distribution company performance

89
PERFORMANCE EVALUATION REPORT OF DISTRIBUTION COMPANIES & K-ELECTRIC STANDARDS DIVISION

Upload: osama-tahir

Post on 24-Dec-2015

19 views

Category:

Documents


0 download

DESCRIPTION

Annual Performance Report of Distribution Companies in Pakistan 2013-14

TRANSCRIPT

Page 1: Distribution company performance

PERFORMANCE EVALUATION REPORT OF DISTRIBUTION COMPANIES & K-ELECTRIC

STANDARDS DIVISION

Page 2: Distribution company performance

TABLE OF CONTENTS

Inter DISCOs Performance Comparison

Individual DISCO wise Analysis

Rating of Distribution Companies

Recommendations

Findings/Analysis

Introduction

Page 3: Distribution company performance

3

INTRODUCTION

Page 4: Distribution company performance

4

INTRODUCTION

In exercise of the powers conferred by Section 46 of the Regulation of Generation, Transmission and

Distribution of Electrical Power Act, 1997 (XL of 1997), read with Section 34 thereof, the National

Electric Power Regulatory Authority, with the approval of the Federal Government has made the

Performance Standards (Distribution) Rules notified vide S.R.O.45(I)/2005 dated 11th January, 2005.

As per rule 7 of Performance Standards (Distribution) Rules 2005, each Distribution Company has to

supply to the Authority an Annual Performance Report every year, before the 31st of August of the

succeeding year in the Forms as set out in the Annexure-I to these rules.

The Annual Performance Report should include as a minimum the following information, namely as per

rule 7(3):-

(a) System Performance Reports:

(b) Consumer Service Performance Reports:

(c) Distribution Companies Written Report on Performance and Plans for Improvement:

Rule 7(2) of Performance Standards (Distribution) Rules-2005 (PSDR) states that the Annual Performance

Report should also contain all relevant information with respect to compliance with these Rules during the

year, including a comparison with the compliance reported to Authority for the previous year.

Page 5: Distribution company performance

5

INTRODUCTION In the analysis part of every DISCO, data provided by each DISCO and KEL for the last four years has been

evaluated along with relevant tables indicating following parameters:-

• Transmission & Distribution Losses

• Recovery in percentage

• Number of consumers served by DISCO in a year

• Total annual number of consumer power supply interruptions

• Aggregate sum of all consumer power supply interruptions (duration in minutes)

• System average Interruption Frequency Index (SAIFI)

• System Average Interruption Duration Index (SAIDI)

• Total number of consumers who applied for new connection

• Percentage consumers who were not given connection in permitted time period

• Total number of consumers who made complaints about Voltage

• Average duration of load-shedding (hrs)

• Total complaints received by DISCO during the year,

• Total length of Distribution System Network (Km)

• Total number of distribution system faults

• Faults/km of distribution system

• Safety (Fatal Incidents)

Page 6: Distribution company performance

6

Year• 2010-11

Year• 2011-12

Year• 2012-13

Year• 2013-14

GRAPHICAL REPRESENTATIONS OF ALL DISTRIBUTION COMPANIES

Page 7: Distribution company performance

7

1. Transmission & Distribution (T & D) Losses

DISCO/Years 2010-11 2011-12 2012-13 2013-14

IESCO 9.7 9.52 9.40 9.46

PESCO 36.9 36.9 34.2 33.5

GEPCO 11.97 11.23 10.75 10.97

FESCO 11.2 10.8 10.8 11.3

LESCO 13.3 13.5 13.2 13.4

MEPCO 15 13 14.8 17.5

QESCO 20.4 20.9 22.7 22.7

SEPCO - - 39.51 38.56

HESCO 33.80 27.70 27.30 26.46

K-Electric 32.20 29.73 27.82 25.30

BTPL - 7.47 8.34 8.57

TESCO - - - -

Page 8: Distribution company performance

8

1. Transmission & Distribution (T & D) Losses

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL0

5

10

15

20

25

30

35

40

T & D Losses (%)

2010-112011-122012-132013-14

Page 9: Distribution company performance

9

2. Recovery

DISCO/Years 2010-11 2011-12 2012-13 2013-14

IESCO 93 96 94.4 120

PESCO 85.4 82.5 84.6 86.3

GEPCO 98.8 98.5 98.2 96

FESCO 97.04 99.76 99.06 100.05

LESCO 98.1 96.1 97.8 97.87

MEPCO 97.97 97.25 91.76 96.04

QESCO 41 36.2 31.8 42.2

SEPCO - - 53.63 58.60

HESCO 76.3 69.1 81.2 79.2

K-Electric 90.17 90.72 88.65 91.22

BTPL - 97.3 100.025 101.442

TESCO - - - -

Page 10: Distribution company performance

10

2. Recovery

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL0

20

40

60

80

100

120

Recovery (%)

2010-112011-122012-132013-14

Page 11: Distribution company performance

11

3. System Average Interruption Frequency Index (SAIFI)

DISCO/Years 2010-11 2011-12 2012-13 2013-14

IESCO 0.41 0.60 0.62 0.05

PESCO 238.8 323.0 341.5 316.5

GEPCO 25.29 27.77 27.14 10.52

FESCO 38.63 59.40 56.80 35.40

LESCO 39.29 29.40 50.57 78.04

MEPCO 185.52 185.30 149.70 201.5

QESCO 164.98 156.08 153.80 144.95

SEPCO - 341.4 4,177.7 251.5

HESCO 1501.6 770.30 730.37 229.9

K-Electric 34.90 33 31.30 24.71

BTPL 1.23 0.01 3.42 0.006

TESCO - - - 0.12

Page 12: Distribution company performance

12

3. System Average Interruption Frequency Index (SAIFI)

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

500

1000

1500

2000

2500

3000

3500

4000

4500

SAIFI

2010-112011-122012-132013-14

Page 13: Distribution company performance

13

4. System Average Interruption Duration Index (SAIDI)

DISCO/Years 2010-11 2011-12 2012-13 2013-14

IESCO 22.6 37.5 34.8 1.66

PESCO 19,535.6 28,189.0 29,570.0 27,946.6

GEPCO 317.1 291.6 263.2 13.14

FESCO 21241 1321 1250 1137

LESCO 3,469.4 2,610.8 4,615.7 4,759.6

MEPCO 15,896.2 16 073.5 12813.9 17704.6

QESCO 13,419.8 12,810.7 12,635 11868.1

SEPCO - 18,233 4,799.9 2442.73

HESCO 1035.6 23,990.8 21,204.6 16,678.6

K-Electric 2191 1858 1790.43 1495.25

BTPL 50.2 1.6 6.9 0.78

TESCO - - - 2.09

Page 14: Distribution company performance

14

4. System Average Interruption Duration Index (SAIDI)

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

5000

10000

15000

20000

25000

30000

SAIDI

2010-112011-122012-132013-14

Page 15: Distribution company performance

15

5. Time frame for New Connections

DISCO/Years 2010-11 2011-12 2012-13 2013-14

IESCO 4.65 5.5 14.7 0

PESCO 32.14 22.00 22.00 9.57

GEPCO 10.76 8.50 10.60 15.24

FESCO 26.55 9.20 12.20 27.7

LESCO 3.09 14.60 14.60 13

MEPCO 36.01 32.30 16.50 15.8

QESCO 1.04 48.0 1.50 1.08

SEPCO - 7.65 3.38 9.0

HESCO 14.87 0.07 0.05 11.86

K-Electric 27.40 34 40.7 13.2

BTPL 0 0 0 0

TESCO - - - 73.7

Page 16: Distribution company performance

16

5. Time frame for New Connections

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

10

20

30

40

50

60

70

80

Time Frame for New Connections

2010-112011-122012-132013-14

Page 17: Distribution company performance

17

6. Average Duration of Load Shedding

DISCOs/Years 2010-11 2011-12 2012-13 2013-14

IESCO 1 5.6 5.6 5

PESCO 4.3 4.9 4.8 4.8

GEPCO 8 3.6 3.2 3.2

FESCO 5 7 7.8 7.25

LESCO 9.79 2.1 0.66 3.5

MEPCO 6.75 9 9 10

QESCO 7 10.5 11.13 10.5

SEPCO - 4 2 2

HESCO 2.33 3.8 7.3 3.75

K-Electric 2 2 2.4 2.3

BTPL 0.5 0.5 0.2 1

TESCO - - - 10.5

Page 18: Distribution company performance

18

6. Average Duration of Load Shedding

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

2

4

6

8

10

12

Average Duration of Load Shedding

2010-112011-122012-132013-14

Page 19: Distribution company performance

19

7. Complaints

DISCOs/Years 2010-11 2011-12 2012-13 2013-14

IESCO 57,421 55,214 63,712 66,739

PESCO 106,749 115,494 116,718 104,812

GEPCO 155,132 456,304 532,925 1,123,731

FESCO 164,356 303,013 236,850 248,241

LESCO 303,793 215,888 558,090 1,163,927

MEPCO 69,601 102,419 103,454 93,198

QESCO 67,348 65,647 65,640 50,811

SEPCO - 8,659 8,813 12,051

HESCO 24,211 13,018 8,613 45,794

K-Electric 49,281 33,135 16,756 509,510

BTPL 723 1,560 1,481 1,550

TESCO - - - 12,585

Page 20: Distribution company performance

20

7. Complaints

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Complaints

2010-112011-122012-132013-14

Page 21: Distribution company performance

21

8. Safety (Fatal Incidents)

DISCOs/Years 2010-11 2011-12 2012-13 2013-14

IESCO 19 15 10 12

PESCO 19 25 25 20

GEPCO 9 11 10 12

FESCO 32 22 26 29

LESCO 25 29 14 35

MEPCO 21 14 12 17

QESCO 20 16 07 02

SEPCO - 3 3 45

HESCO 46 26 7 14

K-Electric 26 14 9 5

BTPL 0 0 0 0

TESCO - - - 1

Page 22: Distribution company performance

22

8. Safety (Fatal Incidents)

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

5

10

15

20

25

30

35

40

45

50

Safety (Fatal Incidents)

2010-112011-122012-132013-14

Page 23: Distribution company performance

23

9 Fault Rate of Distribution System:-

DISCOs/Years 2010-11 2011-12 2012-13 2013-14

IESCO 4.16 4.5 4.25 4.65

PESCO 0.90 0.88 0.88 0.88

GEPCO 67.77 9.09 21.59 21.58

FESCO 3.32 2.50 2.13 2.20

LESCO 8.93 8.0 2.28 50.6

MEPCO 1.24 2.46 2.11 2.81

QESCO 0.84 0.76 0.70 0.835

SEPCO - 5.3 5.9 2.1

HESCO 11.72 1.7 1.4 1.92

K-Electric 2.11 2 1.95 1.96

BTPL 0.04 0.66 2.56 1.46

TESCO - - - 0.49

Page 24: Distribution company performance

24

9 Fault Rate of Distribution System:-

IESC

O

PESCO

GEPCO

FESC

O

LESC

O

MEPCO

QESCO

SEPCO

HESC

O

K-Elect

ric

BTPL

TESCO

0

10

20

30

40

50

60

70

Fault Rate of Distribution System

2010-112011-122012-132013-14

Page 25: Distribution company performance

25

PEFORMANCE RANKING/RATING OF DISTRIBUTION COMPANIES

Page 26: Distribution company performance

26

Ranking / Rating of Distribution Companies

Serial No. Description of Parameters Marking

01 T&D Losses 15

02 Recovery 15

03 SAIFI 7.5

04 SAIDI 7.5

05 Time frame for new Connections 10

06 Nominal Voltage 05

07 Load Shedding (Hrs) 05

08 Consumer Service Complaints 10

09 Safety 20

10 Fault Rate 05

100

Weightage of Parameters

Page 27: Distribution company performance

27

Ranking / Rating of Distribution Companies

By considering the performance DATA reported by DISCOs And seriousness towards

Performance Standards Distribution Rules (PSDR) – 2005 & Distribution Code, the

judgmental approach has been used to rate the each company. So accordingly, the rating of

DISCOs comes out to be as under:DISCO Marks Ranking/Rating

IESCO 82 1st

K-Electric 67.5 2nd

GEPCO 65 3rd

QESCO 61.5 4th

FESCO 60 5th

MEPCO 55 6th

HESCO 55 6th

LESCO 52 7th

PESCO 49 8th

SEPCO 45.5 9th

Page 28: Distribution company performance

28

Ranking / Rating of Distribution Companies

S. No. ParametersWeight

age

Rating of Distribution Companies

PESCO IESCO GEPCO FESCO LESCO MEPCO QESCO SEPCO HESCO K-Electric

1 T&D Losses 15 4 14 12 12 12 10 8 2 6 6

2 Recovery 15 12.5 15 15 15 15 15 2.5 5 10 15

3 SAIFI 7.5 1.5 7.5 7.5 6 6 3 4.5 3 3 6

4 SAIDI 7.5 1 7.5 7.5 6 3 1 1.5 4.5 1 4.5

5 New Connection 10 8 10 6 2 6 6 10 8 8 6

6 Nominal Voltage 5                    

7 Load Shedding 5 3 3 3 2 3 1 1 4 3 4

8 Complaints 10 7 8 2 5 2 8 8 9 9 3

9 Safety 20 8 12 12 3 0 8 18 0 12 18

10 Fault Rate 5 5 5 2 5 1 5 5 5 5 5

11 Total 100 50 82 67 56 48 57 58.5 40.5 57 67.5

Page 29: Distribution company performance

29

Ranking / Rating of Distribution Companies

T&D LossesRange (%) MarksUpto 10 1410.1-15 1215.1-20 1020.1-25 825.1-30 630.1-35 435.1 & above 2

RecoveryRange (%) Marks

Upto 50 2.5

50.1-60 5

60.1-70 7.5

70.1-80 10

80.1-90 12.5

90.1-100 15

SAIFI (13 times)

Range Marks

Upto 13 7.5

13.1-93 6

93.1-173 4.5

173.1-253 3

253.1-333 1.5

SAIDI (14 Minutes)Range Marks

Upto 14 7.5

14-2000 6

2001-4000 4.5

4001-6000 3

6001-12000 1.5

12000 & above 1

Time Frame for New Connections(Provision of 95%)

Range (%) Marks

upto 5 10

5.1-12 8

12.1-19 6

19.26 4

26 & above 2

Nominal VoltageDistribution Company shall supply power to atleast 95% of its consumers within the range of ± 5 % of the nominal voltage. Since the the range of listed companies lies within the prescribed limit, therefore, all companies have been given 5 marks.

Load Shedding (Hours)

Range (%) Marks

upto 3 4

3.1-6 3

6.1-9 2

9 & above 1

Complaints

Range (%)Marks

0% 101 to 3 93.1 to 6 86.1 to 9 79.1 to 12 612.1 to 15 515.1 to 18 418.1 to 21 321.1 to 24 224.1 & above 1

Safety (Fatal Case)Range Marks

No Fatality 20

1 to 2 18

3 to 4 16

4 to 5 14

6 to 7 12

8 to 9 10

10 to 11 8

12 to 13 6

14 to 15 416 & above 0

Fault RateRange Marks

0-5 5

5.1 - 10 4

10.1-20 3

20.1-30 2

30 & above 1

Page 30: Distribution company performance

30

 

ANALYSIS OF EACH DISTRIBUTION COMPANY &

K-ELECTRIC

BASED ON THEIR

ANNUAL PERFORMANCE REPORTS

Page 31: Distribution company performance

31

1) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)

1)Transmission & Distribution (T&D) Losses

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 9.5 9.7

2011-12 9.5 9.52

2012-13 9.5 9.40

2013-14 9.44 9.46 2010-11 2011-12 2012-13 2013-149.29.39.49.59.69.7

T & D Losses

Allowed Limit by NEPRA

Actual Losses by IESCO

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 93

2011-12 100 96

2012-13 100 94.4

2013-14 100 120 2010-11 2011-12 2012-13 2013-140

50

100

150

Recovery (%)

Target Value by NEPRA

Actual Recovery by IESCO

Page 32: Distribution company performance

32

1) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total number of consumers

served by IESCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/(1)

SAIFI (Set limit

by NEPRA)

(1) (2) (3)

2010-11 2,094,299 857,621 0.41 132011-12 2,206,006 1,305,999 0.60 132012-13 2,260,203 1,391,792 0.62 132013-14 2,342,241 120,949 0.05 13

2010-11 2011-12 2012-13 2013-1402468

101214

0.410.60000000000000

1

0.62000000000000

40.05

13 13 13 13

SAIFI

Actual value by IESCO

Set Limit by NEPRA

Years

Total Number of consumers served by

IESCO

Agg.sum of all consumers

power supply interruption

duration (Min)

SAIDISAIDI

(Set limit by

NEPRA)(3)=(2)/(1)

(1) (2) (3)2010-11 2,094,299 47,380,746 22.6 142011-12 2,206,006 82,736,301 37.5 142012-13 2,260,203 78,663,777 34.8 142013-14 2,342,241 3,886,042 1.66 14

2010-11 2011-12 2012-13 2013-140

10

20

30

40

22.6

37.5 34.8

1.66

14 14 14 14

SAIDI

Actual value by IESCO

Set Limit by NEPRA

Page 33: Distribution company performance

33

1) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)

5) Time Frame for New Connections

6) Nominal Voltage

YearsConsumers

applied for new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 81,118 3,779 4.652011-12 84,711 4,640 5.52012-13 86,566 12,735 14.72013-14 70,850 0 0 2010-11 2011-12 2012-13 2013-14

0

5

10

15

20

4.655.5

14.7

0

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed limit by NEPRA

2010-11 2011-12 2012-13 2013-145,000

5,500

6,000

6,500

7,000

5,529

6,463 6,1246,457

Consumers who made complaints about voltageYears Total number of

consumers

No of consumers who made

complaints about voltage

(%) Increase/Decreas

e in number of complaints

2010-11 2,094,299 5,529 -

2011-12 2,206,006 6,463 +14.5

2012-13 2,260,203 6,124 -5.2

2013-14 2,342,241 6,457 +5.1

Page 34: Distribution company performance

34

1) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load Shedding(Hours)

2010-11 1

2011-12 5.6

2012-13 5.6

2013-14 5 2010-11 2011-12 2012-13 2013-140

2

4

6

Average duration of Load Shedding (Hours)

Years Total Complaints received by IESCO

2010-11 57,421

2011-12 55,214

2012-13 63,712

2013-14 66,739 2010-11 2011-12 2012-13 2013-140

20,00040,00060,00080,000

Total Complaints recieved by IESCO

Page 35: Distribution company performance

35

1) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 19

2011-12 15

2012-13 10

2013-14 12 2010-11 2011-12 2012-13 2013-1405

101520

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 50917 211,659 4.16

2011-12 51,833 233,929 4.5

2012-13 52,654 224,058 4.25

2013-14 53,066 246,893 4.65 2010-11 2011-12 2012-13 2013-143.8

4

4.2

4.4

4.6

4.8

Faults/ km of distribuion System

Page 36: Distribution company performance

36

2) PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

2010-11 2011-12 2012-13 2013-140

10

20

30

40

T & D Losses (%)

Allowed limit by NEPRA

Actuall Losses by PESCO

2010-11 2011-12 2012-13 2013-140

20406080

100

Recovery (%)

Taget value by NEPRA

Actual Re-covery by PESCO

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 28 36.9

2011-12 28 36

2012-13 28 34.2

2013-14 20 33.5

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 85.4

2011-12 100 82.5

2012-13 100 84.6

2013-14 100 86.3

Page 37: Distribution company performance

37

2) PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)

3) System Average Interruption Frequency Index (SAIFI):

4) System Average Interruption Duration Index (SAIDI)

2010-11 2011-12 2012-13 2013-140

100

200

300

400

238.8

323 341.5 316.5

13 13 13 13

SAIFI

Actual value by PESCO

Set limit by NEPRA

2010-11 2011-12 2012-13 2013-140.00

5,000.0010,000.0015,000.0020,000.0025,000.0030,000.0035,000.00

19,535.60

28,189.00

29,570.00

27,946.60

14 14 14 14

SAIDI

Actual value by PESCO

Set Limit by NEPRA

Years

Total Number of consumers

served by PESCO

Agg.sum of all consumers

power supply interruption

Duration (Min)

SAIDISAIDI (Set

Limit by NEPRA)

(3)=(2)/(1)

(1) (2) (3)

2010-11 2,459,330 48,044,522,020 19,535.6 14

2011-12 2,542,747 71,677,299,240 28,189.0 14

2012-13 2,530,655 74,832,413,870 29,570.0 142013-14 2,588,473 72,339,031,400 27,946.6 14

Years

Total Number of consumers

served by PESCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

limit by NEPRA)

(1) (2) (3)

2010-11 2,459,330 587,275,327 238.8 13

2011-12 2,542,747 821,123,054 323 13

2012-13 2,530,655 864,386,357 341.5 13

2013-14 2,588,473 819,134,634 316.5 13

Page 38: Distribution company performance

38

2) PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)

5) Time Frame for New Connections

6) Nominal Voltage

2010-11 2011-12 2012-13 2013-140

10

20

30

4032.14

22 22

9.575 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

2010-11 2011-12 2012-13 2013-140

10,00020,00030,00040,00050,000

34,225 36,272 37,932 43,787

Consumers who made complaints about voltage

Years

consumers applied for

new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 60,660 19,496 32.14

2011-12 61,813 13,640 22.00

2012-13 61,813 13,640 22.00

2013-14 67,337 6,448 9.57

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/Decrease

in number of complaints

2010-11 2,459,330 34,225 -

2011-12 2,542,747 36,272 +5.9

2012-13 2,530,655 37,932 +4.5

2013-14 2,588,473 43,787 +15.4

Page 39: Distribution company performance

39

2) PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)

7) Load Shedding

8) Consumer Service Complaints

2010-11 2011-12 2012-13 2013-143.5

4

4.5

5

Average duration of Load shedding (Hours)

2010-11 2011-12 2012-13 2013-1490,000

100,000

110,000

120,000

Total Complaints received by PESCO

Years Average duration of Load shedding(Hours)

2010-11 4.3

2011-12 4.9

2012-13 4.8

2013-14 4.8

Years Total Complaints received by PESCO

2010-11 106,749

2011-12 115,494

2012-13 116,718

2013-14 104,812

Page 40: Distribution company performance

40

2) PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

2010-11 2011-12 2012-13 2013-140

10

20

30

Electrical Incidents resulting in death or serious injury

2010-11 2011-12 2012-13 2013-140.87

0.88

0.89

0.9

Faults/km of Distribution System

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 19

2011-12 25

2012-13 25

2013-14 20

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 75,219 67,597 0.90

2011-12 75,697 65,658 0.88

2012-13 76,511 67,002 0.88

2013-14 77,131 68,437 0.88

Page 41: Distribution company performance

41

3) GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

2010-11 2011-12 2012-13 2013-148

9

10

11

12

T & D Losses (%)

Allowed limit by NEPRA

Actual losses by GEPCO

2010-11 2011-12 2012-13 2013-1494

96

98

100

Recovery (%)

Taget value by NEPRA

Actual Recovery by GEPCO

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 10.5 11.97

2011-12 10.5 11.23

2012-13 10.5 10.75

2013-14 9.48 10.97

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 98.8

2011-12 100 98.5

2012-13 100 98.2

2013-14 100 96

Page 42: Distribution company performance

42

3) GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

2010-11 2011-12 2012-13 2013-1405

1015202530

25.2927.77 27.14

10.52

13 13 13 13

SAIFI

Actual value by GEPCO

Set Limit by NEPRA

2010-11 2011-12 2012-13 2013-140

50100150200250300350

317.1291.6

263.2

13.1414 14 14 14

SAIDI

Actual value by GEPCO

Set Limit by NEPRA

Years

Total Number of consumers

served by GEPCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 2,500,268 63,230,504 25.29 132011-12 2,608,374 72,435,349 27.77 132012-13 2,568,859 69,726,399 27.14 132013-14 2,736,688 28,804,296 10.52 13

Years

Total Number of consumers served by

GEPCO

Agg.sum of all consumers

power supply interruption

duration (Min)

SAIDISAIDI (Set

Limit by NEPRA)(3)=(2)/

(1)

(1) (2) (3)2010-11 2,500,268 792,887,713 317.1 142011-12 2,608,374 760,565,671 291.6 142012-13 2,568,859 676,186,878 263.2 142013-14 2,736,688 35,971,518 13.14 14

Page 43: Distribution company performance

43

3) GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)

5) Time Frame for New Connections

6) Nominal Voltage

2010-11 2011-12 2012-13 2013-140

5

10

15

20

10.76 8.5 10.6

15.24

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

2010-11 2011-12 2012-13 2013-140

1,000

2,000

3,000

4,000

2,265

2,8673,048

3,325

Consumers who made complaints about voltage

Years

consumers applied for

new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 94,358 10,154 10.76

2011-12 90,787 7,757 8.50

2012-13 76,145 8,078 10.60

2013-14 85,477 13,033 15.24

Years Total Number of Consumers

Consumers who made complaints

about voltage

(%) Increase/Decrease

in number of complaints

2010-11 2,500,268 2,265 -

2011-12 2,608,374 2,867 +26.5

2012-13 2,568,859 3,048 +6.31

2013-14 2,736,688 3,325 +9.08

Page 44: Distribution company performance

44

3) GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)

7) Load Shedding

8) Consumer Service Complaints

2010-11 2011-12 2012-13 2013-140

5

10

Average duration of Load shedding (Hours)

2010-11 2011-12 2012-13 2013-140

500,000

1,000,000

1,500,000

Total Complaints received by GEPCO

Years Average duration of Load shedding(Hours)

2010-11 8

2011-12 3.6

2012-13 3.2

2013-14 3.2

Years Total Complaints received by GEPCO

2010-11 155,132

2011-12 456,304

2012-13 532,925

2013-14 1,123,731

Page 45: Distribution company performance

45

3) GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 9

2011-12 11

2012-13 10

2013-14 12 2010-11 2011-12 2012-13 2013-140

5

10

15

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 39,747 2,693,495 67.77

2011-12 41,099 373,667 9.09

2012-13 42,667 921,361 21.59

2013-14 42,681 921,312 21.58 2010-11 2011-12 2012-13 2013-140

20

40

60

80

Faults/km of Distribution System

Page 46: Distribution company performance

46

4) FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 10.83 11.2

2011-12 10.83 10.8

2012-13 10.83 10.8

2013-14 9.13 11.3 2010-11 2011-12 2012-13 2013-140

5

10

15

T & D Losses (%)

Allowed limit by NEPRA

Actual losses by FESCO

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 97.04

2011-12 100 99.76

2012-13 100 99.06

2013-14 100 100.05 2010-11 2011-12 2012-13 2013-1494

96

98

100

102

Recovery (%)

Target value by NEPRA

Actual re-covery by FESCO

Page 47: Distribution company performance

47

4) FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by FESCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 2,996,549 115,742,546 38.63 13

2011-12 3,278,533 194,766,923 59.40 13

2012-13 3,214,275 182,579,281 56.80 13

2013-14 3,288,932 116,444,302 35.40 132010-11 2011-12 2012-13 2013-14

010203040506070

38.63

59.456.8

35.4

13 13 13 13

SAIFI

Actual value by FESCO

Set Limit by NEPRA

Years

Total Number of consumers served by

FESCO

Agg.sum of all consumers power

supply interruption

duration (Min)

SAIDI SAIDI (Set Limit

by NEPRA)

(3)=(2)/(1)

(1) (2) (3)2010-11 2,996,549 63,649,624,760 21241 142011-12 3,278,533 4,331,500,066 1321 142012-13 3,214,275 4,019,965,724 1250 142013-14 3,288,932 3,739,602,394 1137 14

2010-11 2011-12 2012-13 2013-140

5000

10000

15000

20000

2500021241

1321 1250 1137

14 14 14 14

SAIDI

Actual value by FESCO

Set Limit by NEPRA

Page 48: Distribution company performance

48

4) FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)

5) Time Frame for New Connections

6) Nominal Voltage

Years

Consumers applied for

new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 125,060 33,204 26.55

2011-12 119,703 11,027 9.20

2012-13 88,776 10,281 12.20

2013-14 84,886 23,547 27.7 2010-11 2011-12 2012-13 2013-1405

1015202530

26.55

9.212.2

27.7

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/Decrease

In number of complaints

2010-11 2,996,549 18,830 -

2011-12 3,278,533 7,699 -59

2012-13 3,214,275 6,089 -20

2013-14 3,288,932 9,169 +50.5 2010-11 2011-12 2012-13 2013-140

5,000

10,000

15,000

20,000 18,830

7,699 6,089

9,169

Consumers who made complaints about voltage

Page 49: Distribution company performance

49

4) FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 5

2011-12 7

2012-13 7.8

2013-14 7.25 2010-11 2011-12 2012-13 2013-1402468

Average duration of Load shedding (Hours)

Years Total Complaints received by FESCO

2010-11 164,356

2011-12 303,013

2012-13 236,850

2013-14 248,241 2010-11 2011-12 2012-13 2013-140

100,000

200,000

300,000

400,000

Total Complaints received by FESCO

Page 50: Distribution company performance

50

4) FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 32

2011-12 22

2012-13 26

2013-14 29 2010-11 2011-12 2012-13 2013-140

10203040

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 63,794 211,505 3.32

2011-12 58,651 147,342 2.50

2012-13 67,823 144,643 2.13

2013-14 71,424 157,656 2.20 2010-11 2011-12 2012-13 2013-140

1

2

3

Faults/km of Distribution System

Page 51: Distribution company performance

51

5) LAHORE ELECTRIC SUPPLY COMPANY (LESCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed Limit by NEPRA (%) Actual T&D Losses (%)

2010-11 12 13.3

2011-12 12 13.5

2012-13 12 13.2

2013-14 9.80 13.4 2010-11 2011-12 2012-13 2013-140

5

10

15

T & D Losses

Allowed lomit by NEPRA

actual losses by LESCO

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 98.1

2011-12 100 96.1

2012-13 100 97.80

2013-14 100 97.87 2010-11 2011-12 2012-13 2013-1494

96

98

100

Recovery (%)

Target value by NEPRA

Actual recov-ery by LESCO

Page 52: Distribution company performance

52

5) LAHORE ELECTRIC SUPPLY COMPANY (LESCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by LESCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 2,959,110 116,264,697 39.29 132011-12 3,052,299 89,713,568 29.40 132012-13 3,164,986 160,058,187 50.57 132013-14 3,286,668 256,478,823 78.04 13

2010-11 2011-12 2012-13 2013-140

20

40

60

80

100

39.29

29.4

50.57

78.04

13 13 13 13

SAIFI

Actual value by LESCO

Allowed limit by NEPRA

Years

Total Number of consumers

served by LESCO

Agg.sum of all consumers power

supply interruption

duration (Min)

SAIDISAIDI (Set

Limit by NEPRA)(3)=(2)/

(1)

(1) (2) (3)2010-11 2,959,110 10,266,206,977 3,469.4 142011-12 3,052,299 7,968,880,969 2,610.8 142012-13 3,164,986 14,608,740,454 4,615.7 142013-14 3,286,668 15,643,260,013 4,759.6 14

2010-11 2011-12 2012-13 2013-140.00

1,000.00

2,000.00

3,000.00

4,000.00

5,000.00

3,469.40

2,610.80

4,615.70

4,759.60

14 14 14 14

SAIDI

Actual value by LESCO

Allowed limit by NEPRA

Page 53: Distribution company performance

53

5) LAHORE ELECTRIC SUPPLY COMPANY (LESCO)

5) Time Frame for New Connections

6) Nominal Voltage

Years

consumers applied for

new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 137,715 4,253 3.09

2011-12 130,059 19,041 14.60

2012-13 130,059 19,041 14.60

2013-14 121,829 15,842 13.00 2010-11 2011-12 2012-13 2013-140

5

10

15

20

3.09

14.6 14.613

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/Decrease

in number of complaints

2010-11 2,959,110 10,552 -

2011-12 3,052,299 9,312 -11.75

2012-13 3,164,986 8,922 -4.18

2013-14 3,286,668 25,504 +185.852010-11 2011-12 2012-13 2013-14

05,000

10,00015,00020,00025,00030,000

10,552

9,312 8,922

25,504

Nominal Voltage

Page 54: Distribution company performance

54

5) LAHORE ELECTRIC SUPPLY COMPANY (LESCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 3574.3/365 = 9.8

2011-12 2.1

2012-13 0.66

2013-14 3.5 2010-11 2011-12 2012-13 2013-140

5

10

Average duration of Load shedding (Hours)

Years Total Complaints received by LESCO

2010-11 303,793

2011-12 215,888

2012-13 558,090

2013-14 1,163,927 2010-11 2011-12 2012-13 2013-140

500,000

1,000,000

1,500,000

Total Complaints received by LESCO

Page 55: Distribution company performance

55

5) LAHORE ELECTRIC SUPPLY COMPANY (LESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or serious injury

2010-11 25

2011-12 29

2012-13 14

2013-14 35 2010-11 2011-12 2012-13 2013-140

10203040

Electrical Incidents resulting in death or serious injury

Years

Total length of distribution

system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 37,801 337,446 8.93

2011-12 40,489 324,380 8.0

2012-13 26,298 60,085 2.28

2013-14 44,552.7 2,253,103 50.6 2010-11 2011-12 2012-13 2013-140

102030405060

Faults/km of Distribution System

Page 56: Distribution company performance

56

6) MULTAN ELECTRIC POWER COMPANY(MEPCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 15 15

2011-12 15 13

2012-13 15 14.8

2013-14 15 17.5 2010-11 2011-12 2012-13 2013-140

5

10

15

20

T & D Losses (%)

Allowed Limit by NEPRA

Actual Losses by MEPCO

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 97.97

2011-12 100 97.25

2012-13 100 91.76

2013-14 100 96.04 2010-11 2011-12 2012-13 2013-1485

90

95

100

Recovery (%)

Target value by NEPRA

Actual Re-covery by MEPCO (%)

Page 57: Distribution company performance

57

6) MULTAN ELECTRIC POWER COMPANY(MEPCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by DISCOs

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 4,095,946 759,867,592 185.52 132011-12 4,290,373 795,001,382 185.30 132012-13 4,535,062 678,829,469 149.70 132013-14 4,693,061 945,813,581 201.5 13

2010-11 2011-12 2012-13 2013-140

50

100

150

200

250

185.52185.3

149.7

201.5

13 13 13 13

SAIFI

Actual value by MEPCO

Set Limit by NEPRA

Years

Total Number of consumers served by

DISCOs

Agg.sum of all consumers power

supply interruption

duration (Min)

SAIDISAIDI (Set

Limit by NEPRA)(3)=(2)/(1)

(1) (2) (3)2010-11 4,095,946 65,110,006,031 15,896.2 142011-12 4,290,373 689,654,325 16 073.5 142012-13 4,535,062 58,111,790,700 12813.9 142013-14 4,693,061 83,088,717,833 17704.6 14

2010-11 2011-12 2012-13 2013-140.00

5,000.00

10,000.00

15,000.00

20,000.00

15,896.2016,073.50

12,813.90

17,704.60

14 14 14 14

SAIDI

Actual value by MEPCO

Set Limit by NEPRA

Page 58: Distribution company performance

58

6) MULTAN ELECTRIC POWER COMPANY(MEPCO)

5) Time Frame for New Connections

6) Nominal Voltage

Years

consumers applied for

new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections(%)

2010-11 160,994 57,979 36.01

2011-12 219,866 71,137 32.30

2012-13 238,117 39,297 16.50

2013-14 181,188 28,671 15.8 2010-11 2011-12 2012-13 2013-140

10

20

30

4036.01

32.3

16.5 15.8

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new con-nections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/decrease

in number of Complaints

2010-11 4,095,946 0 -

2011-12 4,290,373 0 0

2012-13 4,535,062 0 0

2013-14 4,693,061 0 0 2010-11 2011-12 2012-13 2013-140

0.20.40.60.8

1

0 0 0 0

Consumers who made complaints about voltage

Page 59: Distribution company performance

59

6) MULTAN ELECTRIC POWER COMPANY(MEPCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 6.75

2011-12 9.0

2012-13 9.0

2013-14 10 2010-11 2011-12 2012-13 2013-140

5

10

Average duration of Load shedding (Hours)

Years Total Complaints received by MEPCO

2010-11 69,601

2011-12 102,419

2012-13 103,454

2013-14 93,198 2010-11 2011-12 2012-13 2013-140

50,000

100,000

150,000

Total Complaints received by MEPCO

Page 60: Distribution company performance

60

6) MULTAN ELECTRIC POWER COMPANY(MEPCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 21

2011-12 14

2012-13 12

2013-14 17 2010-11 2011-12 2012-13 2013-140

10

20

30

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 87,619 108,348 1.24

2011-12 45,951 113,120 2.46

2012-13 47,128 99,561 2.11

2013-14 47,446 133,405 2.81 2010-11 2011-12 2012-13 2013-140

0.51

1.52

2.53

Faults/km of Distribution System

Page 61: Distribution company performance

61

7) QUETTA ELECTRIC SUPPLY COMPANY(QESCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 18 20.4

2011-12 18 20.9

2012-13 18 22.7

2013-14 15 28.32010-11 2011-12 2012-13 2013-14

0

10

20

30

T & D Losses (%)

Allowed Limit by NEPRAActual Losses by NEPRA

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 41

2011-12 100 36.2

2012-13 100 31.8

2013-14 100 42.2 2010-11 2011-12 2012-13 2013-140

20406080

100

Recovery (%)

Target value by NEPRA

Actual Re-covery by QESCO (%)

Page 62: Distribution company performance

62

7) QUETTA ELECTRIC SUPPLY COMPANY(QESCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by DISCOs

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set Limit

by NEPRA)

(1) (2) (3)2010-11 487,620 80,445,210 164.98 132011-12 503,158 78,537,463 156.08 132012-13 516,327 79,422,810 153.80 132013-14 535,145 77,573,236 144.95 13

2010-11 2011-12 2012-13 2013-140

50

100

150

200164.98 156.08 153.8 144.95

13 13 13 13

SAIFI

Actual value by QESCO

Set Limit by NEPRA

Years

Total Number of consumers

served by DISCOs

Agg.sum of all consumers

power supply interruption

duration

SAIDISAIDI (Set

Limit by NEPRA)(3)=(2)/

(1)

(1) (2) (3)2010-11 487,620 6,543,784,521 13,419.8 142011-12 503,158 6,445,823,719 12,810.7 142012-13 516,327 6,523,770,172 12,635 142013-14 535,145 6,351,140,612 11868.1 14

2010-11 2011-12 2012-13 2013-140.00

5,000.00

10,000.00

15,000.00 13,419.8012,810.70

12,635.00

11,868.10

14 14 14 14

SAIDI

Actual value by QESCO

Set Limit by NEPRA

Page 63: Distribution company performance

63

7) QUETTA ELECTRIC SUPPLY COMPANY(QESCO)

5) Time Frame for New Connections

6) Nominal Voltage

Yearsconsumers

applied for new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 10,459 109 1.04

2011-12 386 185 48.0

2012-13 12,088 183 1.50

2013-14 17,491 190 1.08 2010-11 2011-12 2012-13 2013-140

102030405060

1.04

48

1.5 1.085 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) increase/decreas

e in number of complaints

2010-11 487,620 5,294 -

2011-12 503,158 5,014 -5.28

2012-13 516,327 3,897 -22.2

2013-14 535,145 4,022 +3.20 2010-11 2011-12 2012-13 2013-140

2,000

4,000

6,000

5,2945,014

3,897 4,022

Consumers who made complaints about voltage

Page 64: Distribution company performance

64

7) QUETTA ELECTRIC SUPPLY COMPANY(QESCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 7

2011-12 10.5

2012-13 11.13

2013-14 10.5 2010-11 2011-12 2012-13 2013-140

5

10

15

Average duration of Load shedding (Hours)

Years Total Complaints received by QESCO

2010-11 67,348

2011-12 65,647

2012-13 65,640

2013-14 50,811 2010-11 2011-12 2012-13 2013-140

20,000

40,000

60,000

80,000

Total Complaints Received by QESCO

Page 65: Distribution company performance

65

7) QUETTA ELECTRIC SUPPLY COMPANY(QESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 20

2011-12 16

2012-13 7

2013-14 2 2010-11 2011-12 2012-13 2013-140

10

20

30

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 48,184 40,411 0.84

2011-12 50,374 38,431 0.76

2012-13 52,000 36,475 0.70

2013-14 48,340 40,394 0.835 2010-11 2011-12 2012-13 2013-140.6

0.650.7

0.750.8

0.850.9

Faults/km of Distribution System

Page 66: Distribution company performance

66

8) SUKKUR ELECTRIC POWER COMPANY(SEPCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2011-12 28 N.A

2012-13 28 39.51

2013-14 15 38.56 2012-13 2013-140

1020

3040

T & D Losses (%)

Allowed Limit by NEPRA

Actual Losses by SEPCO

Years Target value by NEPRA (%) Actual Recovery (%)

2011-12 100 N.A

2012-13 100 53.63

2013-14 100 58.60 2012-13 2013-14

0

50

100

Recovery (%)

Target value by NEPRA

Actual Recovery by SEPCO

Page 67: Distribution company performance

67

8) SUKKUR ELECTRIC POWER COMPANY(SEPCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by DISCOs

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2011-12 643,197 219,610,030 341.4 13

2012-13 687,045 2,870,251,802 4,177.7 13

2013-14 711,727 178,978,331 251.5 132011-12 2012-13 2013-14

0

1000

2000

3000

4000

5000

341.40

4,177.70

251.5013 13 13

SAIFI

Set Limit by NEPRA

Allowed Limit by NEPRA

Years

Total Number of consumers served by

DISCOs

Agg.sum of all consumers power

supply interruption duration (Min)

SAIDISAIDI (Set

Limit by NEPRA)

(3)=(2)/(1)

(1) (2) (3)

2011-12 643,197 11,727,318,040 18,233 14

2012-13 687,045 3,297,761,640 4,799.9 14

2013-14 711,727 1,738,562,122 2442.73 14

2011-12 2012-13 2013-140

5,000

10,000

15,000

20,00018,233.00

4,799.902,442.73

14 14 14

SAIDI

Actual value by SEPCO

Set Limit by NEPRA

Page 68: Distribution company performance

68

8) SUKKUR ELECTRIC POWER COMPANY(SEPCO)

5) Time Frame for New Connections

6) Nominal Voltage

Years

consumers applied for

new connection

Consumers who were not given

connections in permitted time

Consumers who were not given

new connections (%)

2011-12 5,620 430 7.65

2012-13 10,190 345 3.38

2013-14 17,165 1,556 9.0 2011-12 2012-13 2013-140

2

4

6

8

10

7.65

3.38

9

5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Consumers who made

complaints about voltage

2011-12 643,197 0 -

2012-13 687,045 0 0

2013-14 711,727 0 0 2011-12 2012-13 2013-140

0.20.40.60.8

1

0 0 0

Consumers who made complaints about voltage

Page 69: Distribution company performance

69

8) SUKKUR ELECTRIC POWER COMPANY(SEPCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2011-12 4

2012-13 2

2013-14 22011-12 2012-13 2013-14

01234

Average duration of Load shedding (Hours)

Years Total Complaints received by SEPCO

2011-12 8,659

2012-13 8,813

2013-14 12,0512011-12 2012-13 2013-14

0

5,000

10,000

15,000

Total Complaints received by SEPCO

Page 70: Distribution company performance

70

8) SUKKUR ELECTRIC POWER COMPANY(SEPCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2011-12 3

2012-13 3

2013-14 452011-12 2012-13 2013-14

0

20

40

60

Electrical Incidents resulting in death or serious injury

YearsTotal length of

distribution system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2011-12 35,954 190,575 5.3

2012-13 37,323 218,984 5.9

2013-14 39,918 83,463 2.1 2011-12 2012-13 2013-140

2

4

6

Faults/km of Distribution System

Page 71: Distribution company performance

71

9) HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO)

1)Transmission & Distribution (T&D) Losses:

2) Recovery

2010-11 2011-12 2012-13 2013-140

10

20

30

40

T & D Losses (%)

Allowed limit by NEPRA

Actual losses by HESCO

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 28 33.80

2011-12 22 27.70

2012-13 22 27.30

2013-14 15 26.46

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 76.3

2011-12 100 69.1

2012-13 100 81.2

2013-14 100 79.2 2010-11 2011-12 2012-13 2013-140

20406080

100

Recovery (%)

Target value by NEPRA

Actual value by HESCO

Page 72: Distribution company performance

72

9) HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO)

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

Years

Total Number of consumers

served by HESCO

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 1,539,637 2,311,912,695 1501.6 132011-12 883,335 680,501,756 770.30 132012-13 915,805 668,882,208 730.37 132013-14 952,296 218,961,910 229.9 13

2010-11 2011-12 2012-13 2013-140

500

1000

1500

2000

1501.6

770.3 730.37229.9

13 13 13 13

SAIFI

Set Limit by NEPRA

Allowed Limit by NEPRA

Years

Total Number of consumers

served by HESCO

Agg.sum of all consumers power

supply interruptions

SAIDI SAIDI (Set

Limit by NEPRA)

(3)=(2)/(1)

(1) (2) (Minutes) (3)2010-11 1,539,637 1,594,389,070 1035.6 142011-12 883,335 21,191,991,580 23,990.8 142012-13 915,805 19,419,312,750 21,204.6 142013-14 952,296 15,883,027,060 16,678.6 14

2010-11 2011-12 2012-13 2013-140

5000

10000

15000

20000

25000

30000

1,035.60

23,990.8021,204.60

16,678.60

14 14 14 14

SAIDI

Actual value by HESCO

Set Limit by NEPRA

Page 73: Distribution company performance

73

9) HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO)

5) Time Frame for New Connections

6) Nominal Voltage

Yearsconsumers

applied for new connection

Consumers who were not given connections in permitted time

Consumers who were not given

new connections (%)

2010-11 6,746 1,003 14.87

2011-12 16,084 11 0.07

2012-13 26,635 15 0.05

2013-14 41,398 4911 11.86 2010-11 2011-12 2012-13 2013-140

5

10

15

20

14.87

0.07 0.05

11.86

5 5 5 5

Time Frame for New Connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/Decrease

in number of complaints

2010-11 1,539,637 2,536 -

2011-12 883,335 1,585 -37.5

2012-13 915,805 1,496 -5.6

2013-14 952,296 1,743 +16.5 2010-11 2011-12 2012-13 2013-140

1,000

2,000

3,0002,536

1,585 1,496 1,743

Consumers who made complaints about voltage

Page 74: Distribution company performance

74

9) HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO)

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 2.33

2011-12 3.8

2012-13 7.3

2013-14 3.75 2010-11 2011-12 2012-13 2013-1402468

Average duration of Load shedding (Hours)

Years Total Complaints received by HESCO

2010-11 24,211

2011-12 13,018

2012-13 8,613

2013-14 45,794 2010-11 2011-12 2012-13 2013-140

10,00020,00030,00040,00050,000

Total Complaints received by HESCO

Page 75: Distribution company performance

75

9) HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO)

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 46

2011-12 26

2012-13 7

2013-14 14 2010-11 2011-12 2012-13 2013-140

20

40

60

Electrical Incidents resulting in death or serious injury

Years

Total length of distribution

system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 80,172 939,258 11.72

2011-12 42,052 69,824 1.7

2012-13 43,239 62,206 1.4

2013-14 44,040 84,937 1.92 2010-11 2011-12 2012-13 2013-140

4

8

12

Faults/km of Distribution System

Page 76: Distribution company performance

76

10) K-ELECTRIC

1)Transmission & Distribution (T&D) Losses:

2) Recovery

Years Allowed limit by NEPRA (%) Actual T&D Losses (%)

2010-11 23 32.20

2011-12 21 29.73

2012-13 19 27.82

2013-14 17 25.30 2010-11 2011-12 2012-13 2013-140

10

20

30

40

T & D Losses

Allowed Limit by NEPRAActual Losses by K-Electric

Years Target value by NEPRA (%) Actual Recovery (%)

2010-11 100 90.17

2011-12 100 90.72

2012-13 100 88.65

2013-14 100 91.22 2010-11 2011-12 2012-13 2013-1480

85

90

95

100

Recovery (%)

Target value by NEPRA

Actual Re-covery by K-Electric

Page 77: Distribution company performance

77

10) K-ELECTRIC

3) System Average Interruption Frequency Index (SAIFI)

4) System Average Interruption Duration Index (SAIDI)

2010-11 2011-12 2012-13 2013-140

500

1000

1500

2000

25002191

1858 1790.43

1495.25

14 14 14 14

SAIDI

Actual value by K-electric

Set Limit by NEPRA

Years

Total Number of consumers served by K-

Electric

Agg.sum of all consumers power

supply interruption

duration

SAIDISAIDI (Set

Limit by NEPRA)(3)=(2)/

(1)

(1) (2) (Minutes) (3)2010-11 2,370,738 5,195,969,221 2191 142011-12 2,388,579 4,438,509,649 1858 142012-13 2,385,100 4,270,360,371 1790.43 142013-14 2,358,357 3,526,349,005 1495.25 14

2010-11 2011-12 2012-13 2013-140

10

20

30

4034.9 33 31.3 24.71

13 13 13 13

SAIFI

Actual value by KE

Set Limit by NEPRA

Years

Total Number of consumers served by K-

Electric

Total annual number of

power supply interruptions

SAIFI(3)=(2)/

(1)

SAIFI (Set

Limit by NEPRA)

(1) (2) (3)

2010-11 2,370,738 82,737,192 34.90 132011-12 2,388,579 77,612,818 33 132012-13 2,385,100 74,576,586 31.30 132013-14 2,358,357 58,293,812 24.71 13

Page 78: Distribution company performance

78

10) K-ELECTRIC

5) Time Frame for New Connections

6) Nominal Voltage

Yearsconsumers

applied for new connection

Consumers who were not given connections in permitted time

(%) Consumers who were not

given new connections

2010-11 19,129 5,258 27.40

2011-12 10,994 3,765 34

2012-13 5,573 2,269 40.7

2013-14 10,039 1,331 13.2 2010-11 2011-12 2012-13 2013-140

10

20

30

40

50

27.434

40.7

13.25 5 5 5

Time Frame for New connections

(%) Con-sumers who were not given new connections

Allowed Limit by NEPRA

Years Total Number of consumers

Consumers who made complaints

about voltage

(%) Increase/Decreas

e in number of Complaints

2010-11 2,370,738 19,501 -

2011-12 2,388,579 17,419 -10.67

2012-13 2,385,100 15,498 -11.02

2013-14 2,358,357 19,408 +25.22 2010-11 2011-12 2012-13 2013-140

5,00010,00015,00020,00025,000

19,50117,419

15,49819,408

Consumers who made complaints about voltage

Page 79: Distribution company performance

79

10) K-ELECTRIC

7) Load Shedding

8) Consumer Service Complaints

Years Average duration of Load shedding(Hours)

2010-11 2

2011-12 2

2012-13 2.4

2013-14 2.3 2010-11 2011-12 2012-13 2013-141.8

2

2.2

2.4

Average duration of Load shedding (Hours)

Years Total Complaints received by K-Electric

2010-11 49,281

2011-12 33,135

2012-13 16,756

2013-14 509,510 2010-11 2011-12 2012-13 2013-140

200,000

400,000

600,000

Total Complaints received by K-Electric

Page 80: Distribution company performance

80

10) K-ELECTRIC

9) Safety (Fatal Incidents):

10) Fault Rate (No of Faults/Km)

Years Electrical Incidents resulting in death or permanent serious injury to member of staff or public

2010-11 26

2011-12 14

2012-13 9

2013-14 5 2010-11 2011-12 2012-13 2013-140

10

20

30

Electrical Incidents resulting in death or serious injury

Years

Total length of distribution

system in Service (km)

Total No. of Distribution

system faults

Faults/km of Distribution

System

2010-11 24,809 52,324 2.112011-12 25,826 50,984 22012-13 26,666 52,071 1.952013-14 28,337 55,798 1.96 2010-11 2011-12 2012-13 2013-14

1.851.9

1.952

2.052.1

2.15

Faults/km of Distribution System

Page 81: Distribution company performance

11) BAHRIA TOWN PRIVATE LIMITED (BTPL)Sr. # Description APR for

2010-11APR for 2011-12

APR for 2012-13

APR for 2013-14

1 Technical Losses (10%) N.P 7.47 8.34 8.57

2 Administrative Losses N.P 7.47 8.34 8.57

3 Percentage of Recovery N.P 97.3 100.025 101.442

4 Total number of consumers served by BTPL 6,756 8,845 11,838 15,636

5 Total annual number of Power Supply Interruptions 8,291 116 40,510 105

6 Aggregate sum of all consumers Power Supply interruptions duration (minutes) 339,306 14,658 81,454 12,303

7 System Average Interruption Frequency Index (SAIFI), Power Supply Interruptions per consumer per year 1.23 0.01 3.42 0.006

8 System Average Interruption Duration Index (SAIDI), Power Supply Interruptions Durations 50.2 1.6 6.9 0.78

9 Total Number of Consumers applied for Connections 1,197 2,045 2,045 3,698

10 Total Number of Consumers who were not given connections in permitted time period 0 0 0 0

11 Percentage Consumers who were not given connections in permitted time period 0 0 0 0

12 Total number of consumers who made complaints about voltage 0 0 0 0

13 Average duration of load-shedding period (hours) 0.5 0.5 0.2 1

14 Total Complaints received by BTPL during the year 723 1,560 1,481 1,550

15 Total length of Distribution System in service (km) 241 898 1084 1095

16 Total number of Distribution System faults 76 595 2,776 1,601

17 Faults/km of Distribution System 0.04 0.66 2.56 1.46

18 Electrical Incidents resulting in death or permanent serious injury / disability to member of staff / public 0 0 0 0

Page 82: Distribution company performance

82

12) TRIBAL AREAS ELECTRIC SUPPLY COMPANY (TESCO)Sr. # Description APR for

2013-14

1 Technical Losses (10%) N.A

2 Administrative Losses N.A

3 Percentage of Recovery N.A

4 Total number of consumers served by TESCO 390,723

5 Total annual number of Power Supply Interruptions 49,458

6 Aggregate sum of all consumers Power Supply interruptions (minutes) 819,028

7 System Average Interruption Frequency Index (SAIFI), Power Supply Interruptions per consumer per year 0.12

8 System Average Interruption Duration Index (SAIDI), Power Supply Interruptions Durations 2.09

9 Total Number of Consumers applied for Connections 198

10 Total Number of Consumers who were not given connections in permitted time period 146

11 Percentage Consumers who were not given connections in permitted time period 73.7

12 Total number of consumers who made complaints about voltage Nil

13 Average duration of load-shedding period (hours) 10.5

14 Total Complaints received by TESCO during the year 12,585

15 Total length of Distribution System in service (km) 15,320

16 Total number of Distribution System faults 7,540

17 Faults/km of Distribution System 0.49

18 Electrical Incidents resulting in death or permanent serious injury / disability to member of staff / public 1

Page 83: Distribution company performance

83

FINDINGS/CONCLUSIONS

Page 84: Distribution company performance

FINDINGS/CONCLUSIONS

i) T& D Losses

During review of the losses reported by DISCOs in year 2013-14, it has been observed that IESCO,

GEPCO, FESCO, LESCO, MEPCO, QESCO & BTPL have shown no improvement. Instead of

decrease in losses, an increase has been noted as compared to 2012-13.

 

ii) Recovery

It has been noted that Recovery of GEPCO & HESCO has gone down in year 2013-14 when

comparing to 2012-13. Whereas, IESCO, FESCO & BTPL have exceeded the limit of 100% and the

issue is being taken with these DISCOs, so that it can be diagnosed that either this is the result of

recovery of arrears or overbilling. Based on the result, the experience of these DISCOs will be

shared with other DISCOs.

 

iii) SAIFI & SAIDI

As regard of the SAIFI & SAIDI, it has been found that the reported values of LESCO & MEPCO

regarding SAIFI have been increased as compared to last year. Similarly, the values of LESCO &

MEPCO regarding SAIDI have also been increased when compared with data of last year. This

shows their level of seriousness towards the maintenance of network. Due to non-compliance of

SAIFI & SAIDI Standards, legal proceedings have already been initiated on the basis of 2012-13

reports.

It is important to mention here that IESCO & GEPCO have complied with SAIFI & SAIDI

Standards, as mentioned in PSDR-2005.

Page 85: Distribution company performance

FINDINGS/CONCLUSIONS

iv) Time Frame for New Connections

While evaluating the DISCO's reports, it was noticed that GEPCO, FESCO, SEPCO, HESCO &

TESCO have not complied with Rule 4(c) OS 3 - Time Frame for New connections. Their reports

indicate that the % of consumers who were not given connections within due time frame is more

than the specified limit i.e. 5% as mentioned in the PSDR 2005 and also the percent value has been

increased as compared to 2012-13. Further, it has also been observed that none of the DISCO has

provided the reasons for each day delay of not providing connections to applicants as per

requirements of the said rule. Here also, due to non-compliance of Rule 4 (c) Overall Standard 3,

legal proceedings have already been initiated on the basis of 2012-13 reports.

v) Average Duration of Load Shedding (Hrs)

Data submitted by GEPCO, LESCO, SEPCO & KEL regarding Average duration of load shedding

(hrs) seems to be away from ground situations & DISCOs are being asked to submit the details of

their load shedding plans indicating the principles & priorities of load shedding.

vi) Number of Complaints

During review of reports provided by DISCOs for year 2013-14, it has been noticed that all DISCOs

have received more number of complaints in 2013-14 as compared to 2012-13 except PESCO,

MEPCO & QESCO. This shows the level of customer satisfaction & probably indicates that

customers are getting more awareness. Accordingly, DISCOs are being conveyed to explain the

reasons behind such situation.

Page 86: Distribution company performance

FINDINGS/CONCLUSIONS

vii) Safety

This report also indicates the analysis of safety incidents based on the data reported by DISCOs

and found that more number of incidents have been happened in the areas of IESCO, GEPCO,

FESCO, LESCO, MEPCO, SEPCO & HESCO as compared to last year. This may show the

lack/missing of safety culture / Safety management system in the respective DISCO's areas. It has

been noted with concern that for LESCO, FESCO & SEPCO a sudden rise in the number of

incidents has been observed, although, legal proceedings are already foregoing in this regard

based on the data of 2012-13. Moreover, for making effective development of safety culture in each

DISCO, a Safety code has been developed by NEPRA & uploaded on NEPRA web. Based on this,

the DISCOs are being coordinated to develop their detailed/comprehensive Safety Manuals to

encourage Safety System.

viii)Fault Rate

This report depicts that the number of faults in the areas of IESCO, FESCO, LESCO, MEPCO,

QESCO & HESCO have been increased which have resulted in increase of fault rate of their

Distribution system. This indicates that utilization of O&M amounts are not being used properly,

although, all the DISCOs have been allowed almost 10 % more amount under O&M head then the

previous year.

Page 87: Distribution company performance

FINDINGS/CONCLUSIONS

ix) Overall, it can be concluded that DISCOs & KEL remained non-serious in

maintaining the accurate, real & reliable data, resultantly provided the same to

NEPRA even reluctantly. For this, the implementation of Automated Metering

Infrastructure (AMI) has already been initiated. Further, The trend of data provided

by DISCOs and K-Electric indicates that the distribution Codes developed by the

companies themselves and approved by NEPRA are not being implemented in

respect of design, planning, execution, operation, protection & safety etc. NEPRA

has already activated the Distribution Code Review Panel in this regard.

Page 88: Distribution company performance

88

RECOMMENDATIONS

Page 89: Distribution company performance

89

RECOMMENDATIONS

Based on reported data & findings as mentioned at paragraph 8, the following are recommended:

Since, the legal proceedings in form of explanation and show cause notices are already foregoing,

therefore, it is requested to the Authority that the performance of DISCOs & KEL as evaluated in this

analysis report may be linked during the hearings in the matter of Show Cause Notices for DISCOs

and KEL.

As it has already been mentioned that the DISCOs & KEL have failed to provide the real and reliable

data, therefore, it is recommended that adoption of Automated Metering Infra-structure (AMI) may be

started by DISCOs at the earliest for collecting reliable data through their system generated reports.

Initiation of performance audits as and when required i.e. monitoring of the performance standards as

per Rule – 8 of PSDR-2005, especially for IESCO & GEPCO as they have shown achievement of

reliability Standards.

For Better customer relations & focus and proper maintenance of computerized complaint handling

system, DISCOs may be directed to establish Call Centers, same as like Call Center – 118 IESCO.

Physical inspection/ checking of DISCOs maintenance activities as per their defined SOPs, because,

every year, a colossal amount is being allowed to every DISCO under O & M head as this practice has

already been initiated by Standards team for NTDC's grids and concrete results have already been

presented to the Authority.

Collection of online Annual Performance Reports from 2014-15 by uploading prescribed proformas of

Performance Standards (Distribution) Rules 2005 on NEPRA web.

Strict monitoring of implementation of Distribution Code which is at neglected stage by the DISCOs.