diversion and evacuation routes timing development ... · timing patterns - evacuation 16 • base...

19
Diversion and Evacuation Routes Timing Development, Implementation and Applications Presented by: Vishal S. Kakkad, PE, PTOE Traffic Engineering Division Manager June 23, 2016

Upload: others

Post on 17-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Diversion and Evacuation Routes Timing

Development, Implementation and

Applications

Presented by:

Vishal S. Kakkad, PE, PTOE

Traffic Engineering Division Manager

June 23, 2016

Page 2: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Project Background

2

• History– Incidents on Interstate 75 requiring closures

– Interstate 75 Freeway Management System in Manatee and Sarasota Counties

– Implementation of Manatee County Advanced Traffic Management System (ATMS)

– Past history of incidents on Manatee River bridges (US 41/301, Bus US 41)

– Hurricane Evacuation Planning

Photo Source:

Tampa Bay Times

Page 3: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

3

• Objectives– Strategic plan for maximizing the throughput of diversion or

evacuation route through traffic engineering practices

• Traffic signal timing patterns

• Traffic operational improvements

• Law enforcement deployment strategies

• Decision matrix and operations guide development

– Ease of implementation

Project Background

Page 4: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Where Will The Traffic Go?

4

• Interstate 75 carries ≈100,000 vehicles per day– Peak hour about 10% or 10,000 vehicles per hour

• Capacity of a signalized arterial ≈ 1,900 vehicles per lane per hour of green– Example: 3 lanes in one direction, 60% green ≈ 3,420

vehicles per hour

• Most arterials already congested during peak periods

• No arterial roadway has capacity to carry full diversion during the heavier hours

Page 5: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Scenarios

5

Page 6: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Diversion Scenario 3

8

Page 7: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Diversion Scenario 7

12

Page 8: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Evacuation Scenarios

13

Page 9: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Timing Patterns

14

• For Each Diversion Scenario, 3 Timing Patterns

Developed

– Northbound

– Southbound

– Balanced

• For Each Evacuation Route, 2 Timing Patterns

Developed

– Minor Evacuation

– Major Evacuation

Page 10: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Timing Patterns - Diversion

15

• Base Model (Synchro)

• Modify in TruTraffic for Diversion Conditions

– Primary movements: add ≈60 seconds of green time

– Secondary movements: add ≈30 seconds of green time

– Progress Diversion traffic at 25 mph

• Define Patterns and FlexGroups on ATMS.now

• Field Check during Late Night

• Ready for staff to implement when needed

Page 11: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Timing Patterns - Evacuation

16

• Base Model (Synchro)

• Modify in TruTraffic for Evacuation Conditions

– Minor Evacuation – Typical Time of Day Cycle Length

with One-Way Progression at Speed Limit

– Major Evacuation – Increased Cycle Length with One-

Way Progression at Speed Limit

• Define Patterns and FlexGroups on ATMS.now

• Field Check during Late Night

• Ready for staff to implement if needed

Page 12: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Timing Pattern Development

17

Page 13: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Implementation Guide

18

Page 14: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Diversion Scenario 3

19

Page 15: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Route Details

20

Page 16: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Benefits

21

• Ready to use timing plans with multiple scenarios

• Coordinated patterns

• Programmed in central software for easy and

quick implementation

• Maximize available resources

Page 17: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Implementation Comparison

22

6

10

4

0.50

1.501.00

1 2 3 4 5 6

Av

era

ge

do

wn

loa

d t

ime

/In

ters

ect

ion

(m

in)

Traffic Incidents

Diversion and Evacuation Routes Programmed Signal Timings

Before vs. After Implementation

86%

Average Before: 7 minutes

Average After: 1 minute

Page 18: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation

Applications

23

• Traffic Incident Management

• Evacuation Route Timing

• Planned/Unplanned Event Management

• Non-Recurring Congestion Management