![Page 1: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/1.jpg)
DND YARROWS SHIPYARD REMEDIATION
CHALLENGES IN BARRIER WALL CONSTRUCTION AND SITE REMEDIATION
ON ESQUIMALT HARBOUR
CFB EsquimaltVictoria, British Columbia
![Page 2: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/2.jpg)
PROJECT SCOPE• Construction of three laydown areas for site
material.• Construction of a barrier wall around the
perimeter of the site• Remediation of contaminated fill below the
historic 1924 shoreline.• Site restoration.
![Page 3: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/3.jpg)
CFB ESQUIMALT PROPERTIES , VICTORIA, BC
![Page 4: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/4.jpg)
Yarrows History• Operational shipyard from 1893-1994• Peak operations during WW2, 4300 workers• Many HMC ships (22), Liberty Ships, and BC Ferries were
built at the Yarrows Shipyards• Insolvency in 1994; in 1996 2 acres ‘sold’ to Town of
Esquimalt ($1); and 12 acres to DND ($1), with known environmental liability of $6-8 million (soil and sediment contamination)
• Acquisition was “A ‘once in a lifetime’ opportunity to link Naden with the Dockyard “ (VAdm P.W. Cairns, Commander Maritime Command, 1992).
![Page 5: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/5.jpg)
DND YARROWS LOCATION
![Page 6: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/6.jpg)
Yarrows History• Risk management strategy employed from 1996-2006• In 2002 the surficial debris was removed from the site and it
was restored as a materials laydown and storage area.• In 2006, high concentrations of hydrocarbons were detected in
4 monitoring wells and visible Bunker C was noted in one.• Site was re-evaluated and determined that remediation was
required (Class 1 Site)• Funding for remediation was secured through Federal
Contaminated Sites Action Plan program, with SRB oversight• Remediation and site restoration began in 2008 and was
completed in 2009.• Yarrows Remediation Project is a true FCSAP success story
![Page 7: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/7.jpg)
YARROWS SHIPYARD HISTORY
Yarrows Shipyard- Circa 1921
![Page 8: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/8.jpg)
YARROWS SHIPYARD HISTORY
Yarrows Shipyard- Circa 1960’s
![Page 9: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/9.jpg)
YARROWS SHIPYARD HISTORY
Yarrows Shipyard- Circa 1979
![Page 10: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/10.jpg)
DND YARROWS LOCATION
![Page 11: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/11.jpg)
CONTAMINATION ISSUES• The purpose of the remedial program was to remove
all impacted fill placed below the historic 1924 shoreline.
• Based on a number of historical investigations the following volumes of material were identified for removal from the site: Concrete 3,000 m3
Wood Waste 1,500 m3 Rip Rap and Boulders
3,800 m3
Clean sand and gravel
8,800 m3
Uncharacterized material
10,500 m3
Industrial level metals and hydrocarbon
8,200 m3
Suspected Hazardous Waste metals and hydrocarbons
3,200 m3
Total Estimated Volume 39,000 m3
![Page 12: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/12.jpg)
YARROWS PROJECT AREA
![Page 13: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/13.jpg)
LAYDOWN AREAS - YARROWS
![Page 14: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/14.jpg)
LAYDOWN AREA - YEW POINT
![Page 15: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/15.jpg)
LAYDOWN AREA – WORK POINT POINTPROJECT AREA
![Page 16: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/16.jpg)
SITE STRATIGRAPHY
![Page 17: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/17.jpg)
BARRIER WALL CONSTRUCTION• The barrier wall was constructed using two different
methodologies:
1. Bentonite Slurry Wall was used in areas where bedrock was closer to the ground surface.
2. Secant Pile Wall was used in deeper excavation sections.
• Prior to wall construction the top 3 m of fill and concrete was removed to minimize the constructed wall depth.
![Page 18: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/18.jpg)
BENTONITE SLURRY WALL CONSTRUCTION
![Page 19: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/19.jpg)
BENTONITE SLURRY WALL CONSTRUCTION
![Page 20: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/20.jpg)
SECANT PILE WALL CONSTRUCTION
![Page 21: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/21.jpg)
SECANT PILE WALL CONSTRUCTION
![Page 22: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/22.jpg)
ROCK ANCHORS
![Page 23: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/23.jpg)
WALL CONSTRUCTION DETAILSBarrier wall – 210 m long and up to 13 m in height
![Page 24: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/24.jpg)
SITE REMEDIATION
![Page 25: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/25.jpg)
SITE REMEDIATION – SLOT CUT
![Page 26: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/26.jpg)
SITE REMEDIATION
![Page 27: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/27.jpg)
SUMMARY OF REMEDIATION• Approximately 90,000 tonnes of material was removed
from the site.• Impacted fill consisted of soil mixed with metal debris,
slag, Bunker C, creosoted piles and a minor amount of asbestos.
• Approximately 60,000 tonnes of material was disposed of at permitted facilities.
• Approximately 3,000 tonnes of Hazardous Waste metals and hydrocarbons were removed from the site.
• 27,000 tonnes of coarse rock was screened from contaminated fill to reduce the disposal cost. The coarse rock was re-used on site to reduce backfill cost.
![Page 28: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/28.jpg)
CONTAMINATED FILL
![Page 29: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/29.jpg)
CONTAMINATED FILL
![Page 30: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/30.jpg)
CONTAMINATED FILL
![Page 31: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/31.jpg)
CONTAMINATED FILL - OFFSITE
![Page 32: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/32.jpg)
BENTONITE WALL CONSTRUCTION
![Page 33: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/33.jpg)
PROJECT CHALLENGES1. Subsurface Variability2. Stockpile Handling Space and
Laboratory Cost3. Quality of Imported Fill Material4. Regulatory Changes – Cost
Implications5. Weather Effects
![Page 34: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/34.jpg)
SUBSURFACE VARIABILITY• A stratigraphic model was developed
based on the results from seven historic investigations.
• Coarse rock and/or rip rap was identified in zones along the perimeter of the excavation.
![Page 35: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/35.jpg)
SUBSURFACE VARIABILITY
• Thick zones of large rock (1.5 m to 2.5 m) was interpreted as bedrock in historic investigations.
![Page 36: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/36.jpg)
IMPLICATIONS• Barrier wall construction methodology
was altered• Redesign of wall sections to reflect
deeper excavation requirements in some areas
• Slower drilling for pile installation• Wall failure and repair
![Page 37: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/37.jpg)
STRATIGRAPHIC CHANGE – WALL FAILURE
![Page 38: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/38.jpg)
STRATIGRAPHIC CHANGE - IMPLICATIONS
![Page 39: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/39.jpg)
STOCKPILE MANAGEMENT AREA
• During periods where excavation was conducted on a 24 hour/day basis there was insufficient room for soil turnover.
• Result was increased laboratory cost to meet required turn around times.
![Page 40: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/40.jpg)
IMPORTED FILL MATERIAL QUALITY• Imported native backfill material did not
meet federal guidelines.• The backfill material needed to be
screened to remove finer material so it could be used on site as backfill.
![Page 41: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/41.jpg)
REGULATORY CHANGES• As of January 1, 2009 the Province of BC
enacted new sodium and chloride standards.• The regulatory change did not impact
remedial targets.• This impacted the offsite disposal cost of
material as much of the material was re-classified as Commercial level for offsite disposal.
![Page 42: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/42.jpg)
WEATHER EFFECTS• A large storm event occurred during the project that
was atypical of Victoria weather.
• There was three weeks of record snowfall and high winds that halted construction.
![Page 43: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/43.jpg)
CONCLUSIONS• Successful remediation of over 90,000
tonnes of impacted material.• Bentonite and Secant Pile wall performed as
designed.• When barrier walls are going to be
constructed – it is imperative to completely understand stratigraphy along the alignment.
• Plan for delays and unknowns. Can have large cost and time implications.
![Page 44: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/44.jpg)
CONCLUSIONS• Important to have a good QA/QC program in place.
– On sites requiring backfilling understand that:• Backfill from native quarries may not meet
federal guidelines.• Always establish detailed testing program for
all materials leaving and coming onto the site regardless of origin.
• Have a good project risk assessment process in place to identify delays and find solutions.
• Have a strong project team that work together and has a excellent communication structure.
![Page 45: DND YARROWS SHIPYARD REMEDIATION · dnd yarrows shipyard remediation challenges in barrier wall construction and site remediation on esquimalt harbour cfb esquimalt victoria, british](https://reader035.vdocuments.net/reader035/viewer/2022062415/5fe344a70370271e0f12d301/html5/thumbnails/45.jpg)
QUESTIONS?