Canadian Design-Build Institute Practice Manual Document 115: Unique Aspects of Design-Build for Owners 2018 1 Introduction The information contained in this document is intended for use with the Canadian Design-Build Institute (CDBI) documents published by the CDBI. The best practices and additional considerations contained in this publication have been written by Owners for Owners. Owner’s Advantages Single Point of Responsibility Combining both design and construction under the same contract ensures a single-point of responsibility for quality, price, schedule and delivery of construction. A design-build contractual relationship creates an opportunity for delivering a quality product. Once an Owner’s clear Statement of Requirements (SOR) and Performance Specifications are developed, coordination of work and performance become the responsibility of the Design-Builder. Early Confirmation of Price Since both design and construction fall within the responsibility and control of the Design-Builder, a firm price can be established for a given concept. Once the price is fixed by the Design-Builder, Owners can make a prompt “go/no-go” decision early in the project. The construction and design members of the design- build teamwork co-operatively to evaluate alternate designs, innovative solutions, materials, systems, and constructability techniques, always intending to meet or exceed specified performance levels within the contracted price. Commitment to Schedule The Design-Builder is committed to the delivery dates stipulated in the contract. During the proposal stage, there is an overlapping period for designing and pricing. Following contract award, detailed design and construction can be fast-tracked thereby compressing the design/construction time. This results in faster delivery and earlier occupancy of the finished project. Design-Build Practice Manual Document 115: Unique Aspects of Design-Build for Owners

Upload: others

Post on 09-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Document 115: Unique Aspects of Design-Build for Owners

Canadian Design-Build Institute Practice ManualDocument 115: Unique Aspects of Design-Build for Owners 2018 1

IntroductionThe information contained in this document is intended for use with the Canadian Design-Build Institute (CDBI) documents published by the CDBI. The best practices and additional considerations contained in this publication have been written by Owners for Owners.

Owner’s AdvantagesSingle Point of ResponsibilityCombining both design and construction under the same contract ensures a single-point of responsibility for quality, price, schedule and delivery of construction. A design-build contractual relationship creates an opportunity for delivering a quality product. Once an Owner’s clear Statement of Requirements (SOR) and Performance Specifications are developed, coordination of work and performance become the responsibility of the Design-Builder.

Early Confirmation of PriceSince both design and construction fall within the responsibility and control of the Design-Builder, a firm price can be established for a given concept. Once the price is fixed by the Design-Builder, Owners can make a prompt “go/no-go” decision early in the project. The construction and design members of the design-build teamwork co-operatively to evaluate alternate designs, innovative solutions, materials, systems, and constructability techniques, always intending to meet or exceed specified performance levels within the contracted price.

Commitment to ScheduleThe Design-Builder is committed to the delivery dates stipulated in the contract. During the proposal stage, there is an overlapping period for designing and pricing. Following contract award, detailed design and construction can be fast-tracked thereby compressing the design/construction time. This results in faster delivery and earlier occupancy of the finished project.

Design-Build Practice Manual

Document 115: Unique Aspects of Design-Build for Owners

POWELL STREET OVERPASS DESIGN-BUILD PROJECTCDBI AWARD NOMINATION2018

Page 2: Document 115: Unique Aspects of Design-Build for Owners

Canadian Design-Build Institute Practice ManualDocument 115: Unique Aspects of Design-Build for Owners 2018 2

Document 115: Unique Aspects of Design-Build for Owners

Emil Anderson Construction (EAC) Inc. Page 16 Canadian Design-Build Award Nomination Submission Vedder Bridge Replacement Design-Build Project

2 Michael McDonald Architectural Lead

Kasian Architecture Interior Design & Planning Ltd1500 W. Georgia, #1685 Vancouver, V6G 2Z6

[email protected] | 604.760.4836

Greg Smith Structural Lead

WSB Consulting Structural Engineers118-3855 Henning Drive, Burnaby, V5C 6N3

[email protected] | 604-294-3753

Jimmy Ng Mechanical Lead

Formerly with Stantec Consulting, now with PWGSC, Real Property Services Branch

[email protected] | 778.707.6904

Jim Jay Electrical Lead

Stantec ConsultingSuite 1100, 111 Dunsmuir St, Vancouver, V6B 6A3

[email protected] | 604.696.8150

Todd Stewart Civil Lead

Aplin & Martin910 – 1111 West Hastings St.,Vancouver, V6E 2J3

[email protected] | 604.678.4496

Ralph Jeck Building Env. Lead

CSA Building Sciences Western12 - 62 Fawcett Road, Coquitlam, V3K 6V5

[email protected] | 604.523.1366

Paul Marks Acoustical Lead

BKL Consultants Ltd#308 - 1200 Lynn Valley Rd., N. Vancouver, V7J 2A2

[email protected] | 604.988.2508 ex. 103

Design Consultants

03 Installing the 2.5m storm pipe within the overpass structure - a preferred option for the City of Vancouver.

04 Installing the girder beams over rail yard.

Unique Aspects of Procurement and ContractSelecting TeamsDesign and construction are combined in one procurement procedure. An Owner should consider three basic criteria when choosing a design-build team:

1 Qualifications of the design and construction team;

2 Compliance of the design proposal to the Owner’s SOR;

3 The responsiveness of the proposed price to the Owner’s budget and delivery schedule.

Evaluation of the above criteria is defined in the procurement documentation. To achieve best results, CDBI recommends using a two-phase selection process. The first phase is a shortlisting of the top three qualified Design-Builder teams based on the 1st criterion. The second phase evaluates the technical proposal and the cost as related to the 2nd and 3rd criteria.

Honouraria The level of effort required to respond to a proposal call can vary considerably. For Owners requiring detailed technical proposals, CDBI recommends shortlisted proponents be compensated with an honourarium proportionate to the level of detail required in the request for proposal. An honourarium too low for the level of effort requested, (requiring a substantial “investment” by the proponents), may discourage participation in the second phase, thereby limiting the quality of proposals and increasing cost contingencies. Oversimplifying proposal requests to save on honouraria can result in a variance of perceived Owner requirements, and significant price contingencies.

You can find additional information on the calculation of honouraria in CDBI Series 200.

Canadian Design-Build Institute

Series 200 A Guide to Procurement and Award

Design-Build Practice Manual

A Special Committee of theCanadian Construction Association

Copyright 2013

4Project Description The design for the new Kelowna Police Services building has been highly influenced by key principles highlighted in the City of Kelowna’s Official Community Plan. As such, this three-storey facility has been envisioned as a community asset and a significant contribution to the growing downtown Kelowna urban realm.Approximately 100,000 sf in size, this spacious state-of-the-art headquarters houses 380 RCMP members and support staff. It features office space, forensic facilities, records rooms, traffic services, and a host of other police service spaces. The building is constructed to maximize flexibility and is ready for expansions to be executed to an efficient manner, without interrupting on-going operations.

The design aesthetic respects the highly secure nature of a police facility while building on the legacy of the RCMP and a highly visible civic building that is reflective of the vibrant lakeside community. The rectilinear form of the building has been shaped specifically to fit the evolving, urban fabric of Kelowna’s downtown, and to optimize key programmatic relationships that best facilitate the diverse work of the police force.

The critical unifying feature is the central spine concept: a strong east-west axis that functions as the primary organizing mechanism for all design elements. This central spine unifies building systems, circulation, and spatial orientation into a comprehensive, highly-intuitive, efficient, and high-performance workplace.

With an abundance of natural light at each end of the spine, views of the city, hills and Lake Okanagan, and circulation flowing well throughout, the building is bright, and spaces are organized efficiently. These spaces also encourage interaction between staff members as they travel throughout the building.

This high-performance facility promotes energy efficiency, the reduction of greenhouse gas emissions, provides for high building functionality and ultimately seeks to minimize life-cycle costing. The design process integrated sustainability requirements of the Detailed Statement of Requirements including the City’s Sustainable Infrastructure Policy No. 352 and the associated Multiple Bottom Line Framework. Kelowna Police Services Building achieved an Energy Performance of 36% above the ASHRAE 90.1-2010 Appendix G baseline building.

Emil Anderson Construction (EAC) Inc. Page 23 Canadian Design-Build Award Nomination Submission Vedder Bridge Replacement Design-Build Project

Page 3: Document 115: Unique Aspects of Design-Build for Owners

Canadian Design-Build Institute Practice ManualDocument 115: Unique Aspects of Design-Build for Owners 2018 3

Document 115: Unique Aspects of Design-Build for Owners

City of Kelowna Police Services won two awards at the 9th annual Thompson Okanagan Kootenay Commercial Building Awards, hosted by SICA. The awards included the Judge’s Choice for Best Overall Entry, and best Community Institutional.

General Contractor:

Design Team:

April 3, 2018

05

06 Powell Street Overpass - looking East.

Powell Street Overpass completed July 14, 2014 - looking west to downtown Vancouver.

Owner Involvement in DesignDesign-build encourages innovation: in design, construction, and delivery time because of early collaboration by the design-build team during the request for proposal (RFP) stage. The Owner needs to be aware that their involvement during the design process is different from the traditional delivery model. The SOR and performance specifications need to reflect the appropriate level of Owner design input and performance expectations. Owner changes to the SOR or Performance Requirements at a later stage, i.e. during the detailed design phase, may result in comparatively higher costs in construction due to limited competition and can jeopardize the schedule.

Owner’s AdvisorIn the design-build project delivery process, the Owner has a single contract with the Design-Builder and as a result, does not have a direct contract with the design consultant. An Owner should consider selecting an Owner’s Advisor. This Owner’s Advisor (sometimes also called a Bridging Consultant) can assist in creating the SOR, evaluating proposals, selecting the Design-Builder, reviewing construction documents, certifying payment and constructed works compliance with the SOR and Performance Specifications.

Resources:CDBI, Design-Build Practice Manuals

CCDC14 - 2013, Design-Build Stipulated Price Contract

CDBI Fundamentals of Design-Build Tutorial

CDBI National Design-Build Conferences

cdbi.org

Copyright 2018

Must not be copied in whole or in part without written permission from the CDBI.