Document #9C.1
Board of Library Trustees MeetingSeptember 25, 2013
The District of Columbia Public Library
Capital Construction and FacilitiesManagement Report
September 25, 2013
Active Capital Projects Report
Completed Projects
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 2/12
2
Active Capital Projects
Northeast Library – Design-Build Renovations Contacts Progress
Councilmember Tommy Wells
Design work is complete
Contract approved by DC Council
Selective demolition work is complete
Vertical Circulation Addition Steel Work
Complete
Addition is complete
Interior finish work is underway
Ward 6 202.724.8072
ArchitectBell/Vines
Architects
David Bell
Victor Vines
Project
Manager Chris Wright
202.727.4913
Design-Builder Whiting-Turner
Andrew Easter
West End Library – Mixed Use Development Contacts Progress
Councilmember Jack Evans
New ground floor library will be part of mixed use
development
Library designs have been approved
Project has received preliminary PUD approval
from DC Zoning Commission on February 13,
2012
Litigation against project was dismissed
Ward 2 202.724.8058
Architect Ten Arquitectos
Erik Lang
Project
Manager Kim Fuller
202.442.6069
Developer EastBanc
Gareth Eckmann
202.737.1000
This project is a major interior renovation of the 1930’s era
library. Renovations will create a 21st
Century library while
maintaining the historic integrity of the building’s interior.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 3/12
3
West End Interim Library Contacts Progress
Councilmember Jack Evans
DC Department of General Services (DGS) is in
lease negotiations on a potential storefront space
Library’s design-build team has completed the
design for the interim space
Lease has been executed.
Permitting process is underway
Ward 2 202.724.8058
Architect Franck and Lohsen
Art Lohsen
Project
Manager Chris Wright
202.727.4792
Contractor GCS/Sigal
Taryn Morgan
202-944-6634
Woodridge Library – Design Contacts Progress
Councilmember Kenyen McDuffie
CFA approved conceptual plan
Mentor-Protégé Construction Manager selected:
Coakley-Williams and Blue Skye
GMP pricing proposal received & negotiated
Contract package for Board approval underway
Ward 5 (202) 724-8028
Architect Wiencek + Assoc
Bing Thom Arch
Project
Manager Kim Fuller
202.442.6069
Contractor Coakley-Williams
Terrance Caulfield
301.693.5000
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 4/12
4
Woodridge Modular Interim Library Contacts Progress
Councilmember Kenyen McDuffie
Modular Units will be utilized at 1790 Douglass
Avenue NE (District controlled parcel)
MOU signed between Library and DGS
Modular building is in manufacturing
Targeting a late Fall opening.
Ward 5 (202) 724-8028
Architect GDG
Mokhless Alhariri
202.857.0060Project
Manager Chris Wright
202.727.4913
Contractor Modular Genius
Gregg Bichell
410.676.3424
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 5/12
5
Completed Capital ProjectsAnacostia Library – New Building Construction Contacts Progress
Councilmember
Opened to the public - April 26, 2010
Ward 7 YvetteAlexander
202.724.8068
Architect Freelon Group
Philip Freelon919.941.9790
Project
Manager Dedric Boyd
202.727.1127
Contractor Forrester
Construction
Tom Willerton
301.816.1700
DCPL PM
Firm Hill International
Benning Library – New Building Design Contacts Progress
Councilmember
Opened to the public - April 5, 2010
Ward 7 YvetteAlexander
202.724.8068
ArchitectDavis, Brody,
Bond &Aedas
Peter Cook
202.449.1190
Project
Manager Kim Fuller
202.442.6069
Contractor Forrester
Jon McGee
301.255.1750
DCPL PM
FirmA-1 Consulting
New State of the Art Library on Good Hope Road SE is open.
New State of the Art Library located at 3935 Benning Road NE
is open.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 6/12
6
William O. Lockridge Bellevue Library Contacts Progress
Councilmember
Library opened – June 13, 2012
Ward 8 Marion Barry
202.724.8045
Architect Wiencek/Adjaye
Scott Knudson
301.948.6220
Project
Manager Lisa Deanes
202.727.5181
Contractor Coakley-Williams
DCPL PM
Firm
Jair Lynch
Development
Partners
ClevelandPark – New Ceiling and Lighting Contacts Progress
Councilmember
Project complete
Ward 3 Mary Cheh
202.724.8062
Architect N/A
Project
Manager Ed Hampton
202.442.6067
Contractor Eagle
Construction
Project consists of installing a new ceiling and lighting system.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 7/12
7
The Library has received Federal Stimulus Money for energy
enhancements. Projects will take place at the above locations,
focusing on window replacements, energy efficient lighting,
and automated building heating and cooling controls
Deanwood – New Community Center and Library Contacts Progress
Councilmember
Opened to the public on June 25, 2010
Ward 7 YvetteAlexander
202.724.8068
Architect EEK
Sean O’Donnell
Project
Manager
Contractor
Energy Enhancement Projects – Various Locations Contacts Progress
Capitol View, Cleveland Park,
Shepherd Park, Lamond Riggs, Palisades, Southwest, West
End and Woodridge
Councilmember
Energy efficient lighting projects are completed
Window and roof work is completed
Various
Architect T.B.D
Project
Manager Ed Hampton
202.442.6067
Contractor
DCPL PM
Firm
Project is a partnership with the Department of Parks and
Recreation to co-locate a 10,000 square foot library within a
54,000 square foot aquatic center and community center.
Library and Community Center would share such space as
computer lab, senior rooms, tutor rooms and community
meeting rooms. Project location is 49
th
and Quarles St. NE
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 8/12
8
Francis A. Gregory Library – New Library Contacts Progress
Councilmember
Library opened – June 19, 2012
Ward 7 YvetteAlexander
202.724.8068
Architect Wiencek/Adjaye
Scott Knudson
301.948.6220
Project
Manager Lisa Deanes
202.727.5181
Contractor Hess Construction
Jair Lynch
Development
PartnersDCPL PM
Firm
Georgetown Library – Building Renovation Contacts Progress
Councilmember
Opened to the public on October 18, 2010
Ward 2 Jack Evans
202.724.8058
Architect Martinez & Johnson
Tom Johnson
202.333.4480
ProjectManager
Chris Wright
202.272.4913
Contractor N/A
DCPL PM
Firm
Smoot
Construction
Renovation complete and Library open to the public.
Design of the new Francis Gregory Library will include
community input on planning and programming phase. Project
is fully funded.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 9/12
9
MLK Jr. Library – Renovations to Great Hall & Digital Commons Contacts Progress
Councilmember
Complete.
Opened to the public on July 17, 2013
Ward 2 Jack Evans
202.724.8058
Architect The Freelon Group
Derek Jones
919-941-9790
Project
Manager Kim Fuller
202-442-6069
Contractor MCN Build
Joseph Kourney
202.333.3424
Mount Pleasant – Interior Restoration Contacts Progress
Councilmember Jim Graham
Opened to public on September 12, 2012
Ward 1 202.724.8181
Architect Core Architects
Dale Stewart
202.466.6116
ProjectManager
Chris Wright
202.727.4913
Contractor T.B.D
DCPL Project
Management
Smoot
Construction
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 10/12
10
Northeast Library – Exterior Restoration Contacts Progress
Councilmember Tommy Wells
Substantial completion of construction on May 15,
2010
Ward 6 202.724.8072
Architect Bell Architects
David Bell
202.548.7570
Project
Manager Chris Wright
202.727.4913
Contractor Monarc
Construction
C. McDermott,
703.201.1747
Northwest One – New Co-location Facility Contacts Progress
Councilmember Tommy Wells
Library openedon December 7, 2009 to the public
Ward 6
Architect HordCort Plan
ProjectManager
Reagan Assoc
Contractor Forrester
Project consists of Exterior Improvements to windows,
doors, security lighting, masonry restoration, landscaping
and signage.
Project consists of 6,500 SQ FT Library facility as part of
Elementary School and RecreationCenter. This facility replaces
the Sursum Corda kiosk.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 11/12
11
Parklands-Turner – New Storefront Library Contacts Progress
Councilmember Marion Barry
Ribbon cutting held on October 5, 2009 and
opened to the public
Ward 8 202.724.8045
Architect Mood Nolan - DC
Patrick Williams
202.244.
Project
Manager Dedric Boyd
202.727.1129
Contractor Lexx Group
Ken Postell
202.393.
Petworth – Interior Renovations Contacts Progress
Councilmember
Opened on February 28, 2011
Councilmember MurielBowser
Ward 4 202.724.8052
Architect Frank and Loshen
Fletcher Farr
Anoyte
Project
Manager Chris Wright
202.727.4913
Contractor Sigal Construction
Sarah Norman
DCPL PM
Firm
McKissack and
McKissack
Project updates the interior of the Petworth Library to be a
fully functional state of the art 21st
Century Library, while
still being respectful of the buildings historic character.
Project to fit out approximately 5,000 Sq Ft of storefront space
to replace the existing Parklands-Turner kiosk. The storefront
library is similar in size, scope, computers, and collections to the
Georgetown Interim and Tenley-Friendship Interim Libraries.
7/29/2019 Document #9C.1 - Capital Projects Report
http://slidepdf.com/reader/full/document-9c1-capital-projects-report 12/12
12
Tenley Friendship – New Building Contacts Progress
Councilmember
Opened on January 24, 2011
Ward 3 Mary Cheh
202.724.8062
Architect Freelon Group
Philip Freelon
919.941.9790
Project
Manager Dedric Boyd
202.727.1113
Contractor Forrester.
Joe Ockershausen
301.255.1794
DCPL PM
FirmHill International
Martin Luther King Jr. Library – New Teen Spot andCollegeInformationCenter
Contacts Progress
Councilmember
Project complete
Ward 2 Jack Evans
202.724.8058
Architect Sorg Associates
SumanSorg
Project
Manager Kim Fuller
202.442.6070
Contractor Bennett Group
Kolar Bowen
202. 625.3330
Design of the new Tenley Branch Library will include
community input on planning and programming phase. Design
and construction is fully funded.
New Teen Spot and CollegeInformationCenter is a destination
for teens.It provides stimulating learning opportunities that
support their success in life. This destination provides