dnapl remediation at camp lejeune using zvi …infohouse.p2ric.org/ref/41/40601.pdf · dnapl...

33
DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M HILL Bob Lowder, MCB Camp Lejeune EMD Daniel Hood, NAVFAC Mid-Atlantic Tom Sale, Colorado State University Tom Simpkin, Ph.D., P.E., CH2M HILL

Upload: hoangduong

Post on 11-Sep-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing

Christopher Bozzini, P.E., CH2M HILL Bob Lowder, MCB Camp Lejeune EMDDaniel Hood, NAVFAC Mid-AtlanticTom Sale, Colorado State UniversityTom Simpkin, Ph.D., P.E., CH2M HILL

Page 2: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Presentation Outline

Background discussionTechnology descriptionImplementationResultsSummary

Page 3: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Camp Lejeune Background

• Camp Lejeune was established near the city of Jacksonville, N.C, in 1941.

• Base covers 236 square miles• 44,000 Active Duty Military• Maintains over 50 Live-Fire Ranges • NPL site since 1989• Signed FFA in 1991

Page 4: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Camp Lejeune Background

• Environmental Restoration Sites • 43 Installation Restoration (IR) Sites, 22 Operable Units (OUs); 15 Active Sites• 159 Solid Waste Management Unit (SWMU) Sites; 28 Active Sites• 221 Underground Storage Tank (UST) Sites; 32 Active Sites• 25 Military Munitions Response Program (MMRP) Sites

IR Site 82 Pump & Treat MMRP Site

Page 5: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

IR Site 88 Location and History

Building 25 used as dry cleaner since 1940’sOperations ceased in 2004 and building demolished to slabLocated in congested portion of baseSource was solvent poured down floor drains plus tanks located behind building

Bld. 25

Page 6: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

IR Site 88, Former Dry Cleaners

Source - Chlorinated SolventsSource Area Less Than ¼ acreDissolved Plume Approx. 20 AcresPlume Heading Toward River

Page 7: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Historic Investigations/Actions

1997: Phase I/II Focused Remedial Investigation1999: Surfactant Enhanced Aquifer Remediation (SEAR) 2002 – 2003: Supplemental Site Investigation

– Summary of 6 years of RI and Pilot Study2004: Membrane Interface Probe Investigation

– Delineation of DNAPL area1998 – 2004: DNAPL removal using vacuum truck with extraction wells

Page 8: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Site Conditions

• Tetrachloroethene (PCE) primary contaminant • Observable DNAPL Present• Highest groundwater concentrations in non-

DNAPL areas: PCE = 64,000 µg/L TCE = 37,000 µg/LcDCE = 84,000 µg/L VC = 45,000 µg/L

• Source area delineated with MIPSource Area is 10,000 ft2 and 20 ft deep (7,000 yd3)Estimate of 2,100 gallons of PCE (14 tons) present

• Site has silty-clay layer 20 ft bgs

Page 9: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Horizontal Source Zone View

results of MIP investigation

Approximately 10,000 ft2

Page 10: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Vertical Source Zone View

results of MIP investigation

Page 11: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Soil Mixing with Clay-ZVI Addition

• In-Situ Technology using large auger system equipped with nozzles to inject zero valent iron and clay mixture into the soil while mixing the soil

• Pros• relatively fast treatment (< 2 months in field)• robust, able to treat entire area (no dead zones)• reduces treated area permeability

• Cons• Safety due to large equipment• messy• utility removal/relocation• required excavation to account for volume expansion

Page 12: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Conceptual Model of Mixing

Patented technology held by Colorado State University

Page 13: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Column Layout

red – 2,500 lb ZVI

blue – 2,250 lb ZVI

SEAR Test AreaDNAPL Observed

146 total columns2% ZVI (200 tons)

1% bentonite (100 tons)

Page 14: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Project Timeline

Preparation (August 2004 – January 2005)– bench-scale study– utility removal

Mixing (February 2005)– 17 days to mix 7,000 yd3 of soil

Restoration (May – September 2005)– stabilization– parking lot

Monitoring (February 2005 – February 2006)– soil and groundwater monitoring

Page 15: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Building 25 Before Work

Page 16: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Soil Mixing Auger (10 ft diameter)

Page 17: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Soil Mixing

Page 18: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Soil Mixing

Page 19: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Collecting QC Samples

Page 20: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Stabilization

Soil Core of Mixed Material

Page 21: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Parking Lot

Page 22: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Before and After

Page 23: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Overall Treatment AreaWeighted Average Soil Concentrations(78% outside SEAR area, 22% SEAR area)

0

200

400

600

800

1000

1200

Feb-05 May-05 Aug-05 Nov-05 Feb-06

Con

cent

rati

on (

mg/

kg)

TCE PCE

91% Reduction

Page 24: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Overall Treatment Area Average Soil Concentrations

0

200

400

600

800

1,000

1,200

Feb-05 May-05 Aug-05 Nov-05 Feb-06

Con

cent

rati

on (

mg/

kg)

TCE PCE

82% Reduction

Page 25: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Outside SEAR Area Average Soil Concentrations

0

200

400

600

800

1,000

1,200

Feb-05 May-05 Aug-05 Nov-05 Feb-06

Co

nc

en

tra

tio

n (

mg

/kg

)

TCE PCE

>99% Reduction

Page 26: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

SEAR Area Average Soil Concentrations

0

200

400

600

800

1,000

1,200

1,400

Feb-05 May-05 Aug-05 Nov-05 Feb-06

Con

cent

rati

on (

mg/

kg)

TCE PCE

61% Reduction

Page 27: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

PCE Soil Vapor Results (mg/m3)

0

1

10

100

1,000

10,000

Col. 28 Col. 70 Col. 127

Pretreatment Post-Treatment

>99 % Removal

95 % Removal 83 % Removal

Page 28: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

MW-30 – Treatment Area (μg/L)

Nov. 2005 Feb. 2006 Aug. 2006

PCE 200 U 200 U 13 U

TCE 200 U 200 U 13 U

cDCE 1,500 1,600 520 B

Vinyl Chloride

69 J 92 J 42

Acetone 460 110 J 410 B

Page 29: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

MW-31 – Treatment Area (μg/L)

Aug. 2005 Nov. 2005 Feb. 2006 Aug. 2006

PCE 160,000

6,500 J

27,000

17,000 U

7,300 J

120,000 15,000 J 12,000

TCE 19,000 50,000 U 3,800 J

cDCE 140,000 390,000 230,000

Vinyl Chloride

10,000 U 50,000 U 1,800 J

Acetone 5,000 J 24,000 J 27,000 J

Page 30: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

MW-31 (treatment area)

050

100150200250300350400450

Aug-05 Nov-05 Feb-06 May-06 Aug-06

Con

cent

ratio

n (m

g/L)

cDCE PCE TCE

PCE reduction = 93%

Page 31: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

MW-27 (Downgradient)

0

5

10

15

20

25

30

35

Jan-05 Apr-05 Jul-05 Oct-05 Jan-06

Con

cent

rati

on (

mg/

L)

cDCE PCE TCE

PCE non-detect since June 2005, half detection limit plotted

PCE reduction = >90%

Page 32: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Summary

• Seeing excellent contaminant reduction across site (>90%)

• The remnants of the SEAR test may be interfering with the ZVI.• Elevated concentrations are isolated (about 25 ft apart)• These areas should continue to degrade• Bentonite will significantly reduce contaminant mobility

• ZVI still present in treatment area (0.8 and 1.3%) after 9 months

• Hydraulic conductivity reduced by 400 times

Page 33: DNAPL Remediation at Camp Lejeune Using ZVI …infohouse.p2ric.org/ref/41/40601.pdf · DNAPL Remediation at Camp Lejeune Using ZVI-Clay Soil Mixing Christopher Bozzini, P.E., CH2M

Summary

• New 38,000 ft2parking lot with 65 spaces

• Total project cost = $1.96 Million

• Only about 60% of the project cost was for treatment, rest was for restoration and infrastructure

9%

7%

9%

26%

49%

Mgmt, ReportDesign & Treat StudySite PrepMixing, MonitoringRestoration

Cost Breakdown