dmrb volume 3 section 2 part 1 - bd 62/07 - as built ... · 2. remove bd 62/94 from volume 3,...

41
February 2007 DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 3 HIGHWAY STRUCTURES: INSPECTION AND MAINTENANCE SECTION 2 MAINTENANCE PART 1 BD 62/07 AS BUILT, OPERATIONAL AND MAINTENANCE RECORDS FOR HIGHWAY STRUCTURES SUMMARY This Standard gives the Overseeing Organisations’ minimum requirements for the records to be collected and maintained for highway structures. INSTRUCTIONS FOR USE 1. Remove Contents pages from Volume 3 and insert new Contents pages dated February 2007. 2. Remove BD 62/94 from Volume 3, Section 2 which is superseded by this new Standard and archive as appropriate. 3. Insert BD 62/07 into Volume 3, Section 2. 4. Please archive this sheet as appropriate. Note: A quarterly index with a full set of Volume Contents Pages is available separately from The Stationery Office Ltd.

Upload: duongkhue

Post on 02-May-2018

232 views

Category:

Documents


2 download

TRANSCRIPT

February 2007

DESIGN MANUAL FOR ROADS AND BRIDGES

VOLUME 3 HIGHWAY STRUCTURES:INSPECTION ANDMAINTENANCE

SECTION 2 MAINTENANCE

PART 1

BD 62/07

AS BUILT, OPERATIONAL ANDMAINTENANCE RECORDS FORHIGHWAY STRUCTURES

SUMMARY

This Standard gives the Overseeing Organisations’minimum requirements for the records to be collectedand maintained for highway structures.

INSTRUCTIONS FOR USE

1. Remove Contents pages from Volume 3 andinsert new Contents pages dated February 2007.

2. Remove BD 62/94 from Volume 3, Section 2which is superseded by this new Standard andarchive as appropriate.

3. Insert BD 62/07 into Volume 3, Section 2.

4. Please archive this sheet as appropriate.

Note: A quarterly index with a full set of VolumeContents Pages is available separately from TheStationery Office Ltd.

BD 62/07Volume 3, Section 2,Part 1

As Built, Operational andMaintenance Records for

Highway Structures

Summary: This Standard gives the Overseeing Organisations’ minimum requirements forthe records to be collected and maintained for highway structures.

DESIGN MANUAL FOR ROADS AND BRIDGES

THE HIGHWAYS AGENCY

TRANSPORT SCOTLAND

WELSH ASSEMBLY GOVERNMENTLLYWODRAETH CYNULLIAD CYMRU

THE DEPARTMENT FOR REGIONAL DEVELOPMENTNORTHERN IRELAND

Volume 3 Section 2Part 1 BD 62/07

February 2007

REGISTRATION OF AMENDMENTS

Amend Page No Signature & Date of Amend Page No Signature & Date ofNo incorporation of No incorporation of

amendments amendments

Registration of Amendments

Volume 3 Section 2Part 1 BD 62/07

February 2007

REGISTRATION OF AMENDMENTS

Amend Page No Signature & Date of Amend Page No Signature & Date ofNo incorporation of No incorporation of

amendments amendments

Registration of Amendments

VOLUME 3 HIGHWAY STRUCTURES:INSPECTION ANDMAINTENANCE

SECTION 2 MAINTENANCE

PART 1

BD 62/07

AS BUILT, OPERATIONAL ANDMAINTENANCE RECORDS FORHIGHWAY STRUCTURES

Contents

Chapter

1. Introduction

2. Scope

3. Managing Records

4. Records for Highway Structures

5. Summary of Records

6. References

7. Enquiries

Annex A Special Requirements: England

Annex B Special Requirements: Scotland

Annex C Special Requirements: Wales

Annex D Special Requirements: Northern Ireland

Annex E Examples

DESIGN MANUAL FOR ROADS AND BRIDGES

February 2007

Volume 3 Section 2Part 1 BD 62/07

Chapter 1Introduction

1. INTRODUCTION

Mandatory Requirements

1.1 Paragraphs of this Standard that are highlightedby being contained in a box are mandatory. Theremainder of the document contains advice andguidance.

General

1.2 This Standard describes certain records requiredfor highway structures on motorways and other trunkroads or in Northern Ireland all designated roads, butshould be read in conjunction with BD 53 (DMRB3.1.6) – Inspection and Records for Road Tunnels,when dealing with highway tunnels.

1.3 This Standard should be read in conjunction withSD 11 (MCHW 6.1.2) – Requirements for Health andSafety File, and the Construction (Design andManagement) Regulations (CDM) 1994: The Healthand Safety File. The records described in the Standardare considered by the Overseeing Organisations tosatisfy minimum compliance with the CDMRegulations with respect to structures records. TheOverseeing Organisation in Northern Ireland has optedout of SD 11 in favour of the CDM Approved Code ofPractice.

1.4 The records described by this Standard may notbe sufficient for effective management in allcircumstances. Where this is the case, supplementaryrecords should be compiled.

1.5 The Standard also identifies how the recordsshould be held and those parties responsible forcreating, maintaining, reviewing and updating records,i.e. the Designer, Contractor, Agent and OverseeingOrganisation.

1.6 This Standard supersedes BD 62/94 (DMRB3.2.1) – As Built, Operational and MaintenanceRecords for Highway Structures, which is herebywithdrawn.

February 2007

1.7 This Standard must be read in conjunctionwith BD 63 (DMRB 3.1.4) - Inspection ofHighway Structures, which provides details of therecords associated with inspections of highwaystructures.

Background

1.8 The records described in this Standard arespecifically identified to support the business needs andprocesses for managing highway structures, importantaspects of which include:

a. Providing information the OverseeingOrganisations are legally required to hold.

b. Providing information that supports themanagement of highway structures, e.g.inspection scheduling, maintenance planning,structural reviews and assessments.

c. Ensuring that records remain current andaccurate by adopting appropriate reviewing andupdating procedures.

d. Ensuring that records are held in the requiredformat, e.g. computerised Asset ManagementSystems.

e. Ensuring that records are created, maintained andmanaged by the relevant personnel/parties.

1.9 Details of the manner in which these records areto be held by respective Overseeing Organisations areprovided within the Annexes.

Definitions

1.10 The following definitions apply in this Standard:

• Agent – a party appointed by the OverseeingOrganisation to manage highway assets on theirbehalf, e.g. Maintaining Agent, Managing Agent,Managing Agent Contractor, Trunk Road Agent,Concessionaire, Service Provider or OperatingCompany. Where the Overseeing Organisationmanages the highway assets internally, the Agentwill be the branch or section to which the dutieshave been delegated.

1/1

Volume 3 Section 2Part 1 BD 62/07

Chapter 1Introduction

• Contractor – the organisation contracted by theOverseeing Organisation or Agent to undertakeconstruction works on its behalf.

• Designer – the organisation responsible for theoverall design including proprietary components.

• Structural Review – a review of an individualstructure or group of structures to establish orconfirm the validity of its latest assessment (or itsoriginal design, if there has been no subsequentassessment).

Implementation

1.11 This Standard must be used forthwith.Additional and specific requirements for the fourOverseeing Organisations in England, Scotland,Wales, and Northern Ireland are given in AnnexesA to D respectively of this Standard.

Quality Assurance and Audit

1.12 Agents must amend, if necessary, theirQuality Assurance system to reflect therequirements of this Standard.

1.13 The Overseeing Organisation reserves the right toaudit Agents against this Standard.

Feedback

1.14 Any feedback on the use of this Standardmust be provided in accordance with HD 34Implementation and Use of the StandardImprovement System.

February 20071/2

Volume 3 Section 2Part 1 BD 62/07

Chapter 2Scope

2. SCOPE

2.1 This Standard applies to highway structuresover, under or alongside motorways and othertrunk roads or in Northern Ireland all designatedroads.

2.2 Table 1 describes the scope of highwaystructures this Standard applies to. The specificrequirements of each Overseeing Organisation,which may replace or amplify certain aspects of

Table 1 Scope of Highway S

Structure Type Definition

February 2007

Bridge, buried structure, A structure supporting tsubway underpass, culvert it crosses an obstacle (eand any other similar or flood plain) or a servstructure road, railway or canal)

ORA structure supporting ta service (e.g. local roadcanal) over the highway

Earth retaining structure A structure associated whighway where the domis to retain earth

Reinforced/strengthened A structure associated wsoil/fill structure with hard highway where the domfacings is to stabilise the slope a

earth

Sign and/or signal gantry Portal and cantilever ga(see Note 3) support signs and/or sig

Mast Cantilever mast for traff(see Note 3)

High mast for lighting

Mast for camera, radio, and telecommunication equipment

Table 1, are provided in the Annexes and must beadopted.

2.3 The records produced and held for each structureshould be appropriate to its complexity and size.Normally, the detail and quantity of records wouldincrease as complexity and size increase. When aDesigner or Agent are uncertain about the records thatshould be produced or held for a structure they shouldcontact the Overseeing Organisation.

tructures Covered by BD 62

Scope (see Note 1)

he highway as All structures with a clear span or.g. river, valley internal diameter greater than 0.9mice (e.g. local (0.9m or greater in Scotland)

he passage of, railway,

ith the All structures with an effective retainedinant function height, i.e. the level of fill at the back

of the structure above the finishedground level at the front of thestructure, of 1.5m or greater (seeNote 2)

ith the All structures with an effective retainedinant function height of 1.5m or greater (see Note 2)nd/or retain

ntries that Structural aspects of all sign/signalnals gantries

ic signal Structural aspects of all cantilevermasts

Structural aspects of all lighting mastsof 20m or greater, i.e. the verticaldistance from top of post to bottom offlange

speed camera Structural aspects of all maststransmission

2/1

Volume 3 Section 2Part 1 BD 62/07

Chapter 2Scope

Structure Type Definition Scope (see Note 1)

Catenary lighting support system Structural aspects of all catenarysupport systems

Highway signs on posts As agreed by the OverseeingOrganisation

Access gantry A moveable structure providing All moveable access gantries(see Note 4) access to a highway asset, typically

for bridge inspection and maintenance

Tunnels An enclosed length of road of 150m Structural aspects of all tunnels (referor more to BD 53 for other criteria relevant to

tunnels, e.g. M&E requirements)

Other structures Other structures that are within the Structures providing service onlyfootprint of the highway, e.g. service/ crossings either above or below theutility crossings carriageway

Other structures not in above subgroup As agreed by the Overseeingas agreed with Overseeing Organisation Organisation

Third Party structures Any of the above categories but owned As agreed with the Overseeingby others, e.g. private owners or utility Organisationcompanies

Notes for Table 1:

1. Highway structures which are marginally outside these dimensions, especially those which are subject tohydraulic action, may be included within the scope of this Standard by agreement with the OverseeingOrganisation. Also see the Annexes for any specific requirements.

2. Greater than 1.5m in Scotland and Northern Ireland.

3. Signs/signal gantries and masts – structural aspects should include foundations, columns, beams, arms andany structural connections between these. Due consideration should also be given to any significantattachments and their connections when preparing records.

4. Records for access gantries should also comply with The Institution of Structural Engineers publication TheOperation and Maintenance of Bridge Access Gantries and Runways.

February 20072/2

Volume 3 Section 2Part 1 BD 62/07

Chapter 3Managing Records

3. MANAGING RECORDS

General

3.1 This Standard describes certain records requiredfor highway structures and the associatedresponsibilities for providing, maintaining, reviewingand updating these records.

3.2 The details of some records are described inother documentation, e.g. BDs and respective UserManuals/Guides for computerised Asset ManagementSystems. Where this is the case, the descriptions of therecords are not duplicated in this Standard, instead theappropriate cross reference is provided. Wheredescriptions of records are not provided elsewhere thena description is provided in this Standard.

3.3 Records can be held in different formats, but aretypically held as electronic or hard copy (also,electronic records can be held in different formats).This Standard only specifies formats in the Annexes,and in some cases refers to supporting documentationthat specifies the required format. In this way, if therequired format of the record changes, e.g. from hardcopy to electronic or a change in electronic format, thenthis will be reflected in an amendment to the relevantAnnex or supporting documentation.

Computerised Asset Management Systems

3.4 The Overseeing Organisations have computerisedAsset Management Systems for highway structures.These systems hold records, assist the creation andmaintenance of records, and support managementprocesses, e.g. inspection and maintenance planning.

3.5 These systems have associated User Manuals andHelp Files, which are periodically updated to provideadditional guidance to users and/or to reflect changesand improvements to the system. This Standard doesnot replicate the guidance provided in User Manuals/Help Files; instead this Standard refers to thesedocuments where necessary.

3.6 Designers, Contractors, Agents and otherrelevant parties must use the Asset ManagementSystem, and associated User Manuals and HelpFiles, specified by the Overseeing Organisation.Details of the systems are provided in the Annexes.

February 2007

3.7 Where this Standard refers to User Manuals/Help Files these must be taken to be the latestversions.

3.8 The latest versions of User Manuals/Help Filescan be obtained from the Overseeing Organisation.Contact details are provided in the Annexes.

Roles and Responsibilities

3.9 This Standard supports the creation and ongoingmaintenance, review and updating of records. The rolesand responsibilities for these activities are described, ingeneral, in Table 2; the specific roles in eachOverseeing Organisation may be described in theAnnexes.

Table 2 Responsibilities for Records

Activity Responsible Party

Creating a new structure Overseeing Organisationon an Asset ManagementSystem

Providing records for a Engineer, Designer,new structure OR works Contractor and/or Agenton, or modifications to,an existing structure

Providing, maintaining, Agent (some updating ofreviewing and updating records may requirerecords for existing authorisation from thestructures Overseeing Organisation)

Auditing records for new Overseeing Organisationand existing structures and where required, self-

audit by the Agent

3.10 Chapter 4 describes the records required forhighway structures while Chapter 5 summarises theserecords and distinguishes between those required fornew structures and those required for existingstructures.

3/1

Volume 3 Section 2Part 1 BD 62/07

Chapter 3Managing Records

Other Records

3.11 The records defined in this Standard areconsidered by the Overseeing Organisations to beconsistent with CDM Health and Safety Filerequirements and good asset management practice.However, it is recognised that Designers and Agentsmay require additional records to support theiractivities. Exclusion of such records from this Standarddoes not preclude Designers/Agents from holding them,but the Overseeing Organisations do not accept anyfinancial or other responsibilities for these recordsunless formally agreed between the Designer/Agent andthe Overseeing Organisation.

February 20073/2

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Y STRUCTURES

4. RECORDS FOR HIGHWA

General

4.1 This section describes certain records requiredfor the whole life management of highway structures.The records are described under the following genericheadings which are considered to represent theminimum requirements of the CDM Health and SafetyFile:

a. Inventory.

b. Drawings.

c. Design.

d. Construction and demolition.

e. Materials, components and treatments.

f. Certification and tests.

g. Operation.

h. Inspection.

i. Maintenance.

j. Structural assessment and load management.

k. Legal.

l. Environmental.

m. Supplementary records.

4.2 These records should be stored as required by theOverseeing Organisation, as such they may be storedelectronically, in hard copy, or some combination of thetwo, and may be stored in one location, or a number ofdifferent locations. In whatever format or location therecords are stored they should be easily accessible tothose who require them and be clearly marked asbelonging to a particular structure. For example, thefirst point of interaction with these records may be aone page/screen that presents the key information aboutthe structure (e.g. reference, name, location, dimensionsand pictures) and includes references/links to the moredetailed records held under the above headings.

February 2007

4.3 Designers must provide the OverseeingOrganisation with records, in accordance with thisStandard, for all new structures. Forreconstructions, modifications and majormaintenance, Designers must provide theinformation required to update these records.

4.4 Agents must maintain and update theserecords, in accordance with this Standard, forexisting structures.

4.5 It is desirable that the records described in thisStandard are held for all existing structures. For someexisting structures there may be gaps between therecords described in this Standard and those currentlyheld. Agents should seek to identify these gaps andclose them in a cost effective and efficient manner bycombining record reviews, data collection and recordcreation with ongoing management activities. Forexample, these activities may be combined withGeneral Inspections, Principal Inspections and/orroutine maintenance activities.

4.6 Any significant costs associated with closingthe gaps in records or updating records for existinghighway structures must be agreed with theOverseeing Organisation.

4.7 Designers, Contractors, Agents and otherrelevant parties must check the relevantOverseeing Organisation Annex for any additional/specific requirements and for details of howrecords are provided to the OverseeingOrganisation.

4.8 During the life of a structure some records willbe superseded, for example, following maintenance orassessment. In all instances superseded records shouldbe retained in order to provide a full history for thestructure as this may be beneficial to futuremanagement. Any superseded files should be clearlymarked as such, including any reference to the file.

4/1

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Inventory

4.9 Inventory records provide general information oneach structure, these typically include:

a. General inventory details – may include structurename, structure reference, location, constructionyear, Designer, Agent, dimensions, headroom,restrictions, high/heavy load route, road carried/obstacle crossed or obstacle carried/road crossed,and historic listing.

b. Structure type details – may include, for bridgesfor example, the number of spans andconstruction form. Table 1 presents the differentstructure types.

c. Structure summary – a summary of the keyfeatures of the structure, plus section drawingsand location plan.

4.10 The Agent must review, and amend orupdate as necessary, the inventory information as aminimum:

a. As part of the Principal Inspection.

b. As soon as they become aware of any errorsin the current information.

c. As soon as they become aware of anychanges to the structure.

Drawings

4.11 Drawings must include the following as aminimum:

a. Location plan – showing the location of thestructure on the network.

b. General Arrangement drawings – showingplan, elevation and cross–sectional details ofthe structure.

c. As-built drawings, these should includedetails of any:

• Built-in features.

• Any propriety components andprotection systems.

4ine

D

4H(b

4/2

• Service ducts and drainage systems.

• Reinforcement, post-tensioning, etc.and bar bending schedules.

• Demountable structures (e.g. gantries)including designated lifting positions,safe working loads, etc.

.12 Drawings should also provide additionalformation considered necessary for the safe and

ffective management and maintenance of a structure.

esign

4.13 The following design records must beprovided for new structures, modifications, majormaintenance, upgrades and reconstructions inaccordance with the Overseeing Organisation’srequirements:

a. Copies of the signed Approval in Principle(AIP) document and any further addenda asrequired by BD 2, or other structure reviewprocess documents specific to the contractrequirements, e.g. Technical AppraisalForms (TAF) for DBFO.

b. Copies of the signed design and checkcertificates.

c. Copies of the signed ConstructionCompliance Certificates.

d. Key correspondence and/or reports relatingto the design.

e. Any relevant design drawings not alreadycovered by paragraph 4.11.

f. Key design option choice as permitted in thedesign standard.

.14 BD 2 (DMRB 1.1.1) – Technical Approval ofighway Structures, provides more details on items (a),) and (c) above.

4.15 All records must contain the structurereference and the file references, date and versioncontrol number.

February 2007

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Construction and Demolition

4.16 For all new structures, modifications, majormaintenance, upgrades and reconstructions, theDesigner must provide details of:

a. The programme and methods of constructionwhere special techniques were necessary,e.g. dewatering or ground freezing,sequential post tensioning and bearingfixings.

b. Any construction methods/features that maynecessitate special techniques or precautionsif a structure has to be demolished orextensively modified, e.g. method ofdemolition, sequence of demolition to avoidprogressive collapse, jacking of thestructure, or when extensive modificationsare envisaged. Where appropriate, details ofthe special technique or precautions to betaken must be provided.

c. Any significant problems not anticipatedthat arose during construction (orreconstruction), the solutions adopted andthe repercussions on future inspection,maintenance (e.g. materials out ofspecification) and/or demolition. Whereappropriate these should be supplementedwith instrument readings, sketches,photographs and/or reports.

d. Any temporary works left in the structure orassociated earthworks.

e. Any monitoring carried out duringconstruction or required after completion ofthe works.

4.17 The Designer must also provide precisedetails of any major hazards with Health andSafety implications known at the time ofconstruction e.g. external stressing, strutting,hinging, arching etc., which may be important inplanning maintenance and demolition methods.

Materials, Components and Treatments

4.18 The section suggests records that should be heldfor materials, treatments and components. Thesuggested records are not exhaustive. Agents,

February 2007

Designers, and Contractors should also give dueconsideration to the Manual of Contract Documents forHighway Works (MCHW) Volumes 1 (Specification forHighway Works) and Volume 2 (Notes for Guidance onthe Specification of Highway Works) when determiningthe records to be held.

4.19 In all instances, where a product or materialis covered by the Control of Substances Hazardousto Health (COSHH) Regulations full details of theproduct or material specification must be given.

4.20 Annex E provides examples of InformationSheets that may be used to hold details of materials,treatments and components.

Materials

4.21 Records must be provided for all materialsused in the construction and maintenance ofhighway structures that could be of relevance tofuture inspection, maintenance, assessment,demolition and disposal. Records should include,as a minimum, details of the material, name andaddress of the supplier, name and address of anysub-contractors, and where appropriate, thematerial source and its location within thestructure. Examples of the materials for whichrecords must be provided include:

a. Concrete materials: cement; GroundGranulated Blastfurnace Slag (GGBS);Pulverised Fuel Ash (PFA); aggregates;ready mixed concrete; admixtures; mixproportions; reinforcing bars; prestressingwire; reinforcing fibres; strand or bar. Wherea number of concrete mixes are supplied,their destinations must be recorded withineach element, and histograms of concretecube test results for each structural element.

b. Steel materials: plate; rolled sections;prefabricated steelwork, etc. weatheringsteel, type of fixings and torque settings forbolts.

c. Other materials: aluminium, timber, FibreReinforced Plastics (FRP) and imported fill.

4/3

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Components

4.22 Components must include, but not berestricted to, expansion joints; drainage systems;bearings; parapets; waterproofing systems; precastunits; reinforced earth components; brick, precastor masonry facings; lighting systems; and movingbridge equipment.

4.23 Component records must be created for allof the above. The records must provide the detailsof the component (product data sheet), name andaddress of the manufacturer/supplier/sub-contractor, date of installation and, whereappropriate, any test results, the part number andmanufacturer’s drawing (also see drawings listedin paragraph 4.11).

4.24 Where appropriate, the manufacturer’srecommendations for inspection and maintenancemust be included along with relevant productliterature.

Surface and Protective Treatments

4.25 Surface and protective treatment recordsmust include, as a minimum, details of the product(product data sheet), name and address of themanufacturer/supplier and application contractor,the date of application, number of coats and lifeexpectancy before re-coating. The area of thestructure and/or components treated must beshown on the General Arrangement drawings.

4.26 Records must be provided for:

a. Paint – including a copy of the contractspecification and details of any site trials,for example, paint system sheets and paintdata sheets.

b. Concrete impregnation.

c. Concrete surface coatings.

d. Corrosion prevention system, e.g. inhibitors,sacrificial anodes, embedded parts, controlboxes etc.

C

4etw

4/4

ertification and Tests

4.27 Certificates and test records must beprovided for materials, components and treatments.These must include, where appropriate, but not berestricted to:

a. Compliance certificates, e.g. BS EN 1317for parapets. Compliance test certificatesmust be provided for mechanical, electricaland hydraulic equipment.

b. Load test results, e.g. on precast beams,piles, bearings etc.

c. Mill certificates.

d. Cement analyses.

e. Cube test results related to position on theGeneral Arrangement drawings.

f. Sulphate content in the mix.

g. Chloride content in the mix.

h. Alkali-aggregate reactivity/sodium oxideequivalent content in mix.

i. Analysis of fresh concrete, e.g. slump testand Concrete Fresh Analysis.

j. Air entrainment.

k. Silane tests.

l. Test results on fill adjacent to structure.

m. Ground investigation – Geotechnical ReportHighway Structure Summary InformationForm C required by BD 2.

n. Other relevant certificates, including, BritishBoard of Agrément (BBA) and HighwaysAuthorities Product Approval Scheme(HAPAS).

.28 Where relevant, the above list should bextended to cover all tests and certificates required byhe design/construction specification and deemedorthy of capture under CDM.

February 2007

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Operation

4.29 An operating manual and log book must beprovided where appropriate for mechanical orelectrical plant and equipment, for example,moveable bridges.

4.30 The manual must provide details of the day-to-day running of the equipment including whereappropriate, but not be restricted to, operatingprocedures (user instructions), energy managementand routine maintenance schedule (see paragraphs4.38 to 4.41).

4.31 The log book must record activitiesincluding where appropriate, but not restricted to,times and dates of operation and name/ID of staff,time and dates of routine maintenance and name/ID of staff.

Access

4.32 Records must provide details of anyparticular access arrangements. This must include,but not be restricted to, details/drawings of accessto the site (including walkways, ladders andmanholes), details of key holders or permits, anddetails of security to prevent unauthorised access.Details of procedures to obtain approval to enterincluding notice to landowners/interested partiesmust also be provided.

Inspection

New Structures, Reconstructions and Modifications

4.33 Acceptance Inspections must be carried outin accordance with BD 63 and the correspondingrecords provided, including details of any SpecialInspection and/or monitoring requirements.

4.34 Chapter 5 provides a checklist of the recordsrequired for new structures, reconstructions andmodifications. The Acceptance Inspection should beused to check that these records have been provided.

February 2007

Existing Structures

4.35 Inspection schedules and records must beprovided in accordance with BD 63 (DMRB 3.1.4)– Inspection of Highway Structures.

4.36 Condition information from previous inspectionsshould be retained as the change of condition over timegives an indication of the rate of deterioration and, insome cases, remaining service life. This informationcan be used to inform lifecycle maintenance planning.

Maintenance

4.37 Where appropriate, the aforementionedrecords (paragraphs 4.9 through 4.36) must bereviewed and updated following maintenancework.

Routine Maintenance Schedule

4.38 Routine maintenance comprises tasks, generallyundertaken on a 12 monthly basis, such as:

• removing graffiti;

• removing undesirable vegetation, e.g. that blocksdrainage, may cause structural damage orrestricts access;

• removing debris, bird droppings and otherdetritus that blocks drainage and promotescorrosion or other deterioration;

• clearing and ensuring correct operation of drainholes, drainage channels and drainage systems;

• repairing gap sealant to movement joints;

• checking operation of flap valves and greasingwhere required;

• checking and tightening where necessary anyloose nuts and bolts to expansion joints, parapetsupports and gantry holding down assemblies.Replacing nuts and bolts where appropriate;

• replacing expansion joint gaskets where this is aspecific requirement defined for the structure/component;

4/5

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

• removing general dirt and debris from bearings.Where appropriate, cleaning sliding and rollersurfaces if accessible and re-greasing. Followingany additional advice contained in the bearingmanufacturer’s instructions;

• ensuring free flow of water through culverts;

• ensuring correct operation of ancillary equipment(e.g. drainage pumps and associated sumps andpipework) and maintaining certification of liftingdevices;

• checking (and rectifying where necessary)seating of drainage gratings or covers, replacingany missing or defective items;

• checking, cleaning and replacing pedestriansecurity measures (e.g. mirrors, handrails, non-slip surfaces);

• checking for scour damage around trainingworks;

• checking holding down assemblies;

• repairing superficial defects in surface protectionsystems;

• ensuring special finishes are clean and perform tothe appropriate standards.

4.39 Whilst many of these tasks are fairly minor inthemselves, failure to carry them out may lead todeterioration of the structure and the need for morecostly repair operations in the future. The OverseeingOrganisations consider routine maintenance to be costeffective in whole life terms.

4.40 All structures, or groups of similar minorstructures, must have a routine maintenanceschedule consisting of cycle maintenanceactivities:

• New structures, reconstructions andmodifications – Designers must identifyand provide details of those items of routinemaintenance which are appropriate for newstructures, reconstructions andmodifications. The Agent must use thisinformation to prepare a schedule of routinemaintenance activities, prior to orimmediately following handover, which areappropriate for the structure/modification.

D

4c

4/6

This must include a review and, whereappropriate, update of the routinemaintenance schedule for the wholestructure in the case of modifications. Theschedule must be agreed with theOverseeing Organisation.

• Existing structures – if a routinemaintenance schedule does not exist for astructure, then the Agent must identify thoseitems of routine maintenance which areappropriate for the structure and prepare aschedule of activities. The schedule must beprepared during the next inspection. Theschedule must be agreed with theOverseeing Organisation.

4.41 Routine maintenance schedules must bemaintained by the Agent and updated, if necessary,in the light of new information and/or experiencegained from maintaining the structure.

esign Features Affecting Maintenance

4.42 During design, construction, re-constructionand modification (and their different phases),details of features which could have possibleimplications for future maintenance must beprovided.

4.43 Any special maintenance requirementswhich have been assumed in the conception,design and construction must be recordedincluding specific maintenance needs. Fullinformation on the actions required and thefrequency of these actions must be provided, e.g. aMethod Statement for maintenance work onstructural significant details with difficult access,life expectancy of components such as joints andbearings.

4.44 The Designer must provide details ondesign/construction issues and/or structurecharacteristics where these may influence futureassessment.

.45 These may include design live loading,onstruction sequence and construction joint positions.

February 2007

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

Ongoing Management of Existing structures

4.46 In general, maintenance records should be heldthat provide a full view of the maintenance cycle,including, but not restricted to:

a. List of maintenance needs – records shouldinclude details of the maintenance needs thathave been identified, e.g. action required,quantity of work, estimated cost of works, dateidentified and recommended action date. Recordsshould also indicate how the need was identifiede.g. inspection, assessment, lifecyclemaintenance plan.

b. Needs assessment – records should include thepriority/importance of doing the work. Recordsshould also describe how the needs are assessed,e.g. Risk and Value Management assessmentsand/or workshops.

c. Scheme/project development – records shouldprovide details of the schemes/projects that havebeen developed around the maintenance needs,e.g. combining maintenance needs to make betteruse of resources. Where relevant, this shouldinclude the AIP or equivalent documentation, seeparagraph 4.13. The records should provide aclear link between the maintenance needs and thesubsequent scheme/project.

d. Work tracking and completion – records shouldinclude details of progress (against agreedmilestones) and completion details, e.g.completion date, work acceptance and anyproblems encountered. Where appropriate,records should also be updated.

e. Lifecycle maintenance plan – where required bythe Overseeing Organisation an optimisedlifecycle maintenance plan, based on theexpected future (60 years) maintenance needs,should be provided for each structure. The planshould take account of how the structure behavesand deteriorates, the life expectancy of materials,treatments and components, the requiredcondition/performance, and optimised whole lifecosts. The assumptions and procedures used todevelop the plan should be recorded.

4.47 Maintenance records should be retained as thedetails on maintenance needs, intervention frequenciesand service lives can be used to inform maintenanceplanning.

February 2007

Structural Assessment and Load Management

4.48 Also refer to BD 21, BD 48, BD 60, BD 79 andBD 86 and other relevant guidance for information andrecords relating to structural assessment and loadmanagement. In general, these include the followinginformation, where appropriate, for each structure:

a. Date of last Structural Review and reason forreview.

b. Outcome of Structural Review.

c. Date of next scheduled Structural Review.

d. Date of last structural assessment and reason forassessment.

e. AIP (see paragraph 4.13) for original structure (ifthe record exists) or equivalent, modifications/major maintenance and assessments.

f. Code/standard/procedure used for assessment (orreason for exclusion from the assessmentprogramme).

g. Assessor and checker.

h. The vehicle (loading) requirements for thestructure, derived from the route requirements,e.g. 40 tonne, abnormal loading.

i. Critical assessment component.

j. Assessed capacity and/or live load capacityrating.

k. Structural Adequacy Factor (SAF), which is theratio of Assessment Resistance (RA*) to theAssessment Load effects (SA*), i.e. SAF = RA*/SA*.

l. Vehicle Ratings and Reserve Factors(see BD 86).

m. Assessment Inspection report.

n. Assessment report including details of theassessment assumptions and methodology.

o. Current loading restriction and interim measures.

4/7

Volume 3 Section 2Part 1 BD 62/07

Chapter 4Records for Highway Structures

p. Details of any interim measures currently inplace, e.g. physical restrictions, signs, propping,etc.

q. Information to support the recommended regimefor managing abnormal loads.

Legal

4.49 Records must be held of any contracts,licences, legal agreements etc. that influencemanagement of a structure. For example,agreements or easements with landowners, railwayauthorities, local authorities and statutoryundertakers.

Environmental

4.50 It is important that full account is taken ofenvironmental issues during the design, operation andmaintenance of highway structures. Relevantinformation should be held or cross referenced in thestructure records, for example, environmentalstatement, Environmental Impact Assessment (EIA) andSites of Special Scientific Interest (SSSI).

Supplementary Records

4.51 The records described by this Standard may notbe sufficient for effective management in allcircumstances. Where this is the case, supplementaryrecords should be compiled.

4.52 Agents must agree any additional costsassociated with supplementary records with theOverseeing Organisation prior to undertaking thework.

February 20074/8

Volume 3 Section 2Part 1 BD 62/07

February 2007

5. SUMMARY OF RECORDS

5.1 Table 3 summarises the records required forhighway structures, and distinguishes between thoserequired for new and existing structures. Theterminology used in Table 3 is:

a. Provide – original records that must be createdand provided.

b. Maintain – records that should be retained for thestructure and are likely to require regular/periodic reviewing, maintenance and updatingthroughout the structure’s life in order to reflectchanges. Superseded records should be retainedin order to provide a full history for the structurebut should be clearly marked as superseded.

c. Hold – records that should be retained for thestructure but are unlikely to require regular/periodic updating, but on occasion may requirereviewing and updating. Superseded recordsshould be retained in order to provide a fullhistory for the structure but should be clearlymarked as superseded.

d. N/A – not applicable.

5.2 Table 2 gives details of the parties that areresponsible for providing records for new structures andproviding and maintaining records for existingstructures.

Chapter 5Summary of Records

5/1

Volume 3 Section 2Part 1 BD 62/07

February 2007

Table 3 Summary of Records

1. Record 2. Includes 3. Ref 4. New 5. ExistingStructure Structure

Inventory General inventory details 4.9 Provide MaintainStructure type details 4.9 Provide MaintainStructure summary 4.9 Provide Maintain

Drawings Location Plan (and/or Strip Map) 4.11 Provide HoldGeneral Arrangement drawings 4.11 Provide HoldAs-built drawings 4.11 Provide Hold

Design Approval in Principle or equivalent 4.13 Provide HoldDesign and check certificates 4.13 Provide HoldConstruction compliance certificates 4.13 Provide HoldKey correspondence 4.13 Provide HoldDesign drawings 4.13 Provide HoldDesign option choice 4.13 Provide Hold

Construction and Special construction techniques 4.16 Provide HoldDemolition

Special demolition techniques 4.16 Provide HoldConstruction problems and repercussions 4.16 Provide Hold

Materials, Components Materials 4.21 Provide Maintainand Treatments

Components 4.22 Provide MaintainSurface and protective treatments 4.25 Provide Maintain

Certification and Tests 4.27 Provide HoldOperation Operation Manual 4.29 Provide Maintain

Log book 4.29 Provide MaintainAccess 4.32 Provide Maintain

Inspection Acceptance Inspection (see Note 1) 4.33 Provide HoldInspection schedule 4.35 N/A Provide/maintainInspection records 4.35 N/A Provide/Maintain

Maintenance Routine maintenance schedule 4.38 Provide Maintain(see Note 2)

Design features affecting maintenance 4.42 Provide MaintainMaintenance cycle 4.46 N/A Provide/maintainLifecycle maintenance plans 4.46 N/A Provide/maintain

Assessment and Assessments and review 4.48 N/A Provide/maintainLoad Management

Load Management 4.48 N/A Provide/maintainLegal 4.49 Provide MaintainEnvironmental 4.50 Provide MaintainSupplementary records 4.51 Provide Maintain

Notes for Table 3

1. BD 63 provides details of when an existing structure requires an Acceptance Inspection.

2. The party overseeing the maintenance or modification should update the necessary records.

5/2

Chapter 5Summary of Records

Volume 3 Section 2Part 1 BD 62/07

February 2007

Chapter 6References

6/1

6. REFERENCES

Design Manual for Roads and Bridges

BD 2 Technical Approval of Highway Structures(DMRB 1.1.1)

BD 21 The Assessment of Highway Bridges(DMRB 3.4.3)

BD 48 The Assessment and Strengthening ofHighway Bridge Supports (DMRB 3.4.7)

BD 53 Inspection and Records for Road Tunnels(DMRB 3.1.6)

BD 60 Design of Highway Bridges for VehicleCollision Loads (DMRB 1.3.5)

BD 63 Inspection of Highway Structures(DMRB 3.1.4)

BD 79 The Management of Sub-standardHighway Structures (DMRB 3.4.18)

BD 86 The Assessment of Highway Bridges andStructures for the Effects of Special TypesGeneral Order (STGO) and Special Order(SO) Vehicles (DMRB 3.4.19)

HD 34 Implementation and Use of the StandardsImprovement System (DMRB 5.3.1)

MCHW

SD 11 Construction (Design and Management)Regulations 1994: Requirements forHealth and Safety File (MCHW 6.1.2)

Other Publications

Control of Substances Hazardous to Health (COSHH)Regulations 2002

Construction (Design and Management) Regulations1994: The Health and Safety File

Volume 3 Section 2Part 1 BD 62/07

February 2007 7/1

7. ENQUIRIES

All technical enquiries or comments on this Standard should be sent in writing as appropriate to:

Chief Highway EngineerThe Highways Agency123 Buckingham Palace RoadLondon G CLARKESW1W 9HA Chief Highway Engineer

Chief Road EngineerTransport ScotlandTrunk Roads and Professional Services8th Floor, Buchanan House58 Port Dundas RoadGlasgow J HOWISONG4 0HF Chief Road Engineer

Chief Highway EngineerTransport WalesWelsh Assembly GovernmentCathays Parks M J A PARKERCardiff Chief Highway EngineerCF10 3NQ Transport Wales

Director of Engineering (Acting)The Department for Regional DevelopmentRoads ServiceClarence Court10-18 Adelaide Street R J M CAIRNSBelfast BT2 8GB Director of Engineering (Acting)

Chapter 7Enquiries

Volume 3 Section 2Part 1 BD 62/07

IREMENTS: ENGLAND

Annex ASpecial Requirements: England

General

A.1 Compliance with this Annex is deemed bythe Highways Agency to represent compliancewith the requirements of BD 62/07. Therequirements of this Annex supersede those inIAN 38/02, IAN 45/02, IAN 62/05 and IAN 67/05,which are withdrawn.

A.2 Requirements for Agents are set out in theHighways Agency’s Network Management Manual(NMM) Part 2, under “Records and Inspection ofHighway Structures”. Agents must comply with theNMM in the provision of records and inspections.

A.3 Records for new build, modifications andrenewals works to trunk road highway structures inEngland must be supplied by the organisationresponsible for the design of the works (theDesigner), in accordance with the requirements ofthis Annex and taking account of SMIS onlineUser Guidance. Such information supplied inaccordance with this Standard is regarded as partof the Health & Safety (H&S) File required bySD 11/05 (MCHW 6.1.2) and the Designer mustensure that the H&S File is cross referenced asnecessary to SMIS as the prime source of suchinformation.

ANNEX A SPECIAL REQU

February 2007

A.4 The review and acceptance from theDesigner of SMIS data for new build,modifications and renewal works, together with theupkeep of SMIS Structure Files and operationalrecords, is the responsibility of the Agent having/taking responsibility for maintenance of thestructure, who must ensure SMIS is populatedcorrectly.

A.5 The Designer must provide appropriateinformation within the relevant timescales set outin this Annex.

Scope

A.6 The scope of highway structures for whichrecords must be supplied is shown in Table 4.

A/1

Volume 3 Section 2Part 1 BD 62/07

Annex ASpecial Requirements: England

Table 4 Scope of highway structures covered by BD 62

Structure Type (HA owned) (1) SMIS Structure Type Structures for which records are required

Bridge, buried structure, subway Bridge and Large Bridges and buried structures, includingunderpass, culvert and any other similar Culvert pedestrian subways or accommodationstructure underpasses, and culverts, of single span 3m or

greater

Multicell culverts of cumulative span 5m orgreater

Bridges of span less than 3.0m but greater than1.8m (2)

Small Span Structure Bridges of span less than 3.0m but greater than1.8m (2)

All culverts and buried structures of span lessthan 3m but greater than 1.8m

Bridges and buried structures between 0.9m and1.8m

Corrugated metal culverts of span 0.9m orgreater

Earth retaining structure Retaining Wall (3)

Reinforced/strengthened soil/fill structure Retaining Wall (3)with hard facings

Sign and/or signal gantry (cantilever and Sign/Signal Gantry (3)portal)

Mast Cantilever mast for traffic signal Sign/Signal Gantry (3)

High mast for lighting Mast, or Mast Scheme (3)

Mast for camera, radio, speed Mast (3)camera and telecommunicationtransmission equipment

Catenary lighting support systems Mast Scheme (3)

Highway signs and posts Not required on SMIS Not applicable to SMIS

Access gantry As a component ofBridge and LargeCulvert

Tunnels Tunnel (3)

Other structures Service Crossings and Structures providing service only crossingsOther Structures either above or below the carriageway

Service Crossings and Others not in this table but needing structuralOther Structures technical approval

Notes for Table 4:

1. For requirements for Designers involvement in third party owned highway structures see A12. For Agentsinvolvement in third party structures see NMM 2.12.

2. Bridges 1.8m to 3.0m may be classed as either “Bridge and Large Culvert” or “Small Span Structure”,depending on information need. See flow chart in SMIS User Guidance Volume 2, or contact SMISAdministrator.

3. Scope as detailed in BD 62/07 Table 1.

February 2007A/2

Volume 3 Section 2Part 1 BD 62/07

Annex ASpecial Requirements: England

Type of Records to be Supplied

A.7 The types of structure information to be suppliedin accordance with paragraphs A.3 and A.4 aredescribed in Chapter 4 of this Standard and aremaintained within the relevant branch of the SMIShierarchy by the Agent as detailed in the table in SMISUser Guidance Volume 1 under “BD 62 requirements”.Information is initially supplied by the Designer as acombination of uploaded document files, and datakeyed into relevant on-screen data fields.

A.8 The Designer must provide the StructureFile records, in accordance with User GuidanceVolume 2 “Electronic Submission ofDocumentation”, in electronic record format, andwhere available also in native format. Supply innative format only is not acceptable. The SMISAdministrator can be contacted for advice.

A.9 The Designer must provide all requiredkeyed-in data for the structure directly into SMISby applying to the SMIS Administrator for onlineaccess, and working with the Agent taking/havingresponsibility for maintenance of the structure. TheSMIS “Guide for Structure Designers” is availablein the Manuals section of SMIS, or from the SMISadministrator.

A.10 The Designer must liaise with the Agent toestablish an acceptable referencing system for thestructure for SMIS inventory purposes.

A.11 Where bridge and culvert structures aremodified to cater for road widening, the newconstruction must be supplied and input as part ofthe existing structure.

Timescales for records input to SMIS

A.12 For new build, modifications and renewals,Designers must submit the required inventorydetails and Structure File records to the relevantparty within the timescales stated below:

• An Early Notification spreadsheet for eachnew structure, at the time of submission ofthe Approval In Principle form for thestructure, sent to relevant Highways AgencyTechnical Approval contact.

SM

ASsust

C

Asm

Acw

February 2007

• The structure inventory data, at least onemonth before the planned Pre OpeningInspection, POI (refer to BD 63), directlyinto SMIS.

• Structure File documents for the completedworks, no later than three months from theopening (or re-opening) of the structure totraffic, directly into SMIS or to the SMISAdministrator.

upply of Structure Records for Structures not to beaintained by the Agent

A.13 Where a new structure has been constructedunder an HA contract, but ownership is to betransferred to a third party, data and documentationmust be supplied by the Designer as if the structurewas to be maintained by the Agent.

A.14 The HA officer responsible for the transfermust arrange for the issue to the new Owner of anySMIS records, in particular as required byConstruction (Design and Management)Regulations.

.15 On request, the SMIS Administrator can supply atructure Report to the responsible HA officer as ammary record of the SMIS inventory for theructure.

A.16 The HA officer must notify the SMISAdministrator of the date of the change ofownership of the structure not later than one weekafter the transfer.

ontacts

.17 The SMIS Administrator can be contacted [email protected]

.18 Contact details for the relevant local HSE officean be obtained from the HSE website http://ww.hse.gov.uk

A/3

Volume 3 Section 2Part 1 BD 62/07

EMENTS: SCOTLAND

Annex BSpecial Requirements: Scotland

ANNEX B SPECIAL REQUIR

General

B.1 As Built Records are a necessary requirement forthe successful inspection and maintenance of roadstructures throughout their lives and the Engineer foreach trunk road scheme should ensure that the As BuiltRecords are carefully completed. The provision ofadequate records of the works may make futureinvestigations into their construction unnecessary.These records of the works should be prepared by sitestaff during the course of construction.

B.2 A set of As Built Records for each trunkroad structure, as defined in this Annex, must besubmitted to the Overseeing Organisation at theaddress below, prior to the issue of the SubstantialCompletion Certificate. The As Built Records ofany subsequent changes must be submittedfollowing acceptance of the work.

Bridges SectionTrunk Road Network Management DivisionTransport ScotlandBuchanan House58 Port Dundas RoadGlasgow, G4 0HF

Tel: 0141 272 7100e-mail: www.transportscotland.gov.uk

B.3 Bridges Section will record As Built Recordsreceived in the trunk road bridges database and willissue copies to the appropriate Agent for retention bytheir bridges maintenance personnel. Where the Agentis responsible for the submission of the As BuiltRecords then only one set should be submitted to theOverseeing Organisation together with confirmationthat the other set is being retained by the Agent on thebridge record file.

Definition

B.4 Engineer – the person responsible for thesupervision of the works.

Sc

A

February 2007

ope

B.5 This Standard and this Annex apply to thestructures described in Table 1.

s-Built Records

B.6 As Built Records for each highway structuremust consist of the following:

a. Two full sets of As Built Drawings on goodquality A2 size paper (each marked “AsBuilt Drawing” in red). These should beaccompanied by a list of all drawingssubmitted.

b. Two Compact Disc (or other agreedelectronic transfer device) containing copiesof all As Built Drawings relating toindividual structures, drawings to be in pdfor other agreed format e.g. tif. The structurename and reference number should berecorded on each Compact Disc togetherwith the Drawing Numbers and Titles.

c. Two paper and two electronic (stored oncompact discs or other agreed alternative)copies of the Structure Manual (for eachstructure or group of minor structures). TheManual should be suitably indexed for easeof use.

d. Two Colour Prints of Photograph(s)(Completed Structure) – not less than150mm x 100mm. The photographs shouldalso be submitted electronically on theCompact Discs.

e. One set of database input sheets As Built forthe trunk road bridges database (please referto the Trunk Road Bridges Database AsBuilt Records Guide).

f. Each set of As Built Drawings must includea General Arrangement drawing showing theextent of concrete impregnation carried outand marked up with the followinginformation:

B/1

Volume 3 Section 2Part 1 BD 62/07

Annex BSpecial Requirements: Scotland

i. Date of impregnation.

ii. Type of product (includingspecification).

iii. Manufacturer.

iv. Application contractor.

Structure Manual

B.7 For each structure or for a group of minorstructures of similar design (e.g. culverts, signgantries), the Designer must prepare an individualManual of information from the design andconstruction phases which could have possibleimplications for future maintenance. This will becomplementary to the As Built drawings.

B.8 The contents of this manual must complywith the requirements set down in Chapter 4 of thisStandard. The forms to use for materials andcomponents, and examples of the information to beincluded, are provided in Annex E.

February 2007B/2

Volume 3 Section 2Part 1 BD 62/07

REMENTS: WALES

Annex CSpecial Requirements: Wales

ANNEX C SPECIAL REQUI

General

C.1 As Built Records are a necessary requirement forthe successful inspection and maintenance of roadstructures throughout their lives and the Engineer foreach trunk road scheme should ensure that the As BuiltRecords are carefully completed. The provision ofadequate records of the works may make futureinvestigations into their construction unnecessary.These records of the works should be prepared by sitestaff during the course of construction.

C.2 A set of As Built Records for trunk roadstructures, as defined in this Annex, must besubmitted to the Overseeing Organisation at theaddress below, within three months from the dateof issue of the Substantial Completion Certificate.

Chief Bridge EngineerTransport WalesWelsh Assembly GovernmentCathays ParkCardiff, CF10 3NQ

C.3 Transport Wales will record As-Built Recordsreceived in the trunk road bridges database and willissue copies to the appropriate Agent for retention bytheir bridges maintenance personnel. Where the Agentis responsible for the submission of the As BuiltRecords then only one set should be submitted to theOverseeing Organisation together with confirmationthat the other set is being retained by the Agent on thebridge record file.

C.4 Transport Wales maintain an Advice Note:Transport Wales Supplement to BD 62/07 andBD 63/07 that compliments this Standard. Agents,Designers, Contractors must follow therequirements set down in this Advice Note andcheck they are working to the latest version of theAdvice Note. These requirements are in addition tothose contained in the main body (Chapters 1 to 5)of this Standard and this annex.

S

A

Cm

February 2007

cope

C.5 This Standard and this Annex apply to thestructures described in Table 1.

s-Built Records

.6 As Built Records for each highway structureust consist of the following:

a. Two full sets of As Built Drawings on goodquality A1 size paper (each marked “AsBuilt Drawing” in red). These should beaccompanied by a list of all drawingssubmitted.

b. Two Compact Disc (or other agreedelectronic transfer device) copies of all AsBuilt Drawings relating to individualstructures, drawings to be in .pdf format.The structure name and structure referencenumber should be recorded on eachCompact Disc. Each Compact Disc musthave a searchable electronic index ofDrawing Numbers and Titles.

c. Two paper and two electronic copies of theStructural Manual (for each structure orgroup of minor structures). The electroniccopies are to be on Compact Disc and be in.pdf format. The structure name andstructure reference number should berecorded on each Compact Disc. EachCompact Disc must have a searchableelectronic index of contents.

d. Two Prints of Photograph(s) (CompletedStructure.) Colour Prints – not less than150mm x 100mm. The photographs mustalso be submitted electronically on CompactDisc in .jpg format. The structure name andstructure reference number should berecorded on each Compact Disc. EachCompact Disc must have a searchableelectronic index of contents.

C/1

Volume 3 Section 2Part 1 BD 62/07

Annex CSpecial Requirements: Wales

e. One set of Trunk Road Bridge DatabaseSheets for the trunk road bridges databasesystem (refer to the Advice Note).

f. Two paper copies of Form ROADS 277(refer to the Advice Note).

g. Two copies of General Arrangementdrawings, showing the extent of silaneimpregnation carried out and marked upwith the following information:

i. Date of impregnation.

ii. Type of product (includingspecification).

iii. Manufacturer.

iv. Application contractor.

Structure Manual

C.7 For each structure or for a group of minorstructures of similar design (e.g. culverts, signgantries), the Designer must prepare an individualManual of information from the design andconstruction phases which could have possibleimplications for future maintenance. This will becomplementary to the As Built drawings.

C.8 The contents of this manual must complywith the requirements set down in Chapter 4 of thisStandard. The forms to use for materials andcomponents, and examples of the information to beincluded, are provided in Annex E.

February 2007C/2

Volume 3 Section 2Part 1 BD 62/07

EMENTS: NORTHERN

Annex DSpecial Requirements: Northern Ireland

ANNEX D SPECIAL REQUIRIRELAND

General

D.1 In Northern Ireland MCHW documentSD 11 is not applicable. The OverseeingOrganisation applies the principles of the CDMApproved Code of Practice. The Designer mustdetermine which, if any, of the records listed inparagraph 4.1 need to be put into or be referencedin the H&S File.

D.2 A set of As Built Records for roadstructures, as defined in this Annex, must besubmitted to the appropriate Roads ServiceDivisional Office within six months from the dateof issue of the Maintenance Certificate:

D.3 Structures Section within the appropriate RoadsService Divisional Office will record As Built Recordsreceived in the Roads Service Bridge ManagementSystem (RSBMS) and will issue copies to theappropriate Agent for retention by their bridgesmaintenance personnel.

Scope

D.4 This Standard and this Annex apply to thestructures described in Table 1 and anyamplification to this table, specific to NorthernIreland, contained in BD 2.

As-Built Records

D.5 As Built Records for each highway structuremust consist of the following:

a. Two full sets of A2 size As Built Drawingson good quality paper (each marked “AsBuilt Drawing” in red). These should beaccompanied by a list of all drawingssubmitted.

S

February 2007

b. Two Compact Disc copies of all drawingsrelating to individual structures, drawings tobe AutoCad and saved in *.dwg format. Thestructure name and structure referencenumber should be recorded on eachCompact Disc together with the DrawingNos.

c. Two paper copies and an electronic copy(stored on Compact Disc) of the StructuralManual (for each structure or group ofminor structures).

d. Two Prints of Photograph(s) (CompletedStructure) plus electronic copy stored onCompact Disc. Colour Prints – not less than150mm x 100mm.

e. One set of database input sheets As-Built forthe Roads Service Bridge ManagementSystem (RSBMS), the latest versions ofthese sheets can be obtained from theOverseeing Organisation.

f. Two copies of GA drawings, showing theextent of silane impregnation carried out andmarked up with the following information:

i. Date of impregnation.

ii. Type of product (includingspecification).

iii. Manufacturer.

iv. Application contractor.

tructure Manual

D.6 For each structure or for a group of minorstructures of similar design (e.g. culverts, signgantries), the Designer must prepare an individualStructure Manual of information from the designand construction phases which could have possibleimplications for future maintenance. This will becomplementary to the As-Built drawings.

D/1

Volume 3 Section 2Part 1 BD 62/07

Annex DSpecial Requirements: Northern Ireland

D.7 The contents of this manual must complywith the requirements set down in Chapter 4 of thisStandard. The forms to use for materials andcomponents, and examples of the information to beincluded, are provided in Annex E.

February 2007D/2

Volume 3 Section 2Part 1 BD 62/07

n

ss,

,

Annex EExamples

ANNEX E EXAMPLES

General

E.1 This Annex provides examples of forms that mbe used to record information that will assist theongoing management of a structure. The examplesprovided are:

• Example 1: Materials Information Sheet – maybe used for materials such as concrete (insitu orprecast), cement for concrete, coarse and fineaggregates for concrete, reinforcement, granulabackfill, etc.

• Example 2: Components and Products: JointsInformation Sheet – where each row on the sheshould relate to a joint in a specific position onthe bridge, for example, Deck/North AbutmentJoint, Deck Joint over pier etc.

• Example 3: Components and Products: ParapetInformation Sheet – may be used to providedetails of each parapet type.

• Example 4: Components and Products: BridgeBearings Information Sheet – where each row othe sheet may relate to a specific bearing type.

• Example 5: Components and Products:Waterproofing Information Sheet.

• Example 6: Components and Products:Miscellaneous Information Sheet – may be usedto record information about components such aprestressed concrete beams, gratings and frameetc.

• Example 7: Protection of Steelwork: ContractSpecification 1900 – may be used to providedetails of:

– Environment – the exposure conditions,e.g. road salts and grit.

– Required Durability of System – theexpected timing and type of maintenancee.g. minor and major after x1 and x2 yearsrespectively.

– Paint System – the specification forpreparation, coating, thickness etc.

February 2007

ay

r

et

s

– Special Considerations – any specialconsiderations for this paint system, areaof application etc.

– Variations and Minimum Requirements –any permitted variations and minimumrequirements or tolerances.

– Fixings – treatment of any fixings, e.g.bolts and nuts.

– Other – other information relevant to thispaint system.

• Example 8: Notes for Inspection andMaintenance – example text is provided.

E.2 These examples are provided as guidance andAgents may wish to tailor them to reflect their specificmanagement needs.

E/1

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 1: Materials Information Sheet

MATERIALS INFORMATION SHEET

Scheme name

Sructure name(s)

Structure ref no(s)

Main Contractor

Material Supplier’s Name Source Name Element and/or(enter all materials used) and Address and Address location on

structure

February 2007E/2

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 2: Components and Products – Joints Information Sheet

JOINTS INFORMATION SHEET

Scheme name

Structure name(s)

Structure ref no(s)

1. Relevant Drawing No’s Manufacturer’s NameJoint Location Joint Type and Address

2. Contract Reference No

1.

2.

1.

2.

1.

2.

1.

2.

1.

2.

1.

2.

February 2007 E/3

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 3: Components and Products – Parapets Information Sheet

PARAPETS INFORMATION SHEET

Scheme name

Structure name(s)

Structure ref no(s)

Fabricator and Erector’s 1. Relevant Drawing No’s Manufacturer’s NameParapet Type Name and Address and Address

2. Contract Reference No

1.

2.

1.

2.

1.

2.

1.

2.

1.

2.

February 2007E/4

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 4: Components and Products – Bridge Bearings Information Sheet

BRIDGE BEARINGS INFORMATION SHEET

Scheme name

Structure name(s)

Structure ref no(s)

1. Relevant Drawing No’s Manufacturer’s Manufacturer’s NameBearing Types Reference Number and Address

2. Contract Reference No

1.

2.

1.

2.

1.

2.

1.

2.

1.

2.

February 2007 E/5

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 5: Components and Products – Waterproofing Information Sheet

WATERPROOFING INFORMATION SHEET

Scheme name

Structure name(s)

Structure ref no(s)

Component/Product/Material Manufacturer/Supplier/Source(enter all components/ Installer Name and Address Name and Address

products/materials used)

February 2007E/6

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 6: Components and Products – Miscellaneous Information Sheet

MISCELLANEOUS INFORMATION SHEET

Scheme name

Structure name(s)

Structure ref no(s)

Component/Product/Material Manufacturer/Supplier/Source Relevant Location on(enter all components/ Name and Address Drawing No’s Structure

products/materials used)

February 2007 E/7

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 7: Protection of Steelwork – Contract Specification 1900

INFORMATION SHEET: PROTECTION OF STEELWORK AGAINST CORROSION

Scheme name

Structure name(s)

Structure ref no(s)

Standard Ref

1. Environment

2. Required durabilityof systems

3. Paint System

4. Special considerations

5. Variations andminimum requirements

6. Fixings

7.

8.

February 2007E/8

Volume 3 Section 2Part 1 BD 62/07

Annex EExamples

Example 8: Notes for Inspection and Maintenance

INFORMATION SHEET: NOTES FOR INSPECTION AND MAINTENANCE

Structure name(s)

Structure ref no(s)

Central Pier Base Excavation to founding level revealed some small fissures in the underlying sandstone.These were cleaned out, inspected and grouted up prior to construction of the baseslab. Further details are given in the report, sketch and correspondence following thesenotes.

Drainage Bearing shelf drainage at abutments and centre pier should be inspected and cleared asnecessary. The outlet pipes should be inspected and rodded. Gullies at base ofabutments should be inspected and cleared as necessary. The rear face drainage layeroutfalls by underground pipe to manholes. These outlets should be inspected to ensurethey are functioning correctly. Any significant accumulations of silt and debris on thebearing shelf or in the drainage system should be noted and investigated.

Waterproofing The bridge deck east service bay has a waterproof membrane of mastic asphalt. Thewest service bay invert is waterproofed with Conidec. Any defects in the decksurfacing should be investigated to assess possible damage to the waterproofing. Theservice bay cover slabs are covered by Bituthene and Bitushield. Deck waterproofingmust remain intact for the reinforcement in the deck slab to be protected as required.

Joints Sealants to expansion and movement joints should be checked for deterioration. Theepoxy mortar transition strips should be checked for debonding or cracking. Holdingdown bolts to cover plates should be checked for tightness.

Bearings Guides and dowels and rubber pot bearings should be inspected to ensure they arefunctioning correctly and to note any failure or excessive wear of moving elements.Metal sections of bearings, guides and dowels should be checked for corrosion andpainted as necessary. Rubber bearings should be inspected to ensure that the rubberprotection to the steel laminations has not cracked or debonded. The condition of thebearing seating material should also be checked. Holding-down bolts should bechecked for tightness and any welds checked for cracking.

Alkali-Aggregate During the construction contract period the Overseeing Organisation issued additionalReactivity substitute specification clauses to cover potential alkali-aggregate problems. The Test

House (give name) carried out an assessment of the aggregates and concrete withparticular reference to concrete mix details and cement contents. Calculations using thefigures given in the Test House (give name) report with information from cementprovided (give name) gave total alkali contents for the Class 45/20 concrete marginallyabove the 3.0 kg/m3 maximum recommended. Cement with a lower alkali content wasused for the parapet edge beams. For the other mixes calculations gave total alkalicontents less than 3.0 kg/m3. Further details are included in the appendix on Alkali-Aggregate Reactivity.

Services and service The services carried on the deck are indicated on the drawings. Particular attentionbays should be paid to the pipe bays to ensure they are properly drained and that services

are not leaking. It should be noted that the pipe bays are not designed to carry backfill.Vent pipes with flame traps lead from each service bay, to prevent pressure build up inthe event of a mains failure.

Etc.

February 2007 E/9