.000 -0.006 0.600 0.022J-47 J-43 77.810 26.500 3/4" PVC 150.000 -0.044 0.600 0.022J-33 J-44 83.300 33.000 1" PVC 150.000 0.092 0.600 0.022J-34 J-45 71.880 26.500 3/4" PVC 150.000 0.056 0.600 0.022J-13 J-22 52.710 26.500 3/4" PVC 150.000 0.266 0.600 0.011J-14 J-25 48.190 26.500 3/4" PVC 150.000 0.375 0.680 0.022J-26 J-39 53.480 26.500 3/4" PVC 150.000 0.228 0.600 0.009J-27 J-40 47.040 26.500 3/4" PVC 150.000 0.173 0.600 0.005J-28 J-41 43.400 26.500 3/4" PVC 150.000 0.159 0.600 0.004J-23 J-36 61.390 26.500 3/4" PVC 150.000 0.313 0.600 0.015J-24 J-37 54.930 26.500 3/4" PVC 150.000 0.236 0.610 0.009J-21 J-26 51.810 26.500 3/4" PVC 150.000 0.189 0.620 0.006

RESULTADOS EN LOS TRAMOS, LINEA DE ADUCCION Y RED DE DISTRIBUCION - ANCOBAMBA

Start Node

Stop Node

Diameter (mm")

Hazen-Williams C

Flow (L/s)

Headloss Gradient

(m/m)

J-20 J-27 64.210 26.500 3/4" PVC 150.000 0.156 0.600 0.004J-32 J-43 56.310 26.500 3/4" PVC 150.000 0.105 0.600 0.002J-30 J-48 43.950 26.500 3/4" PVC 150.000 0.207 0.600 0.007J-48 J-31 78.990 33.000 1" PVC 150.000 0.360 0.610 0.007J-36 J-48 54.610 26.500 3/4" PVC 150.000 0.183 0.600 0.006J-37 J-31 79.770 26.500 3/4" PVC 150.000 0.136 0.600 0.003

VARIACION DE CONSUMOS

MAXIMO ANUAL DE LA DEMANDA HORARIA (K2)

- Para poblaciones mayores de 10000 habitantes K2 = 1.800

- Para poblaciones de 2000 a 10000 habitantes K2 = 2.500

_ Para poblaciones hasta 1750 habitantes K2 = 2.522

_ Para poblaciones hasta 1500 habitantes K2 = 2.544

_ Para poblaciones hasta 1250 habitantes K2 = 2.566

_ Para poblaciones hasta 1000 habitantes K2 = 2.588

_ Para poblaciones hasta 900 habitantes K2 = 2.609

_ Para poblaciones hasta 800 habitantes K2 = 2.631

_ Para poblaciones hasta 700 habitantes K2 = 2.653

_ Para poblaciones hasta 600 habitantes K2 = 2.623

_ Para poblaciones hasta 500 habitantes K2 = 2.631

_ Para poblaciones hasta 400 habitantes K2 = 2.640