ACER— Agency for tht’ Coop’ration01 Inergv Regulators
OPINION OF THE AGENCY FOR THE COOPERATION OF ENERGYREGULATORS No 16/2014
of3O July 2014
ON THE IMPLEMENTATION OF INVESTMENTS IN ELECTRICITYTRANSMISSION NETWORKS
THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,
HAVING REGARD to Regulation (EC) No 7 1 3/2009 of the European Parliament and of theCouncil of 1 3 July 2009 establishing an Agency for the Cooperation of Energy Regulators’ , and, inparticular, Articles 6(7) and 6(8) thereof,
HAVING REGARD to the favourable opinion of the Board of Regulators of 1 7 July 2014, issuedpursuant to Article 15(1) ofRegulation (EC) No 713/2009,
WHEREAS:
(1) Articles 6(7) and 6(8) of Regulation (EC) No 713/2009 task the Agency for the Cooperation ofEnergy Regulators (“the Agency”) with monitoring the progress as regards the implementationof investments to create new interconnector capacity and the implementation of the electricityUnion-wide ten-year network development plan (“EU TYNDP”).
(2) In this Opinion, the Agency reports on its monitoring of progress in the development of theinvestments included in the list of investments of pan-European significance in Appendix 1 ofthe EU TYNDP released by ENTSO-E on 5 July 2012 (“TYNDP” investments). Themonitoring has been performed with reference to investment items, as disaggregated in theENTSO-E “2013 TYNDP Monitoring Update”2.
(3) In this Opinion, the Agency also reports on its monitoring of the investments included in theRegional Investment Plans3 published on 5 July 2012, which are not included in the 2012 EUTYNDP (“REG” investments) and of other investments of cross-border relevance, which arenot included in the 2012 EU TYNDP or in the 2012 Regional Investment Plans, but appeareither in the national investment plans (“OTHER” investments) or are developed by Third-PartyPromoters (“TPP” investments).
1j L 211, 14.8.2009, p.’
2 ENTSO-E “2013 Monitoring update ofthe IYNDP 2012 Table ofprojects”, 1 July 2013, Annex 1 — Monitoringupdate TYNDPhftps://www.entsoe.eu/fileadminluserupload!library/SDC/TYNDP/2012/1 3O7OlMonitoring_updatejYNDP2O 12_Table_ofprojects_FINAL.pdf.3 ENTSO-E TYNDP 2012 (p.23) indicates that “investments needs and projects of European importance arecomprehensively depicted in the Regional Investment Plans”.
Page 1 of 46
-
ACER.\gency hr ht (OOpt’rtlOflot ltr Rgulator
(4) National regulatory authorities (“NRAs”) have provided essential input for this Opinion bysubmitting information on components of transmission investments4 in an online data collectionprocess (completed on 1 0 April 2014) and additional updates provided until 27 June 2014. Thisinformation is summarised in the Annex to this Opinion,
HAS ADOPTED THIS OPINION:
1. Introduction
In the Agency’ s view, the monitoring of the implementation of investments in electricitytransmission networks should in principle include an evaluation over time of four fundamentalaspects:
. the expected benefits from each investment;
. the increase of transfer capacity at a network boundary, and in particular, of cross-bordergrid transfer capability (“XB GTC”)5 delivered by each investment;
. the cost of each investment;
. the status and the timing/progress of each investment.
Benefits for society are the objective of network development and of individual investments.However, due to the interaction of different investments in meshed networks, measuring actualbenefits of each investment is very complex (if not impossible, at least for some types of benefits).
The increase in XB GTC is a means to an end (the benefits), and not an end in itself. Albeit transfercapacity may also be affected by interaction among investments in meshed networks, it is moreeasily calculable and measurable than final benefits. It allows the monitoring of the actual evolutionof capacity6 once the investment is commissioned against the expected increase in XB GTC at theplanning stage. Further, XB GTC may constitute a proxy for some types of benefits, in particularregarding market integration.
Similarly, the investment costs can also be easily monitored during the different phases of theinvestment (either as a planned range, planned value or as an actual value). The actual cost, oncethe investment is commissioned, can be assessed against the expected cost at the planning stage.
Finally, the status of each investment can be monitored through the identification of differentinvestment phases. The timing and progress can be monitored through the identification ofinvestment development steps7, such as the approval of the investment in a national development
4 In this Opinion, “component” (or investment component) means the national part of a transmission investment item.5 In this Opinion, the term “cross-border grid transfer capability” is used in line with ENTSO-E Guideline for CostBenefit Analysis ofGrid Development Projects, version 14 November 2013.6 Increase ofNet Transfer Capacity (NTC).7 The Agency introduced a list of eleven steps in the process of developing electricity transmission projects of EU-wideimportance. See Agency’s recommendation regarding cross-border cost allocation requests, p.3.http://www.acer.europa.euIOfficialdocuments/ActsoftheAgency/Recommenthtions/ACER%20Recomendation%2007-201 3.pdf
Page 2 of 46
-
ACERfor tht’ (oop4’rtion
— ol Lnt’rgv Rtguit&r
plan, the start of the permitting procedure, the end of the permitting procedure, the start of theconstruction phase, the commissioning date and others.
As already noted in the Agency’ s Opinion on national ten-year electricity network developmentplans8, the definitions of benefit- and cost-related aspects are still under development at Europeanlevel9, affecting the availability of investment-by-investment information in the 2012 EU TYNDPand in national plans, which is still limited.
In this Opinion therefore, the Agency focuses on the XB GIC and on the timing aspect (status andtiming/progress of investment components). With respect to the latter aspect, very limitedinformation is available on the dates of investment development stages, which are therefore notfurther discussed in this Opinion.
Section 2 identifies investments and investment components considered in this Opinion andprovides an insight into the availability of data. Section 3 investigates increases in XB GTC,including a separate monitoring of commissioned investments. Section 4 describes the status ofinvestment components. Section 5 assesses the progress in the implementation of investmentcomponents. Section 6 evaluates the delayed, rescheduled and cancelled investments, including ananalysis of the causes for such delays, rescheduling and cancellations. finally, Section 7 providesconsiderations with regard to investment monitoring in view of forthcoming EU TYNDPs.
2. Investments under monitoring and availability of data
The monitoring activity is performed at a disaggregated level, i.e. at transmission investmentcomponent level, even in the case of clusters. As some investment components of interconnectioninvestments are located in countries outside the scope of this Opinion (which covers EU MemberStates and Norway’°), the monitoring covers 838 components corresponding to 757 investments, aspresented in Table 1.
8 Opinion of the Agency for the Cooperation of Energy Regulators No 08/2014 of 4 April 2014 on National Ten-YearNetwork Development Plans pursuant to article 8(11) of the Regulation (EC) no 714/2009http://www.acer.europa.eu/Official documents/Acts of the Agency/Opinions/Opinions/ACER%200pinion%2008-20 14.pdf9 See ENTSO-E “Guideline to Cost Benefit Analysis of Grid Development Projects”, 14 November 2013,https://www.entsoe.eu/fileadmi&userupload/library/events/Workshops/CBAI13 1 1 14ENTSO-E_CBAMethodology.pdf.10 Thanks to the voluntary participation ofthe Norwegian NRA.
Page 3 of 46
-
ACERAg?fl:y or (opt’rttonof L.ncrgv Regulators
Table 1 Breakdown of investments and investment components
Category InvestmentsComponents of
investmentsTYNDP 607 656
REG 104 109OTHER 13 1$
TPP 33 55Total 757 838
Out of which, interconnections 99 180Out of which, internal 658 658
Assessments are based on the available data supplied by NRAs:
. information regarding the status of investment components is available for approximately84% of them;
. information regarding the progress of investment components is available for approximately64% of them;
. information regarding the commissioning date of investment components is available forapproximately 67% of them.
When analysing the different categories of investments (TYNDP, REG, OTHER, TPP) separately,data availability appears to be more limited for TPP investments, compared to the ones in othercategories, for instance:
. information on the expected date of commissioning is available only for 1 5% of the TPPcomponents, compared to 71% of the investment components in other categories;
. information on the status of the investment is available only for 44% of the TPPcomponents, compared to 87% of investments in other categories.
Based on this finding, the Agency has focused its monitoring activity on the time aspects (Sections4, 5 and 6 ofthis Opinion) for TYNDP, REG and OTHER” investment components.
3. Creation of interconnector capacity
Based on available data, the Agency has analysed the implementation of 125 investmentcomponents (69 interconnector and 56 internal investment components) for which informationregarding an increase in XB GTC was provided by NRAs. The Agency notes that out of these 125investment components, 12 have already been commissioned.
Details about the expected increase in XB GTC for the 1 1 3 investment components which are notyet commissioned are presented in the Annex to this Opinion (60 interconnector components inTable I and 53 internal components in Table II). Furthermore, 12 investment components (4
1 1 OTHER investment components are not monitored in Sections 5 and 6 because they do not exist in 2012 EU TYNDP,therefore it is not possible to assess progress.
Page 4 of 46
-
ACER
..\g’:y tør ht’ (
-
ACER
II .\g’nLy for hL’ Coprticnof l.nergv Rtg:trs
1500 GIC1500 GTC DE-NL
600
1000 (cluster)’8 DK-DEDK 1200 4200
700 NO-DK700 DK-NL
EE 550’ (cluster) EE-LV 5501400 ES-fR
E52° l700to 1200from 300 to 400 ES-PT
fI 500 fl-SE 5001200
FR-ES1200
1000 I 1500 FR-CH I CH - FR1000 FR-BE1000
FR 10300/102001000 FR-GB1000
700 FR-IE1200 FR-IT1000 FR-DE
504215
154HR-BA
HR 30 125350
200
100 HR-SI
18 The XB GTC increase at cluster level refers to 2 investment components on the Danish side: Tjele (DK) - KassO(DK) - Border with Germany I Audorf. According to DERA, a capacity increase will also affect DK-NO border.19 The XB GTC increase at cluster level refers to 3 investment components on the Estonian side: Harku (EE)- Sindi(EE) 1 10 kV circuit, Harku (EE)- Sindi (EE) 330 kV circuit and Kilingi-Nomme (EE) — Border with Latvial Riga CHP2substation.20 The XB GTC increases for Spain are per border. The value on the French border takes into account 5 investmentcomponents on the Spanish side: Santa Llogaia (ES) - BescanO (ES) line, Santa Llogaia (ES) substation, BescanO (ES)substation, Sta. Llogaia converter station, Sta.Llogaia (ES) — border with France I Baixas and does not include thesubsea interconnector Gatica (ES) - Border with France I Aquitaine as this is not in Spanish national plan. The value onthe Portuguese border is derived by deducting the capacity increase given by the commissioned investment (see Table3).
1500 GTCDE-PL
Page 6 of 46
-
ACER
.\gt’rcy br th’ cxptrt in() 1.t’TV Regulators
500 (cluster)221500
IE-GB1000
IE 47001500 IE-NI700 IE-FR
1200 I 1000 FR- IT I IT-FR1600/ 1500 AT- IT! IT-AT1000 1 950 CH - IT I IT-CR
IT23 600 IT—NorthemAfrica 7200/56801000 IT-ME
800/250SI- IT / IT-SI
1000/380
500LT-PL
LT 500 1700700 LT-SE
LU 400 (cluster)24 BE-LU 400MT 200 MT-IT 200
700 NL-DKNL 2200
1500 NL-DE1400 NO-DE
NO 700 NO-DK 35001400 NO-GB500 PL-DE/CZ/SK
1 500 (cluster)25 DE/CZ/SK-PLPL 30001 500 PL-DE/CZ/SK
500 (cluster)26 DE/CZ/SK-PL
21 The XB GTC increase at cluster level refers to 2 investment components on the Hungarian side: Gonyu area (HU) -Border with Slovakia I Gabcilcovo and SajOivánka (HU) - Border with Slovakia I Rimavskã Sobota.22 The XB GTC increase at cluster level refers to 1 investment component on the Hungarian side: Area of Kisvãrda —Border with Slovakia /Velkë Kapuany23 Italian NRA inputs are per border with additional details on the french-Italian border (see at the end of Section 3).24 The XB GTC increase at cluster level refers to 2 investment components on the Luxembourgish side: (first step)phase shifting transformer in Schifftange (LU) and (second step) works on existing cable related to substationsBascharage and Schifflange (LU).25 The XB GTC increase at cluster level refers to 4 investment components on the Polish side: Plewiska (PL) - Borderwith Germany I EisenhUttenstadt, Krajnik (PL) - Baczyna (PL), Mikulowa (PL) - Swiebodzice (PL) and substationGubin (PL).26 The XB GTC increase at cluster level refers to 5 investment components on the Polish side: Krajnik (PL) - Borderwith Germany I Vierraden, switchgear in substation Krajnik, switchgear in substation Mikulowa, PST in substationKrajnik, PST in substation Mikulowa.
400 / 1 1 00 (clustei1RU RU-SK/SK-RU 900/1600
Page 7 of 46
-
ACERAg&’rwy for th.’ (()%M’ratLOflof Ltwrgv Regulators
425 RO-MD1225
$00 RO-TRRO
2$ SE-LT1500 I 1200
700 (cluster)SE
$00 I 500 SE-Fl I Fl-SEindicative value 1 00029
SI IT4640SI indicative 1640°
indicative 2000 SI-RU1 100 I 400 (cluster)3’
SK-HU I HU-SK 1600 I 9005K500 (cluster) 32
Table 3 presents the 12 commissioned investment components (corresponding to $ investmentitems, as four items are interconnectors between Member States commissioned on both sides, thuscomposed of two components each) which resulted in an increase in XB GTC:
. three Estonian and Finnish investment items of EstLink II, which became commerciallyoperational in February 2014;
. the East-West Interconnector (Ireland-Great Britain);
. the “Southern Interconnection” Puebla de Guzman - Tavira (Spain-Portugal), which wascommissioned in May 2014;
. two reinforcements (reconductoring or upgrades) of existing lines on the French-Italianborder and on Croatian-Bosnian border and the Oltarzew substation in Poland.
For the 12 commissioned investment components, as far as the comparison is possible taking intoaccount that some capacities are at cluster level, the Agency notes that there are no differences
27 The XB GIC increase at cluster level refers to 13 investment components on the Polish side: Siedlce UjrzanOw (PL) -Milosna (PL), Elk (PL) - Lomza (PL), substation Lomza (PL), switchgear in substation Ostroleka, Ostroleka (PL) -Narew (PL), Ostroleka (PL) - StanislawOw (PL), substation StanislawOw, Kozienice (PL) - Siedlce UjrzanOw (PL),Kozienice substation, Plock (PL) - Olsztyn Matki (PE), Olsztyn Mtki substation, Ostroleka (PL) - Olsztyn Matki (PL)and Elk (PL) - Border with Lithuania I Alytus. The increase is 500 MW in a first stage and 1000 MW after a secondstage. The XB GTC increase at investment level for Elk (PL) - Border with Lithuania I Alytus is 400 MW.28 The XB GTC increase at cluster level refers to 1 investment component on the Swedish side: Nybro (SE) - Borderwith Lithuania I Klaipeda29 According to AGEN-RS, the NTC values provided are only indicative, the future conditions in neighbouringcountries are not considered in calculations. Therefore, the final NTC values on the Slovene borders will have to bebilaterally/multilaterally harmonized (or using Pentalateral procedure) between ELES and TSOs of neighbouringcountries, so that the final values may vary significantly from the indicative values above.30 The XB GTC increase at cluster level refers to 3 investment components on the Slovenian side: Divaca (SI) -Cirkovce (SI), phase shifting transformer in Okroglo (SI) and Okroglo (SI) - Border with Italy / Udine.31 The XB GTC increase at cluster level refers to 3 investment components on the Slovakian side:Gabcilcovo - Border with Hungary / Gonyu area, Rimavská Sobota -Border with Hungary / SajOivãnka and Velk Dur(5K) - Gabcikovo (5K).32 The XB GTC increase at cluster level refers to 2 investment components on the Slovakian side: Lemeany (5K) -Velké Kapuany (5K) and Velké Kapuany -Border with Hungary / Area of Kisvãrda.
500-1000 (cluster)2’ PL-LT
Page 8 of 46
-
between the XB GTC increase reported by NRAs and the grid transfer capability increase availablein Annex I to the 2012 EU TYNDP.
The total increase in interconnector capacity for the commissioned investment items is 1550-2250MW. Furthermore, the full availability of 1 000 MW on the Polish-Lithuanian border and of 600MW on the French-Italian border depends on the completion of clusters of investments.
New southern interconnection. New400kV OHL single-circuit line betweenPuebla de Guzman (ES)- Tavira (PT)
33 The increase in XB GTC varies according to peak I off-peak conditions and to the period ofthe year.34 This is the value at cluster level, including other reinforcements and in particular the Trino — Lacchiarella Italianinternal line.35 This value is at cluster level including the investments described in Table 2 (see footnote for the PL-LT cluster).
Table 3: Actual increases in XB GTC for commissioned investment con
4.17
XB GTCTYNDP actualInvestment increase ImpactedItem Code Substation I Substation 2 Investment description (MW) border
onents
Puebla deGuzman (ES)
Border withPT (Tavira) 300-400 ES to PT
OnBorder with ES average(Puebla de about
4.17 Guzman) Tavira (PT) As above (PT component) iOOO PT to ESReplacement of conductors (by ACCS)on various lines from Cornier (FR) to
Border with IT Piossasco (IT) (Total length of lines21.54 Cornier (FR) (Piossasco) 257 km) 600 fR-IT
600 (atBorder with FR cluster
21.54 (Cornier) Piossasco As above (IT component) level)34 IT-FRRe-establishment oftwo previouslyexisting 220kV single circuit
Border with BA interconnection Trebinje(BA)-Plat(HR);28228 (Trebinje) Plat(HR) Total length 10km. 100 HR-BA
A new AC substation will be connectedby splitting 400kV line RogowiecMilosna and Milosna-Plock and 220kV 1000(clus
59.372 Oltarzew (PL) line Mory-Sochaczew and Mory-JanOw. ter)35 PL-LTA new HVDC (450kV) connection willbe built between Estonia and Finland.
63.391 Anttila (Fl) New substation Anttila part.Border with Fl
63.391 Püssi (EE) (Anttila) As above. Marine cableBorder with EE 650 (at
63.391 (Püssi) Anttila (Fl) As above (Fl component). Marine cable cluster63.391 (Fl) Anttila (Fl) As above. DC overhead line part. level) EE-FI
A new 260 km HVDC (200 kV DC)underground and subsea connection
Border with between Ireland and Britain with80.461 Woodland (IE) GB (Deeside) 500MW capacity. 500 IE-GB
Page 9 of 46
-
ACER.\gent:y for f :c)p’Tt iOnO LflCIV Rtgulatc)rs
TYNDP actualInvestment increase ImpactedItem Code Substation 1 Substation 2 Investment description (MW) border
Border with IF80.461 (Woodland) Deeside (GB) As above (IF component)
4. Status of investments
In this Opinion, the following investment statuses as defined by the 2012 EU TYNDP areconsidered:
. “under consideration”,
. “planned”,
. “design and permitting”,
. “under construction”, and
. “commissioned”36.
Further, the “cancelled” status is considered.
4.1 Status ofthe TYNDP, REG and OTHER investments
The analysis regarding the status of the TYNDP, REG and OTHER investments has been carriedout for 679 investment components, as no information was reported for the other 1 04 investmentcomponents.
For the purpose of comparison with 2012 EU TYNDP data, the analysis of the status has beencarried out separately for TYNDP, REG and OTHER investments.
TYNDPOut of the total 566 TYNDP investment components for which information is available, the Agencyhas found that 1 3 % are currently “under consideration”, 24% are “planned”, 3 6% are in the designand permitting phase, 1 3% are in the construction phase, 1 1% have been commissioned and 3%have been cancelled (Figure 1). Compared to the status of the 2012 EU TYNDP investmentssummarised in Figure the Agency observes a significant reduction of the TYNDP investments
36 This status is intended as “completed” for the investment components of interconnection lines: when only one of theinvestment components is completed, it cannot be commissioned yet due to the lack of completion on the other side.37 Figure 2 refers to 64$ investment components instead of 656 due to the lack of information on the status of Magenta(IT) substation and as the commissioned status of some projects in Spain is not included:
. Magenta substation was included in 2012 FU TYNDP as a sub-investment of investment item 21 .8 1 Trino (IT)- Lacchiarella (IT), which included a voltage upgrade of the existing Magenta 220 I 132 kV substation up to380 kV. After the definition of the new interconnection project between Italy and Switzerland (HVDC linkbetween Pallanzeno and Baggio), Magenta substation also supports the new interconnection project. FNTSO-Ftherefore classified Magenta substation as part of cluster 3 1, under item code 3 1 .932, in the 20 13 TYNDPMonitoring Update.
Page 10 of 46
-
I\jgçy;J;()PI!fl
(ii Inercv Rgui;totc
in the “Design and Permitting” status (see further analysis at the end of this Section). The Agencynotes that 33% of the TYNDP investments which were “under construction” in 2012 have beencommissioned.
Figure 1: The current status of the TYNDP Figure 2: Status of TYNDP investments in 2012investments
Sunder1. consideration. under consideration
splanned S plannedS design & permitting
S Under constr uction
S Commissioned
a Cancelled
REGOut of the 1 01 REG investment components for which information is available, the Agency hasfound that 1 3% are currently “under consideration”, 1 6% are “planned”, 28% are in the design andpermitting phase, 1 3% are in the construction phase, 14% have been commissioned and 1 6 % havebeen cancelled (Figure 3). Compared to the status of the 2012 REG investments summarised inFigure 438, the Agency observes a significantly higher percentage of cancelled investmentscompared to the TYNDP investments. The Agency notes that 67% of the REG investments whichwere “under construction” in 2012 have been commissioned.
. BescanO substation is a sub-investment of TYNDP investment item 5.37 Santa Llogaia (ES) - BescanO (ES).As indicated in the 2012 EU TYNDP, Appendix I, “Bescano-Vic I Senmenat 400 kV commissioned”.
. Penagos, Udalla, Pesoz and Abanto substations in Spain are sub-investments of TYNDP investment item 6.22.As indicated in the 2012 EU TYNDP, Appendix I, Soto (ES) - Penagos (ES) and Zierbena (ES) - Abanto (ES)were commissioned. “Section Pesoz — Salas commissioned”. “From Penagos I Aguayo to Udallacommissioned” .
. Muruarte substation is a sub-investment of TYNDP investment item 7.23 Ichaso (ES) - CastejOn (ES). Asindicated in the brief description of the investment item in the 2012 EU TYNDP, Appendix I, “SectionCastejOn-Muruarte 400 kV is afready in service”.
. Arcos - Guadame is a sub-investment of TYNDP investment item 1 1 .29 Cartuja (ES) — Guadame (ES). Asindicated in the brief description of the investment item in the 2012 EU TYNDP, Appendix I, “Arcos - Cabra -Guadame section commissioned”.
38 Figure 4 refers to 108 investment components instead of 109 as Camporosso phase shifting transformer (IT) wascommissioned before issuing the EU TYNDP 2012, as indicated in ENTSO-E “Regional Investment Plan ContinentalCentral South - final”, 5 July 2012.
Page 11 of 46
‘I0
Udesign &permitting
S underconstruction
-
ACER.\g’r:v the cf))f’4’T t lOll(It IflCTV RCiUI.ltl)TS
Figure 3: The current status of REGinvestments
________
. underconsideration
I planned
S design &per mitting
S underconstruction
S Commissioned
Figure 4: The status of REG investments inRegional Investment Plans 2012
S [)esigrr & Permitting
The status of the 12 OTHER investment components for which information is available is presentedin figure 539•
In particular, such situation applies to 42 Spanish TYNDP components, 21 Italian TYNDP andREG components and 9 Polish TYNDP and REG components. Furthermore, 4 components ofinterconnection investments have returned to an “under consideration” status:
. the AT component of Lienz (AT) - Veneto region (IT);
. the AT component of Area Bodensee (AT, CH, DE) — Area Bodensee (AT, CH, DE)
39 A list of OTHER investments including the description and status for each investment components can be found inthe Annex to this Opinion, Table XI.
under consideration
S planner]
S Cancelled
S under construction
figure 5: The current status of OTHER investments
S under consideration
S Planned
S Design & permitting
S Under construction
The Agency finally notes that 1 08 TYNDP and REG investment components have returned to anearlier status than the one in the 2012 EU TYNDP or Regional Investment Plans as illustrated inTable 4.
Page 12 of 46
-
ACER.\gt’rwy fo n’
ot lWTV Rt’U1.;t&)rS
. the BG component of Maritsa East 1 (BG) - Nea Santa (GR);
. the GB component of Kvilldal (NO) — tbd (GB).
Under consideration 1
. . . Under consideration 1$75 design & permitting
Planned 5723 planned Under consideration 23
4.2 Investment components already commissioned
In total, 76 TYNDP and REG investment components have already been commissioned. This totalincludes about 10 investment components (more disaggregated than in the 2012 EU TYNDP) thatwere already commissioned before the 2012 EU TYNDP, as discussed in other parts of Section 44O
The Agency has found that 1 investment is only partly commissioned. Table 5 provides furtherdetails.
Table 5: Investment items oi commissioned
Commissioned On time
5. Timing and progress of implementation of investments
For the purpose of this Opinion, the term “investment rescheduled” corresponds to an investmentwhich is voluntarily postponed by a transmission system operator due to changes of its externaldriver (e.g. postponed connection of new generation, lower demand, less urgent need for aninvestment due to updated planning data or priority to other transmission solutions).
40 For more details, see Table III in the Annex to this Opinion for the interconnector investment components, and TableIv in the Annex for the internal investment components.
Page 13 of 46
Table 4: Investme
10 under constructionDesign & permitting 7
Planned 2
TYNDP Progress!Investment Country commissioningItem Code Code Component ! Investment item description Status date
27.223 SI
HR
The existing substation of Cfrkovce(SI) willbe connected to one circuit of the existingHeviz(HU)-Zerjavinec(HR) double circuit400kV OHL by erecting a new 80km doublecircuit 400kV OHL in Slovenia. The projectwill result in two new cross-border circuits:Heviz(HU)-Cirkovce(SI) and Cfrkovce (SI)Zerlavinec (HR).HU
PlannedDelayed I Notbefore 2018
Design andpermitting On time /20 16
-
ACERAgency for bt’ (xp’rtzonof l.ncrgy Regulators
The term “investment delayed” corresponds to an investment which is still needed at the expecteddate, but cannot be delivered on time due to various external factors like permitting, environmental,legislative reasons, etc.41.Considering that the availability of information about the expected timing and progress ofinvestments is rather limited for the investment components “under consideration” compared to theother investment statuses, the Agency has decided not to include these investment components in itsanalysis. The analysis for commissioned investments is presented separately in Section 5.2.
5 . 1 TYNDP and REG investments (excluding commissioned investments)
Out of 569 TYNDP and REG investment components (information was missing for 145 investmentcomponents), 44% are ‘on time’ , 3 1% encounter delays, 21 % are rescheduled and 4% are expectedahead of schedule, as illustrated in Figure 6.
Figure 6: Progress of implementation of TYNDP and REG investments (excludingcommissioned, cancelled and “under consideration”)
5 .2 Investment components already commissioned
Expected ahead ofschedule
S On time
S Delayed
S Rescheduled
Out of the 76 commissioned investment components, 24 components have been commissioned ontime, 1 0 with a delay and 2 ahead of schedule. Information is not available for 40 components.
41 Based on the input received, the Agency notes that postponing of some investments could have been due to multiplereasons in the delayed and rescheduled categories.
Page 14 of 46
-
ACERAgency for :hL’ C p’rt ion
— ()fl.neTgv Rgti1toc
6. Analysis of the delayed, rescheduled and cancelled investments
This section presents the Agency’s evaluation of the reasons for a delay, rescheduling andcancellation of investments.
6. 1 Reasons for a delay
The Agency has identified 8 reasons why the implementation of investments has been delayed.
. Delays due to permit granting reasons;
. National law changes affecting permitting;
. Environmental problems and re-routing;
. Delays related to acquisition of land;
. Delays due to correlation with other delayed transmission investments;
. Delay in tendering process;
. Delay related to finalisation of agreements across borders or with third party promoters;
. Localisation and siting of substation(s).
Based on the detailed information presented in Figure I in the Annex42, the Agency has found that66% of the investment components are delayed due to permitting issues, environmental reasons andre-routing, siting of substations and national law changes affecting permitting43.
6.2 Reasons for rescheduling
The Agency has identified 5 main reasons why the implementation of investments has beenrescheduled:
. Changes on the generation side, including delays in the expected date of connection of newrenewable-based generation;
. Changes due to correlation with other (prioritised or rescheduled) transmission investments;
. Changes on the demand side;
. Changes in planning data input;
. Rescheduling of works during the construction phase either to guarantee the continuity ofservice or due to other technical issues;
Based on the detailed information presented in Figure II in the Annex44, the Agency has found thata significant proportion (58%) of investment components have been rescheduled due to changes on
42 Information was available for 85% ofthe delayed investment components.43 A list of all investments encountering delays in their implementation and the detailed reasons for the delay can befound in the Annex to this Opinion. See Table V for interconnector investment components and Table VI for internalinvestment components.44 Information was available for 85% ofthe rescheduled investment components.
Pagel5of46
-
t) I.!CV Rtç.uIatorS
generation and demand side or changes in the overall planning data inputs. Next, 1 8% ofrescheduling is related to priority given to other transmission investments45.
6.3 Assessment ofthe cancelled investment components
As already reported in Section 4, the Agency has found that 32 investment components have beencancelled (16 TYNDP components and 16 REG components)46.The Agency has identified 7 main reasons why the implementation of the investments has beencancelled:
. Changes due to the overall planning process and inputs;
. Changes on the demand side;
. Changes on the generation side;
. Changes due to other transmission investments;
. Studies which never turned into a planned investment;
. Environmental reasons and re-routings;
. Investments becoming third party projects (thus cancelled from national plans).
Based on the detailed information presented in Figure III in the Annex47, the Agency has found thata significant proportion (59%) of investment components has been cancelled due to changes on thegeneration or demand side or in the overall planning inputs. Next, 25% of investment componentshave been cancelled due to other transmission investments or because the study never turned into aplanned investment.
7. Considerations in view of the forthcoming EU TYNDPs
The Agency acknowledges that the availability of data presented in this Opinion was limited, whichis partly due to the novelty of the process, but also to the presentation of the grid transfer capacitiesat cluster level in the 2012 EU TYNDP. As already indicated in its Opinion on the ENTSO-Eguideline for Cost-Benefit Analysis (CBA), the Agency, in line with the draft ENTSO-E CBAmethodology48, reaffirms the importance of including single-investment GTC increases in the 2014EU TYNDP.
45 A list of all investments encountering a reschedule in their implementation and the detailed reasons can be found inthe Annex to this Opinion. See Table VII for interconnector investment components and Table VIII for internalinvestment components.46 The increase in cancelled investments in comparison to the number of cancelled projects observed in the Agencyopinion on national ten-year electricity network development plans (which reported 24 cancelled investmentcomponents) is related to the updates of some national plans and to new information provided by some NRAs. Inparticular, the Norwegian NRA informed the Agency that the investment 67.411 Rød (NO) - Sylling (NO) is notcancelled, but under consideration and rescheduled indefinitely. For detailed information see Annex to this Opinion,Table IX for interconnector investment components and Table X for internal investment components.47 Information was available for all the cancelled investment components.48 ENTSO-E, “Guideline to Cost Benefit Analysis ofGrid Development Projects”, 14 November 2013.
Pagel6of46
-
ACER;\g&’nt:v fr hL’ ( cMft’rat C’fl() Lergv Rvgul:uors
More generally, as already noted in its previous opinions49, the Agency expects ENTSO-E toundertake a Cost-Benefit Analysis for all transmission investments in the 2014 EU TYNDP, in linewith the currently available methodology. Such an analysis would allow for more information to bereported on in the forthcoming monitoring activities of the Agency, in particular with regard to theXB GTCs at investment item level50 and with regard to the costs and benefits of each investmentitem.
The Agency considers that the s 201 3 TYNDP Monitoring Update has improvedcompared to the 2012 EU TYNDP in terms of clarity of the information provided (in the 2012 EUTYNDP the expected commissioning date for 1 94 investment components was not clearly defined —e.g. mid-term, long-term — and 1 8 investment items had no expected commissioning date). TheAgency expects ENTSO-E to clearly and uniquely indicate the expected commissioning date in the2014 EU TYNDP.
The Agency also considers that ENTSO-E should provide disaggregate information on eachinvestment item (as ENTSO-E did in the 201 3 TYNDP Monitoring Update, compared to the 2012EU TYNDP). The presence of more disaggregated investments in the forthcoming EU TYNDPswill facilitate the future implementation monitoring of investments.
As already noted in its Opinion on National Ten-Year Network Development Plans51, the Agencyobserves that in a few cases - in particular for investments under consideration - the 2012 EUTYNDP did not provide details or sufficient clarity in investment descriptions. The Agency calls onENT$O-E to provide complete and clear descriptions in the 2014 EU TYNDP.
Done in Ljubljana on 30 July 2014.
For the Agency:
A1Irto’ototschnigDirnctor
49 Opinion ofthe Agency for the Cooperation ofEnergy Regulators No 17/2013 of 1 August 2013 on the 2012 ENISOE Annual Reporthttp://www.acer.europa.eulOfficialdocuments/Acts_of_the_Agency/Opinions/Opinions/ACER%200pinion%2017-2013.pdf50 According to ENTSO-E CBA Guidelines (p.20), “the Delta-GIC must be reported for each investment”.furthermore, in its Opinion on ENTSO-E TYNDP 2012, the Agency afready recommended that costs are presented foreach individual investment item inside each project cluster.51 Opinion ofthe Agency on National Ten-Year Network Development Plans, p. 8.
Page 17 of 46
-
AC
ER
—A
genc
yio
rth
e(oopr
1(f
l
ot[r
rgy
Rcg
ulat
ors
Annex
I—
Info
rm
ation
on
com
ponents
of
transm
ission
investm
ents
National
Regulatory
Authorities
fro
m2
9jurisdictions
(A
T,
BE
,B
G,
CY
,C
Z,
DE
,D
K,
EE
,E
L,
ES
,F
l,
FR
,G
B,
HR
,H
U,
IT
,IE
,L
T,
LU
,M
T,
NI,
NL
,N
O52,
PL
,P
T,
RO
,S
E,
SI,
5K
)participated
in
th
eprocess,
pro
vid
in
gtheir
in
pu
ts
on
com
po
nen
ts
oftransm
ission
in
vestm
en
ts
by
27
June
2014.
No
contributio
nw
as
received
fro
mL
V.
Table
I(P
art
A):
Increases
of
interconnector
capacity
related
to
interconnector
investm
ent
com
ponents
TY
ND
PE
xpec
ted
XB
GT
CC
ountr
y.
..
..
imp
acte
din
ves
tmen
tS
ubst
atio
n1
Sub
stat
ion
2S
tatu
sco
mm
issi
onin
gex
pect
edC
ode
.bord
erit
emC
ode
dat
ein
crea
se(M
W)
Bor
der
wit
hE
S.
Bai
xas
(FR
)(S
ta.
Llo
gaia
)U
nder
cons
truc
tion
2015
1200
fR-E
S
FR
16.3
8B
orde
rw
ith
ES
(Gat
ica)
Aqu
itai
ne(F
R)
Und
erco
nsid
erat
ion
2020
1200
FR
-E
S
FR
21.5
5G
rande
lie
(FR
)B
orde
rw
ith
iT(P
ioss
asco
)U
nder
cons
truc
tion
201 8
1200
FR
-IT
FR
22.5
7T
hd(F
R)
Bor
der
wit
hC
H(T
bd)
Und
erco
nsid
erat
ion
Bef
ore
2023
1 000
FR
-CH
23
.60
Avelin/M
astaing(F
R)
Bor
der
wit
hB
E(H
orta
)U
nder
cons
ider
atio
nB
efor
e20
231 0
00F
R-B
EB
orde
rw
ith
FR
Hor
ta(n
ew40
0-ky
.
BE
23.6
0.
..
Und
erco
nsid
erat
ion
2018
-202
010
00fR
—B
E—
_____
(A
vehnlM
astam
g)
substation)
(BE
)25
.62
Tou
rbe(
FR
)B
orde
rw
ith
GB
(Chi
ilin
g)D
esig
n&
perm
itti
ng20
2010
00F
R-G
B
AT
26.6
3L
ienz
(AT
)B
orde
rw
ithlT
Und
erco
nsid
erat
ion
>20
231 0
00A
T-I
T(V
enet
ore
gion
)
SI27
.68
Okr
oglo
(SI)
Bor
der
wit
hIT
(Udi
ne)
Pia
nned
>20
20m
dica
tive
1640
IT(c
iust
er)
27
.22
3C
irkovce
(S
I)
Bor
der
wit
hH
U(H
eviz
)P
iann
ed>
2018
*in
dica
tive
2000
SI-
HU
HR
27
.227
Border
wit
hB
AL
ika
(H
R)
Un
der
co
nsid
erati
on
2020
504
HR
-B
A(B
anja
Luk
a)SI
27.A
96S
iove
nia
(51)
Bor
der
wit
hIT
(Sai
gare
da)
Pla
nned
>20
22in
dica
tive
1000
SI-
IT
DK
36.1
41
Isho
jIB
jaw
ersk
ov(D
K)
r1fr)
Desig
n&
perm
itti
ng20
1 860
0D
K-D
E
DE
36.1
41rBo
rder
wit
hD
KB
entw
isch
lGU
stro
w(D
E)
Des
ign
&pe
rmit
ting
201 8
600
DE
-DK
——
-—
—L_
____
__L
(Ish
øjIB
jever
skov)
52T
heN
orw
egia
nN
RA
part
icip
ated
inth
efr
amew
ork
oft
he
Age
ncy
coop
erat
ion
wit
hN
RA
sofE
UM
embe
rSt
ates
.
FR
5.36
Pag
e18
of
46
-
AC
ER
Age
ncy
forh
tC
oope
rat i
onof
1ncr
gvR
cgu1
ator
;
TY
ND
PE
xpec
ted
XB
GT
CC
ount
ry.
..
..
Impa
cted
Inve
stm
ent
Sub
stat
ion
1S
ubst
atio
n2
Sta
tus
com
mis
sion
ing
expe
cted
Cod
e.
bord
er-
Item
Cod
eda
tein
crea
se(M
W)
:—
oi
—:
142
Bo
rder
wit
hN
O(T
on
stad
)W
ilst
er(D
E)
Des
ign
&p
erm
ith
ng
201$
1400
DE
NO
DE
39.1
44A
udorf
(DE
)B
ord
erw
ith
DK
(Kas
sö)
Pla
nn
ed2
01
910
00(c
lust
er)
DE
-DK
DK
Bord
erw
ith
DE
(Aud
orf
)K
assö
(DK
)U
nd
erco
nsi
der
atio
n2019
1000
(clu
ster
)D
K-D
E
BE
40.A
2953
Bord
erw
ith
LU
Auban
ge
(BE
)U
nd
erco
nsi
der
atio
n2020
400
BE
-LU
t(B
asch
arag
e)D
E47.2
12(D
E)
Bor
der
with
AT
(St.
Pet
er)
Des
ign
&perm
itti
ng
2018
20
00
(clu
ster
)D
E-A
T.
Bord
erw
ith
HU
110
0(c
lust
er)
SK
-HU
5K
48.2
14
Gab
cflc
ovo
(SK
)..
Pla
nned
201$
——
(Gonyuar
ea)
400(c
lust
er)
HU
-SK
Bord
erw
ith
SK
..
400
(clu
ster
)H
U-S
KH
U48.2
14
.G
onyuar
eaP
lan
ned
20
16
—
(G
abcik
ovo)
110
0(c
lust
er)
SK
-HU
____
_.
,B
ord
erw
ith
HU
110
0(c
lust
er)
SK
-HU
SK
4$.A
126
Rim
avsk
aSo
bo
ta(S
K)
.,.
,P
lan
ned
201$
(Saj
oiv
anka)
400
(clu
ster
)H
U-S
KB
ord
erw
ith
SK
.,
.,
400
(clu
ster
)H
U-S
KH
U4$.A
126
.S
ajo
ivan
ka(
HU
)P
lan
ned
20
16
—
(Rim
avsk
aS
ob
ota
)1
100
(clu
ster
)S
K-H
UB
G5L
25
6M
arit
saE
ast
l(B
G)
Bo
rder
wit
hG
R(N
.San
ta)
Under
con
sid
erat
ion
1100
(clu
ster
)
SK
54.A
12
7V
eilc
éK
apuany
(SK
)B
ord
erw
ith
HU
Un
der
con
sid
erat
ion
2021
500
(clu
ster
)S
K-H
U—
(Are
aof
Kis
var
da)
HU
54.A
12
7B
ord
erw
ith
5K
irea
ofK
isv
árd
a(H
U)
Pla
nned
2021
500
(clu
ster
)H
U5K
(Vei
lce
Kap
usa
ny)
DE
58.1
40E
isen
hUtt
enst
adt (
DE
)B
orde
rw
ith
PL
(Ple
wis
ka)
Pla
nned
2022
1500
DE
-PL
Bord
erw
ith
DE
.50
0P
L->
DE
/CZ
/SK
PL
5$.1
40(E
isen
hUtt
enst
adt)
Ple
wis
ka(P
L)
Pla
nned
2020
1500
DE
/CZ
/SK
->P
LL
T59
.368
Aly
tus
(LT
)B
ord
erw
ith
PL
(Elk
)D
esig
n&
per
mit
ting
2015
500
LT
-PL
PL
59.3
6$B
ord
erw
ith
LT
(Aly
tus)
Elk
(PL
)U
nd
erco
nst
ruct
ion
2015
(500
1 °clu
ste
r)L
T-P
L
LL
T6
0.3
83
Kla
iped
a(L
T)
Bord
erw
ith
SE
(Nybro
)D
esig
n&
per
mit
tin
g2015
700
LT
-SE
SE
60
.3$
3B
ord
erw
ith
LT
(Kla
iped
a)N
ybro
(SE
)U
nd
erco
nst
ruct
ion
2015
700
LT
-SE
53T
he
inves
tmen
t40.A
29
isupdat
edin
the
EN
TS
O-E
2013
TY
ND
PM
on
ito
rin
gU
pd
ate
wit
hre
spec
tto
the
20
12
EU
TY
ND
P
Pag
e19
of
46
NO
37.1
42T
onst
ad(N
O)
Bord
erw
ith
DE
(Wil
ster
)D
esig
n&
per
mit
ting
201$
1400
NO
-DE
-
AC
ER
Agen
cyfo
rth
Coo
pera
tion
ol
Lnc
rçv
Reg
ulat
ors
DI(
Borderw
NO
Tjele
(D
K)
Un
der
co
nstru
ctio
n2014
70
0D
K-N
O
___________
(Kri
stia
nsan
d)
DK
71 .
427
End
rup
(DK
)B
orde
rw
ith
NL
Des
ign
&p
erm
ittin
g2
01 9
700
DK
-NL
(Eem
shav
en)
NL
71 .
427
Bor
der
wit
hD
K(E
ndru
p)E
emsh
aven
(NL
)D
esig
n&
perm
itti
ng20
1 870
0N
L-D
K
BE
74.4
43B
ord
erw
ith
GB
Zee
brug
ge(B
E)
Pla
nned
Q2
2018
1000
(clu
ster
)B
E-
GB
IE8
1.46
2W
oodl
and
(IE
)B
orde
rw
ith
Ni
(Tur
leen
an)
Des
ign
&pe
rmit
ting
201 7
1500
IE-N
ID
E92
.146
Aac
hen/
Dti
ren
regi
on(D
E)
Bor
der
wit
hB
E(L
ixhe
)P
lann
ed20
1 820
00(c
lust
er)
DE
-BE
____
_
BE
92. 1
46(A
ache
nlD
uren
regi
on)
Lix
he(B
E)
Des
ign
&pe
rmit
ting
Q4
201 8
1000
BE
-D
E
DE
94.1
39B
orde
rw
ith
PL
(Kra
jnik
)V
ierr
aden
Und
erco
nstr
ucti
on20
1 71 5
00D
E-P
L
PL94
.139
Kra
jnik
(PL
)B
orde
rw
ith
DE
(Vie
rrad
en)
Und
erco
nstr
ucti
on20
1 6
DE
103.
145
Niederrhein
(DE
)B
orde
rw
ith
NL
Des
ign
&pe
rmit
ting
2016
1500
(clu
ster
)D
E-
NL
(Doe
tmch
em)
NL
O3.
145
Bor
der
wit
hD
ED
oeti
nche
m(N
L)
Des
ign
&pe
rmit
ting
2016
1500
GT
CN
L-D
E(N
iede
rrhe
m)
IE10
6.A
34D
unst
own
(IE
)B
orde
rw
ith
GB
(Pen
tfr)
Und
erco
nsid
erat
ion
afte
r20
2010
00IE
-GB
Gre
atIs
land
orK
nock
raha
Bor
der
wit
hF
R.
IE10
7.A
25U
nder
cons
ider
atio
n20
2570
0IE
-FR
(IE
)(L
a
FR
107.
A25
Bord
erw
ithlE
Kno
ckra
ha)
La
Mar
tyre
(FR
)U
nder
cons
ider
atio
nB
eyon
d20
2370
0F
R-I
E
:—o—
—K
dll
thl(
NO
)B
orde
rw
ith
GB
(Tbd
)D
esig
n&
perm
itti
ng20
2014
00N
O-G
B
Fl
111.
396
Fhi
land
Nor
th(F
l)B
orde
rw
ith
SE(S
wed
enU
nder
cons
ider
atio
n>
2021
500
Fl-
SE
-_
__
________
—-—
—-—
—
bidd
mga
rea
SE
1/5E
2)
SE11
1 .39
6S
wed
enbi
ddin
gar
eaU
nder
cons
ider
atio
n20
2580
0/50
0S
E-F
l/F
l-S
E
—
RO
267
Suc
eava
(RO
)B
orde
rw
ith
MD
(Bal
ti)
Des
ign
&pe
rmit
ting
2020
425
RO
-MD
268
Con
stan
ta(R
O)
Bor
der
wit
hT
R(P
asak
oy)
Und
erco
nsid
erat
ion
>20
2080
0R
O-T
R
FR
TP
PC
alai
s(F
R)
Bor
der
wit
hG
BD
esig
n&
perm
itti
ng20
1610
00F
R-G
B—
__—
——
--—
__
__
__
__
__
__
__
__
__
_
(Fol
kest
one)
t
,A
1
Pag
e2O
of4
6
Bor
der
wit
hL
V(R
-TE
C2)
NO
70.4
26K
rist
ians
and
(NO
)B
orde
rw
ith
DK
(Tje
le)
Und
erco
nstr
ucti
on20
1470
0N
O-D
K5u
(clu
ster
)
-
AC
ER
:\g
ncy
for
th’(o
oprt
on
ot
hncr
gvR
egul
ator
s
Bor
der
wit
hG
B(P
embr
oke
and
Pen
tir)
Tab
leII
(Par
tA
):In
crea
ses
ofin
terc
onnec
tor
capa
city
rela
ted
toin
tern
alin
vest
men
tco
mpo
nent
s
Des
ign
&pe
rmit
ting
BE
24.4
45L
illo
(BE
)D
esig
n&
perm
itti
ngQ
420
1713
00(c
lust
er)
NE
-BE
—-—
--—
——
Van
Eyck
(BE
)U
nder
cons
truc
tion
Jan.
2015
1300
(clu
ster
)N
L-B
EB
E24
.445
aG
ram
me
(BE
)V
anE
yck
(BE
)U
nder
cons
truc
tion
Jan.
2015
1300
(clu
ster
)N
L-B
EB
E24
.A26
Hor
ta(B
E)
Doe
l/M
erca
tor
(BE
)D
esig
n&
perm
itti
ng20
16-2
020
1300
(clu
ster
)N
L-B
E
BE
24.A
27Z
andv
liet
phas
esh
ifti
ngP
lann
ed20
1613
00(c
lust
er)
NL
-BE
tran
sfor
mer
(BE
)
IP
age
21of
46
IET
PP
Co.
Off
aly
(IE
)
TY
ND
PE
xpec
ted
XB
GT
CC
ount
ry.
..
..
Impa
cted
Inve
stm
ent
Sub
stat
ion
1S
ubst
atio
n2
Sta
tus
com
mis
sion
ing
expe
cted
Cod
e.
bord
erIt
emC
ode
date
incr
ease
(MW
)
Und
erco
nsid
erat
ion
nla
1500
IE-
GB
MT
OT
HE
RM
alta
Bor
der
wit
hIT
Und
erco
nstr
ucti
on20
1420
0M
T-I
T(R
agus
aar
ea,
Sic
ily)
LT
OT
HE
RL
TB
orde
rw
ith
PL
Des
ign
&pe
rmit
ting
2021
500
LT
-PL
FR
OT
HE
RF
RB
orde
rw
ith
DE
Und
erco
nsid
erat
ion
Bef
ore
2023
1000
FR
-DE
____
_F
RO
TH
ER
Cot
enti
n(F
R)
Bor
der
wit
hG
B(E
xete
r)U
nder
cons
ider
atio
n20
2210
00F
R-G
B
Tab
leI
(Par
tB
):U
nspe
cifi
edin
crea
ses
ofin
terc
on
nec
tor
capa
city
rela
ted
toin
terc
on
nec
tor
inve
stm
ent
com
pone
nts
AT
26.A
102
Bor
der
wit
hIT
(Tbd
)T
bd(A
T)
DE
47.A
76V
Ohr
inge
nI
Leu
polz
(DE
)B
orde
rw
ith
AT
RO
50.2
3$B
orde
rw
ith
RS
(Pan
cevo
)R
esit
a(R
O)
LT
381
IVis
agin
as(L
T)
Bor
der
wit
hL
V
Cou
ntry
TY
ND
PE
xpec
ted
XB
GT
CIm
pact
edC
ode
Item
Cod
e
__
__
__
__
date
incr
ease
(MW
)bord
erln
vest
men
tS
ubst
atio
n1
Sub
stat
ion
2S
tatu
sco
mm
issi
onin
gex
pect
ed
Und
erco
nsid
erat
ion
2020
AT
-IT
Pla
nned
2020
DE
-AT
Des
ign
&pe
rmit
ting
201 5
RO
-RS
Und
erco
nsid
erat
ion
LT
-LV
-
AC
ER
Agc
ncy
forth
(;()
c)pcr
(it)
fl()
tin
crg
vR
kguh
tt)f
s
-—
______________________
——
—
in
dicativ
e1640
SI
27.2
25
Div
aca
(SI)
Cir
kovce
(SI)
Under
co
nstr
ucti
on
2025
SI-
IT(c
luste
r)
HR
27
.A105
Lik
a(H
R)
Bri
nje
(HR
)P
lan
ned
2020
1215
HR
-B
A
HR
27.A
106
Lik
a(H
R)
Vele
bit
(HR
)P
lan
ned
20
20
154
HR
28A
11
4K
onjs
ko
(HR
)V
ele
bit
(HR
)P
lan
ned
2020
30
HR
-BA
-
DK
-DE
an
dD
KD
K3
9.4
28
Kassø
(DK
)T
jele
(DK
)U
nd
er
co
nstr
ucti
on
20
14
1000
(clu
ste
r)
280
(iluste
firs
tL
U4
0.4
46
PS
TS
chif
flange
(LU
)P
lan
ned
I2
01
4B
E-L
U
Baschara
ge
-S
chifflange
Under
co
nsid
era
tio
n2015
400
(clu
ste
r)B
E-L
UL
U4
0.446
-—
-_
__
__
__
(L
U)
---—
__
__
__
__
DE
-P
L;
PL
-C
Z;
DE
43
.A75
Lauchstä
dt
(DE
)M
eit
ing
en
(DE
)P
lanned
2022
50
0G
TC
DE
-C
Z
DE
43A
81
Osterath(D
E)
Ph
ilip
psb
urg
(D
E)
Plan
ned
2019
50
0G
TC
DE
-NL
;D
E-fR
——
---—
——
—
Bru
nsbU
ttel
,Wil
ster
, Kreis
Grol3gartach,
Go
ldsh
öfe
,1000
GT
C;
DE
-DK
-NO
;D
E4
3.A
88
Pla
nn
ed
2022
——
——
-—
Segeberg
(DE
)G
rafe
nrh
ein
feld
(DE
)5
00
GT
CD
E-A
T-C
H
1000
GT
CD
E4
4.1
47
Do
llem
(DE
)H
am
bu
rglN
ord
(DE
)D
esig
n&
perm
itti
ng
2015
DE
-DK
(clu
ste
r)
1000
GT
CD
E44
.148
Aud
orf(
DE
)H
ambu
rg/N
ord
(DE
)D
esig
n&
perm
itti
ng20
1 7D
E-D
K—
—-—
——
——
——
——
——
——
—_
___
__
__—
—
(clu
ste
r)
DE
-PL
;P
L-C
Z;
DE
45.1
53R
edw
itz
(DE
)G
rafe
nrhe
infe
ld(D
E)
Des
ign
&pe
rmit
ting
2014
500
GT
CD
E-C
Z—
—--_
__
__
_—
1100
(clu
ster
)S
K-H
U5K
48.2
98V
elk
Dur
(5K
)G
abci
kovo
(5K
)U
nder
cons
truc
tion
2016
(clr
)H
U-S
KB
G-G
Ran
dB
GB
G51
.257
Mari
tsa
Eas
tI
(BG
)P
lovd
iv(B
G)
Des
ign
&perm
itting
2018
1100
(clu
ster
)T
R_____
BG
51.2
58M
arit
saE
ast
1(B
G)
Mar
itsa
Eas
t3
(BG
)D
esig
n&
perm
itti
ng11
00(c
lust
er)
TR
SK53
A13
4L
emea
ny
(SK
)V
eilc
éK
apu
any
(5K
)U
nder
cons
ider
atio
n20
2350
0(cl
uste
r)S
K-H
U50
0P
L->
DE
ICZ
/SK
PL58
.353
Kra
jnik
(PL
)B
aczy
na(P
L)
Pla
nned
2020
1500
DE
/CZ
/SK
->P
L50
0P
L->
DE
/CZ
/SK
PL
58.3
55M
ilcul
owa
(PL
)S
wie
bodz
ice
(PL
)P
lann
ed20
2015
00D
E/C
Z/S
K->
PL
,,4P
age
22of
46
7
-
AC
ER
:\g
’ncy
for
th’
t ;hpert
t()f
l
C)t
Lfl
CV
gV
Rcg
ula
trs
%1
Page
23of
46
PL
J
59.3
69S
iedi
ceU
jrza
nOw
(PL
)M
ilos
na(P
L)
Des
ign
&pe
rmit
ting
2015
1000
(clu
ster
)P
L/L
TP
L59
.370
Elk
(PL
)L
omza
(PL
)D
esig
n&
perm
itti
ng20
1510
00(c
lust
er)
PL
59.3
70L
omza
(PL
)U
nder
cons
truc
tion
2015
1000
(clu
ster
)P
L/L
TP
L59
.371
Ost
role
ka(P
L)
Und
erco
nstr
ucti
on20
1510
00(c
lust
er)
PL
/LT
PL59
.371
Ost
role
ka(P
L)
Nar
ew(P
L)
Und
erco
nstr
ucti
on20
1410
00(c
lust
er)
PL
/LT
PL
59.3
73O
stro
leka
(PL
)St
anis
law
Ow
(PL
)P
lann
ed20
20iO
OO
(clu
ster
)P
UL
LL
__
59.3
73St
anis
law
Ow
(PL
)U
nder
cons
truc
tion
2019
1000
(clu
ster
)P
L/L
TP
L59
.374
Koz
ieni
ce(P
L)
Sie
dice
Ujr
zanO
w(P
L)
Des
ign
&pe
rmit
ting
2019
1000
(clu
ster
)P
L/L
TP
LK
ozie
nice
(PL
)__
____
____
____
____
____
__P
lann
ed20
1910
00(c
lust
er)
PL
Plo
ck(P
L)
1O
lszt
ynM
atki
(PL
)P
lann
ed10
00(c
lust
er)
PL
/LT
PLO
lszt
ynM
atki
(PL
)P
lann
ed20
1 81 0
00(c
lust
er)
PL
/LT
Rev
sing
(DK
)L
ander
upgrd
(DK
)P
lann
ed20
2112
00D
KID
EE
E62
.388
Har
ku(E
E)l
lOkV
J
Sind
i(E
E)
Des
ign
&pe
rmit
ting
2020
550
(clu
ster
)E
E-L
V
—-—
Har
ku(E
E)
Sind
i(E
E)
Des
ign
&pe
rmit
ting
2020
550
(clu
ster
)E
E-L
VB
E75
.444
Zom
erge
m(B
E)
Zee
brug
ge(B
E)
Des
ign
&pe
rmit
ting
Qi
2016
1000
(clu
ster
)B
E-G
B.
..
..
1500
PL
->D
E/C
Z/S
KP
L94
.A68
Sw
itch
gear
Kra
jnfl
c(P
L)
Des
ign
&pe
rmit
ting
2017
500
DE
/CZ
ISK
->P
L-:-
-—--
—-z
----
----
..
1500
PL
->D
E/C
Z/S
KP
L94
.A69
Sw
itch
gear
Mik
ulow
a(P
L)
Des
ign
&pe
rmit
ting
201 6
500
DE
/CZ
/SK
->P
L.
..
1500
PL
->D
E/C
Z/S
KP
L94
.A70
PS
TK
rajn
ik(P
L)
Und
erco
nstr
ucti
on20
1650
0D
E/C
Z/S
K->
PL
.—
.1 5
00PL
94.A
71P
SI
Milc
ulow
a(P
L)
Und
erco
nstr
ucti
on20
1650
0D
E/C
Z/S
K->
PL
BG
95.2
65V
idno
(BG
)S
vobo
da(B
G)
Und
erco
nsid
erat
ion
2019
1000
BG
-RO
BG
95.A
119
Dob
rudj
a(B
G)
Bur
gas
(BG
)U
nder
cons
ider
atio
n20
2018
00B
G-R
OP
L10
0.33
5O
stro
leka
(PL
)O
lszt
ynM
atki
(PL
)D
esig
n&
perm
itti
ng20
1710
00(c
lust
er)
PL
-LT
HR
OT
HE
RT
umbr
i(H
R)
Vel
eevac
(HR
)P
lann
ed20
2310
0H
R-S
I
—--—
OT
HE
RN
ovaS
ela(
HR
)P
lat
(HR
)P
lann
ed20
2350
HR
-BA
—--—
Mel
ina
(HR
)P
lann
ed20
2320
0H
R-B
A
-
AC
ER
mA
g’nc
yfo
rth
’C
oope
rat
on
of
Ln
cr;y
)gu
Iat)
r
Table
II
(P
art
B):
Unspecified
increases
of
interconnector
capacity
related
tointernal
in
vestm
ent
com
ponents
Tra
nsfo
rmer
Saj
Oiv
ãnka
]P
lann
edI
HU
48.A
127
(HU
)
BG
51.
262
Mar
itsa
Eas
t1
(BG
)B
urga
s(B
G)
Und
erco
nsid
erat
ion
201 9
TR
Rah
man
(RO
)-D
obru
dja(
BG
)R
O53
.271
Med
gidi
aS
(RO
)D
esig
n&
perm
itti
ng20
16R
O-B
Gp1it
—
400
kVO
HL
Stu
pina
(RO
)D
esig
n&
perm
itti
ng20
16R
O-B
GR
O53
.272
Med
gidi
aS
(RO
)V
ama
(BG
)sp
lit
NO
407
Ton
stad
(NO
)A
rend
al(N
O)
Des
ign
&pe
rmit
ting
2020
/202
2(N
O,
UK
,D
E)
NO
A6
1S
amna
nger
(NO
)S
auda
(NO
)P
lann
ed20
21
(NO
,D
E,
UK
)
FR
21.5
4C
om
ier(
FR
)B
orde
rw
ith
IT(P
ioss
asco
)O
nti
me
2012
IT21
.54
Bor
der
wit
hF
R(C
orni
er)
IP
ioss
asco
(IT
)20
13.
exis
ting
line
toZ
erja
vine
cH
R27
.223
Cir
kovc
e(S
I)(H
R)
On
tim
e
HR
28.2
28B
orde
rw
ith
BA
(Tre
binj
e)P
lat
(HR
)O
nti
me
2014
EE
6339
1PU
ssi
(EE
)B
orde
rw
ith
Fl
(Ant
tila
)O
nti
me
Fl
63.3
91B
orde
rw
ith
EE
(PU
ssi)
Ant
tila
(Fl)
On
tim
e20
14IE
8046
1W
oodl
and(
IE)
Bor
der
wit
hG
B(D
eesi
de)
On
tim
e20
13G
B80
.461
Bor
der
wit
hIE
(Woo
dlan
d)D
eesi
de(G
B)
Bor
der
wit
hL
U(B
elva
l)L
U6
1B
orde
rw
ith
FR
(Mou
lain
e)B
elva
l(L
U)
Del
ayed
Oct
20
13
24o
f46
AT
HU
48.A
127
Rea
ctor
Saj
Oiv
ãnka
(HU
)I
Pla
nned
2016
HU
,S
K
Tab
leII
I:L
ist
ofco
mm
issi
oned
inte
rco
nn
ecto
rin
vest
men
tco
mpo
nent
s
PT
4.17
deG
Bor
der
wit
hL
(Pue
bla
deG
uzm
an)
Bor
der
wit
hP
T(
Tav
ira
(PT
)A
head
of
sche
dule
2011
(com
plet
ed)
-
AC
ER
.A
gt’
ncy
for
the
(oopra
ton
ot
Lfl
CrV
Rcg
ula
tors
Tab
leIV
:L
ist
ofco
mm
issi
oned
inte
rnal
inve
stm
ent
com
pone
nts
TY
ND
P
Country
..
..
.
Code
In
vestm
en
tS
ub
statio
n1
Substation
2P
ro
gress
in
country/E
UC
om
missio
nin
gd
ate
Item
Code
PT
16
Lagoaca
(P
T)
(B
yA
rmam
ar)
Recarei
(P
T)
(B
yA
rm
am
ar)
Dela
yed
2013
ES
4.
17
P.G
uzm
an
(E
S)
2013
ES
4.1
7G
uil
lena
(E
S)
Pu
eb
lad
eG
uzm
an
(E
S)
2009
ES
4.2
1A
ldeadavil
a(E
S)
Vil
larin
o(E
S)
2013
ES
4.2
1JM
Orio
l(E
S)
Caceres
(E
S)
20
10
ES
5.1
9V
ic(E
S)
Pie
rola
(E
S)
20
12
ES
j5.3
6S
ta.L
logaia
(E
S)
On
tim
e2
01
4
ES
•2___
(E
S)
[_
__
__
__
__
__
__
__
__
__
__
__
__
On
tim
e2
01
1
5.3
7_
__
Santa
Llo
gaia
(E
S)
Dela
yed
20
14
FR
Bai
xas
(F
R)
Gaudiêre
(F
R)
On
tim
e2013
Gra
do(E
S)
Dela
yed
2013
—
ES
6.22
Pen
agos
(ES
)20
10E
S6
12
Uda
lla(
ES
)20
11E
S6.
22P
esoz
(ES
)20
11E
SE
lP
alo
(E
S)
20
11
ES
Aba
nto(
ES
)20
10E
S7
__
__
Muruarte
(E
S)
2008
ES
72
4M
unie
sa
(E
S)
2013
ES
7.2
4_
_M
ezqu
ita
(ES
)-
2011
ES
Pui
gpel
at(E
S)
Pen
edes
(ES
)20
13E
S9.
26C
atad
au(E
S)_
____
____
____
___
2010
ES
1 033
Man
zana
res(
ES
)20
1210
.33a
Man
zana
res
(ES
)B
raza
tort
as(E
S)
2012
ES
10.3
3aB
raza
tort
as(E
S)_
___________
2012
ES
10.3
3aA
rcos
(ES
)G
uada
me(
ES
)20
10E
S14
.34
Tri
ves
(ES
)T
orde
sill
as(E
S)20
12E
S____
14.3
4A
pare
cida
(ES
)20
12E
S14
34b
PS
TG
alap
agar
(ES
)20
12E
S14
.34e
Mud
arra
(ES
)T
orde
sill
as(E
S)-
2012
FR
17.4
5T
aute
(FR
)O
udon
(FR
)O
nti
me
2012
FR
1 8.4
8G
audi
ëre
(FR
)R
ueyr
es(F
R)
2012
IT21
.81
Tri
no(I
T)
Lac
chia
rell
a(I
T)
2014
,/f_
Pag
e25
of4
6
PT
3.14
Marate
ca
(PT
)F
anhö
es(P
1)20
12
-
AC
ER
t\g
ncy
for
thc
Coo
p4ra
tion
ofL
:ncr
gyR
egul
ator
s
HR
28.A
11
5P
lat(H
R)
On
tim
e2014
IT30
.87
Fer
olet
o(I
T)
Mai
da(I
T)
2013
IT32
.96a
New
380
kVsu
bsta
tion
sfo
rR
ES
(IT
)20
12IT
32.A
99A
lian
o(IT
)20
12N
O37
.408
Kri
stia
nsan
d,F
eda
(NO
)O
nti
me
DE
44.
18
1D
auersberg
(D
E)
Lim
bu
rg
(D
E)
20
12
AT
47221
St.
Peter
(A
T)
Em
sthofen
(A
T)
Delay
ed
20
14
AT
47.2
21S
tPet
er(A
T)
Del
ayed
2014
AT
47.2
21E
mst
hofe
n(A
T)_
____
____
____
Del
ayed
2014
PL
59.3
72O
ltar
zew
(PL
)A
head
of
sche
dule
2014
Fl
63.3
91
Ant
tila
(Fl)
On
tim
e20
14E
E63
.391
Pus
si(E
E)
(EE
)O
ntim
e20
14
L_
63.391
c!FD
____
____
____
____
____
_A
nttila
(F
l)
On
tim
e20
14F
l64
.392
Yll
ikkä
lä(F
l)H
uuto
kosk
i(F
l)O
ntim
e20
13G
B77
.451
aD
ounr
eay
(GB
)B
eaul
y(G
B)
Del
ayed
2013
FR
89.A
24B
ritt
any
(FR
)O
nti
me
2013
(firststaeas
inE
U
PL
10
13
38
Kozienice(P
L)
Mo
ry
/P
iaseczn
o(P
L)
ES
27M
orve
dre
(ES
)S
anta
Pon
sa(E
S)
2012
(not
e:S
ud-A
veyr
onde
laye
d20
13(F
ruge
s)F
R41
Fru
ges
Sud
-Ave
yron
Mam
e-S
udS
omm
e(F
R)
Mam
e-S
ud
can
celled
and
(not
e:S
ud-A
veyr
on:
Som
me
‘on
tim
e’)
2017
and
Som
me:
2015
)
tF
RF
euil
lane
(FR
)R
ealt
or(F
R)
On
tim
eju
ne20
12IT
Cam
poro
sso(
1T)
2011
Har
nbur
g/K
rum
mel
(DE
)S
chw
erin
(DE
)20
12G
R24
6A
live
ri(G
R)
Sys
tem
(GR
)D
elay
ed20
13G
yor(
HU
)M
arto
nv
asar
(HU
)O
nti
me
2012
Deb
rece
n(H
U)
On
tim
e20
135K
296
Med
zibr
od(5
K)
poin
to
fsp
litt
ing
(5K
)P
L32
2K
rom
olic
e(P
L)
37
A0
8ik
sÜan
san
d(N
O)
On
tim
e-—
-o—
--S
amna
nger
(NO
)O
nti
me
2013
///
Pag
e26
of
46
IT28
.86
PS
TV
illa
nova
(IT
)20
12
-
AC
ER
:\ge
ncy
for
thc
Coopra
tion
ofln
crgv
Rcg
u1at
)rs
figure
I-
Mai
nre
ason
sfo
rde
laye
din
vest
men
ts
SD
elay
sdu
eto
perm
itgr
anti
ngre
ason
s
SN
atio
nal
law
chan
ges
affe
ctin
gpe
rmit
ting
SE
nvir
onm
enta
lpr
oble
ms
and
rero
utin
g
BL
and
acqu
siti
on
SD
elay
sdu
eto
corr
elat
ion
with
othe
rde
laye
dtr
ansm
issi
onin
vest
men
ts
SD
elay
inte
nder
ing
proc
ess
SD
elay
rela
ted
tofi
nali
sati
onof
agre
emen
tsac
ross
bord
ers
orw
ithtti
ird
part
ypr
omot
ers
Loc
alis
atio
nan
dsi
ting
ofsu
bsta
tion
(s)
othe
r
Inad
diti
onto
the
reas
ons
abov
e,th
eca
tego
ry“o
ther
reas
ons”
incl
udes
dela
ysin
cons
truc
tion
wor
ks,
tech
nolo
gica
lre
ason
san
dfi
nanc
ing
reas
ons.
,lP
age
27of
46
ano
info
-
AC
ER
—A
g?fl
cyfo
r!h’(?
opra
tin
()i
flC
rVguIa
trs
Tab
leV
:D
elay
edin
terc
onnec
tion
inve
stm
ents
and
rela
ted
reas
ons
.de
lays
inw
orks
5.36
Bai
xas
(FR
)S
ta.L
loga
ia20
14F
R01
.06.
2015
ES
2015
(arc
hite
ctur
altr
eatm
ent)
Nm
vest
men
tpr
ogre
ssJ
(ES
).
repo
rted
onth
esu
bsta
tion
The
tend
erin
gpr
oces
sha
sbe
ende
laye
ddu
eto
2155
Gra
nde
lie
(FR
)P
ioss
asco
(IT
)20
17/2
018
FR
2019
IT(b
lank
)a
post
pone
men
to
fa
few
No
inve
stm
ent
prog
ress
mon
ths.
The
proj
ect
isre
port
edno
wpla
nned
for
2019
——
—___
__
__
__
__
__
__
(ins
tead
of
201$
)”.
27.2
23ex
isti
ngli
neto
Cir
kovc
e(S
I)20
16H
USI
>20
1$In
vest
emen
tre
port
edon
othe
rpe
rmit
ting
reas
ons
—--—
Hev
izçH
)tim
eR
esch
edul
ing
of
wor
kdu
eto
furt
her
seco
ndar
y2$
.70
Vil
lano
va(I
T)
Las
tva
(ME
)20
15IT
2017
ME
perm
itti
ngdu
ring
land
(out
of
scop
e)ri
ghts
acqu
isit
ion
and
cons
truc
tion
phas
eE
xpec
ted
com
mis
sion
ing
date
has
been
post
pone
ddu
eto
slow
lypr
ogre
ssed
nego
tiat
ions
betw
een
4$.2
14G
abci
kovo
(5K
)G
onyu
area
2016
SK
201$
HU
2016
Slo
vak
TS
OS
EP
S,
a.s.
Inve
stem
ent
report
edon
(HU
)an
dH
unga
rian
TS
Oti
me
MA
VIR
,Z
Rt.
inid
enti
fyin
ga
loca
tion
of
the
SK—
HU
bord
erli
ne
—
cros
sing
.
_/,
1P
age2
8o
f46
Del
ays
inau
thor
izat
ion
Vil
ado
Con
depr
oces
sdu
eto
ach
ange
4.1$
Fon
tefr
ia(E
S)
(PT
)(B
yV
iana
2014
ES
2014
PT
2016
envi
ronm
enta
lre
ason
son
the
rout
ean
don
the
doC
aste
lo)
and
re-r
outi
ngs
loca
tion
of
subs
tati
ons
wer
ein
duce
dby
envi
ronm
enta
lco
ncer
ns
-
AC
ER
—:\
rWv
for
thc
(o
op
rit
on
()iL
nerg
vR
gu
Iato
rs
An
agre
emen
tbet
wee
n.
.th
eG
reek
and
the
51 .
256
Man
tsa
Eas
t1
N.S
anta
(GR
)lo
ng
term
BG
GR
2020
No
mv
estm
ent
pro
gre
ssB
ulg
aria
nT
SO
isst
ill
(BG
)re
port
ed.
pen
dm
gin
ord
erth
epro
ject
tom
ove
on.
71.4
27E
ndru
p(D
K)
Eem
shav
en2
01
6D
K2
01
9N
L2018
Inv
estm
ent
report
edas
env
iro
nm
enta
lre
aso
ns
—----—
-______________
(NL
)jr
esch
edu
led
and
re-r
outr
ngs
tI
The
pro
ject
has
bee
nre
ferr
edto
anin
dep
end
ent
enq
uir
yto
81.4
62W
oodl
and
(1E
)T
urle
enan
(Ni)
2016
IE20
17N
I(b
lank
)as
sess
whe
ther
any
oral
lN
omve
stm
ent
prog
ress
oft
he
pro
pose
dA
CO
HL
,sh
ou
ldbe
pla
ced
jun
derg
roun
d.L
on
gpro
cedure
sfo
rth
e
92.1
46
Aac
hen
/DU
ren
Lix
he
(BE
)2
01
7D
E2
01
8B
EQ
420
18N
oin
ves
tmen
tp
rog
ress
revis
ion
oft
he
sect
?rre
gio
n(D