PROYECTOS DE INVERSIÓN CULMINADOS HASTA ABRIL - 2014 (En Nuevos Soles) Actualizado: 30 de Abril de 2014 ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO PRESUPUESTO PRINCIPAL EJECUCION DEL AÑO INVERSIÓN TOTAL OBSERVACIONES GENERALES 1 54583 DEFENSA RIBEREÑA RIO HUALLAGA - JUANJUI JUANJUI SEDE CENTRAL CULMINADA ENCARGO S/. 1,771,951.04 S/. 0.00 S/. 0.00 0.00% S/. 2,780,888.00 156.94% 2 58103 CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA-HUICUNGO HUICUNGO S. CENTRAL/SRHC-J LIQUIDADA A.D. S/. 1,158,227.96 S/. 0.00 S/. 0.00 0.00% S/. 1,350,326.70 127.49% 3 29306 PACHIZA SEDE CENTRAL LIQUIDADA A.D. S/. 517,655.46 S/. 0.00 S/. 0.00 0.00% S/. 584,760.00 123.23% 4 56319 DEFENSA RIBEREÑA RIO HUALLAGA - CAMPANILLA CAMPANILLA SRHC-J LIQUIDADA A.D. S/. 1,377,991.03 S/. 0.00 S/. 0.00 0.00% S/. 1,478,245.00 97.51% 5 82922 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 279,220.00 S/. 0.00 S/. 0.00 0.00% S/. 171,719.00 61.50% 6 71341 NVA. CAJAMARCA RIOJA CULMINADA S/. 2,542,484.00 S/. 0.00 S/. 0.00 0.00% S/. 1,410,376.00 55.47% 7 151152 SHAPAJA SAN MARTIN PEHCBM LIQUIDADA A.D. S/. 2,057,084.66 S/. 0.00 S/. 0.00 0.00% S/. 780,331.00 37.93% - 9 IRRIGACION 82797 YORONGOS RIOJA PEAM CULMINADA A.D. S/. 84,620.00 S/. 0.00 S/. 0.00 0.00% S/. 78,229.41 92.45% - 10 IRRIGACION 83729 NVA. CAJAMARCA RIOJA PEAM CULMINADA A.D. S/. 466,716.00 S/. 0.00 S/. 0.00 0.00% S/. 242,271.67 51.91% - 11 IRRIGACION 83054 REHABILITACION DE BOCATOMA BAJO TONCHIMA POSIC RIOJA PEAM CULMINADA A.D. S/. 83,351.98 S/. 0.00 S/. 0.00 0.00% S/. 141,735.75 100.00% - 12 IRRIGACION 12469 MORALES SAN MARTIN PEHCBM CERRADO A.D. S/. 1,974,796.00 S/. 0.00 S/. 0.00 0.00% S/. 1,974,796.00 124.84% 13 IRRIGACION 16417 UCHIZA TOCACHE PEHCBM CULMINADA A.D. S/. 4,331,466.80 S/. 0.00 S/. 0.00 0.00% S/. 4,615,541.31 100.00% - 14 IRRIGACION 147477 JUAN GUERRA SAN MARTIN PEHCBM CULMINADA A.D. S/. 640,829.50 S/. 0.00 S/. 0.00 0.00% S/. 655,758.00 77.07% - 15 IRRIGACION 82917 NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 265,686.00 S/. 0.00 S/. 0.00 0.00% S/. 265,685.96 100.00% - 16 IRRIGACION 83791 NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 389,641.00 S/. 0.00 S/. 0.00 0.00% S/. 342,270.21 87.84% - 17 IRRIGACION 95236 SAN RAFAEL BELLAVISTA PEHCBM CULMINADA A.D. S/. 3,629,778.19 S/. 0.00 S/. 0.00 0.00% S/. 3,819,623.00 105.23% - 18 IRRIGACION - MEJORAMIENTO CANALES DE RIEGO – IRRIGACION WINGE PICOTA PICOTA PEHCBM CULMINADA A.D. S/. 2,677,123.75 S/. 0.00 S/. 0.00 0.00% S/. 2,677,123.75 100.00% 2715499.77 19 IRRIGACION 82920 REHABILITACIÓN DE BOCATOMA DE ALTO ALIANZA NVA. CAJAMARCA RIOJA PEAM CULMINADA - S/. 190,518.81 S/. 0.00 S/. 0.00 0.00% S/. 190,518.81 100.00% - 20 IRRIGACION 82821 REHABILITACION DE BOCATOMA TELLO LA UNION NVA. CAJAMARCA RIOJA PEAM CULMINADA CONTRATA S/. 120,023.00 S/. 0.00 S/. 0.00 0.00% S/. 140,316.00 100.00% - CODIGO SNIP MODALIDAD EJECUCION PIM DEL AÑO AVAN. % DEL AÑO AVAN % TOTAL BASE/REF. (F-15/Exp. Tec.) DEFENSA RIBEREÑA MARISCAL CACERES Convenio Específico Nº 0035–2008 GRSM-PGR, con MP de Mcal. Cáceres-Juanjui Obra inaugurada 18-12-10 Liquidación observada DEFENSA RIBEREÑA MARISCAL CACERES El proyecto se ejecutó por encargo, a la SRHC- Oficina Zonal Juanjui. La información fue suministrada por SRHC DEFENSA RIBEREÑA CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA- III ETAPA, PROVINCIA MARISCAL CACERES-REGION SAN MARTIN MARISCAL CACERES Primer devengado: setiembre 2009 Ultimo devengado: agosto 2010 Ppto Sede Central, ejecutado OZMC DEFENSA RIBEREÑA MARISCAL CACERES Obra culminada y liquidada, la fuente de financiamiento son R.O. DEFENSA RIBEREÑA REHABILITACION DE DEFENSA RIBEREÑA DEL SECTOR DOMINGO PUESTO Obra culminada, la fuente de financiamiento son R.O. DEFENSA RIBEREÑA CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO YURACYACU EN LOS SECTORES NUEVA CAJAMARCA I Y LOS OLIVOS DIST. NUEVA CAJAMARCA - PROV. RIOJA MD NVA. CAJAMARCA/ S. CENTRAL A.D. CONVENIO Financiamiento por parte de la Sede Central. Convenio N° 016-2008-GRSM/PGR DEFENSA RIBEREÑA CONSTRUCCION DE DEFENSA RIBEREÑA DE LA ZONA URBANA, MARGEN IZQUIERDA RIO HUALLAGA EN LA LOCALIDAD Y DISTRITO DE SHAPAJA, PROVINCIA DE SAN MARTIN - SAN MARTIN REHABILITACION DEL SISTEMA DE RIEGO YORONGOS, LATERALES 17, 18 Y 19 REHABILITACION DE LA BOCATOMA MICHUCO MARGEN DERECHA RIO YURACYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA, SAN MARTIN REHABILITACION Y MEJORAMIENTO IRRIGACION CUMBAZA EN LA PROVINCIA Y REGION SAN MARTIN Al 13-12-12 el monto consignado en el SOSEM, no coincide con el consignado en el Informe de Cierre. Se tomó como valor de la inversión total el del Informe de Cierre CONSTRUCCIÒN DE INFRAESTRUCTURA DE RIEGO EN LA CAPTACIÒN PAMPAYACU, PROVINCIA DE TOCACHE, REGIÒN SAN MARTÌN REHABILITACION DEL CANAL DE RIEGO CUMBAZA, MARGEN DERECHA RIO CUMBAZA TRAMO KM 31+981 AL 32+167, DISTRITO DE JUAN GUERRA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN REHABILITACION BOCATOMA ALTO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA REHABILITACION DE BOCATOMA LUCHADOR - NARANJILLO, DISTRITO NUEVA CAJAMARCA MEJORAMIENTO DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL LATERAL 25, MARGEN DERECHA IRRIGACION SISA,DISTRITO SAN RAFAEL, PROVINCIA BELLAVISTA, REGION SAN MARTIN

Upload: kassiel-sanchez-diaz

Post on 24-Dec-2015

295 views

Category:

Documents


5 download

DESCRIPTION

ASA

TRANSCRIPT

Page 1: Documento 1647

PROYECTOS DE INVERSIÓN CULMINADOS HASTA ABRIL - 2014

(En Nuevos Soles)Actualizado: 30 de Abril de 2014

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALES

1 54583 DEFENSA RIBEREÑA RIO HUALLAGA - JUANJUI JUANJUI SEDE CENTRAL CULMINADA ENCARGO S/. 1,771,951.04 S/. 0.00 S/. 0.00 0.00% S/. 2,780,888.00 156.94%

2 58103 HUICUNGO S. CENTRAL/SRHC-J LIQUIDADA A.D. S/. 1,158,227.96 S/. 0.00 S/. 0.00 0.00% S/. 1,350,326.70 127.49%

3 29306 PACHIZA SEDE CENTRAL LIQUIDADA A.D. S/. 517,655.46 S/. 0.00 S/. 0.00 0.00% S/. 584,760.00 123.23%

4 56319 DEFENSA RIBEREÑA RIO HUALLAGA - CAMPANILLA CAMPANILLA SRHC-J LIQUIDADA A.D. S/. 1,377,991.03 S/. 0.00 S/. 0.00 0.00% S/. 1,478,245.00 97.51%

5 82922 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 279,220.00 S/. 0.00 S/. 0.00 0.00% S/. 171,719.00 61.50%

6 71341 RIOJA CULMINADA S/. 2,542,484.00 S/. 0.00 S/. 0.00 0.00% S/. 1,410,376.00 55.47%

7 151152 SHAPAJA SAN MARTIN PEHCBM LIQUIDADA A.D. S/. 2,057,084.66 S/. 0.00 S/. 0.00 0.00% S/. 780,331.00 37.93% -

9 IRRIGACION 82797 YORONGOS RIOJA PEAM CULMINADA A.D. S/. 84,620.00 S/. 0.00 S/. 0.00 0.00% S/. 78,229.41 92.45% -

10 IRRIGACION 83729 RIOJA PEAM CULMINADA A.D. S/. 466,716.00 S/. 0.00 S/. 0.00 0.00% S/. 242,271.67 51.91% -

11 IRRIGACION 83054 REHABILITACION DE BOCATOMA BAJO TONCHIMA POSIC RIOJA PEAM CULMINADA A.D. S/. 83,351.98 S/. 0.00 S/. 0.00 0.00% S/. 141,735.75 100.00% -

12 IRRIGACION 12469 MORALES SAN MARTIN PEHCBM CERRADO A.D. S/. 1,974,796.00 S/. 0.00 S/. 0.00 0.00% S/. 1,974,796.00 124.84%

13 IRRIGACION 16417 UCHIZA TOCACHE PEHCBM CULMINADA A.D. S/. 4,331,466.80 S/. 0.00 S/. 0.00 0.00% S/. 4,615,541.31 100.00% -

14 IRRIGACION 147477 JUAN GUERRA SAN MARTIN PEHCBM CULMINADA A.D. S/. 640,829.50 S/. 0.00 S/. 0.00 0.00% S/. 655,758.00 77.07% -

15 IRRIGACION 82917 RIOJA PEAM CULMINADA CONTRATA S/. 265,686.00 S/. 0.00 S/. 0.00 0.00% S/. 265,685.96 100.00% -

16 IRRIGACION 83791 RIOJA PEAM CULMINADA CONTRATA S/. 389,641.00 S/. 0.00 S/. 0.00 0.00% S/. 342,270.21 87.84% -

17 IRRIGACION 95236 SAN RAFAEL BELLAVISTA PEHCBM CULMINADA A.D. S/. 3,629,778.19 S/. 0.00 S/. 0.00 0.00% S/. 3,819,623.00 105.23% -

18 IRRIGACION - MEJORAMIENTO CANALES DE RIEGO – IRRIGACION WINGE PICOTA PICOTA PEHCBM CULMINADA A.D. S/. 2,677,123.75 S/. 0.00 S/. 0.00 0.00% S/. 2,677,123.75 100.00% 2715499.77

CODIGOSNIP

MODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

DEFENSA RIBEREÑA

MARISCAL CACERES

Convenio Específico Nº 0035–2008 GRSM-PGR, con MP de Mcal. Cáceres-JuanjuiObra inaugurada 18-12-10Liquidación observada

DEFENSA RIBEREÑA

CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA-HUICUNGO

MARISCAL CACERES

El proyecto se ejecutó por encargo, a la SRHC-Oficina Zonal Juanjui.La información fue suministrada por SRHC

DEFENSA RIBEREÑA

CONSTRUCCION DEFENSA RIBEREÑA RIO HUAYABAMBA- III ETAPA, PROVINCIA MARISCAL CACERES-REGION SAN MARTIN

MARISCAL CACERES

Primer devengado: setiembre 2009Ultimo devengado: agosto 2010Ppto Sede Central, ejecutado OZMC

DEFENSA RIBEREÑA

MARISCAL CACERES

Obra culminada y liquidada, la fuente de financiamiento son R.O.

DEFENSA RIBEREÑA

REHABILITACION DE DEFENSA RIBEREÑA DEL SECTOR DOMINGO PUESTO

Obra culminada, la fuente de financiamiento son R.O.

DEFENSA RIBEREÑA

CONSTRUCCION DE DEFENSA RIBEREÑA Y ENCAUZAMIENTO DEL RIO YURACYACU EN LOS SECTORES NUEVA CAJAMARCA I Y LOS OLIVOS DIST. NUEVA CAJAMARCA - PROV. RIOJA

NVA. CAJAMARCA

MD NVA. CAJAMARCA/ S.

CENTRAL

A.D.CONVENIO

Financiamiento por parte de la Sede Central.Convenio N° 016-2008-GRSM/PGR

DEFENSA RIBEREÑA

CONSTRUCCION DE DEFENSA RIBEREÑA DE LA ZONA URBANA, MARGEN IZQUIERDA RIO HUALLAGA EN LA LOCALIDAD Y DISTRITO DE SHAPAJA, PROVINCIA DE SAN MARTIN - SAN MARTIN

REHABILITACION DEL SISTEMA DE RIEGO YORONGOS, LATERALES 17, 18 Y 19

REHABILITACION DE LA BOCATOMA MICHUCO MARGEN DERECHA RIO YURACYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA, SAN MARTIN

NVA. CAJAMARCA

REHABILITACION Y MEJORAMIENTO IRRIGACION CUMBAZA EN LA PROVINCIA Y REGION SAN MARTIN

Al 13-12-12 el monto consignado en el SOSEM, no coincide con el consignado en el Informe de Cierre.Se tomó como valor de la inversión total el del Informe de Cierre

CONSTRUCCIÒN DE INFRAESTRUCTURA DE RIEGO EN LA CAPTACIÒN PAMPAYACU, PROVINCIA DE TOCACHE, REGIÒN SAN MARTÌN

REHABILITACION DEL CANAL DE RIEGO CUMBAZA, MARGEN DERECHA RIO CUMBAZA TRAMO KM 31+981 AL 32+167, DISTRITO DE JUAN GUERRA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN

REHABILITACION BOCATOMA ALTO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA

NVA. CAJAMARCA

REHABILITACION DE BOCATOMA LUCHADOR - NARANJILLO, DISTRITO NUEVA CAJAMARCA

NVA. CAJAMARCA

MEJORAMIENTO DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL LATERAL 25, MARGEN DERECHA IRRIGACION SISA,DISTRITO SAN RAFAEL, PROVINCIA BELLAVISTA, REGION SAN MARTIN

S16
USER: DECIA= 2'730,085.38
M18
jlinares: DECIA: 584,760.00 EL MONTO ACTUAL ES EEGUN SOSEM Y CORRESPONDE AL PERFIL
K19
jlinares: INC. SUPERVISION: 1'346,447.23+50,000.00=1'396,447.23 PPTO.: 09-07-10 OZMC: 1'346,447.23+31,543.80
M19
jlinares: EL MONTO ACTUAL ES EEGUN SOSEM Y CORRESPONDE AL PERFIL
M20
jlinares: DECIA: 171,719.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
M21
jlinares: DECIA: 1'410,376.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
M22
jlinares: DECIA: 780,331.00
S22
USER: MONTO LIQUIDADO
S24
jlinares: SEGÚN LUCHO ROJAS
T24
USER: SEGÚN SOSEM
M27
jlinares: SEGÚN SOSEM: MONTO DEL PERFIL
N27
jlinares: SEGÚN SOSEM: 1'175,415.00 SEGÚN I. CIERRE: 1'974,796.00
K29
jlinares: MONTO SEGÚN SOSEM
M29
jlinares: VIABILIDAD: 850,910.00 INVERSION: 640,830.00 EL SOSEM TOMO EL VALOR DE LA VIABILIDAD
M30
jlinares: DECIA: 176,305.00 MONTO ACTUAL SEGÚN SOSEM
M31
jlinares: DECIA: 96,187.00 MONTO ACTUAL SEGÚN SOSEM
N31
jlinares: SEGÚN SOSEM
T31
USER: SEGÚN SOSEM
K32
jlinares: SNIP 15: 04-11-09
M32
jlinares: DECIA: 3'819,623.00 MONTO ACTUAL, SEGÚN SOSEM
T32
USER: EN EL SOSEM ESTA RESPECTO AL MONTO VIABLE (113%)
Page 2: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

19 IRRIGACION 82920 REHABILITACIÓN DE BOCATOMA DE ALTO ALIANZA RIOJA PEAM CULMINADA - S/. 190,518.81 S/. 0.00 S/. 0.00 0.00% S/. 190,518.81 100.00% -

20 IRRIGACION 82821 REHABILITACION DE BOCATOMA TELLO LA UNION RIOJA PEAM CULMINADA CONTRATA S/. 120,023.00 S/. 0.00 S/. 0.00 0.00% S/. 140,316.00 100.00% -

21 IRRIGACION 82924 CALZADA MOYOBAMBA PEAM CULMINADA - S/. 44,740.00 S/. 0.00 S/. 0.00 0.00% S/. 4,239.00 9.47% -

22 IRRIGACION 83106 AWAJUN RIOJA PEAM CULMINADO ENCARGO S/. 208,191.00 S/. 0.00 S/. 0.00 0.00% S/. 208,191.00 100.00% -

23 AGROPECUARIA 104777

PEAM CULMINADA CONTRATA

S/. 4,862,351.62

S/. 223,746.03

S/. 0.00 S/. 0.00 0 S/. 644,839.97 11.74%

En proceso de liquidación

PEAM LIQUIDADA CONTRATA S/. 214,217.36 Obra liquidada

24 IRRIGACION Sin codigo REHABILITACIÓN DE BOCATOMA LUCHADOR SHICA SORITOR MOYOBAMBA SEDE CENTRAL LIQUIDADA ENCARGO S/. 150,000.00 S/. 0.00 S/. 0.00 0.00% S/. 149,637.14 99.76%

25 IRRIGACION EL DORADO SEDE CENTRAL LIQUIDADA ENCARGO S/. 123,820.00 S/. 0.00 S/. 0.00 0.00% S/. 123,703.87 100.00%

26 59245 SAN CRISTOBAL PICOTA PEHCBM LIQUIDADA ENCARGO S/. 1,017,234.96 S/. 0.00 S/. 0.00 0.00% S/. 679,539.42 100.00%

27 52033 SAN HILARION PICOTA PEHCBM CULMINADA ENCARGO S/. 4,411,171.84 S/. 66,967.00 S/. 64,511.73 96.33% S/. 4,882,910.10 100.00%

28 SAN HILARION PICOTA PEHCBM LIQUIDADA ENCARGO S/. 799,778.00 S/. 0.00 S/. 0.00 0.00% S/. 799,773.06 100.00%

29 Sin codigo DESCOLMATACION Y ENCAUZAMIENTO DEL RIO CEDRO POLVORA TOCACHE MP TOCACHE LIQUIDADA ENCARGO S/. 0.00 S/. 0.00 S/. 0.00 0.00% S/. 85,539.83 100.00%

30 IRRIGACION 83713 SAN FERNANDO RIOJA N.E. LIQUIDADA NE S/. 290,912.72 S/. 0.00 S/. 0.00 0.00% S/. 177,137.90 100.00%

31 - TOCACHE TOCACHE MP TOCACHE CULMINADA CONVENIO S/. 121,250.00 S/. 0.00 S/. 0.00 0.00% S/. 121,250.00 -

32 IRRIGACION - REHABILITACIÓN DE LA BOCATOMA RÚSTICA EL MILAGRO AWAJUN RIOJA MD AWAJUN LIQUIDADA ENCARGO S/. 96,910.00 S/. 0.00 S/. 0.00 0.00% S/. 96,838.36 100.00%

33 IRRIGACION 144157 RIOJA SEDE CENTRAL CULMINADA - S/. 4,142,047.22 S/. 0.00 S/. 0.00 0.00% - - -

34 IRRIGACION 82918 RIOJA PEAM CULMINADA - S/. 228,796.00 S/. 0.00 S/. 0.00 0.00% S/. 228,796.03 100.00% -

35 IRRIGACION 82934 YURACYACU RIOJA PEAM CULMINADA - S/. 66,181.00 S/. 0.00 S/. 0.00 0.00% S/. 66,180.72 100.00% ONVENIO ESPECIFICO Nº 016-2008-GRSM /PGR

36 IRRIGACION 82912 RIOJA PEAM CULMINADA - S/. 60,749.00 S/. 0.00 S/. 0.00 0.00% S/. 60,749.16 100.00% -

NVA. CAJAMARCA

NVA. CAJAMARCA

OBRA DE PREVENCION REVESTIMIENTO CANAL EL AMAZONICO

MEJORAMIENTO DE CAPTACION Y CANAL DE CONDUCCION DEL SISTEMA DE RIEGO EL MILAGRO

MEJORAMIENTO DEL SERVICIO DE PROTECCION Y CONSERVACION DE LA ZONA DE AMORTIGUAMIENTO DEL BOSQUE DE PROTECION DEL ALTO MAYO EN LA PROVINCIA DE

RIOJA - SAN MARTIN

CONSTRUCCION DE LA INFRAESTRUCTURA ADMINISTRATIVA DEL ANP - BPAM

RIOJA, MOYOBAMBA

RIOJA, MOYOBAMBA

CONSTRUCCION DE LA INFRAESTRUCTURA DE CENTROS DE CAPACITACION RURAL, CERCO PERIMETRICO E INSTALACION DE UNIDAD DE TRATAMIENTO PRIMARIO

Obra Liquidada con: RER Nº 433-2010-GRSM/PGR.Convenio Nº 052-2004-GR-SM/PGR - Municipalidad de Soritor.

INDECI EMERGEN

CIA

REHABILITACIÓN DE OBRAS DE ARTE, LATERAL Nº 21 MARGEN DERECHA IRRIGACIÓN SISA

SAN JOSE DE SISA

Obra Liquidada con: RER Nº 434-2010-GRSM/PGRConvenio Nº 062-2004-GR-SM/PGR - Municipalidad de San Rafael.

DEFENSA RIBEREÑA

REHABILITACION DEFENSA RIBEREÑA RIO HUALLAGA PUERTO RICO

Obra Liquidada con: RER Nº 404-2011-GRSM/PGR. Modificada con R.E.R Nº Conv. N° 013-2007-GR-SM/PGR., Munic. Distrital de San Cristobal

DEFENSA RIBEREÑA

AMPLIACION DEFENSA RIBEREÑA RIO HUALLAGA-SAN HILARION

Trabajos paralizados a partir del 08/01/2013. Se reiniciaron los trabajos a partir del 02/05/2013

DEFENSA RIBEREÑA

INDECI EMERGEN

CIA

REHABILITACION DE DEFENSA RIBEREÑA RIO HUALLAGA SAN HILARION

Obra Liquidada con: RGR Nº 047-2011-GRSM/GRI.PIP cerrado con informe de ejecucion de PIP de emergencia por desastres de gran magnitud, con fecha 26-03-12Conv. N° 014-2007-GR-SM/PGR., Munic. Distrital de San Hilarion

DEFENSA RIBEREÑA

Obra Liquidada con : RER Nº 666-2011-GRSM/PGR.Convenio de encargo Nº 006-2007-GRSM-PGR entre GRSM y MPT

MEJORAMIENTO DE 530 ML DEL CANAL SAN JOSE DE PERLA MAYO – SAN FERNANDO, PROVINCIA DE RIOJA, SAN MARTIN

Obra Liquidada con: RGR Nº 068-2011-GRSM/GRINucleo Ejecutor

DEFENSA RIBEREÑA

ENCAUZAMIENTO, LIMPIEZA DE CAUCE, ARMADO DE LA PLATAFORMA MARGEN DERECHA DEL RIO TOCACHE

Culminó el año 2007Convenio de encargo Nº 051-2007-GRSM-PGR

Obra Liquidada con: RER Nº 1353-2010-GRSM/PGRConvenio Nº 049-2004-GR-SM/PGR - Municipalidad de Awajun.

MEJORAMIENTO DEL SISTEMA DE RIEGO ALTO PLANTANOYACU, DISTRITO NUEVA CAJAMARCA, PROVINCIA DE RIOJA - REGION SAN MARTIN

NVA. CAJAMARCA

PROTECCION DE RIBERA RIO YURACYACU - CANAL NARANJAL, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA

NUEVA CAJAMARCA

REHABILITACIÓN DEFENSA RIBEREÑA RIO YURACYACU CANAL CONSTELACIÓN

REHABILITACION TOMA DE CAPTACION BAJO PLANTANAYACU, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA

NUEVA CAJAMARCA

M36
jlinares: DECIA: 4,239.00
N36
jlinares: SEGÚN SOSEM
T36
USER: SEGÚN SOSEM
I37
USER: SOSEM NO REGISTRA EJECUCION
N49
jlinares: SOSEM NO REGISTRA INFORMACION. EN PROCESO...
M50
jans Linares: PERFIL, SOSEM
M51
jans Linares: PERFIL, SOSEM
M52
jans Linares: SOSEM, PERFIL
Page 3: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

37 IRRIGACION 82787 RIOJA PEAM CULMINADA - S/. 228,739.00 S/. 0.00 S/. 0.00 0.00% S/. 228,739.18 S/. 100.00 -

38 IRRIGACION AWAJUN RIOJA PEAM CULMINADA - S/. 190,519.00 S/. 0.00 S/. 0.00 0.00% S/. 134,311.83 100.00% -

39 IRRIGACION 141058 RIOJA SEDE CENTRAL CULMINADA CONTRATA S/. 3,566,122.13 S/. 0.00 S/. 0.00 #DIV/0! S/. 3,038,255.85 101.38%

41 TRANSPORTES 63772 BELLAVISTA PEHCBM CULMINADA A.D. S/. 46,155,360.00 S/. 0.00 S/. 0.00 0.00% S/. 47,307,819.00 102.50% -

42 TRANSPORTES 11648 BAJO BIAVO BELLAVISTA SEDE CENTRAL LIQUIDADA A.D. S/. 1,414,408.64 S/. 0.00 S/. 0.00 0.00% S/. 1,561,162.00 110.38% -

43 TRANSPORTES 50545 EL DORADO PEHCBM CULMINADA A.D. S/. 798,232.00 S/. 0.00 S/. 0.00 0.00% S/. 901,460.00 112.93% -

44 TRANSPORTES 71806 CONTRATA S/. 100,021,674.01 S/. 0.00 S/. 0.00 0.00% S/. 133,655,057.65 128.57%

45 TRANSPORTES 51154 HUALLAGA DRTC LIQUIDADA A.D. S/. 1,264,505.00 S/. 0.00 S/. 0.00 0.00% S/. 1,276,902.00 100.98% -

46 TRANSPORTES 7608 LAMAS LAMAS DRTC/ S. CENTRAL CULMINADA CONTRATA S/. 1,996,365.00 S/. 0.00 S/. 0.00 0.00% S/. 559,567.00 28.03%

47 TRANSPORTES 81199 LAMAS PEHCBM CERRADO A.D. S/. 4,632,478.00 S/. 0.00 S/. 0.00 0.00% S/. 4,840,259.00 104.49%

48 TRANSPORTES 11918 SAPOSOA HUALLAGA SEDE CENTRAL CULMINADA - S/. 1,982,038.00 S/. 0.00 S/. 0.00 S/. 1,383,940.71 69.82% -

49 TRANSPORTES 116841 LAMAS PEHCBM CULMINADA CONTRATA S/. 3,811,719.00 S/. 0.00 S/. 0.00 0.00% S/. 4,316,061.00 113.23% -

50 TRANSPORTES 8982 SORITOR MOYOBAMBA CULMINADA CONVENIO AD S/. 1,611,720.00 S/. 0.00 S/. 0.00 0.00% S/. 1,334,675.00 100.00% Convenio 015-2007-GRSM/PGR con la MD Soritor

51 TRANSPORTES 9607 SORITOR MOYOBAMBA PEAM CULMINADA A.D. S/. 3,401,937.00 S/. 0.00 S/. 0.00 0.00% S/. 1,028,914.00 30.24% -

52 TRANSPORTES 9651 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 3,827,372.00 S/. 0.00 S/. 0.00 0.00% S/. 3,780,861.00 98.78% -

53 TRANSPORTES 136413

I ETAPA

MOYOBAMBA MOYOBAMBA SEDE CENTRAL

LIQUIDADA CONTRATA

S/. 2,139,884.64

S/. 409,890.95 S/. 0.00 S/. 0.00 0.00% S/. 318,964.11 100.00%

REHABILITACION BOCATOMA GALINDONA, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA

NUEVA CAJAMARCA

PROTECCIÓN DE RIBERA MARGEN IZQUIERDA RIO NARANJILLO BOCATOMA EL MILAGRO

MEJORAMIENTO DEL CANAL PRINCIPAL DEL SISTEMA DE RIEGO UCRANIA - AZUNGUILLO, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA, REGION SAN MARTIN

NUEVA CAJAMARCA

AMC - Contrato N° 036-2012-GRSM (01-08-12)Obra culminada con contrato de Obra en Proceso de Liquidación

CONSTRUCCIÓN DEL PUENTE VEHICULAR BELLAVISTA SOBRE EL RIO HUALLAGA

BELLAVISTA, ALTO BIAVO, BAJO BIAVO)

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA VECINAL LA PERLA DE PONACILLO - YANAYACU EN EL DISTRITO DE BAJO BIAVO, PROVINCIA DE BELLAVISTA

CONSTRUCCION DEL PUENTE VEHICULAR SOBRE LA QUEBRADA PISHUAYA EN LA LOCALIDAD Y DISTRITO DE SAN JOSE DE SISA, PROVINCIA DE EL DORADO - SAN MARTIN

SAN JOSE DE SISA

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA EMPALME PE-5N - CUÑUMBUQUE - ZAPATERO - SAN JOSE DE SISA

SAN JOSE DE SISA,

CUÑUMBUQUE, ZAPATERO

EL DORADO Y LAMAS

PEHCBM/S. CENTRAL

CULMINADA/EN ARBITRAJE

Contrato N° 500-2008-GRSM-PEHCBMLP N° 005-2008-GRSM-PEHCBM/CE

CONSTRUCCION PUENTE COLGANTE VEHICULAR DEL DISTRITO DE TINGO DE SAPOSOA, PROVINCIA DE HUALLAGA, DEPARTAMENTO DE SAN MARTIN

TINGO DE SAPOSOA

MEJORAMIENTO DE LA CARRETERA DV. FERNANDO BELAUNDE TERRY (KM 606 DE R05N) LAMAS (R-111)

CONVENIO 008-2007-GRSM/PGR con la Municipalidad de Lamas

CONSTRUCCION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL TRAMO EMPALME PE - 5N (PUENTE BOLIVIA) - LAMAS - PROVINCIA DE LAMAS – DEPARTAMENTO DE SAN MARTIN

LAMAS Y SHANAO

PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 02-10-09Informe de cierre = 05-09-11

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA VECINAL SAPOSOA - EL DORADO EN LA LOCALIDAD DE EL DORADO, DISTRITO DE SAPOSOA, PROVINCIA DE HUALLAGA

CONSTRUCCION DEL PUENTE VEHICULAR SOBRE EL RIO CUMBAZA, EN LA LOCALIDAD DE SAN ROQUE DE CUMBAZA, DISTRITO DE SAN ROQUE DE CUMBAZA, PROVINCIA DE LAMAS-SAN MARTIN

SAN ROQUE DE CUMBAZA

CONSTRUCCION DE LA CARRETERA VECINAL SAN MARCOS - SELVA ALEGRE, EN EL DISTRITO DE SORITOR, PROVINCIA DE MOYOBAMBA.

S. CENTRAL/ MD SORITOR

REHABILITACION Y MEJORAMIENTO CAMINO VECINAL SORITOR - VILLA HERMOSA (L=19+360 KM.) Y CONSTRUCCION DEL PUENTE COLGANTE CARROZABLE INDOCHE (L=60 M.) EN LA LOCALIDAD DE VILLA HERMOZA-DISTRITO SORITOR-PROVINCIA DE MOYOBAMBA

MEJORAMIENTO CAMINO VECINAL: MARGINAL - PARAISO - SANTA ROSA DE OROMINA - LAS PALMERAS DE OROMINA, DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL JIRON DOS DE MAYO CUADRAS 18, 19, 20 Y CALLE AEROPUERTO DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN

Obra LiquidadaContrato N° 062-2010-GRSM/GGR (19-04-10)

M53
jans Linares: SOSEM, PERFIL
N57
USER: SEDE C. + PEHCBM
N58
USER: SEDE C. + DRT
N59
USER: PEHCBM
N62
USER: SEDE C.
N63
USER: PEHCBM
S63
USER: COINCIDE AL INFORME DE CIERRE
N65
USER: PEHCBM
N66
USER: SEDE C.
N67
USER: PEAM
N68
USER: PEAM
Page 4: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

53 TRANSPORTES 136413

I I ETAPA

MOYOBAMBA MOYOBAMBA SEDE CENTRAL

CULMINADA A.D.

S/. 2,139,884.64

S/. 1,398,368.71 S/. 0.00 S/. 0.00 0.00% S/. 1,708,548.31 100.00% Obra culminada en proceso de liquidación (80%)

60 TRANSPORTES 55625 PEAM CULMINADA CONTRATA S/. 7,885,502.00 S/. 0.00 S/. 0.00 0.00% S/. 5,463,834.00 69.29% -

61 TRANSPORTES 72995 SHAMBOYACU PICOTA DRTC LIQUIDADA CONTRATA S/. 112,256.00 S/. 0.00 S/. 0.00 0.00% S/. 112,256.00 100.00%

62 TRANSPORTES 11631 AWAJUN RIOJA PEAM CULMINADA CONTRATA S/. 3,064,016.00 S/. 0.00 S/. 0.00 0.00% S/. 5,178,603.87 105.45% -

63 TRANSPORTES 11244 AWAJUN RIOJA PEAM CULMINADA CONTRATA S/. 2,681,988.21 S/. 0.00 S/. 0.00 0.00% S/. 3,047,674.00 113.63% -

64 TRANSPORTES 11261 YURACYACU RIOJA PEAM CULMINADA CONTRATA S/. 1,740,831.20 S/. 0.00 S/. 0.00 0.00% S/. 1,796,901.00 103.22% -

65 TRANSPORTES 28489 EL PORVENIR SAN MARTIN INADE-PEHCBM CERRADO A.D. S/. 2,140,458.97 S/. 0.00 S/. 0.00 0.00% S/. 2,970,706.00 100.00%

66 TRANSPORTES 66713 MORALES SAN MARTIN CULMINADA ENCARGO S/. 2,517,436.00 S/. 0.00 S/. 0.00 0.00% S/. 3,271,340.70 129.95%

67 TRANSPORTES 92590 UCHIZA TOCACHE CULMINADA A.D. S/. 869,939.02 S/. 0.00 S/. 0.00 0.00% S/. 734,399.00 84.42%

69 TRANSPORTES 45124 TARAPOTO SAN MARTIN CULMINADA ENCARGO S/. 9,963,497.12 S/. 0.00 S/. 0.00 0.00% S/. 9,906,703.00 99.43%

70 TRANSPORTES 45983 CHIPURANA SAN MARTIN PEHCBM CERRADO A.D. S/. 7,934,653.00 S/. 0.00 S/. 0.00 0.00% S/. 7,985,331.00 100.64%

71 TRANSPORTES 7308 MORALES SAN MARTIN CULMINADA A.D. S/. 3,199,421.00 S/. 0.00 S/. 0.00 0.00% S/. 6,676,420.37 100.00% Convenio 002-2005-GSM/PGR

72 TRANSPORTES 80253 SAN MARTIN CULMINADA A.D. S/. 139,678.00 S/. 0.00 S/. 0.00 0.00% S/. 243,951.74 100.00% -

73 TRANSPORTES 25041 JUAN GUERRA SAN MARTIN CULMINADA ENCARGO S/. 618,422.00 S/. 0.00 S/. 0.00 0.00% S/. 588,111.00 100.00% A.D. (Convenio Especifico Nº 05-2009-GRSM/PGR)

74 TRANSPORTES 116252 SAN MARTIN PEHCBM CULMINADA CONTRATA S/. 1,020,574.90 S/. 0.00 S/. 0.00 0.00% S/. 924,615.09 100.00%

75 TRANSPORTES 18267 CONSTRUCCION DEL PUENTE ESPINO ACCESO UCHIZA TOCACHE DRTC LIQUIDADA A.D. S/. 2,634,864.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

76 TRANSPORTES 42382 SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 1,861,268.00 S/. 0.00 S/. 0.00 0.00% S/. 1,345,255.17 72.28%

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL JIRON DOS DE MAYO CUADRAS 18, 19, 20 Y CALLE AEROPUERTO DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN

CONSTRUCCIÓN CAMINO VECINAL EMPALME CARRETERA F. BELAUNDE TERRY - PUENTE TRIUNFO - NUEVO TACABAMBA, DISTRITOS DE JEPELACIO Y PINTO RECODO, PROVINCIAS DE MOYOBAMBA Y LAMAS

JEPELACIO Y PINTO RECODO

MOYOBAMBA Y LAMAS

REHABILITACION DE LA CARRETERA PICOTA - SHAMBUYACU, TRAMO CRITICO KM 43+880 AL KM 44+000

Obra Liquidada con: RDR Nº 618-2008-GR-TC/DR-SMDRTC-SM

MEJORAMIENTO DE CAMINO VECINAL: NARANJILLO- SHAMPUYACU- PUERTO SANTA ROSA Y ACCESO A PUERTO PRIMAVERA, L = 16.10 KM. Y CONSTRUCCION DE PUENTE TUMBARO

MEJORAMIENTO DE CAMINO VECINAL EN EL TRAMO DE BAJO NARANJILLO - SAN FRANCISCO-PUERTO LA BALSA DEL MAYO, EN EL DISTRITO DE AWAJUN, PROVINCIA DE RIOJA

MEJORAMIENTO DEL CAMINO VECINAL: YURACYACU – UCRANIA, KM. 05+800

CONSTRUCCIÓN CARRETERA NVO. SAN JUAN - CHAMBIRA, KM 06+500 AL KM 15+000

Informe de cierre: 07-12-12El incremento o variación del presupuesto ejecutado respecto al perfil viable, se debe a los adicionales de obra por partidas nuevas ocacionado por factores climaticos

MEJORAMIENTO DE LA PARTE ALTA Y BAJA DE LA AV. SALAVERRY - SECTOR PUENTE BY PASS MORALES, DISTRITO DE MORALES - SAN MARTIN - SAN MARTIN

S. CENTRAL/MD MORALES

CONVENIO POR ENCARGO Nº 005 - 2008 - GRSM - PGR

REHABILITACION DEL CAMINO VECINAL SHAPAJA – RIO HUALLAGA, SANTA LUCIA – CERRO DULCE – RIO HUALLAGA, DISTRITO DE UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN

MP TOCACHE/S. CENTRAL

En reportes anteriores fijura como contratista el CONSORCIO EUREKA

MEJORAMIENTO DE LA AV. CIRCUNVALACION, EN LA CIUDAD Y DISTRITO DE TARAPOTO, EN LA PROVINCIA DE SAN MARTIN - SAN MARTIN

MP SAN MARTIN/ S. CENTRAL

Culminó el año 2009 la I ETAPAConvenio Especifico Nº 038 - 2007 de la I Etapa

CONSTRUCCION CARRETERA CHAMBIRA - PONGO ISLA, UBICADO EN LA LOCALIDAD DE YARINA DISTRITO DE CHIPURANA, PORV. SAN MARTIN

PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 07-07-11Informe de cierre = 05-09-12

CONSTRUCCION PUENTE VEHICULAR ATUMPAMPA SOBRE EL RIO CUMBAZA Y ACCESOS EN LA LOCALIDAD DE MORALES, DISTRITO DE MORALES, PROVINCIA DE SAN MARTIN

S. CENTRAL/ MP SAN MARTIN/

PEHCBM

MEJORAMIENTO DEL ACCESO A LA AA.VV. SATELITE, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN

BANDA DE SHILCAYO

MD BANDA DE SHILCAYO

MEJORAMIENTO DEL CAMINO VECINAL EN EL TRAMO JUAN GUERRA KM 15 - CRUCE A BELLO HORIZONTE, EN EL DISTRITO DE JUAN GUERRA, EN LA PROVINCIA DE SAN MARTIN

MD JUAN GUERRA/S. CENTRAL

CONSTRUCCION DE LA CARRETERA DEPARTAMENTAL SM - 105, TRAMO PELEJO - PAPAPLAYA - PROVINCIA Y DEPARTAMENTO DE SAN MARTIN

EL PORVENIR Y PAPAPLAYA

Contrato Nº 012 - 2009-GRSM-PEHCBM/PS (Supervisión)-D.U. N° 078-2009 (Adj. Dir.)Contrato Nº 013 - 2009-GRSM-PEHCBM/PS (Ejecución)-D.U. N° 078-2009 (Adj. Dir.)

Obra Liquidada con: RDR Nº 808 - 2008 - GR - TC/DR-SMDRTC-SM

CONSTRUCCION DE UN PUENTE VEHICULAR BELEN Y ACCESOS, DISTRITO DE SHUNTE, PROVINCIA DE TOCACHE - SAN MARTIN

Liquidación en la GRI, se reviso la Liquidación Financiera con Informe Nº 082-2009-GRSM/SGSyLO/MRSConvenio Nº 003-2007-GRSM/PRODATU - DRTC

L70
USER: INC. SUPERVISION
K77
jlinares: SEGÚN FORMATO 1 Y 2 PEAM
N77
USER: PEAM
K78
USER: NI EN SOSEM NI EN SNIP 15
N78
jlinares: DRT
K79
jlinares: SEGÚN FORMATO 1 Y 2 PEAM
M79
jlinares: SOSEM
N79
USER: SOSEM: PEAM
K80
jlinares: SEGÚN SNIP 15
M80
jlinares: SEGÚN SOSEM
K81
jlinares: SNIP 15
M81
USER: SEGÚN SOSEM
N81
USER: PEAM
N83
USER: SOSEM
N84
USER: SEDE C.
O84
USER: MP TOCACHE
N86
jlinares: SEDE C.
O86
USER: MP SM
N87
USER: PEHCBM
S87
USER: SOSEM REGISTRA: 5'485,377.00 MONTO ACTUAL SEGÚN INFORME DE CIERRE
H92
USER: EN FICHA SNIP INDICA SEDE CENTRAL
N93
USER: SOSEM: SEDE C. + DRT
S93
jans Linares: LUCHO R:2'242,444.54
Page 5: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

77 TRANSPORTES 58284 POLVORA TOCACHE DRTC/MP TOCACHE CULMINADA S/. 360,727.00 S/. 0.00 S/. 0.00 0.00% S/. 318,390.70 100.00% -

78 TRANSPORTES 52198 MIGUEL GRAU TOCACHE DRTC CULMINADA A.D. S/. 598,642.00 S/. 0.00 S/. 0.00 0.00% S/. 165,490.37 27.64%

79 TRANSPORTES 131653 TOCACHE SEDE CENTRAL LIQUIDADA CONTRATA S/. 4,587,529.00 S/. 0.00 S/. 0.00 0.00% S/. 3,304,437.41 100.00% Contrato N° 049-2011-GRSM/GGR

80 TRANSPORTES Sin codigo SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 437,870.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2009

81 TRANSPORTES Sin codigo SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 241,374.54 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2009

82 TRANSPORTES Sin codigo SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 200,000.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2010

83 TRANSPORTES 72948 TODOS PEAM CULMINADA CONTRATA S/. 5,960,870.00 S/. 0.00 S/. 0.00 0.00% S/. 4,624,000.00 100.00% -

84 TRANSPORTES 65098 TODOS PEHCBM CULMINADA A.D. S/. 5,999,998.00 S/. 0.00 S/. 0.00 0.00% S/. 5,344,926.77 100.00% -

85 TRANSPORTES 131660 TOCACHE SEDE CENTRAL LIQUIDADA CONTRATA S/. 913,799.32 S/. 0.00 S/. 0.00 0.00% S/. 922,590.74 100.00%

86 TRANSPORTES 148810 MOYOBAMBA PEAM LIQUIDADA CONTRATA S/. 4,593,507.10 S/. 0.00 S/. 0.00 0.00% S/. 4,955,272.80 100.00%

87 TRANSPORTES 124876 HUALLAGA PEHCBM CULMINADA A.D. S/. 58,735,934.00 S/. 0.00 S/. 0.00 0.00% S/. 59,595,583.12 100.00%

88 TRANSPORTES 23700 CONSTRUCCION PUENTE VEHICULAR NUEVO MUNDO BAJO BIAVO BELLAVISTA INADE-PEHCBM CERRADO A.D. 3,952,000.00 S/. 0.00 S/. 0.00 0.00% S/. 4,182,064.94 100.00% Cerrado

89 TRANSPORTES - BARRANQUITA LAMAS PEHCBM CULMINADA ENCARGO S/. 112,935.60 S/. 0.00 S/. 0.00 0.00% S/. 112,935.60 100.00%

90 TRANSPORTES 123926 SAUCE SAN MARTIN PEHCBM CERRADO CONTRATA S/. 1,127,600.00 S/. 0.00 S/. 0.00 0.00% S/. 1,104,600.00 #REF!

91 TRANSPORTES 104012 YANTALO MOYOBAMBA LIQUIDADA S/. 1,791,909.18 S/. 0.00 S/. 0.00 0.00% S/. 1,874,758.52 100.00%

92 TRANSPORTES Sin codigo LAMAS LAMAS SEDE CENTRAL LIQUIDADA - S/. 110,000.00 S/. 0.00 S/. 0.00 0.00% S/. 110,000.00 100.00%

93 TRANSPORTES Sin codigo MANTENIMIENTO DEL PUENTE CUÑUMBUQUE CUÑUMBUQUE LAMAS S. CENTRAL/DRTC LIQUIDADA - S/. 369,868.65 S/. 0.00 S/. 0.00 0.00% S/. 258,908.06 100.00% -

94 TRANSPORTES - VARIOS VARIOS SEDE CENTRAL LIQUIDADA - S/. 70,000.00 S/. 0.00 S/. 0.00 0.00% S/. 69,994.80 100.00% -

CONSTRUCCION DE PUENTES CARROZABLES DEL CAMINO VECINAL CEDRO-LA FLORIDA , PROVINCIA DE TOCACHE - SAN MARTIN

A.D.Convenio Nº 054-2007-GRSM/PGR

REHABILITACIÓN DEL CAMINO VECINAL SARITA COLONIA – ATUSPARIA – DESVÍO CASERÍO MIGUEL GRAU (L=7.400 KM.)

Primer devengado - Diciembre 2007 Ultimo devengado - Setiembre 2008

REHABILITACIÓN DE LA CARRETERA EMP. PE-5N (TOCACHE) - PALMA ESPINO - EMP. PE-12A

UCHIZA Y TOCACHE

EMERGENCIA VIAL DE LA CARRETERA DEPARTAMENTAL SM-111 TRAMO: EMP. PE-5N (TOCACHE) - PALMA ESPINO - EMP. PE-12A (DV. PALMA DE ESPINO)

MANTENIMIENTO DE EMERGENCIA DE LA CARRETERA DEPARTAMENTAL METAL - MARCOS TRAMO: KM 40+000 (CACERIO METAL) AL KM 43+366 (1)

MANTENIMIENTO DE EMERGENCIA DE LA CARRETERA DEPARTAMENTAL METAL - MARCOS TRAMO: KM 43+366 (RIO METAL) AL KM 45+000

FORTALECIMIENTO DEL POOL DE MAQUINARIA PESADA DEL PROYECTO ESPECIAL ALTO MAYO

MOYOBAMBA Y RIOJA

IMPLEMENTACION DE EQUIPO Y POOL DE MAQUINARIA PESADA DEL PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO

SM, Picota, Mariscal Caceres, Lamas,

Huallaga, El Dorado,

Bellavista

REHABILITACION DE LA CARRETERA PUENTE PUSHURUMBO - NUEVO BELEN

TOCACHE Y SHUNTE

Contrato N° 065-2011-GRSM/GGR (Supervisión)Contrato N° 048-2011-GRSM/GGR (Ejecución)Contrato N° 012-2010-GRSM/GGR (Ejecución)

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA – YANTALÓ, PROVINCIA DE MOYOBAMBA, DEPARTAMENTO DE SAN MARTÍN

YANTALO Y MOYOBAMBA

Obra Culminada y LiquidadaDECRETO DE URGENCIA N°041 - 2009

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL SM-103: EMPALME PE-5N (SACANCHE) - EL ESLABON - PISCOYACU - SAPOSOA, PROVINCIA DEL HUALLAGA, REGION SAN MARTIN

EL ESLABON, SACANCHE, SAPOSOA, PISCOYACU

CP - Contrato Nº 134 - 2010-GRSM-PEHCBM/PS (Supervisión)LP - Contrato Nº 191 - 2010-GRSM-PEHCBM/PS (Ejecución)

REHABILITACION DE LA CARRETERA PONGO DE CAYNARACHI-BARRANQUITA. TRAMOS Km. 04+000 al Km. 05+500 - Km. 07+000 al Km. 09+500 - Km. 12+000 al Km. 14+000 - Km. 17+000 al kM. 20+000 - Km. 22+000 al Km. 25+000

POR ENCARGO, CONVENIO Nº 012-2007-GRSM-PGR del 27/09/2007

MEJORAMIENTO DEL NIVEL DE SEGURIDAD DEL SERVICIO DE TRANSPORTE FLUVIAL EN EL PUERTO SAUCE DIST. DE SAUCE PROV. Y REGIÓN SAN MARTÍN

PIP Cerrado, con informe de cierre en BP.Informe de cierre = 26-10-12Contrato N° 033 - 2010-GRSM-PEHCBM/PS - AMC (Ejecucion)

MEJORAMIENTO DEL CAMINO VECINAL YANTALO - BOCA DE HUASCAYACU, PROVINCIA DE MOYOBAMBA - SAN MARTIN

MD YANTALO/S. CENTRAL

CONTRATAConvenio

Específico N° 06-2010-

GRSM/PGR(GRSM y MDY)

Financiamiento: FONIPREL (Recursos Determinados) + GRSMModalidad: CONTRATA (LP N°001)PROFISA CONTRATISTAS GENERALES SAC

MANTENIMIENTO RUTINARIO DE LA CARRETERA DEPARTAMENTAL RUTA SM 104, EMP. PE 5N (DIV. LAMAS).

Obra Liquidada con: RDR Nº 410-2010-GR-TC/DR-SM.Direccion Regional de Transportes

ACTUALIZACION DEL PLAN VIAL DEPARTAMENTAL PARTICIPATIVO Y FORMULACION DE PROYECTOS

S94
jans Linares: LUCHO R.: 318,390.70
I96
jans Linares: EN INVERSION 2007-2012 ESTA LIQUIDADA
I103
jlinares: AEGUN FORMATO 1 Y 2 REMITIDA POR EL PEAM
Page 6: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

95 TRANSPORTES 6737 HUALLAGA LIQUIDADA CONTRATA S/. 2,749,262.05 S/. 0.00 S/. 0.00 0.00% S/. 3,143,268.38 100.00%

96 TRANSPORTES Sin codigo SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,309,934.04 S/. 0.00 S/. 0.00 0.00% S/. 1,320,135.40 100.00%

97 TRANSPORTES Sin codigo ZAPATERO LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 115,646.40 S/. 0.00 S/. 0.00 0.00% S/. 108,019.00 100.00%

98 TRANSPORTES Sin codigo REHABILITACIÓN CARRETERA SHAPAJA CHAZUTA SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 131,252.40 S/. 0.00 S/. 0.00 0.00% S/. 123,361.93 100.00%

99 TRANSPORTES Sin codigo HUALLAGA S. CENTRAL/DRTC LIQUIDADA CONTRATA S/. 0.00 S/. 0.00 S/. 0.00 0.00% S/. 37,413.67 100.00%

100 TRANSPORTES Sin codigo LAMAS SEDE CENTRAL LIQUIDADA S/. 112,935.60 S/. 0.00 S/. 0.00 0.00% S/. 107,802.17 95.45%

101 TRANSPORTES Sin codigo MOYOBAMBA SEDE CENTRAL LIQUIDADA S/. 130,474.80 S/. 0.00 S/. 0.00 0.00% S/. 130,475.00 100.00%

102 TRANSPORTES 73823 SHUNTE TOCACHE DRTC CULMINADA A.D. S/. 296,663.00 S/. 0.00 S/. 0.00 0.00% S/. 241,392.43 100.00% Culminó el año 2008

103 TRANSPORTES - DRTC CULMINADA A.D. S/. 653,000.00 S/. 0.00 S/. 0.00 0.00% S/. 653,000.00 100.00% Culminó el año 2009

104 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 200,000.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2011

105 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 246,464.84 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2010

106 TRANSPORTES - TOCACHE TOCACHE DRTC CULMINADA A.D. S/. 300,000.00 S/. 0.00 S/. 0.00 0.00% - - Culminó el año 2011

107 TRANSPORTES - SHUNTE TOCACHE N.E. CULMINADA A.D. S/. 327,972.49 S/. 0.00 S/. 0.00 0.00% S/. 327,972.49 100.00%

108 TRANSPORTES 126698 TOCACHE TOCACHE MP TOCACHE CULMINADA A.D. S/. 763,751.00 S/. 0.00 S/. 0.00 0.00% S/. 407,186.02 100.00%

109 TRANSPORTES - SAN MARTIN DRTC CULMINADA A.D. S/. 504,201.68 S/. 0.00 S/. 0.00 0.00% S/. 504,201.68 100.00% Culminó el año 2008

114 TRANSPORTES - LAMAS DRTC CULMINADA - S/. 250.00 S/. 0.00 S/. 0.00 0.00% S/. 250,000.00 100.00% -

115 TRANSPORTES - SAN MARTIN DRTC CULMINADA A.D. S/. 524,017.00 S/. 0.00 S/. 0.00 0.00% S/. 524,017.00 100.00% Culminó el año 2007

116 TURISMO 27986 HUICUNGO SEDE CENTRAL LIQUIDADA A.D. S/. 214,581.95 S/. 0.00 S/. 0.00 0.00% S/. 180,000.00 100.00%

117 TRANSPORTES 57520 LAMAS LAMAS CULMINADA - S/. 39,629.00 S/. 0.00 S/. 0.00 0.00% S/. 36,593.11 100.00% -

118 TRANSPORTES Sin codigo DRTC CULMINADA - S/. 672,268.00 S/. 0.00 S/. 0.00 0.00% S/. 672,268.00 100.00% -

119 TRANSPORTES 27978 PICOTA SEDE CENTRAL CULMINADA - S/. 1,598,812.00 S/. 0.00 S/. 0.00 0.00% S/. 1,343,659.25 100.00%

REHABILITACION DE LA CARRETERA SACANCHE - SAPOSOA, KM. 0+000 - KM. 21+281.21 (Longitud=21.281 Kms)

SACANCHE Y SAPOSOA

MTC - PVD / S. CENTRAL

Contrato de ejecución de Obra Nº 007-2007-GRSM/PR - CONSORCIO SACANCHE

MANTENIMIENTO PERIÓDICO CARRETERA SAN JOSÉ DE SISA (PTE. SISA 49+ 900) - AGUA BLANCA - SAN PABLO - EMP. PE-5N (BELLAVISTA KM. 121+800).

SAN JOSE DE SISA, AGUA

BLANCA, SAN PABLO Y

BELLAVISTA

EL DORADO Y BELLAVISTA

Obra Liquidada con: RER Nº 011-2010-GRSM/PGR.Contrato de ejecucion de Obra Nº 001-2009-GRSM/PGR - Consorcio Continental.

REHABILITACIÓN CARRETERA CUÑUMBUQUE - SISA, TRAMO NUEVO CELENDÍN - SAN JUAN DE TALLIQUIHUI

Obra Liquidada con: RER Nº 1104-2010-GRSM/PGRConvenio Nº 001-2007-GR-SM/GGR - Dirección Regional de Transportes.

SHAPAJA Y CHAZUTA

Obra Liquidada con: RER Nº 1186-2010-GRSM/PGRConvenio Nº 002-2007-GR-SM/GGR - Dirección Regional de Transportes.

MANTENIMIENTO RUTINARIO DE LA CARRETERA DEPARTAMENTAL SACANCHE - SAPOSOA

SACANCHE Y SAPOSOA

Obra Liquidada con: RER Nº 1487-2010-GRSM/PGRContrato N° 001-2009-GRSM/PGR- Microemp. Asoc. De Conserv. Y Serv. Gener. SAC.

REHABILITACION DE LA CARRETERA PONGO - BARRANQUITA

CAYNARACHI Y BARRANQUITA

ENCARGOPEHCBM

Obra Liquidada con: RER Nº 386-2011-GRSM/PGR.Convenio de Encargo Proyecto Especial Huallaga Central y Bajo Mayo. Esta siendo analizada para solicitar su baja por la SEDE CENTRAL

REHABILITACION DE LA CARRETERA BAÑOS TERMALES – JEPELACIO – ALTO CARRIZALES

MOYOBAMBA Y JEPELACIO

ENCARGOMD JEPELACIO

Obra Liquidada con: RGR Nº 022-2011-GRSM/GRI.Convenio de Encargo Municipalidad Distrital de Jepelacio

REHABILITACIÓN DEL CAMINO DEPARTAMENTAL: NUEVO BELÉN - MONTECRISTO (TRAMO CRITICO KM. 00+000 - KM. 04+000)

MANTENIMIENTO RUTINARIO Y ATENCION DE EMERGENCIAS VIALES DE LOS TRAMOS: JUANJUI - CAMPANILLA Y PIZANA - TOCACHE (RUTA NACIONAL Nº PE 5N) (1)

JUANJUI, CAMPANILLA Y

TOCACHE

MARISCAL CACERES Y TOCACHE

MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL; RUTA SM-110: EMP. PE-5N (DV. YACUSISA) - PUENTE PUSHURUMBO; TRAMO KM. 00+000 AL KM 13+000

MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL EMP. PE-5N PUENTE PUSHURUMBO - SHUNTE; TRAMO KM. 13+000 AL KM 35+000

MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL; RUTA SM-110: TRAMO KM. 35+000 AL KM 47+000

MANTENIMIENTO PERIODICO DE LA CARRETERA DEPARTAMENTAL RUTA SM-110, TRAMO KM. 35+000 (SHUNTE) - KM. 43+336

Culminó el año 2010N.E. "RIO METAL RIO GRUESO"A.D. (Convenio Nº 017-2010-GRSM/PGR)

REHABILITACION Y MEJORAMIENTO DEL CAMINO VECINAL VIÑA DEL RIO - ACCESO HUALLAGA - CARRICILLO, DISTRITO DE TOCACHE, PROVINCIA DE TOCACHE - SAN MARTÍN

Culminó el año 2010A.D. (Convenio Nº07-2010-GRSM/PGR)

MANTENIMIENTO PERIODICO CARRETERA PUENTE COLOMBIA SHAPAJA CHAZUTA

SHAPAJA Y CHAZUTA

MANTENIMIENTO PERIODICO DE LA CARRETERA PONGO - BARRANQUITA

PONGO Y BARRANQUITA

MANTENIMIENTO PERIODICO DE LA CARRETERA PONGO - BARRANQUITA - PELEJO (Tramos Críticos)

PONGO, BARRANQUITA Y

PELEJO

MEJORAMIENTO DE LOS SERVICIOS TURISTICOS DEL CIRCUITO DE JESUS DE PAJATEN A OCHONACHE, EN EL DISTRITO DE HUICUNGO

MARISCAL CACERES

La obra se culminó y liquidó.Se ejecutó bajo la modalidad de administración directa.

CONSTRUCCION DE UN PONTON EN ACCESO PRINCIPAL C.P KECHWA WAYKU, PROVINCIA DE LAMAS - SAN MARTIN

MP LAMAS/S. CENTRAL

MANTENIEMINTO PERIODICO DE LA CARRETERA EMP. PE-5N - CUÑUMBUQUE-SISA

LAMAS, CUÑUMBIUQUE, ZAPATERO, S.J.

SISA

LAMAS, EL DORADO

MEJORAMIENTO DE CAMINO VECINAL TINGO DE PONAZA - PUCUSHCAYACU - NUEVA ESPERANZA

TINGO DE PONAZA

Convenio Nº 031-2008-GRSM/PGRLiquidación en la GRI proceso de revisión

M133
jlinares: SEGÚN SOSEM
N133
jlinares: SEGÚN OZMC
Page 7: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

120 TRANSPORTES 91083 SAPOSOA HUALLAGA CULMINADA - S/. 196,340.00 S/. 0.00 S/. 0.00 0.00% S/. 103,715.00 100.00% -

121 TRANSPORTES 72999 HUALLAGA PEHCBM CULMINADA A.D. S/. 18,519,307.24 S/. 475,625.00 S/. 475,538.96 99.98% S/. 24,106,956.68 130.17% -

123 TRANSPORTES 194097 JUANJUI PEHCBM CULMINADA A.D. S/. 1,380,586.91 S/. 429,319.00 S/. 380,762.47 88.69% S/. 1,504,713.75 100.00% -

126 TRANSPORTES 142977 EL DORADO PEHCBM CULMINADA CONTRATA S/. 9,173,652.95 S/. 2,185,964.00 S/. 1,605,962.03 73.47% S/. 9,511,304.67 86.20%

129 TRANSPORTES 190328 RIOJA PEAM CULMINADA CONTRATA S/. 8,837,328.00 S/. 321,578.00 S/. 0.00 0.00% S/. 9,046,975.06 19.40%

131 TRANSPORTES 176885 UCHIZA TOCACHE MD UCHIZA CULMINADA S/. 3,195,029.00 S/. 0.00 S/. 0.00 0.00% S/. 3,195,028.75 100.00%

132 TRANSPORTES 182606 SHUNTE TOCACHE MD SHUNTE CULMINADA S/. 477,660.10 S/. 0.00 S/. 0.00 0.00% S/. 158,486.27 100.00%

133 TRANSPORTES 57515 LAMAS LAMAS CULMINADA - S/. 43,471.00 S/. 0.00 S/. 0.00 0.00% S/. 43,203.88 100.00%

134 TRANSPORTES 57513 LAMAS LAMAS SEDE CENTRAL CULMINADA - S/. 50,644.00 - - - S/. 46,463.00 91.74%

136 34916 BELLAVISTA BELLAVISTA PEHCBM/SRMC LIQUIDADA S/. 1,916,605.61 S/. 0.00 S/. 0.00 0.00% S/. 2,110,036.00 110.09%

137 8305 SAN RAFAEL BELLAVISTA CULMINADA ENCARGO S/. 520,873.00 S/. 0.00 S/. 0.00 0.00% S/. 424,989.58 100.00%

138 43463 BELLAVISTA BELLAVISTA SEDE CENTRAL LIQUIDADA A.D. S/. 687,184.72 S/. 0.00 S/. 0.00 0.00% S/. 804,243.34 100.00%

139 31637 II ETAPA EL DORADO SRBM CULMINADA - S/. 806,168.00 S/. 0.00 S/. 0.00 0.00% S/. 398,871.00 49.48% -

140 74732 PISCOYACU HUALLAGA MD PISCOYACU CERRADO - S/. 906,976.00 S/. 0.00 S/. 0.00 0.00% S/. 997,358.36 100.00%

141 87195 SACANCHE HUALLAGA MP HUALLAGA CULMINADA - S/. 1,596,605.00 S/. 0.00 S/. 0.00 0.00% S/. 1,550,509.00 100.00% -

142 34165 SAPOSOA HUALLAGA CULMINADA - S/. 1,141,418.00 S/. 0.00 S/. 0.00 0.00% S/. 1,256,515.69 100.00% Convenio 023-2008-GRSM/PGR - M.P. HUALLAGA

143 90062 CUÑUMBUQUE LAMAS MP LAMAS/SRBM-T CULMINADA A.D. S/. 1,255,813.00 S/. 0.00 S/. 0.00 0.00% S/. 1,182,935.47 100.00% -

144 65273

I ETAPA

HUICUNGO S. CENTRAL/OZMC

LIQUIDADA A.D.

S/. 1,708,472.66

S/. 578,401.24 S/. 0.00 S/. 0.00 0.00%

S/. 1,755,060.00 102.73%

II ETAPA LIQUIDADA A.D. S/. 1,073,065.50 S/. 0.00 S/. 0.00 0.00% Obra Liquidada con el 18-01-11

145 7903 SORITOR MOYOBAMBA CULMINADA A.D. S/. 239,190.00 S/. 0.00 S/. 0.00 0.00% S/. 252,914.98 100.00% Convenio 055-2007-GRSM/PGR con la MD Soritor

CONSTRUCCION DEL CAMINO PEDESTRE DESDE EL CACERIO ALTO PACHIZA - MOTELILLO - AL CASERIO LA CANAAN - DISTRITO DE SAPOSOA, PROVINCIA DE HUALLAGA - SAN MARTIN

MP HUALLAGA/S. CENTRAL

CONSTRUCCIÓN DEL CAMINO VECINAL PISCOYACU-NUEVO SACANCHE-EL DORADO EN LA PROVINCIA DE HUALLAGA, REGIÓN SAN MARTÍN

PISCOYACU, SAPOSOA

MEJORAMIENTO DEL PUENTE VEHICULAR CHAMBIRA DE LA LOCALIDAD DE JUANJUI, DISTRITO DE JUANJUI, PROVINCIA DE MARISCAL CACERES - SAN MARTIN

MARISCAL CACERES

CONSTRUCCION DEL PUENTE VEHICULAR SAN MARTIN DE ALAO Y ACCESOS, DISTRITO DE SAN MARTIN - EL DORADO - SAN MARTIN

SAN MARTIN DE ALAO

*Adicionales de Obra = S/. 865,982.99*Deductivos de Obra = S/. 187,376.51* Adicional de Supervisión = S/. 179,227.65

MEJORAMIENTO DEL CAMINO VECINAL SM-502, TRAMO:EMP. PE-5N (DV. RIOJA) - POSIC , PROVINCIA DE RIOJA - SAN MARTIN

POSICRIOJA

Contrato Nº 033-2012Decreto de Urgencia Nº 016-2012

REHABILITACIÓN Y MEJORAMIENTO DEL CAMINO VECINAL PUERTO HUICTE - UNIÓN CADENA (EMP. SANTA LUCÍA), DISTRITO DE UCHIZA - TOCACHE - SAN MARTÍN

CONVENIO Nº 01-2012-

GRSM/PGR

Financiado por el GRSM Y FONIPRELDECRETO DE URGENCIA N°054-2011LP N° 003-2012-MDUContrato de Consultoria de obra y ejecución de obra

CONSTRUCCION DEL PUENTE CONGANTE PEATONAL MARIPOSA, DISTRITO DE SHUNTE - TOCACHE - SAN MARTIN

CONVENIO Nº 05-2012-

GRSM/PGR

Se asignó presupuesto para la culminación de la obra

CONSTRUCCION ALCANTARILLA EN JR. DOMINGO CANAL BARRIO LA PLAZA, PROVINCIA DE LAMAS - SAN MARTIN

MP LAMAS/S. CENTRAL

R.G.G.R. N°090-2007-GRSM/GGR43203.88

CONSTRUCCION ALCANTARILLA EN LA PROLONGACION 02 DE MAYO BARRIO MUNICHIS, PROVINCIA DE LAMAS - SAN MARTIN

Resolución Gerencial General Regional N°099-2007-GRSM/GGR, DEL 17/12/2007 QUE APRUEBA EL EXPEDIENTE TECNICO

EDUCACION Y CULTURA

RECUPERACION DE AULAS, SERVICIOS HIGIENICOS E IMPLEMENTACION CON MOBILIARIO ESCOLAR Y AMPLIACION DE TALLERES DE LA I.E. N° 0050 - ABRAHAM CARDENAS RUIZ

A.D.R.E.R. Nº 986-2007-GRSM/P

GR

Obra liquidadaSegún informacion de la OZMCR.E.R. Nº 986-2007-GRSM/PGR

EDUCACION Y CULTURA

RECUPERACION DE 06 AULAS E IMPLEMENTACION CON MOBILARIO + SS.HH EN LA ESCUELA PRIMARIA DE MENORES N° 0049 CRISTINO GARCIA CARHUAPOMA

S. CENTRAL/MD SAN RAFAEL

Convenio Nº 001-2008-GRSM/PGR - Municipalidad Distrital de San Rafael.

EDUCACION Y CULTURA

MEJORAMIENTO Y AMPLIACION DEL I.E. Nº 0208 SANTIAGO ANTUNEZ DE MAYOLO BARRIO SAN JUAN BELLAVISTA

Obra liquidada.Según informacion de la OZMC

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO EL DORADO

SAN JOSE DE SISA

EDUCACION Y CULTURA

RECONSTRUCCION, MEJORAMIENTO DEL I.E. Nº 0025 - MIGUEL A. PINEDO VASQUEZ - PISCOYACU, PROVINCIA DE HUALLAGA - SAN MARTIN

PIP Cerrado, con informe de cierre en BP.Transferencia de obra = 14-02-12Informe de cierre = 04-06-12

EDUCACION Y CULTURA

CONSTRUCCIÓN Y SUSTITUCIÓN DE LA INFRAESTRUCTURA JOSE HERÁCLIDES VELA Nº 0752 DEL DISTRITO DE SACANCHE PROV. DE HUALLAGA

EDUCACION Y CULTURA

MEJORAMIENTO Y SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA I.E. Nº 0020 ERNESTO CHAVEZ TAMARIZ - SAPOSOA - SAN MARTIN

S. CENTRAL/MP HUALLAGA

EDUCACION Y CULTURA

RECOSTRUCCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA EN LA I.E. 0763 CABO EJERCITO PERUANO SANTIAGO TAPULLIMA PASHANASE DIST. DE CUÑUMBUQUE, PROVINCIA DE LAMAS - SAN MARTIN (TRANSF. OZBM)

EDUCACION Y CULTURA

SUSTITUCION Y MEJORAMIENTO DE LA I.E. SECUNDARIA CAHUIDE - HUICUNGO

MARISCAL CACERES

Obra Liquidada el 31-03-09Mediante R.E.R. N° 376 - 2008-GRSM/PGR, se encarga la ejecución a la OZMC-J

EDUCACION Y CULTURA

RECUPERACION DE AULAS DE LA EPM Nº 00898 EL LUCERO - SORITOR

S. CENTRAL/ MD SORITOR

F153
USER: 2008
K155
jlinares: DECIA: 1'989,053.00 MONTO ACTUAL SEGÚN SRHC
M155
jlinares: DECIA: 2'110,036.00
N155
jlinares: SEGÚN SOSEM
S156
jans Linares: LUCHO: 403,918.48
M157
jlinares: DECIA: 804,243.00 MONTO ACTUAL SEGÚN SOSEM, CORRESPONDE AL PERFIL
D163
jlinares: FUENTE: SRMC (Ing. Simon Zarpan)
S163
USER: SEGÚN SOSEM
Page 8: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

146 29186 MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL CULMINADA A.D. S/. 857,134.00 S/. 0.00 S/. 0.00 0.00% S/. 943,789.14 110.11% Ejecutado mediante convenio

147 51528 MOYOBAMBA MOYOBAMBA SEDE CENTRAL CULMINADA CONTRATA S/. 92,844.00 S/. 0.00 S/. 0.00 0.00% S/. 92,844.00 100.00%

148 102513

I ETAPA

JEPELACIO MOYOBAMBA

SEDE CENTRAL LIQUIDADA CONTRATA

S/. 3,921,155.63

S/. 507,803.90

S/. 0.00 S/. 638,426.18 #DIV/0! S/. 3,833,688.90 97.72%II ETAPA SEDE CENTRAL LIQUIDADA CONTRATA S/. 992,159.85

III ETAPA SEDE CENTRAL CULMINADA CONTRATA S/. 2,512,245.30

149 37830 JEPELACIO MOYOBAMBA SEDE CENTRAL TRANSFERIDA S/. 2,084,960.86 S/. 0.00 S/. 0.00 0.00% S/. 2,191,303.46 100.00%

150 30157

- RIOJA RIOJA DRE CULMINADA CONTRATA

S/. 1,467,330.32

S/. 0.00 S/. 0.00 0.00%

S/. 1,241,293.83 84.60%

-

III ETAPA. RIOJA RIOJA SEDE CENTRAL LIQUIDADA CONTRATA S/. 0.00 S/. 0.00 0.00%

151 9931 MORALES SAN MARTIN LIQUIDADA A.D. S/. 1,262,584.00 S/. 0.00 S/. 0.00 0.00% S/. 1,060,956.00 84.03% Culminó el año 2010

152 47543 CHAZUTA SAN MARTIN SRBM-T LIQUIDADA A.D. S/. 2,647,714.22 S/. 0.00 S/. 0.00 0.00% S/. 2,340,257.00 88.39%

153 49387 MORALES SAN MARTIN LIQUIDADA A.D. S/. 310,351.00 S/. 0.00 S/. 0.00 0.00% S/. 389,836.00 125.61% Culminó el año 2011

154 18368 TARAPOTO SAN MARTIN CULMINADA A.D. S/. 543,791.00 S/. 0.00 S/. 0.00 0.00% S/. 543,791.00 100.00% Culminó el año 2007

155 31469 MOYOBAMBA MOYOBAMBA SEDE CENTRAL TRANSFERIDA CONTRATA S/. 1,557,416.00 S/. 0.00 S/. 0.00 0.00% S/. 1,155,557.89 74.20%

156 162225 JEPELACIO MOYOBAMBA SEDE CENTRAL CULMINADA A.D. S/. 357,875.45 S/. 0.00 S/. 0.00 0.00% S/. 455,280.00 100.00%

EDUCACION Y CULTURA

SUSTITUCION DE INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA N 00496 SUGLLAQUIRO - DEL DISTRITO DE MOYOBAMBA

EDUCACION Y CULTURA

FORTALECIMIENTO DE LAS AREAS ADMINISTRATIVAS DE LA SEDE DE LA UNIDAD DE GESTION EDUCATIVA LOCAL DE MOYOBAMBA

AMC-La casita de la computadora SRLtda por 48,834.00

EDUCACION Y CULTURA

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL C.N.A. JENARO ERNESTO HERRERA TORRES - JERILLO - DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, SAN MARTIN

Contrato N° 072-2011-GRSM-GGR adquisición de mobiliarioContrato de ejecucion de Obra Nº 054-2011-GRSM/GGR - Bricks y Concret Contratistas Generales S.A.C.Proyectista: Ing. Alfonso Vasquez Tello-Decreto de Urgencia N° 078-2009 (ADS N° 019-2009-GRSM)

Proyectista: Ing. Emilio Shica CabreraAmpliaciones de plazo: 1, 2, 3, 4, 5, 6, 7 = 28, 17, 14, 09, 30, 09, 07 dcDeductivo 1: RER N° 925-2012-GRSM/PGRAdicional 1: RER N° 925-2012-GRSM/PGRContrato N° 003-2012-GRSM/GGR

Val.N°07 del Cont. Principal:Acumulado Ejec. Fis.=100%, Progr. Fis. =100%Ejec. Finan= 2,341,000.00 Progr. Finan.= 2,341,000.00Mensual (Mes de Marzo)Ejec. Fis.=5.69%, Ejec. Finan= 133,152.81

EDUCACION Y CULTURA

RECUPERACION Y MEJORAMIENTO DE INFRAESTRUCTURA EDUCATIVA DE LA I.E. N° 00561-RAMIREZ-JEPELACIO-MOYOBAMBA-SAN MARTIN

CONTRATA/TERCERIZADA

Obra Liquidada con: R.G.G.R. N° 162-2012-GRSM/GGRContrato de ejecución N° 022-2009-GRSM/PGR liquidadoCasa Ingenieros Contratistas S.A.C.Obra Transferida a la Dirección Reginal de Educación - Moyobamba U:E N° 300-096

EDUCACION Y CULTURA

SUSTITUCION Y MEJORAMIENTO DE INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA MANUEL SEGUNDO DEL AGUILA VELASQUEZ-RIOJA

SUSTITUCIÓN Y MEJORAMIENTO DE INFRAESTRUCTURA DE LA INSTITUCIÓN EDUCATIVA MANUEL SEGUNDO DEL ÁGUILA VELÁSQUEZ - RIOJA

Obra Liquidada con: RER Nº 1993-2010-GRSM/PGRContrato N° 028-2010-GRSM/GGRADS N° 020-2010-GRSM / Engineering Build SAC

EDUCACION Y CULTURA

AMPLIACION Y MEJORAMIENTO DEL COLEGIO MILITAR MARISCAL ANDRES AVELINO CACERES EN LA LOCALIDAD DE MORALES

S. CENTRAL/ SRBM-T

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BÁSICAS DE LA INSTITUCION EDUCATIVA DE MENORES Nº 015 - SAN PEDRO DEL DISTRITO DE CHAZUTA – PROVINCIA DE SAN MARTIN

Obra Liquidada con: RSR Nº 071 -2012-GRSM/SRBM-TCon R.E.R. Nº 496 - 2009 - GRSM/PGRse delega como Unidad Ejecutora a la Oficina Zonal Bajo Mayo - Tarapoto

EDUCACION Y CULTURA

CONSTRUCCION DEL CERCO PERIMETRICO DE LA ALDEA INFANTIL VIRGEN DEL PILAR - MORALES-DE LA PROVINCIA DE SAN MARTIN.

S. CENTRAL/ SRBM-T

EDUCACION Y CULTURA

SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA EN LA ESCUELA ESTATAL Nº 0655 JOSE ENRIQUE CELIS BARDALES

S. CENTRAL/ SRBM-T

EDUCACION Y CULTURA

RECUPERACION DE INFRAESTRUCTURA EDUCATIVA DE LA IE N° 00021 RICARDO PALMA - PUEBLO LIBRE - MOYOBAMBA - SAN MARTIN

Obra Liquidada con:R.G.G.R. Nº 348-2008-GR-SM/GGRTrámite con informe N° 035-2012-SGSyLO/SAMVA Administración: Informe N° 040-2012-SGSyLO/SAMVContrato Nº 012-2007-GRSM/PGRCONSORCIO OROMINAObra Transferida a la Dirección Reginal de Educación - Moyobamba U:E N° 300-096

EDUCACION Y CULTURA

MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E Nº 00512 - JERILLO - JEPELACIO - MOYOBAMBA - SAN MARTÍN

La obra está culminada bajo la modalidad de administración directa, inaugurada el 16-12-11 en proceso de liquidación

K168
Aprobado Mediante RGR N°015-2011-GRSM/GRI, del 06/07//2011
S168
jlinares: 1'256,980.00 (ANTES) DESPUES; 1'260,980.00
J171
jlinares: EL TERMINO TERCERIZADA SE EXTRAE DE LA LIQUIDACION
M177
jlinares: SOSEM= 731,783.00
V178
jlinares: SE ENCONTRO LA RESOLUCION DE LIQUIDACION
Page 9: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

157 119138 RIOJA SEDE CENTRAL CONTRATA S/. 704,831.48 S/. 0.00 S/. 0.00 0.00% S/. 573,077.00 100.00%

158 98450

I ETAPA

PAJARILLO SAN MARTIN

SRHC LIQUIDADA CONTRATA

S/. 2,201,193.00

S/. 571,477.94 S/. 0.00 S/. 0.00 0.00%

S/. 1,875,000.00 109.38%

II ETAPA SRHC LIQUIDADA CONTRATA 1´642,732.46 S/. 0.00 S/. 0.00 0.00%

159 12134 RECUPERACIÓN DEL CEO JUANJUI JUANJUI SEDE CENTRAL LIQUIDADA CONTRATA S/. 489,811.45 S/. 0.00 S/. 0.00 0.00% S/. 391,584.01 100.00%

160 - TARAPOTO SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 5,187,657.84 S/. 0.00 S/. 0.00 0.00% S/. 6,237,657.84 100.00%

161 15955 SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 379,659.00 S/. 0.00 S/. 0.00 0.00% S/. 379,659.00 100.00%

162 - VARIOS LAMAS SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,566,196.25 S/. 0.00 S/. 0.00 0.00% S/. 1,566,196.25 100.00%

163 38889 LAMAS SEDE CENTRAL CULMINADA - S/. 1,288,197.00 S/. 0.00 S/. 0.00 0.00% S/. 1,288,197.00 100.00%

164 40532 LAMAS SEDE CENTRAL CULMINADA - S/. 345,983.00 S/. 0.00 S/. 0.00 0.00% S/. 345,983.00 100.00%

165 43632 TABALOSOS LAMAS SEDE CENTRAL LIQUIDADA - S/. 694,257.00 S/. 0.00 S/. 0.00 0.00% S/. 191,292.61 27.55%

166 9647 TABALOSOS LAMAS SEDE CENTRAL CULMINADA - S/. 151,669.00 S/. 0.00 S/. 0.00 0.00% S/. 151,669.00 100.00%

167 38961 BARRANQUITA LAMAS SEDE CENTRAL CULMINADA - S/. 547,257.00 S/. 0.00 S/. 0.00 0.00% S/. 547,257.00 100.00%

168 36715 BARRANQUITA LAMAS SEDE CENTRAL CULMINADA - S/. 99,950.00 S/. 0.00 S/. 0.00 0.00% S/. 99,950.00 100.00%

169 36822 BARRANQUITA LAMAS SEDE CENTRAL CULMINADA - S/. 427,517.00 S/. 0.00 S/. 0.00 0.00% S/. 339,206.89 79.34%

170 5807 ZAPATERO LAMAS SEDE CENTRAL LIQUIDADA CONTRATA S/. 318,688.00 S/. 0.00 S/. 0.00 0.00% S/. 66,900.00 100.00%

171 13242 SHAMBOYACU PICOTA SEDE CENTRAL CULMINADA CONTRATA S/. 475,585.00 S/. 0.00 S/. 0.00 0.00% S/. 475,585.00 100.00%

172 17214 SAN MARTIN SEDE CENTRAL CONTRATA S/. 915,973.00 S/. 0.00 S/. 0.00 0.00% S/. 1,150,555.00 100.00%

179 31652 EL DORADO SEDE CENTRAL LIQUIDADA CONTRATA S/. 905,697.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

180 17449 PUCACACA PICOTA SRBM/S. CENTRAL LIQUIDADA CONTRATA S/. 523,872.00 S/. 0.00 S/. 0.00 0.00% S/. 557,943.00 106.50%

181 20921 JEPELACIO MOYOBAMBA DRE//S. CENTRAL LIQUIDADA CONTRATA S/. 1,329,095.31 S/. 0.00 S/. 0.00 0.00% S/. 1,586,555.42 119.37%

EDUCACION Y CULTURA

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS, AMPLIACION Y REHABILITACION DE LA INFRAESTRUCTURA DE LA I.E.I N° 134-JESUS DE NAZARETH - SEGUNDA JERUSALEN, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN

ELIAS SOPLIN VARGAS

PROY. LIQUIDADO

PROYECTO LIQUIDADO CON RGGR N°035-2014-GRSM/GGR, del 05/03/2014, con un monto total de Inversión de 596,635.00 Nuevos Soles

EDUCACION Y CULTURA

MEJORAMIENTO Y SUSTITUCION DEL SERVICIO EDUCATIVO DE LA I.E. - ARTURO BARTRA GARCIA - PAJARILLO, DISTRITO DE PAJARILLO - MARISCAL CACERES - SAN MARTIN

Según cuadro "Avance noviembre 2012" la Obra está Liquidada.Según el cuadro "Avance noviembre 2012", el costo de la obra es: 435,675.80Según informacion alcanzada por la OZMC: Obra LiquidadaSegún el cuadro "Avance noviembre 2012", el costo de la obra es: 1'369,847.69

EDUCACION Y CULTURA

MARISCAL CACERES

Aprobación del Exp. Tec.: R.G.G.R. N° 018-2005-GRSM/GGRContrato de ejecucion de Obra Nº 008-2005-GRSM/GGR - Q & L Contratistas Gener. SAC.

EDUCACION Y CULTURA

CONSTRUCCION DEL COLISEO CERRADO - TARAPOTO (LIQUIDACIÓN FINANCIERA)

Obra Liquidada con Resolución Ejecutiva Regional Nº 230-2008-GR-SM/GGR

EDUCACION Y CULTURA

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA CLEOFE DEL AGUILA AREVALO DEL DISTRITO DE LA BANDA DE SHILCAYO

BANDA DE SHILCAYO

Obra Liquidada con Resolución Gerencial General Regional Nº 205-2008-GR-SM/GGR Contrato N° 021-2007-GRSM/GGR

EDUCACION Y CULTURA

RECONSTRUCCIÓN DE 07 CENTROS EDUCATIVOS, UBICADOS EN LA PROVINCIA DE LAMAS.

Obra Liquidada con Resolución Ejecutiva Nº -2008-GR-SM/GGR.Contrato N° 017-2007-GRSM/GGR

EDUCACION Y CULTURA

1.- CONSTRUCCIÓN DE LA INFRAESTRUCTURA DEL COLEGIO NACIONAL JOSE FAUSTINO SANCHEZ CARRIÓN-PACAYZAPA-ALONSO DE ALVARADO-LAMAS-SAN MARTÍN I Etapa

ALONSO DE ALVARADO

Contrato liquidado, en tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

2.- MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN LA IE Nº 0307-ROQUE - I ETAPA

ALONSO DE ALVARADO

Contrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

3.- RECUPERACION Y MEJORAMIENTO DE INFRAESTRUCTURA EDUCATIVA DE LA IE N° 0358 DANIEL A. CARRION GARCIA - ESTANCIA TABALOSOS - I ETAPA

Contrato Nº 017-2007-GRSM/GGRContrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

4.- AMPLIACIÓN DE LA INFRAESTRUCTURA DEL CENTRO EDUCATIVO N° 0292 DE TABALOSOS - I ETAPA

Contrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

5.- SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA E.I. N 0773 ANEXO SANGAMAYOC-DISTRITO DE BARRANQUITA-PROVINCIA DE LAMAS - I ETAPA

Contrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

6.- SUSTITUCION DE INFRAESTRUCTURA EDUCATIVA DE LA I.E N 0590 -BARRANQUITA - I ETAPA

Contrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

7.- SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. Nº 0591 - SANTIAGO DE BORJA - I ETAPA

CONTRATO Nº 017-2007-GRSM/GGRContrato liquidadoen tramite para su transferencia durante el presente año 2014

EDUCACION Y CULTURA

RECUPERACION DE 05 AULAS Y MOBLIARIO EN EL C.E.I. Nº 00740 DE SAN JUAN DE TALLIQUIHUI - II ETAPA

Obra Liquidada con R.E. Nº 361-2008-GR-SM/GGR.Contrato de ejecucion de Obra Nº 004-2007-GRSM/GGR

EDUCACION Y CULTURA

RECUPERACIÓN DE LA INFRAESTRUCTURA EDUCATIVA E IMPLEMENTACIÓN CON MOBILIARIO EN EL COLEGIO ESTATAL INTEGRADO AGROPECUARIO N° 0771-SHAMBUYACU - I y II ETAPA

Obra Liquidada con:R.G.G.R. Nº 142-2008-GR-SM/GGR (I ETAPA).PENDIENTE DE LIQUIDACION (Según SAMV).Contrato N° 007-2007-GRSM/GGR- NATIVAS MAQUINARIAS E.I.R.L

EDUCACION Y CULTURA

AMPLIACION DE LA NUEVA INFRAESTRUCTURA EN LA INSTITUCION EDUCATIVA INTEGRADA Nº 0094 -SHILCAYO- DEL DISTRITO DE LA BANDA DE SHILCAYO

BANDA DE SHILCAYO

CONTRATO LIQUIDADO

Obra Liquidada con Resolución Ejecutiva Regional Nº 272-2009-GR-SM/PGRContrato N° 015-2008-GRSM/GGI

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DE LA OFERTA EDUCATIVA DE LA IE N° 0326-INTEGRADO NIVEL PRIMARIA Y SECUNDARIA,-CENTRO POBLADO SANTA MARTA-SAN JOSE DE SISA

SAN JOSE DE SISA

Obra Liquidada con Resolución Gerencial General Regional Nº 054-2009-GR-SM/GGRContrato N° 018-2007-GRSM/GGR

EDUCACION Y CULTURA

SUSTITUCIÓN DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CESAR RUIZ REATEGUI DE PUCACACA

Obra Liquidada con: R.G.G.R. Nº 005-2009-GR-SM/GGRContrato de ejecución de Obra Nº 010-2007-GRSM/PGR - CONSTRUCTORA REGIONAL AMAZONICA S.R.L

EDUCACION Y CULTURA

SUSTITUCION DE LA INFRAESTRUCTURA EDUCATIVA DEL C.N. JUAN VELASCO ALVARADO, PACAYPITE-NUEVO SAN MIGUEL JEPELACIO

Obra culminada, operativa y con contrato liquidadaContrato N° 011-2007-GRSM/PGRConstructora y Negociaciones Milagro de Jesús E.I.R.L.

M180
jlinares: 503,541.22
K181
jlinares: DECIA: 2'314,252.00 SNIP 15 Y SOSEM: 2'201,193.00
M181
jlinares: DECIA: 435,873.01 MONTO ACTUAL SEGÚN CUADRO "AVANCE NOV. 2012"
S181
jlinares: SEGÚN SOSEM
V182
jlinares: Según el cuadro "Avance noviembre 2012", el avance al mes de agosto 2012 es: 143,518.37. Además, la obra está en proceso de liquidación.
N187
jlinares: SOSEM NO REGISTRA NANCI
N188
jlinares: SOSEM NO REGISTRA NANCI
N190
jlinares: SOSEM NO REGISTRA NANCI
N191
jlinares: SOSEM NO REGISTRA NANCI
N192
jlinares: SOSEM NO REGISTRA NANCI
N195
jlinares: SEGÚN SOSEM al 12-12-12 AL PARECER SOLAMENTE CORRESPONDE A LA II ETAPA
S195
jlinares: SEGÚN SOSEM= 256,546.00 12-12-12
Page 10: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

182 75435

I ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA

S/. 4,205,806.00

-

S/. 0.00 S/. 0.00 0.00% S/. 3,614,540.56 89.00%

II ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA -

III ETAPA MOYOBAMBA MOYOBAMBA DRE/S. CENTRAL LIQUIDADA CONTRATA S/. 404,763.29

183 172815 TARAPOTO SAN MARTIN SRBM LIQUIDADA A.D. S/. 299,093.54 S/. 0.00 S/. 0.00 0.00% S/. 299,092.00 100.00%

184 32632 UCHIZA TOCACHE CULMINADA S/. 224,892.00 S/. 0.00 S/. 0.00 0.00% S/. 270,969.00 100.00%

185 52692 TOCACHE CULMINADA ENCARGO S/. 653,282.00 S/. 0.00 S/. 0.00 0.00% S/. 934,999.00 143.12%

186 45503

I ETAPA TOCACHE S. CENTRAL/SRAH CULMINADA A.D.

S/. 1,799,288.00 S/. 0.00 S/. 0.00 0.00% S/. 1,344,937.85 74.75%

II ETAPA TOCACHE S. CENTRAL/SRAH CULMINADA A.D. Culminó el año 2009

187 55370 TOCACHE CULMINADA ENCARGO S/. 653,282.00 S/. 0.00 S/. 0.00 0.00% S/. 906,003.00 138.68%

188 13086 MORALES SAN MARTIN S. CENTRAL/SRBM CULMINADA A.D. S/. 262,980.00 S/. 0.00 S/. 0.00 0.00% S/. 351,626.00 133.71%

189 103959 SAN MARTIN N.E. CULMINADA A.D. S/. 318,021.44 S/. 0.00 S/. 0.00 0.00% - -

190 54850 MOYOBAMBA MOYOBAMBA PEAM CULMINADA CONTRATA S/. 2,593,285.00 S/. 0.00 S/. 0.00 0.00% S/. 1,216,774.00 46.92% -

191 178011 I ETAPA JUANJUI SRHC LIQUIDADA CONTRATA S/. 1,107,930.08 S/. 672,375.15 S/. 0.00 S/. 0.00 0.00% S/. 587,934.00 53.07% La I Etapa está culminada y liquidada.

192 52646 CUÑUMBUQUE LAMAS MD CUÑUMBUQUE CULMINADA S/. 185,718.04 S/. 0.00 S/. 0.00 0.00% S/. 185,718.04 -

193 13237 CASPIZAPA PICOTA S. CENTRAL/SRBM CULMINADA S/. 418,916.00 S/. 0.00 S/. 0.00 0.00% S/. 554,580.95 100.00%

194 50118 PARDO MIGUEL RIOJA CULMINADA - S/. 293,916.00 S/. 0.00 S/. 0.00 0.00% S/. 413,554.82 100.00% -

195 - MOYOBAMBA MOYOBAMBA IPD MOYOBAMBA CULMINADA - S/. 550,000.00 S/. 0.00 S/. 0.00 0.00% S/. 550,000.00 -

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO ALTO MAYO - MOYOBAMBA

Obra Liquidada con: RER Nº 268-2011-GRSM/PGR.Contrato Nº 023 - 2010 - GRSM/PGRCASAS CONTRATISTAS INGENIEROS S.A.C.En tramite para su transferencia en el presente año 2014

Resolución de Liquidacióntrámite con:Informe N° 032-2012-SGSyLO/SAMVAadministración: Informe N° 039-2012-SGSyLO/SAMVObra Concluida en Proceso de LiquidaciónEn tramite para su transferencia en el presente año 2014Obra culminada y operativa con contrato liquidado En tramite para su transferencia en el presente año 2014

EDUCACION Y CULTURA

CONSTRUCCION DE LA TRIBUNA NORTE Y TANQUE-CISTERNA Y MEJORAMIENTO DE LOS SEVICIOS HIGIENICOS Y CAMERINOS DEL ESTADIO MUNICIPAL, EN EL DISTRITO DE TARAPOTO, PROV. DE SAN MARTIN - SAN MARTIN

Obra Liquidada con: RSR Nº 072 -2012-GRSM/SRBM-TMediante Memorando Nº 077 - 2011 - GRSM/GRI, la GRI - GRSM, delega como Unidad Ejecutora a la Oficina Zonal Bajo Mayo - Tarapoto

EDUCACION Y CULTURA

AMPLIACIÓN, MEJORAMIENTO, IMPLEMENTACION EN EL CENTRO EDUCATIVO N° 0463 - SAN JUAN DE PORONGO, DISTRITO DE UCHIZA, PROVINCIA DE TOCACHE

MP TOCACHE/S. CENTRAL

ENCARGOConvenio Nº 013-2007-GRSM/PGR

Monto actual según SOSEMInversión total según informacion de la GRI: 258,969.19Culminó el año 2007Convenio Específico Nº 013-2007-GRSM-PGR

EDUCACION Y CULTURA

AMPLIACION DE INFRAESTRUCTURA E IMPLEMENTACION I.E. NICANOR REATEGUI DEL AGUILA, PROVINCIA DE TOCACHE

NUEVO PROGRESO

MD NVO. PROGRESO

Culminó el año 2007Convenio Especifico Nº 011-2007-GRSM-PGR

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DE LA OFERTA EDUCATIVA DEL INSTITUTO SUPERIOR TECNOLOGICO ALTO HUALLAGA

NUEVO PROGRESO

Culminó el año 2007A.D. (R. E. R Nº985-2007-GRSM/PGR)

NUEVO PROGRESO

EDUCACION Y CULTURA

AMPLIACION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E. CIRO ALEGRIA BAZAN INTEGRADO CENTRO POBLADO RAMAL DE ASPUZANA, PROVINCIA DE TOCACHE - SAN MARTIN

NUEVO PROGRESO

MD NVO. PROGRESO

Culminó el año 2007Convenio Especifico Nº 012-2007-GRSM-PGR

EDUCACION Y CULTURA

AMPLIACION Y MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA E IMPLEMENTACION CON MOBILIARIO EN LA I.E. Nº 0031 "MARIA ULISES DAVILA PINEDO" DISTRITO DE MORALES

Convenio RESOL. EJECUT. REG. Nº 554 -2008-GRSM/PGR. Sub Region Bajo Mayo

EDUCACION Y CULTURA

AMPLIACION DE INFRAESTRUCTURA EDUCATIVA, 04 AULAS,EN LA I.E. Nº 0096 - LAS PALMAS, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN

BANDA DE SHILCAYO

Culminó el año 2010 N.E. "LOS PALMEAÑITOS DE LA IE N° 0096"A.D. (Convenio Nº 001-2010-GRSM/PGR)

ADMINISTRACION Y

PLANEAMIENTO

REHABILITACION Y AMPLIACION DE LAS DEPENDENCIAS TECNICO ADMINISTRATIVAS DEL PEAM

EDUCACION Y CULTURA

MEJORAMIENTO INTEGRAL DEL SERVICIO EDUCATIVO OFRECIDO EN LA I.E. Nº 0401 ARTURO CHUMBE VARGAS – HUAYABAMBA, DISTRITO DE JUANJUI, PROVINCIA DE MARISCAL CÁCERES, DEPARTAMENTO DE SAN MARTÍN

MARISCAL CECERES

EDUCACION Y CULTURA

CONSTRUCCION DE 03 AULAS, DIRECCION, SSHH E IMPLEMENTACION CON MOBILIARIO ESCOLAR EN LA INSTITUCION EDUCATIVA INICIAL Nº 256-CUÑUMBUQUE

CONVENIO X ENCARGO

Conv Esp. Interint. Nº 002-2008-GRSM/PGRLiquidación en la GRI, se reviso la Liq.Financiera con Informe Nº 005-2010-GRSM/SGSyLO/MRS

EDUCACION Y CULTURA

RECUPERACIÓN DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA N° 0769 DE CASPIZAPA

CONVENIO X ENCARGO

Pago al residente: Contrato N° 1009 por 9,000.00 (AMC)Encargo con RESOL. EJECUT. REG. Nº -2008-GRSM/PGR. Sub Region Bajo Mayo

EDUCACION Y CULTURA

CONSTRUCCIÓN DE AULAS E IMPLEMENTACIÓN DE MOBILIARIOS DE LA I.E. MANUEL GONZALES PRADA LOCALIDAD DE NARANJOS, DISTRITO DE PARDO MIGUEL - RIOJA - SAN MARTIN

MD PARDO MIGUEL/S. CENTRAL

EDUCACION Y CULTURA

RECONSTRUCCION DE TRIBUNAS Y REMODELACION DE INSTALACIONES DEL ESTADIO MOYOBAMBA

CONVENIOLIQUIDACION EN LA GRI PROCESO DE REVISION

S206
jlinares: DECIA= 3'614,541.00 SOSEM= 3'618,541.00
I207
jlinares: LIQUIDACION EN TRAMITE
N211
jlinares: DECIA= 775,637.79
M214
jlinares: DECIA= 773,632.54
M215
USER: DECIA: 302,465.00 MONTO ACTUAL SEGÚN SOSEM
K216
USER: DEL REGISTRO EN LA FASE DE INVERSION
S216
USER: SOSEM NO REGISTRA EJECUCION
K218
jlinares: SEGÚN SNIP 15 Y SOSEM (19-04-12), E.T. INTEGRAL
L218
jlinares: I ETAPA SEGÚN OZMC
N218
jlinares: SRHC MONTO CONTRATADO SEGÚN SOSEM
Page 11: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

196 109152

I ETAPA

JEPELACIO MOYOBAMBA

SEDE CENTRAL CULMINADA CONTRATA

S/. 2,307,602.98

S/. 584,043.27

S/. 800,236.00 S/. 187,413.99 11.88% S/. 1,415,353.00 81.20%

II ETAPA SEDE CENTRAL CULMINADA CONTRATA S/. 1,955,246.63

197 113643

II ETAPA

MOYOBAMBA MOYOBAMBA

SEDE CENTRAL CULMINADA CONTRATA

S/. 4,266,892.56

S/. 3,670,808.16

S/. 0.00 S/. 638,426.18 0.00% S/. 4,581,791.08 99.61%

I ETAPA SEDE CENTRAL CULMINADA CONTRATA S/. 1,229,183.16

198 135121 JEPELACIO MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,704,657.95 S/. 0.00 S/. 0.00 0.00% S/. 1,619,170.26 94.99%

199 46448 RIOJA SEDE CENTRAL CULMINADA CONTRATA S/. 2,687,108.57 S/. 1,638,369.00 S/. 932,337.94 56.91% S/. 2,009,914.29 #REF!

200 136869 JEPELACIO MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 2,962,740.58 S/. 764,502.00 S/. 264,483.98 34.60% S/. 0.00 #REF! LP, CONTRATO N° 053-2012-GRSM

201 154026 TOCACHE TOCACHE SEDE CENTRAL CULMINADA CONTRATA S/. 8,409,660.83 S/. 4,253,044.00 S/. 2,479,132.62 58.29% S/. 6,595,228.45 #REF!

202 142607 HUICUNGO SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,725,940.36 S/. 0.00 S/. 0.00 0.00% S/. 1,623,609.64 100.36%

203 101389 LAMAS SEDE CENTRAL LIQUIDADA CONTRATA S/. 2,717,398.59 S/. 0.00 S/. 0.00 0.00% S/. 2,526,577.49 104.56%

204 172520 MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 3,334,822.70 S/. 0.00 S/. 0.00 0.00% S/. 2,778,932.71 102.28%

205 80134 MOYOBAMBA MOYOBAMBA SEDE CENTRAL CULMINADA CONTRATA S/. 690,354.55 S/. 558,091.00 S/. 332,406.47 59.56% S/. 464,670.47 #REF! ADS - Contrato N° 060-2012/GRSM

207 77489 OBRA PRINCIPAL PICOTA PICOTA PEHCBM CULMINADA CONTRATA S/. 6,790,421.97 S/. 6,790,421.97 S/. 2,233,048.00 S/. 1,107,584.64 49.60% S/. 5,023,685.09 73.36%

209 74610 RIOJA RIOJA PEAM CULMINADA CONTRATA S/. 6,388,570.93 S/. 120,294.00 S/. 41,748.00 34.70% S/. 6,282,288.12 90.21%

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DE SERVICIO EDUCATIVO EN LA INST. EDUC. N°0896 – SIETE DE JUNIO – JEPELACIO – MOYOBAMBA

Ampliaciones de plazo: 1, 2, 3, 4, 5, paralizacion, 6, 7, 8, 9, 10 = 11, 06, 60, 13, 27, 157, 07, 30, 07, 07, 05

La obra fisica está concluida, el ispector solicitó la recepción. La comisión de recepción está programando su visita de campo, a fin de constatar la culminación.Ampliaciones de plazo: 1, 2, 3, 4, 5 = 08, 12, 09, 09, 45

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. Nº 00804 - VALLE DE LA CONQUISTA - MOYOBAMBA - SAN MARTIN

Val.N°08 del Cont. Principal:Acumulado Ejec. Fis.=94.64%, Progr. Fis. =100%Ejec. Finan= 3,208,610.61 Progr. Finan.= 3,320,000.00Mensual (Mes de Marzo)Ejec. Fis.=3.36%, Ejec. Finan= 82,281.91 El contrato de ejecución de Obra se encuentra liquidado, se aplico una penalidad de S/. 13,940.70 por demora en termino de obra.Mediante Contrato N°002-213-GRSM/GGR con la empresa L&N DISTRIBUIDORA SAC, por un monto de S/. 28,720.00 se realiza la adquisición de mobiliario para esta etapa del proyecto

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BÁSICAS DEL SERVICIO EDUCATIVO DE LA INSTITUCIÓN EDUCATIVA PRIMARIA N 00956 - ALTO RIOJA - DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA - SAN MARTIN

Con maxima penalidad, esta ejecutando a cuenta del contratista.Paralización de obra = 61 dc Ampliaciones de plazo: 93 dcADS, Contrato N° 037-2010-GRSM/GGR (Supervisión)Contrato N° 001-2012-GRSM/GGR (Ejecución)ADP N° 006-2011-GRSM (suma alzada)

EDUCACION Y CULTURA

SUSTITUCION, MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. N 00123 SEGUNDA JERUSALEN-ELIAS SOPLIN VARGAS- RIOJA

ELIAS SOPLIN VARGAS

LP, CONTRATO N° 054-2012-GRSMCONTRATO DE OBRA LIQUIDADO, POR LIQUIDAR PROYECTO

EDUCACION Y CULTURA

AMPLIACION SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA DE LA IE LUIS HERNAN RAMIREZ MENDOZA - LA HUARPIA - JEPELACIO - MOYOBAMBA - SAN MARTIN

EDUCACION Y CULTURA

MEJORAMIENTO INTEGRAL DEL SERVICIO EDUCATIVO EN LA I.E. N 0412 - TOCACHE, DISTRITO Y PROVINCIA DE TOCACHE - DEPARTAMENTO DE SAN MARTÍN

AMP PLAZO 1: 6 dc RGGR 125-2012-GRSM/GGRADP, CONTRATO N° 043-2012-GRSMLP, CONTRATO N° 044-2012-GRSMAMC, CONTRATO N° 024-2011-GRSM-GGR (Elaboración de Exp. Téc.)OBRA RECEPCIONADA EN PROCESO DE LIQUIDACION (Con Plazo al 01/04/2014)

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS DEL SERVICIO EDUCATIVO EN LA I.E. N 0418 VICTOR MANUEL PEREZ MORALES - HUICUNGO - MARISCAL CACERES - SAN MARTIN

MARISCAL CACERES

ADP N° 003-2012-GRSMOBRA LIQUIDADA , COORDINAR PARA LIQUIDAR EL PROYECTO

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. 0352, PACAYZAPA - ALONSO DE ALVARADO - LAMAS - SAN MARTIN

ALONSO DE ALVARADO

LP, Contrato N° 080-2012-GRSM/GGRD.U. N°016-2012OBRA CULMINADA Y LIQUIDADA

EDUCACION Y CULTURA

MEJORAMIENTO EN LA CALIDAD DEL SERVICIO EDUCATIVO EN LA I.E. N 00179 - SAN JOSÉ DEL ALTO MAYO, MOYOBAMBA - SAN MARTÍN

LP - Contrato N° 076-2012-GRSM/GGRD.U. N°016-2012

EDUCACION Y CULTURA

CONSTRUCCION DE COLISEO Y MEJORAMIENTO DEL AUDITORIO DE LA I.E. IGNACIA VELASQUEZ DE LA CIUDAD DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA - SAN MARTIN

EDUCACION Y CULTURA

AMPLIACION SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA ALBERTO LEVEAU GARCIA LOCALIDAD DE PICOTA, PROVINCIA DE PICOTA - SAN MARTIN

LP - Contrato Nº 002 - 2013-GRSM-PEHCBM/PS (Ejecucion)D.U. N°016-2012'EL 22/01/2014 SE RESOLVIO CONTRATO. EL SALDO DE OBRA SE EJECUTA POR ADMINISTRACION DIRECTA

EDUCACION Y CULTURA

CONSTRUCCION DEL COLISEO DE LA CIUDAD DE RIOJA, DISTRITO Y PROVINCIA DE RIOJA - SAN MARTIN

AMC-Contrato N° 027-2012-GRSM-PEAM-01.00 (Supervision)AMC-Contrato N° 019-2012-GFRSM-PEAM.01.00 (Ejecucion)Elaboracion expediente tecnico: ADS 024-2009-GRSM - GARCAM EIRL - D.U. N° 078-2009 (A.D.)

U223
USER: PARALIZACIONES:15+15+15+15+32+11+19+14+21=157 DC
K225
RGR Nº 057-2011-GRSM/GRI, RESOLUCION QUE APRUEVA EL EXP. INTEGRAL
Page 12: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

211 176738 UCHIZA TOCACHE MD UCHIZA CULMINADA S/. 2,791,899.00 S/. 0.00 S/. 0.00 0.00% S/. 2,801,899.00 100.00%

212 149257 CAMPANILLA MD CAMPANILLA CULMINADA S/. 403,295.65 S/. 0.00 S/. 0.00 0.00% S/. 403,295.65 100.00% -

213 108569 BAJO BIAVO BELLAVISTA S. CENTRAL/SRBM CULMINADA S/. 1,074,967.24 S/. 38,855.00 S/. 3,600.00 9.27% S/. 1,675,881.28 100.00% Obra culminada y recepcionada, falta liquidación

214 60055

II ETAPA

SAN HILARION PICOTA

SEDE CENTRAL CULMINADA CONTRATA

S/. 4,733,585.52

S/. 3,309,385.91

S/. 228,528.00 S/. 112,168.33 49.08% S/. 0.00 100.00%

I ETAPA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,685,971.73

215 15963 II ETAPA EL DORADO SEDE CENTRAL CULMINADA CONTRATA S/. 637,369.00 S/. 0.00 S/. 0.00 0.00% S/. 196,427.00 100.00% La II Etapa está culminada.

216 146557 RIOJA SEDE CENTRAL CULMINADA S/. 2,950,815.00 S/. 41,679.00 S/. 17,862.00 42.86% S/. 35,724.00 1.21%

217 131507 EL DORADO CULMINADA A.D. S/. 106,352.00 S/. 0.00 S/. 0.00 0.00% S/. 106,352.00 100.00%

219 SALUD 16471 II ETAPA BELLAVISTA BELLAVISTA S. CENTRAL/SRHC CULMINADA A.D. S/. 1,993,173.00 S/. 433,413.26 S/. 0.00 S/. 0.00 0.00% S/. 1,724,914.23 86.54%

229 SALUD 26829 SAN PABLO BELLAVISTA LIQUIDADA A.D. S/. 767,525.21 S/. 0.00 S/. 0.00 0.00% S/. 1,353,335.48 105.51%

230 SALUD 9101 SAN PABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 447,092.18 S/. 0.00 S/. 0.00 0.00% S/. 328,388.97 100.00%

231 SALUD 9100 SAN PABLO BELLAVISTA SEDE CENTRAL TRANSFERIDA CONTRATA S/. 437,426.54 S/. 0.00 S/. 0.00 0.00% S/. 316,708.85 72.40%

232 SALUD 130041 EL PORVENIR SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 755,279.24 S/. 0.00 S/. 0.00 0.00% S/. 598,657.88 100.00%

EDUCACION Y CULTURA

AMPLIACIÓN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIÓN EDUCATIVA INTEGRADO RICARDO PALMA SORIANO, EL PORVENIR, DISTRITO DE UCHIZA - TOCACHE - SAN MARTÍN

CONVENIO Nº 01-2012-

GRSM/PGR

Contrato S/N supervision (ADS)Contrato N° 002-2012-MDU - D.U. N° 054-2011 (LP)-ejecucionFinanciado por el GRSM y FONIPREL

EDUCACION Y CULTURA

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E 0755-HORACIO ZEVALLOS GAMES DE LA LOCALIDAD DE CAMPANILLA,DISTRITO DE CAMPANILLA, PROVINCIA DE MARISCAL CACERES - SAN MARTIN

MARISCAL CACERES

CONVENIO Nº 02-2012-

GRSM/PGR

EDUCACION Y CULTURA

MEJORAMIENTO SUSTITUCION Y EQUIPAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA N° 0084 ANDRES AVELINO CACERES DORREGARAY NUEVO LIMA, DISTRITO DE BAJO BIAVO-BELLAVISTA-SAN MARTIN

CONVENIO X ENCARGO

EDUCACION Y CULTURA

MEJORAMIENTO DE LA OFERTA EDUCATIVA EN LA I.E. JOSE CARLOS

MARIATEGUI LACHIRA - SAN CRISTOBAL DE SISA - SAN HILARION

- PICOTA - SAN MARTIN

OBRA CULMINADA RECEPCIONADA Y EN PROCESO DE LIQUIDACIÓN, El Adicional N°01 y Deductivo Vinculante fueron denegados.

OBRA LIQUIDADA, • Con fecha 29 de Enero del 2013, se firma el CONTRATO N° 006-2013-GRSM/GGR con la Empresa PROYECTOS Y DESARROLLOS MALKY SOCIEDAD COMERCIAL DE RESPONSABILIDAD LIMITADA, para la adquisición de mobiliario de la Primera Etapa del Proyecto por un monto de S/. 67,835.00; teniendo un plazo de entrega de 30 días Calendarios.

EDUCACION Y CULTURA

SUSTITUCION DE LA INFRAESTRUCTURA EN LA INSTITUCION EDUCATIVA INTEGRADA Nº 0274 LUISA SANCHEZ RAMIREZ DE LA BANDA DE PISHUAYA EN EL DISTRITO DE SAN JOSE DE SISA

SAN JOSE DE SISA

EDUCACION Y CULTURA

MEJORAMIENTO DE LAS CONDICIONES BASICAS PARA BRINDAR EL SERVICIO EDUCATIVO EN LA I.E. JOSE CARLOS MARIATEGUI - NARANJILLO - NUEVA CAJAMARCA - RIOJA - SAN MARTIN

NUEVA CAJAMARCA

Contrato N° 063-2012-GRSM (Elaboracion de exp. tec.)-AMC-Arboleda Gil Wiliams Salomon

EDUCACION Y CULTURA

CONSTRUCCION DE LOSA DEPORTIVA Y GRADERIAS DE LA I.E. N 0277 SANTA CRUZ, EN EL CENTRO POBLADO DE SANTA CRUZ, EN EL DISTRITO DE SAN JOSE DE SISA, PROVINCIA DE EL DORADO - SAN MARTIN

SAN JOSE DE SISA

S. CENTRAL/NUCLEO

EJECUTOR

AMPLIACION, REHABILITACION Y EQUIPAMIENTO DEL HOSPITAL RURAL DE BELLAVISTA

La obra está culminada bajo la modalidad de administración directa.

REPOSICION Y EQUIPAMIENTO DEL CENTRO DE SALUD CONSUELO, DISTRITO DE SAN PABLO, PROVINCIA DE BELLAVISTA, DEPARTAMENTO DE SAN MARTIN

DRS/SRHC/S. CENTRAL

Mediante R.E.R.Nº 376-2008-GRSM/PGR se designa a entidad ejecutora

RECUPERACION, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD FAUSA SAPINA

Contrato N° 020-2010-GRSM/PGRObra Transferia a Región San Martin Salud Huallaga Central U.E N° 402-1059,mediante RGGR N° 199-2013-GRSM/GGR del 21/10/2013, el acta de transferencia fue suscrita el 28/10/2013

RECUPERACION, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD DOS DE MAYO

Obra Liquidada con: RGGR N° 123-2012-GRSM/GGRObra Transferia a Región San Martin Salud Huallaga Central U.E N° 402-1059,mediante RGGR N° 144-2013-GRSM/GGR del 08/08/2013, el acta de transferencia fue suscrita el 28/10/2013

FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD PELEJO, MICRORED BARRANQUITA, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD SAN MARTIN

Obra Liquidada con:R.G.G.R. N° 110-2012-GRSM/GGRR.G.R. Nº 035-2011-GRSM/GRIObra Transferia a Región San Martin Salud U.E N° 400-0930,mediante RGGR N° 159-2013-GRSM/GGR del 03/09/2013, el acta de transferencia fue suscrita el 26/12/2013

K244
Aprobado mediante RGR N° 063-2011-GRSM/GRI, del 29/11/2011
K260
jlinares: DECIA: 1'282,690.00 MONTO ACTUAL SEGÚN SRHC
V261
jlinares: DECIA: Obra Liquidada con: R.E.R. Nº 1992-2010-GRSM/PGR R.G.G.R. N° 124-2012-GRSM/GGR
M262
jlinares: DECIA= 316,709.00
V262
jlinares: DECIA: R.E.R. N° 002-2011-GRSM/PGR
Page 13: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

233 SALUD 113525

I ETAPA JUANJUI SEDE CENTRAL LIQUIDADA CONTRATA

S/. 5,266,399.00

S/. 0.00 S/. 0.00 0.00% S/. 5,665,017.00 107.57%

II ETAPA JUANJUI SEDE CENTRAL LIQUIDADA CONTRATA S/. 475,079.52 S/. 0.00 S/. 0.00 0.00% S/. 434,689.77 100.00%

234 SALUD 39621 MOYOBAMBA MOYOBAMBA CULMINADA A.D. S/. 627,773.00 S/. 0.00 S/. 0.00 0.00% S/. 464,475.00 73.99% -

235 SALUD 13346 SORITOR MOYOBAMBA S. CENTRAL/PEAM CULMINADA A.D. S/. 635,456.00 S/. 0.00 S/. 0.00 0.00% S/. 270,558.00 42.58% -

236 SALUD 9114 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 362,660.60 S/. 0.00 S/. 0.00 0.00% S/. 230,453.00 100.00%

237 SALUD 65010 SAN MARTIN CULMINADA A.D. S/. 3,890,578.00 S/. 0.00 S/. 0.00 0.00% S/. 5,091,751.00 130.87% Culminó el año 2008

238 SALUD 80501 VARIOS DRS CULMINADA CONTRATA S/. 4,982,949.00 S/. 0.00 S/. 0.00 0.00% S/. 4,754,374.00 95.41% Culminó el año 2009

239 41351 VARIOS SEDE CENTRAL CULMINADA CONTRATA S/. 1,929,451.00 S/. 0.00 S/. 0.00 0.00% S/. 1,858,068.00 96.30% -

240 SALUD 9118 SAN PABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 429,640.47 S/. 0.00 S/. 0.00 0.00% S/. 314,939.68 73.30%

241 SALUD 130301 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 682,086.02 S/. 0.00 S/. 0.00 0.00% S/. 529,440.00 77.62%

242 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AGUA BLANCA AGUA BLANCA EL DORADO SEDE CENTRAL LIQUIDADA ENCARGO S/. 22,950.00 S/. 0.00 S/. 0.00 0.00% S/. 20,907.10 100.00%

243 SALUD Sin codigo REHABILITACIÓN DEL HOSPITAL RURAL DE PAPAPLAYA PAPAPLAYA SAN MARTIN DRS LIQUIDADA ENCARGO S/. 21,469.00 S/. 0.00 S/. 0.00 0.00% - -

244 SALUD Sin codigo SAPOSOA HUALLAGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,225.00 S/. 0.00 S/. 0.00 0.00% S/. 6,627.50 115.71%

245 SALUD Sin codigo LAMAS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 8,973.00 S/. 0.00 S/. 0.00 0.00% S/. 8,210.70 112.31%

246 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ALIANZA CAYNARACHI LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 12,590.00 S/. 0.00 S/. 0.00 0.00% S/. 11,486.00 109.54%

247 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AMINIO SHATOJA EL DORADO SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,155.00 S/. 0.00 S/. 0.00 0.00% S/. 6,544.50 111.98%

248 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPAMPA MORALES SAN MARTIN DRS LIQUIDADA ENCARGO S/. 12,573.00 S/. 0.00 S/. 0.00 0.00% - -

MEJORAMIENTO DE LOS SERVICIOS DEL HOSPITAL DE APOYO I - JUANJUI, PROVINCIA DE MARISCAL CACERES,

REGION SAN MARTIN

MARISCAL CACERES

Para reclasificación con Informe N° 040-2012-SGSyLO/SAMVEl tiempo de Ejecucion fue de 180 dias pero hubo 254 dias de ampliacion.Contrato de ejecucion de Obra Nº 037-2009-GRSM/GGR - Consorcio JuanjuiCONTRATO N° 040-2011-GRSM/GGRen tramite para su transferencia durante el presente año 2014

MARISCAL CACERES

Obra culminada, en operación y liquidadaen tramite para su transferencia durante el presente año 2014

EQUIPAMIENTO DEL SERVICIO DE EMERGENCIA DEL HOSPITAL DE MOYOBAMBA.

ADMINISTRACION CENTRAL - MINSA

AMPLIACION, REHABILITACION Y EQUIPAMIENTO DEL CENTRO DE SALUD SORITOR

RECUPERACIÓN, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD PONGO ISLA

Obra Liquidada con R.E.R. Nº 069-2011-GRSM/PGRContrato de ejecucion de Obra Nº 017-2010-GRSM/ GGR

MEJORAMIENTO DEL ACCESO AL HOSPITAL DE APOYO I, EN LA LOCALIDAD DE LA BANDA DE SHILCAYO, DISTRITO DE LA BANDA DE SHILCAYO - SAN MARTIN - SAN MARTIN

BANDA DE SHILCAYO

MD BANDA DE SHILCAYO/S.

CENTRAL

IMPLEMENTACION DE LA RED DE SERVICIO DE SANGRE EN LA REGION SAN MARTIN

MOYOBAMBA, SAN MARTIN,

RIOJA, MARISCAL CACERES,

HUALLAGA, TOCACHE

PREVISION SOCIAL

FORTALECIMIENTO AL PROGRAMA DE NUTRICION Y SEGURIDAD ALIMENTARIA EN LOS DISTRITOS DE TARAPOTO, MOYOBAMBA, CALZADA, RIOJA Y NUEVA CAJAMARCA EN EL DEPARTAMENTO DE SAN MARTIN

MOYOBAMBA, SAN MARTIN,

RIOJA

RECUPERACIÓN, MEJORAMIENTO Y EQUIPAMIENTO DEL PUESTO DE SALUD RAMON CASTILLA

Obra liquidada.Contrato de Ejecución de Obra N° 006-2012-GRSM/GGR en tramite para su transferencia durante el presente año 2014

FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD LECHE, MICRORED DE SALUD HUIMBAYOC, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD SAN MARTIN

Obra culminada, en operación y liquidadaCulminó el año 2011Contrato Nº 008-2011-GRSM/GGR en tramite para su transferencia durante el presente año 2014

Convenio Nº 021-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con R.E.R. Nº 1190-2010-GRSM/PGRConvenio Nº 020-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD 7 DE JULIO (AHUIHUA)

Obra Liquidada con: R.E.R. Nº 1191-2010-GRSM/PGRConvenio Nº 038-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD ALFONSO UGARTE

Obra Liquidada con: R.E.R. Nº 1192-2010-GRSM/PGRConvenio Nº 025-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1193-2010-GRSM/PGRConvenio Nº 035-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1194-2010-GRSM/PGRConvenio Nº 022-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1195-2010-GRSM/PGRConvenio Nº 026-2007-GR-SM/GGR - Dirección Regional de Salud.

M264
jlinares: DECIA= 5'540,279.00
S264
jans Linares: COSTO DE OBRA SEGÚN L.R.D.C: 434,689.77
S265
jans Linares: COSTO DE OBRA SEGÚN L.R.D.C: 434,689.77
M266
jlinares: DECIA= 464,475.00
S269
jans Linares: LUCHO: 4'562,895.02
N270
jlinares: DECIA= 4'631,124.20
M271
jlinares: DECIA= 1'858,068.00
Page 14: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

249 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPLAYA MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA ENCARGO S/. 11,930.00 S/. 0.00 S/. 0.00 0.00% S/. 10,887.00 110.11%

250 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD ATUMPAMPA MORALES SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 12,573.00 S/. 0.00 S/. 0.00 0.00% S/. 11,455.70 109.56%

251 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD AUCALOMA SAN ANTONIO SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,445.00 S/. 0.00 S/. 0.00 0.00% - -

252 SALUD Sin codigo SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,073.00 S/. 0.00 S/. 0.00 0.00% - -

253 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD CAJATAMBO UCHIZA TOCACHE SEDE CENTRAL LIQUIDADA ENCARGO S/. 7,796.00 S/. 0.00 S/. 0.00 0.00% S/. 7,796.00 100.00%

254 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD CAYENA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,139.00 S/. 0.00 S/. 0.00 0.00% S/. 8,355.10 112.07%

255 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD HUAYABAMBA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 14,478.00 S/. 0.00 S/. 0.00 0.00% S/. 13,195.20 110.00%

256 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD HUINGUILLO JUANJUI DIRES LIQUIDADA ENCARGO S/. 8,492.00 S/. 0.00 S/. 0.00 0.00% S/. 7,762.80 91.41%

257 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD LA VICTORIA JUANJUI SEDE CENTRAL LIQUIDADA ENCARGO S/. 6,512.00 S/. 0.00 S/. 0.00 0.00% S/. 5,980.80 116.57%

258 SALUD Sin codigo PISCOYACU HUALLAGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 11,263.00 S/. 0.00 S/. 0.00 0.00% S/. 10,286.70 110.77%

259 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD PACASMAYO AGUA BLANCA EL DORADO DIRES LIQUIDADA ENCARGO S/. 6,870.00 S/. 0.00 S/. 0.00 0.00% S/. 6,303.00 100.00%

260 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD PANJUY TABALOSOS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,042.00 S/. 0.00 S/. 0.00 0.00% S/. 13,042.00 S/. 100.00

261 SALUD Sin codigo CUÑUMBUQUE LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 10,727.00 S/. 0.00 S/. 0.00 0.00% S/. 9,789.30 110.12%

262 SALUD Sin codigo TABALOSOS LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,015.00 S/. 0.00 S/. 0.00 0.00% S/. 13,015.00 100.00%

263 SALUD Sin codigo SAN MARTIN DRS LIQUIDADA ENCARGO S/. 10,207.00 S/. 0.00 S/. 0.00 0.00% S/. 10,207.00 100.00%

264 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD SAN REGIS SAPOSOA HUALLGA SEDE CENTRAL LIQUIDADA ENCARGO S/. 13,969.00 S/. 0.00 S/. 0.00 0.00% S/. 12,787.10 113.29%

265 SALUD Sin codigo TOCACHE TOCACHE SEDE CENTRAL LIQUIDADA ENCARGO S/. 8,648.00 S/. 0.00 S/. 0.00 0.00% S/. 8,648.00 100.00%

266 SALUD Sin codigo REHABILITACIÓN DEL PUESTO DE SALUD SHAPAJA SHAPAJA SAN MARTIN SEDE CENTRAL LIQUIDADA ENCARGO S/. 10,475.00 S/. 0.00 S/. 0.00 0.00% S/. 19,619.50 187.30%

267 SALUD Sin codigo MOYOBAMBA MOYOBA,BA SEDE CENTRAL LIQUIDADA ENCARGO S/. 9,045.00 S/. 0.00 S/. 0.00 0.00% S/. 8,280.50 113.74%

268 SALUD 130135 BARRANQUITA LAMAS SEDE CENTRAL TRANSFERIDA CONTRATA S/. 548,705.16 S/. 0.00 S/. 0.00 0.00% S/. 464,654.10 100.00%

269 SALUD 130298 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 847,010.15 S/. 0.00 S/. 0.00 0.00% S/. 658,479.00 100.00%

Obra Liquidada con: R.E.R. Nº 1196-2010-GRSM/PGRConvenio Nº 032-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1196-2010-GRSM/PGRConvenio Nº 032-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1197-2010-GRSM/PGRConvenio Nº 027-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD CABO ALBERTO LEVEAU - MACHUNGO

CABO ALBERTO LEVEAU

Obra Liquidada con: R.E.R. Nº 1198-2010-GRSM/PGRCulminó el año 2007Convenio Nº 050-2007-GR-SM/GGR - Dirección Regional de Salud.

Convenio Nº 046-2007-GR-SM/GGR - Dirección Regional de Salud.

MARISCAL CACERES

Obra Liquidada con: R.E.R. Nº 1200-2010-GRSM/PGRConvenio Nº 042-2007-GR-SM/GGR - Dirección Regional de Salud.

MARISCAL CACERES

Obra Liquidada con: R.E.R. Nº 1201-2010-GRSM/PGRConvenio Nº 043-2007-GR-SM/GGR - Dirección Regional de Salud.

MARISCAL CACERES

Obra Liquidada con: R.E.R. Nº 1202-2010-GRSM/PGRConvenio Nº 044-2007-GR-SM/GGR - Dirección Regional de Salud.

MARISCAL CACERES

Obra Liquidada con: R.E.R. Nº 1203-2010-GRSM/PGRConvenio Nº 045-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD NUEVO SACANCHE

Obra Liquidada con: R.E.R. Nº 1204-2010-GRSM/PGRConvenio Nº 039-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1205-2010-GRSM/PGRConvenio Nº 034-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1206-2010-GRSM/PGRConvenio Nº 029-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD SAN FRANCISCO DEL RIO MAYO

Obra Liquidada con: R.E.R. Nº 1207-2010-GRSM/PGRConvenio Nº 030-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD SAN MIGUEL DEL RIO MAYO

Obra Liquidada con: R.E.R. Nº 1208-2010-GRSM/PGRConvenio Nº 018-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD SAN PABLO DE TIPISHCA

CHIPURANA Y NAVARRO

Obra Liquidada con: R.E.R. Nº 1209-2010-GRSM/PGRCulminó el año 2007Convenio Nº 036-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con. R.E.R. Nº 1210-2010-GRSM/PGRConvenio Nº 040-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD SAN ROSA DE SHAPAJA

Obra Liquidada con: R.E.R. Nº 1211-2010-GRSM/PGRConvenio Nº 047-2007-GR-SM/GGR - Dirección Regional de Salud.

Obra Liquidada con: R.E.R. Nº 1212-2010-GRSM/PGRCulminó el año 2007Convenio Nº 037-2007-GR-SM/GGR - Dirección Regional de Salud.

REHABILITACIÓN DEL PUESTO DE SALUD VALLE LA CONQUISTA

Obra Liquidada con: R.E.R. Nº 1213-2010-GRSM/PGRConvenio Nº 033-2007-GR-SM/GGR - Dirección Regional de Salud.

FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD SANTIAGO DE BORJA, MICRO RED BARRANQUITA, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD

Obra Liquidada con: RGGR N° 106-2012-GRSM/GGRContrato Nº 001-2010-GRSM-ORAObra Transferia a Región San Martin Salud U.E N° 400-0930,mediante RGGR N° 164-2013-GRSM/GGR del 03/09/2013, el acta de transferencia fue suscrita el 26/12/2013

FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD YARINA, MICRO RED HUIMBAYOC, RED SAN MARTIN, DIRECCION REGIONAL DE SALUD

Obra Liquidada con R.G.G.R. Nº 070-2011-GRSM/GRIContrato (R.E.R Nº 1185-2010-GRSM/PGR)Contrato Nº 066-2010-GRSM/GGR

V300
jlinares: DECIA: R.G.R. Nº 036-2011-GRSM/GRI
Page 15: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

270 SALUD 108466 PINTO RECODO LAMAS SEDE CENTRAL CULMINADA N.E./A.D. S/. 359,689.85 S/. 138,308.18 S/. 0.00 S/. 0.00 0.00% S/. 658,479.00 183.07%

272 SANEAMIENTO 10519 SAN PABLO BELLAVISTA S. CENTRAL/SRBM-T CULMINADA A.D. S/. 2,176,389.08 S/. 0.00 S/. 0.00 0.00% S/. 2,336,744.00 100.00%

273 SANEAMIENTO 10503 SAN RAFAEL BELLAVISTA CERRADO A.D. - S/. 0.00 S/. 0.00 0.00% S/. 4,745,243.00 123.30%

274 SANEAMIENTO 78793 EL PORVENIR SAN MARTIN MD PORVENIR CULMINADA S/. 2,644,690.00 S/. 0.00 S/. 0.00 0.00% S/. 1,814,917.00 100.00% -

275 SANEAMIENTO 7331 BELLAVISTA BELLAVISTA LIQUIDADA A.D. S/. 631,977.92 S/. 0.00 S/. 0.00 0.00% S/. 2,320,453.00 181.37% Ejecución por convenio de encargo a la SRBM-T

276 SANEAMIENTO 10292 SAN RAFAEL BELLAVISTA MD SAN RAFAEL CULMINADA ENCARGO S/. 1,824,311.00 S/. 0.00 S/. 0.00 0.00% S/. 1,966,008.00 107.77% Convenio Específico N° 003-2010-GRSM/PGR

277 SANEAMIENTO 11762 EL DORADO CULMINADA CONVENIO S/. 1,709,320.00 S/. 0.00 S/. 0.00 0.00% S/. 1,185,760.00 100.00%

278 SANEAMIENTO 23723 AGUA BLANCA EL DORADO S. CENTRAL/SRBM CULMINADA CONVENIO S/. 1,912,745.00 S/. 0.00 S/. 0.00 0.00% S/. 1,997,695.00 100.00%

279 SANEAMIENTO AGUA BLANCA EL DORADO SEDE CENTRAL CULMINADA CONTRATA S/. 263,536.75

280 SANEAMIENTO 34829 SHATOJA EL DORADO SEDE CENTRAL LIQUIDADA CONTRATA S/. 3,529,828.30 S/. 0.00 S/. 0.00 0.00% S/. 3,455,887.02 100.00%

281 SANEAMIENTO 11801 EL ESLABON HUALLAGA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,991,929.00 S/. 0.00 S/. 0.00 0.00% S/. 832,728.37 41.81%

282 SANEAMIENTO 9442 SACANCHE HUALLAGA S. CENTRAL/SRHC-J CULMINADA S/. 1,502,697.21 S/. 0.00 S/. 0.00 0.00% S/. 2,455,351.00 114.27%

283 SANEAMIENTO 9326

I ETAPA

PISCOYACU HUALLAGA SRHC-J/S. CENTRAL

CULMINADA CONTRATA

S/. 1,583,819.00

-

S/. 0.00 S/. 0.00 0.00% S/. 1,346,015.94 84.99%

II ETAPA LIQUIDADA CONTRATA -

284 SANEAMIENTO 5806

RUMISAPA LAMAS

SRBM/S. CENTRAL

LIQUIDADA A.D.

S/. 858,624.25 S/. 0.00 S/. 0.00 0.00% S/. 579,126.00 73.68%

RUMISAPA LAMAS LIQUIDADA

285 SANEAMIENTO 12569 PINTO RECODO LAMAS SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,559,176.00 S/. 0.00 S/. 0.00 0.00% S/. 1,467,100.00 94.09%

286 SANEAMIENTO 67085 LAMAS LAMAS MP LAMAS CERRADO CONTRATA S/. 5,617,085.00 S/. 0.00 S/. 0.00 0.00% S/. 5,802,052.00 103.29%

287 SANEAMIENTO 96265 SHANAO LAMAS CULMINADA A.D. S/. 921,699.00 S/. 0.00 S/. 0.00 0.00% S/. 347,647.00 37.72% -

288 SANEAMIENTO 23736 BARRANQUITA LAMAS S. CENTRAL/SRBM-T LIQUIDADA A.D. S/. 3,909,701.00 S/. 0.00 S/. 0.00 0.00% S/. 3,927,214.00 100.45%

MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE BETANIA EN EL, DISTRITO DE PINTO RECODO - LAMAS - SAN MARTIN

Comisión de recepción RGGR N° 068-2012-GRSM/GGR 26/07/12Acta de recepción de obra 21-08-12La obra paralizó desde 21-06-11Adenda N° 01 al Convenio N° 003 (16-11-10)Conenio N° 003-2010-GRSM/PGR, firmado (19-03-10)

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CONSUELO

Mediante R.E.R. Nº 609-2008-GRSM-PGR se delegó a la U.E. SRBM-T, para administrar, ejecutar y liquidar la obra.Obra culminada.

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAN RAFAEL Y LA LIBERTAD

S. CENTRAL/PEHCBM

PIP cerrado, con informe de cierre. Entransferencia física de obra= 29-12-10Informe de cierre= 04-09-12

CONSTRUCCION DEL SISTEMA DE ALCANTARILLADO DE EL PORVENIR - PELEJO, DISTRITO DE EL PORVENIR - SAN MARTIN - SAN MARTIN

CONVENIO Nº06-2012-GRSM/PGR

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA CIUDAD DE BELLAVISTA

AGUA P' TODOS/S. CENTRAL/SRBM-T

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CRISTINO GARCIA CARHUAPOMA

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN MARTIN DE ALAO

SAN MARTIN DE ALAO

S. CENTRAL/ MD SAN MARTIN DE

ALAO

Convenio Nº 003-2006-GRSM/PGR Munic. Distr. San Martin de Alao

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE AGUA BLANCA

Convenio R.G.G.R. Nº 095-2006-GRSM/GGRRESOL. EJECUT. REG. Nº 445 -2010-GRSM/PGR. Oficina Zonal Bajo Mayo - Tarapoto.

Mantenimiento

REHABILITACIÓN DEL SISTEMA DEL SISTEMA DE ALCANTARILLADO DE LA LOCALIDAD DE AGUA BLANCA - PROVINCIA DE EL DORADO - SAN MARTIN

INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SHATOJA

Liquidada con: RSR N° 068-2011-GRSM/SRBM-TConsorcio Shatoja - Contrato N° 001-2010-GRSM/SRBM-TLP N° 001-2010-GRSM-SRBM-T/CEDU N° 041-2009

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE EL ESLABÓN

Contrato de ejecución de Obra Nº 026-2007-GRSM/GGRProcedimiento especial de seleccion - DS 24-2006-VIVIENDA

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SACANCHE - II ETAPA

CONVENIO X ENCARGO

La obra se ejecutó bajo la modalidad de admnistracion directa. Actualmente está culminada.Ejecución por convenio de encargo a la SRHC-MC-J

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PISCOYACU

CONVENIO CON R.G.G.R. Nº 106-2006-GRSM/GGR, LIQUIDADO

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PISCOYACU - II ETAPA.

Obra Liquidada con: RGGR N 2009-GR-SM/GGRContrato de ejecución de Obra Nº 002-2008-GRSM/PGR - CONSORCIO EUREKA

INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE RUMISAPA

Contrapartida de la Sede del GRSM y ejecutó SRBM- T

SALDO INSTALACION DE UN SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE RUMISAPA

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PINTO RECODO

Liquidación de contrato con R.E.R. N° 889-2009-GRSM/PGR: 1'407,530.93

AMPLIACION DEL SISTEMA DE CAPTACION Y CONDUCCION DEL SISTEMA DE AGUA POTABLE, LAMAS, PROVINCIA DE LAMAS - SAN MARTIN

Informe de cierre: 07-09-12.La entidad encargada de la operación y mantenimiento es la UE, por lo que no corresponde la transferencia (EMAPA SM)

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE EN EL DISTRITO DE SHANAO - LAMAS - SAN MARTIN

MD SHANAO/S. CENTRAL

INSTALACION DEL SISTEMA DE AGUA POTABLE DE LAS LOCALIDADES DE SANTA ROSA, LA UNION, SAN MARTIN, JUAN SANTOS ATAHUALPA, NUEVA ALEGRIA, BARRANQUITA Y OTRAS

Ficha SNIP con PIP viable, falta realizar informe para pasar a la FASE DE INVERSIÖN

K302
jlinares: PROYECTO INICIAL: 90 DC INFRAESTRUCTURA: 284,709.35 EQUIPAMIENTO : 60,030.50 ESTUDIOS : 14,950.00 ------------------------------------------- TOTAL : 359,689.85
L302
jlinares: SALDO DE OBRA: 30 DC INFRAESTRUCTURA: 86,523.24 EQUIPAMIENTO : 54,009.03 DEUDAS : 16,775.91 MAT. EN ALMACEN : -19,000.00 ------------------------------------------ TOTAL : 138,308.18
N302
jlinares: DECIA= 49,438.00
S302
USER: DECIA= 112,468.00
M304
jlinares: DECIA= 2'336,744.00
M305
jlinares: DECIA= 4'724,743.00 REPRESENTA MONTO EJECUTADO REAL
S305
USER: SOSEM: 4'724,743.00 INFORME DE CIERRE: 4'745,243.00
K306
USER: 30-11-09 = 2'843,919.00 28-08-12 = 2'644,690.00
M306
jlinares: DECIA= 111,564.00
S306
jlinares: DECIA= 111,564.00
M307
jlinares: DECIA= 2'320,453.00
M308
jlinares: decia= 1'966,007.00
N308
jlinares: decia= 1'966,007.00
M309
jlinares: DECIA= 1'185,760.00
M310
jlinares: DECIA= 1'997,695.00
N310
jlinares: DECIA= 1'997,695.00
D314
jlinares: II ETAPA: SEGÚN OZMC
M314
jlinares: SEGÚN SOSEM
N314
jlinares: SRMC + SEDE C.
M315
jlinares: DECIA= 1'346,016.00
N315
jlinares: DECIA= 1'346,016.00
K317
jlinares: DECIA: 785,962.00
M317
jlinares: DECIA= 579,126.00
N317
jlinares: DECIA= 579,126.00
K319
jans Linares: SEGÚN PERFIL
S320
USER: MONTO SOSEM COINCIDE CON EL DEL INFORME DE CIERRE
Page 16: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

289 SANEAMIENTO 11956 CALZADA MOYOBAMBA SEDE CENTRAL

CULMINADA

A.D. S/. 4,025,563.00

S/. 0.00 S/. 0.00 0.00%

S/. 3,260,235.00 100.00% Ejecución en 3 periodos: 2009, 2010, 2011

II ETAPA LIQUIDADA S/. 2,542,278.15 S/. 0.00 S/. 0.00 0.00%

290 SANEAMIENTO 8769 HABANA MOYOBAMBA SEDE CENTRAL CULMINADA CONVENIO S/. 1,606,176.00 S/. 0.00 S/. 0.00 0.00% S/. 1,214,952.00 75.64%

291 SANEAMIENTO 29738 JEPELACIO MOYOBAMBA PEAM LIQUIDADA A.D. S/. 13,658,899.30 S/. 0.00 S/. 0.00 0.00% S/. 11,540,773.00 84.49% -

292 SANEAMIENTO 36984 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 845,417.00 S/. 0.00 S/. 0.00 0.00% S/. 937,609.00 150.59% -

293 SANEAMIENTO 114854 MOYOBAMBA MOYOBAMBA EPSS MOYOBAMBA CULMINADA - S/. 272,890.00 S/. 0.00 S/. 0.00 0.00% S/. 251,282.00 92.08% -

294 SANEAMIENTO 27727 SAN CRISTOBAL PICOTA SEDE CENTRAL CERRADO CONTRATA S/. 2,482,564.00 S/. 0.00 S/. 0.00 0.00% S/. 2,397,376.00 #REF!

295 SANEAMIENTO 12970 SAN HILARION PICOTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 3,004,670.00 S/. 69,299.00 S/. 35,041.00 50.56% S/. 3,072,693.00 100.00%

296 SANEAMIENTO 27332 BUENO AIRES PICOTA SEDE CENTRAL CONTRATA S/. 1,815,712.00 S/. 0.00 S/. 0.00 0.00% S/. 1,480,235.00 81.52% -

297 SANEAMIENTO 12761 SAN HILARION PICOTA S. CENTRAL/SRBM-T CERRADO CONTRATA S/. 829,170.00 S/. 0.00 S/. 0.00 0.00% S/. 1,218,883.00 147.00%

298 SANEAMIENTO 16975 CASPISAPA PICOTA S. CENTRAL/SRBM CULMINADA A.D. S/. 1,288,331.00 S/. 0.00 S/. 0.00 0.00% S/. 1,521,338.00 118.09%

299 SANEAMIENTO 60611 TRES UNIDOS PICOTA S. CENTRAL/SRBM-T LIQUIDADA A.D. S/. 2,505,811.50 S/. 0.00 S/. 0.00 0.00% S/. 2,696,009.00 100.00%

300 SANEAMIENTO TRES UNIDOS PICOTA S. CENTRAL CULMINADA CONTRATA S/. 352,635.23

301 SANEAMIENTO 10942 PILLUANA PICOTA S CENTRAL/SRBM-T LIQUIDADA ENCARGO/AD S/. 1,550,133.30 S/. 0.00 S/. 0.00 0.00% S/. 1,670,476.80 100.00%

302 SANEAMIENTO 48607 RIOJA CULMINADA - S/. 70,197.00 S/. 0.00 S/. 0.00 0.00% S/. 84,158.00 119.89% -

303 SANEAMIENTO 26015 SAN FERNANDO RIOJA SEDE CENTRAL CONTRATA S/. 2,417,418.00 S/. 0.00 S/. 0.00 0.00% S/. 1,969,486.00 81.47% CONTRATO Nº -2007-GRSM/PGR

304 SANEAMIENTO 76000 CHIPURANA SAN MARTIN SRBM CULMINADA A.D. S/. 394,427.76 S/. 0.00 S/. 0.00 0.00% S/. 726,928.00 100.00% -

305 SANEAMIENTO 11282

- SAUCE SAN MARTIN SEDE CENTRAL CONTRATA

S/. 8,316,800.00

S/. 8,316,800.00

S/. 0.00 S/. 0.00

0.00%

S/. 7,344,932.20 100.00%

- SAUCE SAN MARTIN LIQUIDADA ENCARGO S/. 366,559.41 0.00% Obra liquidada

306 SANEAMIENTO 15727 CACATACHI SAN MARTIN MDC CERRADO ENCARGO S/. 720,338.00 S/. 0.00 S/. 0.00 0.00% S/. 487,054.00 67.61%

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CALZADA

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE HABANA

CONVENIO Nº 012-2006-GRSM/PGR; Municipalidad Distrital de Habana

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE JEPELACIO

INSTALACION DEL SISTEMA DE AGUA POTABLE DEL CENTRO POBLADO MENOR SAN JOSE DEL ALTO MAYO Y ANEXOS, DISTRITO MOYOBAMBA

AMPLIACION DE LA RED DE DESAGUE EN EL SECTOR BELLA AURORA CUADRAS 1, 2 Y 3 - MOYOBAMBA

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE PUERTO RICO

Obra Liquidada con: RER Nº 1781-2010-GRSM/PGRTransferencia: 16-12-10 (A la fecha no existe documento de la transferencia)Informe de cierre: 10-12-10Contrato N° 002-2007-GRSM/PGR- Consorcio Oro Verde

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN HILARION

Obra Liquidada con: RGR Nº 074-2011-GRSM/GRIObra en operación

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE BUENOS AIRES

CULMINADA/EN ARBITRAJE

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE EN LA LOCALIDAD DE SAN HILARION

No se encuentra operativo por que el proyecto no se ejecuto en su totalidad (Según informe de cierre).Transferencia: 05-10-10 (MDSH)INFORME DE CIERRE: 29-09-10

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE CASPIZAPA

Primera Etapa de la Obra ejecutado por encargo a la SRBM mediante R.G.G.R. Nº 039-2006-GRSM/GGR lo cual se encuantra liquidado por un monto de S/. 570,000.00

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE TRES UNIDOS

Obra liquidada.Obra ejecutada, culminada y liquidada por AD por la OZBM

Mantenimiento

REHABILITACIÓN DEL SISTEMA DE AGUA POTABLE DE LA OBRA: "MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE TRES UNIDOS"

La Obra se encuentra recepcionada y en proceso de liquidación

CONSTRUCCION DEL SISTEMA DE DRENAGE PLUVIAL EN LA LOCALIDAD DE PILLUANA

Obra entregada y recepcionada por la MD PilluanaObra liquidada por la entidad encargada de la ejecucion (OZBM)

MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE EN EL C.P.M SAN JUAN DE RIO SORITOR, DISTRITO DE NUEVA CAJAMARCA - RIOJA - SAN MARTIN

NVA. CAJAMARCA

MD NVA. CAJAMARCA

INSTALACION DEL SISTEMA DE ALCANTARILLADO EN AL LOCALIDAD DE SAN FERNANDO

CULMINADA/EN ARBITRAJE

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DEL ALCANTARILLADO DE LA LOCALIDAD DE NAVARRO-CHIPURANA (COMPONENTE I - AGUA POTABLE)

MEJORAMIENTO DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAUCE Y 8 DE JULIO

CULMINADA/EN ARBITRAJE

Obra en ArbitrajeProyecto culminado y operativo. Etapa en arbitraje del GRSM con el CONSORCIO SAUCE.

SALDO DE OBRA DEL PROYECTO MEJORAMIENTO DEL SISTEMA DE ALCANTARILLADO EN LAS LOCALIDADES DE SAUCE Y 8 DE JULIO.

S. CENTRAL/PEHCBM

REHABILITACION, MEJORAMIENTO Y/O AMPLIACION DEL SISTEMA DE AGUA Y SANEAMIENTO DE LA LOCALIDAD DE CACATACHI EN EL DISTRITO DE CACATACHI, PROVINCIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN

La UE es la encargada de la operación y mantenimiento, por lo que no existe transferencia.Informe de cierre: 06-08-10

K326
jlinares: SEGÚN FORMATO 1 Y 2 PEAM: 7'893,538.24 SNIP 15: 13'658,899.30
M326
jlinares: DECIA=11'481,889.00 MONTO ACTUAL SEGÚN SOSEM
N326
jlinares: SEGÚN SOSEM: SEDE C.: 36,223.00 PEAM: 11'504,550.00
S326
USER: DECIA= 11'481,889.00
M327
jlinares: DECIA= 937,.609.00
S329
USER: EN INFORME DE CIERRE INDICA: Monto de Inversión Ejecutado: 2'221,005.95 liquidacion: 2'221,005.95 MONTO ACTUAL SEGÚN SOSEM
M330
jlinares: SEGÚN SOSEM
N330
jlinares: SEGÚN SOSEM
S332
USER: SOSEM: 1'218,883.00 INFORME DE CIERRE: 1'185,381.07
K336
jlinares: OZBM ejecutó la obra con un VR del 23-02-10 de: 1'639,013.31, bajo la modalidad de AD, en 223 dc. 1'550,133.30, AD, 150 dc.
O341
jans Linares: VERIFICAR
S343
USER: EL INFORME DE CIERRE NO MUESTRA NINGUN MONTO
Page 17: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

307 SANEAMIENTO 12190 HUIMBAYOC SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 4,072,124.00 S/. 0.00 S/. 0.00 0.00% S/. 4,169,240.00 102.38%

308 SANEAMIENTO 60336

CHAZUTA SAN MARTIN PEHCBM CULMINADA A.D.

S/. 5,993,729.00

- S/. 0.00 S/. 0.00 0.00%

S/. 8,037,367.00 134.10%

Culminó el año 2008

CHAZUTA SAN MARTIN PEHCBM CULMINADA A.D. - S/. 0.00 S/. 0.00 0.00% Culminó el año 2010

309 SANEAMIENTO 103370 SAN MARTIN EMAPA SM LIQUIDADA ENCARGO S/. 1,141,167.27 S/. 0.00 S/. 0.00 0.00% S/. 1,088,111.00 100.00%

310 SANEAMIENTO 106752 UCHIZA TOCACHE PEHCBM CERRADO CONTRATA S/. 5,845,234.31 S/. 0.00 S/. 0.00 0.00% S/. 5,798,682.00 99.20%

311 SANEAMIENTO 168742 SAN HILARION PICOTA SRBM CULMINADA CONTRATA S/. 384,232.67 S/. 0.00 S/. 0.00 0.00% S/. 417,789.00 108.73% -

312 SANEAMIENTO 82923 AWAJUN RIOJA PEAM CULMINADA - S/. 88,208.00 S/. 0.00 S/. 0.00 0.00% S/. 88,208.00 100.00% -

313 SANEAMIENTO 3783 PROTECCIÓN DE LA LINEA DE CONDUCCIÓN CACHIYACU SAN MARTIN SEDE CENTRAL TRANSFERIDA CONTRATA S/. 133,540.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

314 SANEAMIENTO 5744 LAMAS LAMAS SEDE CENTRAL LIQUIDADA - S/. 808,132.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

315 SANEAMIENTO Sin codigo LAMAS SEDE CENTRAL LIQUIDADA ENCARGO S/. 84,560.00 S/. 0.00 S/. 0.00 0.00% S/. 84,544.00 99.98%

316 SANEAMIENTO CHIPURANA SAN MARTIN MD CHIPURANA LIQUIDADA ENCARGO S/. 73,892.00 S/. 0.00 S/. 0.00 0.00% S/. 71,892.00 100.00%

317 SANEAMIENTO 29184 BELLAVISTA BELLAVISTA SEDE CENTRAL CONTRATA S/. 2,017,449.99 S/. 0.00 S/. 0.00 0.00% S/. 2,346,798.08 100.00%

318 SANEAMIENTO 67150 MORALES SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 194,771.00 S/. 0.00 S/. 0.00 0.00% S/. 189,821.86 100.00%

319 SANEAMIENTO 62245 TARAPOTO SAN MARTIN EMAPA SM CERRADO A.D. S/. 681,408.00 S/. 0.00 S/. 0.00 0.00% S/. 680,245.00 100.00% -

320 SANEAMIENTO 77554 SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 272,115.00 S/. 0.00 S/. 0.00 0.00% S/. 268,185.47 100.00% Conv Esp. Interint. Nº 008-2008-GRSM/PGR

321 SANEAMIENTO 57994 TARAPOTO SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 273,365.00 S/. 0.00 S/. 0.00 0.00% S/. 330,075.02 S/. 100.00 Culminó el año 2008

322 SANEAMIENTO 67208 TARAPOTO SAN MARTIN EMAPA/S. CENTRAL CERRADO A.D. S/. 162,421.00 S/. 0.00 S/. 0.00 0.00% S/. 147,126.84 100.00% -

INSTALACIÓN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE HUIMBAYOC

Obra liquidada con: R.G.G.R. N° 131-2012-GRSM/GGRContrato N° 004-2007-GRSM/PGRCONSORCIO VIRGEN DEL CARMENMediante Acuerdo Regional de autorización de Transferencia Ac. Reg. N°032-2013-GRSM/CR del 10/07/2013, se realiza la Transferencia de Obra a la Municipalidad Distrital de Huimbayoc con R.E.R N° 866-2013-GRSM/PGR del 17/10/2013 con acta de transferencia del 09/12/2013

INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE CHAZUTA

OPERACIÓN Y MANTENIMIENTO -INSTALACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA LOCALIDAD DE CHAZUTA

AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE JR. RECREO - BANDA DE SHILCAYO

BANDA DE SHILCAYO

Culminó el año 2009A.D. Convenio Especifico Nº 012-GRSM/PGR

INSTALACION DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DE LETRINAS SANITARIAS PARA LOS CASERIOS DE BOLAYNA, CUNYAG, NUEVA AREQUIPA, CAHUIDE, NUEVA UNION, SAN JUAN DE PORONGO, BAJO HUAYNABE Y ALTO HUAYNABE EN EL DISTRITO DE UCHIZA, PROV. DE TOCACHE

Transferencia: 10-04-12 (MD UCHIZA)-Mediante Acta de entrega de obra.Informe de cierre: 26-10-12

MEJORAMIENTO DE LA PRESTACION DEL SERVICIO DE AGUA POTABLE EN LA LOCALIDAD DE SAN HILARION, DISTRITO DE SAN HILARION, PROVINCIA DE PICOTA, REGION SAN MARTIN

CONSTRUCCION DE SISTEMA DE DRENAJE DE AGUAS DE INUNDACIÓN QUEBRADA CAÑO HONDO

TARAPOTO, MORALES,

BANDA DE SH.

Obra Liquidada con: R.E.R. Nº 251-2003 -GR-SM/PGRContrato de Ejec. De Obra Nº 110-2002-CTAR-SM/PEMediante Acuerdo Regional de autorización de Transferencia Ac. Reg. N°038-2013-GRSM/CR del 10/07/2013, se realiza la Transferencia de Obra a la Municipalidad Provincial de San Martin con R.E.R N° 876-2013-grsm/pgr del 17/10/2013 con acta de transferencia del 20/12/2013

MEJORAMIENTO DE LA COBERTURA DEL SISTEMA DE DESAGUE LAMAS

Obra Liquidada con: R.G.G.R. Nº 017-2005 -GR-SM/GGRADP Nº 001-2004-GRSM/PE.

REHABILITACIÓN DE LA CAPTACIÓN DEL SISTEMA DE AGUA POR GRAVEDAD ROQUE

ALONSO DE ALVARADO

Obra Liquidada con: R.E.R. Nº 431-2010-GRSM/PGRConvenio Nº 060-2004-GR-SM/PGR - Municipalidad de Alonso de Alvarado.

INDECI EMERGEN

CIA

REHABILITACION DE CAPTACION DE SISTEMA DE AGUA POTABLE LOCALIDAD DE NAVARRO

Obra Liquidada con: R.G.R. Nº 003-2011-GRSM/GRIConvenio Nº 009-2007-GRSM/PGR - Municipalidad Distrital de Chipurana

INSTALACION DE UN SISTEMA DE ALCANTARILLADO PARA LAS LOCALIDADES DE EL PORVENIR Y LIMON

LIQUIDADA/EN ARBITRAJE

Contrato N° 011-2007-GRSM/GGR (Supervision) ADSContrato N° 003 (Ejecución) ADS 24-2006-Vivienda

MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. ALFONSO UGARTE C-1 A LA C-8 MORALES

CULMINO EL AÑO 2008Conv Esp. Interint. Nº 006-2008-GRSM/PGR

AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE JR. JOSE OLAYA C-4 A 15 - TARAPOTO

AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DE LA CARRETERA A YURIMAGUAS KM 0+000.00 A 1+000.00 - BANDA DE SHILCAYO

BANDA DE SHILCAYO

AMPLIACION Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO DE JR. CUSCO C-1 A 6 - TARAPOTO

AMPLIACION DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. ESPAÑA C-4 A LA C-6 - TARAPOTO

V344
jlinares: DECIA: R.E. N° 014-2009-GR-SM/GGR DECIA: CULMINO EL AÑO 2007
M348
jlinares: 07-12-12 = 5'798,682.00
S348
USER: SEGÚN SOSEM, COINCIDE CON INFORME DE CIERRE
K349
jlinares: 07-12-12 = 285,285.00 18-05-11 = 384,232.67
M350
jlinares: 07-12-12 = 23,661.00
N350
jlinares: PEAM
S350
jlinares: 07-12-12 = 88,208.00 SOSEM: 23,661.00
Page 18: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

323 SANEAMIENTO 71464 TARAPOTO SAN MARTIN EMAPA/S. CENTRAL CULMINADA ENCARGO S/. 256,559.00 S/. 0.00 S/. 0.00 0.00% S/. 256,559.00 100.00% Convenio N° 027-2008

326 SANEAMIENTO 9490 I y II ETAPA ALTO BIAVO BELLAVISTA S. CENTRAL/OZMC-J LIQUIDADA A.D. S/. 1,553,796.00 S/. 170,772.92 S/. 0.00 S/. 0.00 0.00% #REF! 100.00% -

327 SANEAMIENTO 66274 TABALOSOS LAMAS MD TABALOSOS CULMINADA CONVENIO S/. 139,044.00 S/. 0.00 S/. 0.00 0.00% S/. 79,638.16 100.00% Conv Esp. Interint. Nº 032-2008-GRSM/PGR

328 SANEAMIENTO 92190 RIOJA RIOJA CULMINADA - S/. 291,603.00 S/. 0.00 S/. 0.00 0.00% S/. 289,787.27 100.00% -

329 SANEAMIENTO 101143 BAJO BIAVO BELLAVISTA MD BAJO BIAVO CULMINADA - S/. 297,496.00 S/. 0.00 S/. 0.00 0.00% S/. 292,192.44 100.00% -

330 SANEAMIENTO 98531 BARRANQUITA LAMAS S. CENTRAL/SRBM LIQUIDADA - S/. 87,742.00 S/. 0.00 S/. 0.00 0.00% S/. 81,015.59 100.00% -

332 SANEAMIENTO 68629 PROY. PRINCIPAL SAPOSOA HUALLAGA PEHCBM CULMINADA CONTRATA S/. 23,773,420.03 S/. 2,424,680.00 S/. 1,178,438.86 48.60% S/. 29,311,576.53 89.84%

333 SANEAMIENTO 59351 JUANJUI PEHCBM CULMINADA CONTRATA S/. 56,201,259.70 S/. 1,125,999.00 S/. 1,125,998.26 100.00% S/. 57,775,676.59 99.83%

334 SANEAMIENTO 159242 CHAZUTA SAN MARTIN PEHCBM CULMINADA CONTRATA S/. 2,699,903.52 S/. 791,835.00 S/. 791,835.00 100.00% S/. 2,477,012.12 #REF!

335 SANEAMIENTO 53873

Inicial

RIOJA RIOJA

PEAM CULMINADA CONTRATA

S/. 50,562,837.99

###

S/. 4,865,933.00 S/. 4,712,938.03 96.86% S/. 52,108,799.26 99.44%

II ETAPA PEAM CULMINADA CONTRATA S/. 1,350,899.22 ADP-Contrato Nº 028-2012-GRSM-PEAM-01.00

337 SANEAMIENTO 31917 OBRA PRINCIPAL RIOJA PEAM CULMINADA CONTRATA S/. 11,303,520.84 ### S/. 864,582.00 S/. 592,791.00 68.56% S/. 0.00 0.00%

338 SANEAMIENTO 149384 RIOJA PEAM CULMINADA CONTRATA S/. 1,756,388.00 S/. 0.00 S/. 0.00 0.00% S/. 1,627,007.93 92.63% ADP - Contrato N° 029-2012-GRSM-PEAM-01.00

340 ENERGIA 29779 BAJO BIAVO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,875,752.00 S/. 0.00 S/. 0.00 0.00% S/. 2,112,825.76 100.00%

341 ENERGIA 27994 ELECTRIFICACION DEL VALLE DE PONACILLO ALTO BIAVO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 2,024,637.00 S/. 0.00 S/. 0.00 0.00% S/. 1,949,538.16 96.29% ###

MEJORAMIENTO DE LAS REDES Y CONEXIONES DOMICILIARIAS DE AGUA POTABLE Y ALCANTARILLADO DEL JR. TUPAC AMARU C-1 A 5, PP.JJ. NUVE DE ABRIL-TARAPOTO

MEJORAMIENTO DEL SISTEMA DE AGUA DE LAS LOCALIDADES DE CUZCO BARRANCA ABANCAY

INSTALACION DE AGUA POTABLE CASERIO ALTO PROGRESO DE ALMENDRILLO, DISTRITO DE TABALOSOS - LAMAS - SAN MARTIN

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO JR. TEOBALDO LOPEZ - RIOJA

MP RIOJA/S. CENTRAL

AMPLIACION DEL SISTEMA DE AGUA POTABLE PUERTO NUEVO, SANTA ELENA Y LA UNION, DISTRITO DE BAJO BIAVO - BELLAVISTA - SAN MARTIN

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE DE LA LOCALIDAD DE SANGAMAYOC DEL DISTRITO DE BARRANQUITA, PROVINCIA DE LAMAS - SAN MARTIN

MEJORAMIENTO DEL SISTEMA DE ABASTECIMIENTO DE AGUA POTABLE

Y ALCANTARILLADO DE LA LOCALIDAD DE SAPOSOA

Contrato Nº 067 - 2011-GRSM-PEHCBM/PS (Supervision)Contrato Nº 089 - 2011-GRSM-PEHCBM/PS (Ejecución) - LP

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE JUANJUI

MARISCAL CACERES

Contrato Nº 068 - 2011-GRSM-PEHCBM/PS (Supervision) - CPContrato Nº 076 - 2011-GRSM-PEHCBM/PS (Ejecución) - LP* Adicionales de Obra = S/. 17'748,778.10* Deductivos de Obra = S/. 11'706,218.71* Adicional de Supervision = S/. 686,078.08* Adicional de Interv. Social = S/. 82,900.00* Adicional de Mitig. Amb. = S/. 109,800.00

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y CONSTRUCCION DE LETRINAS SANITARIAS DE LA LOCALIDAD DE ACHINAMIZA , DISTRITO DE CHAZUTA - SAN MARTIN - SAN MARTIN

Contrato Nº 068 - 2012-GRSM-PEHCBM/PS (Supervision) - ADSContrato Nº 070 - 2012-GRSM-PEHCBM/PS (Ejecucion) - D.U. 016-2012

MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN

CP-Contrato N° 18 (Supervision)ADP-Contrato N° 028-2012-GRSM-PEAM-01.00 (Ejecucion)LP-Contrato N° 9 (Ejecución de obra)AMC-Contrato 15 (compra de terreno para laguna de oxidacion)

INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN EL CPM DE NARANJILLO, DISTRITO DE NUEVA CAJAMARCA, PROVINCIA DE RIOJA - SAN MARTIN

NVA. CAJAMARCA

CP-Contrao 8LP-Contrato 01

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE POR GRAVEDAD, LOCALIDADES SEGUNDA JERUSALEN- SANTA FE, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN

ELIAS SOPLIN VARGAS

ELECTRIFICACION DE 06 LOCALIDADES DEL DISTRITO DE BAJO BIAVO

Contrato de ejecución de Obra Nº 008-2007-GRSM -- LP

Adicional - RER N° 362-2011-GRSM/PGRSe ejecuto con Contrato N° 017-2009-GRSM/GGRProyecto en proceso de Recepción 212 días de paralización Contrato N° 017-2009-GRSM/GGR (31-08-09) - AMC

L364
jlinares: II ETAPA
Page 19: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

342 ENERGIA 23522 SAPOSOA HUALLAGA SEDE CENTRAL CONTRATA S/. 2,490,960.00 S/. 0.00 S/. 0.00 0.00% S/. 1,661,068.79 66.68% Contrato Nº 009-2007-GRSM/PGR -- LP

343 ENERGIA 48147 ZAPATERO LAMAS MEM-DGER CULMINADA CONTRATA S/. 3,008,720.00 S/. 0.00 S/. 0.00 0.00% S/. 5,402,740.00 179.57% -

344 ENERGIA 38695 LAMAS SEDE CENTRAL CONTRATA S/. 590,088.00 S/. 0.00 S/. 0.00 0.00% S/. 536,970.00 91.00%

345 ENERGIA 27977 LAMAS LAMAS SEDE CENTRAL LIQUIDADA CONTRATA S/. 385,638.00 S/. 0.00 S/. 0.00 0.00% S/. 344,609.00 89.36%

346 ENERGIA 14267 SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,910,009.00 S/. 0.00 S/. 0.00 0.00% S/. 2,212,218.00 115.82%

347 ENERGIA 112624 SGER-MEM CULMINADA - S/. 3,655,474.00 S/. 0.00 S/. 0.00 0.00% S/. 92,042.00 2.52%

348 ENERGIA 41576 JEPELACIO MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 425,136.00 S/. 0.00 S/. 0.00 0.00% S/. 471,427.00 110.89%

349 ENERGIA 2107 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 2,851,575.00 S/. 0.00 S/. 0.00 0.00% S/. 2,575,003.00 90.30% -

350 ENERGIA 40543 JEPELACIO MOYOBAMBA PEAM CULMINADA A.D. S/. 56,416.00 S/. 0.00 S/. 0.00 0.00% S/. 81,376.00 144.24% -

351 ENERGIA JEPELACIO MOYOBAMBA LIQUIDADA CONTRATA S/. 657,116.00 S/. 0.00 S/. 0.00 0.00% #REF! #REF!

352 ENERGIA 27940 MOYOBAMBA MOYOBAMBA PEAM CULMINADA A.D. S/. 722,651.00 S/. 0.00 S/. 0.00 0.00% S/. 878,053.00 121.50% -

353 ENERGIA 45282 MOYOBAMBA MOYOBAMBA PEAM LIQUIDADA A.D. S/. 706,278.00 S/. 0.00 S/. 0.00 0.00% S/. 726,724.00 102.89%

354 ENERGIA 40831 MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 292,992.28 S/. 0.00 S/. 0.00 0.00% S/. 319,459.00 101.50%

355 ENERGIA 15789 BELLAVISTA SEDE CENTRAL CONTRATA S/. 2,006,631.00 S/. 0.00 S/. 0.00 0.00% S/. 1,914,574.00 95.41%

ELECTRIFICACION RURAL DE LAS LOCALIDADES CIRCUNDANTES EN EL TRAMO SAPOSOA - NUEVA VIDA

CULMINADA/EN ARBITRAJE

ELECTRIFICACION RURAL DE LAS LOCALIDADES DE CARANAYACU, NUEVO MUNDO, BAGAZAN, VISTOSO GRANDE, VISTOSO CHICO, POLOPONTA, NUEVO CELENDIN Y SAN JUAN DE TALLIQUIHUI, PERTENECIENTE AL DISTRITO DE ZAPATERO, PROVINCIA DE LAMAS, REGION SAN MARTIN.

ELECTRIFICACION RURAL DE LOS CACERIOS SOMOS LIBRES Y PUEBLO NUEVO

TABALOSOS Y ALONSO DE ALVARADO

CONTRATO LIQUIDADO

Obra Liquidada con: RER Nº 040-2009-GRSM/PGRContrato de ejecución de Obra Nº 019-2007-GRSM/ GGR

ELECTRIFICACION RURAL DE LA COMUNIDAD DE ALTO SHAMBOYACU

Obra Liquidada con: RGGR Nº 046-2009-GR-SM/GGRContrato de ejecucion de Obra Nº 024-2008-GRSM/GGR

ELECTRIFICACION RURAL DEL TRAMO JUANJUI-PACHIZA CAMPANILLA,DISTRITOS DE PACHIZA, HUICUNGO, CAMPANILLA, PROVINCIA DE MARISCAL CACERES, REGION SAN MARTIN

PACHIZA, HUICUNGO, CAMPANILLA

MARISCAL CACERES

Obra Liquidada con: RGGR Nº 055-2009-GR-SM/GGRContrato de ejecución de Obra Nº 012-2007-GRSM/PGR

ELECTRIFICACIÓN DE DIEZ (10) CASERÍOS UBICADOS EN LOS MÁRGENES DE LOS RÍOS HUAYABAMBA Y JELACHE - JURISDICCIÓN DE LOS DISTRITOS DE HUICUNGO Y PACHIZA, PROVINCIA DE MARISCAL CÁCERES, DEPARTAMENTO DE SAN MARTÍN

PACHIZA, HUICUNGO

MARISCAL CACERES

Primer devengado NOVIEMBRE-2009Ultimo devengado DICIEMBRE-2009

ELECTRIFICACION RURAL DE LOS CASERIOS DE CARRIZAL Y NUEVO CUTERVO, JURISDICCION DEL DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN

Obra Liquidada con: RGGR Nº 346-2008-GR-SM/GGRContrato Nº 027-2007-GRSM/GGR

ELECTRIFICACION RURAL EN CINCO (05) LOCALIDADES DE LA PROVINCIA DE MOYOBAMBA DEL DEPARTAMENTO DE SAN MARTIN: DOMINGO PUESTO, VALLE LA CONQUISTA, PUEBLO LIBRE, LA LIBERTAD DE HUASCAYACU, BUENOS AIRES

ELECTRIFICACION RURAL DE LA UNIDAD AGROPECUARIA ALTO JERILLO, COMPRENSION DEL DISTRITO DE JEPELACIO

41603

ELECTRIFICACION RURAL DE LOS CASERIOS POTRERILLO, ALTO RIOJA Y 7 DE JUNIO, JURISDICCION DEL DISTRITO DE JEPELACIO, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN

S. CENTRAL/GARCAM

Obra Liquidada con: RGGR Nº 056-2009-GR-SM/GGRContrato. Nº 025-2008-GRSM/GGR

ELECTRIFICACION RURAL DE CUATRO CENTROS POBLADOS SAN JOSE DE HABANA, SANTA ROSA DE OROMINA, PARAISO

ELECTRIFICACION RURAL DE LAS LOCALIDADES DE SAN JOSE DEL MORRO, CAMPO ALEGRE, PEDRO PASCASIO NORIEGA Y HUAÑIUNA; DEL DISTRITO Y PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN

Obra Liquidada con Resolución Gerencial Nº 114-2010-GRSM-PEAM.01.00Contrato N° 028-2010-GRSM/GGR- Engineering Build SAC.

ELECTRIFICACION RURAL DE LA LOCALIDAD DE FLOR DEL MAYO, JURISDICCION DEL DISTRITO DE MOYOBAMBA, PROVINCIA DE MOYOBAMBA, REGION SAN MARTIN.ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO DE SAN MARTIN 2008-I, ITEM 2: ELECTRIFICACIÓN RURAL DE LA LOCALIDAD DE FLOR DE MAYO

Contrato Liquidado con: RER Nº 990-2010-GRSM/PGRContrato N° 002-2009-GRSM/PGR - Consorcio El Morro.Se realizo mediante: LP, llave en mano-c.u., estudios (60 dc) + ejecucion (60 dc)Aprobación del exp. tec. de contratación: RGGR Nº 275-2008-GRSM/GGR

ELECTRIFICACION DEL VALLE ASHCUYACU TRAMO PERUATE-NUEVA FLORIDA-SHAMBOYACU

BELLAVISTA Y SAN PABLO

CULMINADA/EN ARBITRAJE

Ejecutado por la SRHC Oficina Zonal Mariscal Caceres - Juanjui; bajo R.G.G.R. Nº 099-2006-GRSM/GGR

K386
jlinares: MONTO DEL PERFIL
K387
jlinares: SEGÚN SOSEM:MONTO IGUAL AL DEL PERFIL
N387
jlinares: SEGÚN SOSEM
M388
jlinares: 07-12-12 = 2'212,218.00
N388
jlinares: SEDE C.
O388
jlinares: DEP+DGER
H389
USER: DECIA: SEDE CENTRAL
M389
jlinares: DECIA= 92,042.00
K390
USER: DECIA: 1,042.00
M390
jlinares: DECIA= 471,427.00
N391
jlinares: PEAM
M392
jlinares: DECIA= 81,376.00
N392
jlinares: PEAM
K393
jlinares: SEGÚN SOSEM=MONTO PERFIL
M393
jlinares: SEGÚN SOSEM
M394
jlinares: DECIA= 878,053.00
N394
jlinares: PEAM
M395
jlinares: DECIA= 726,724.00 SEGÚN SOSEM
N395
jlinares: PEAM
K396
jlinares: DECIA: 314729.1 MONTO ACTUAL SEGÚN PROY. INV. PUBLICA S.C. 2007-2012
M396
jlinares: SEGÚN SOSEM
M397
jlinares: DECIA= 1'914,574.00
Page 20: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

356 ENERGIA 50309 SAN CRISTOBAL PICOTA SEDE CENTRAL CULMINADA - S/. 207,095.00 S/. 0.00 S/. 0.00 0.00% S/. 206,945.00 99.93% -

357 ENERGIA 16450 BUENO AIRES PICOTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 838,921.00 S/. 0.00 S/. 0.00 0.00% S/. 511,929.00 61.02%

358 ENERGIA 57438 SHAMBOYACU PICOTA CULMINADA S/. 351,361.00 S/. 0.00 S/. 0.00 0.00% S/. 361,111.00 79.72%

359 ENERGIA 59282 PUCACACA PICOTA S. CENTRAL/SRBM-T CULMINADA A.D. S/. 218,471.00 S/. 0.00 S/. 0.00 0.00% S/. 237,316.00 100.00% -

360 ENERGIA 15836 RIOJA SEDE CENTRAL CONTRATA S/. 1,513,068.00 S/. 0.00 S/. 0.00 0.00% S/. 1,706,266.00 100.00%

361 ENERGIA 94840 PEAM CULMINADA CONTRATA S/. 0.00 S/. 0.00 0.00% S/. 4,535,084.94 100.00% AMC Nº 030

362

ENERGIA

7307

SAN MARTIN

SEDE CENTRAL

CONTRATA

S/. 3,589,673.44

-

S/. 0.00 S/. 0.00 0.00% S/. 4,556,935.00 100.00%

ENERGIA SAN MARTIN LIQUIDADA CONTRATA S/. 3,154,729.10

363 ENERGIA 25906 TOCACHE TOCACHE CULMINADA - S/. 119,410.00 S/. 0.00 S/. 0.00 0.00% S/. 119,452.64 100.04% -

364 ENERGIA - UCHIZA TOCACHE MP TOCACHE CULMINADA ENCARGO S/. 1,571,763.52 S/. 0.00 S/. 0.00 0.00% S/. 1,571,763.52 100.00%

365 ENERGIA 190857 MOYOBAMBA MOYOBAMBA SEDE CENTRAL LIQUIDADA CONTRATA S/. 93,976.00 S/. 73,021.78 S/. 73,021.78 100.00% S/. 73,021.78 100.00%

366 ENERGIA 41881 UCHIZA TOCACHE SEDE CENTRAL CULMINADA - S/. 1,726,108.00 S/. 0.00 S/. 0.00 0.00% S/. 1,733,653.00 100.44% -

367 ENERGIA 79885

TARAPOTO SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA

S/. 917,493.68

- S/. 0.00 S/. 0.00 0.00% S/. 675,178.00 73.59%

TARAPOTO SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 505,067.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

368 ENERGIA 136464 MOYOBAMBA MOYOBAMBA SEDE CENTRAL CULMINADA CONTRATA S/. 509,973.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

369 ENERGIA 46163 RIOJA RIOJA SEDE CENTRAL LIQUIDADA CONTRATA S/. 344,821.00 S/. 0.00 S/. 0.00 0.00% #REF! 100.00%

CONSTRUCCION DEL SISTEMA DE ELECTRIFICACION DEL SECTOR AMPLIACION EN LA LOCALIDAD DE PUERTO RICO PROVINCIA DE PICOTA - SAN MARTIN

ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO SAN MARTIN - SECTOR 1 - ITEM 04: ELECTRIFICACION DE LAS LOCALIDADES DEL TRAMO BUENOS AIRES-SAN ANTONIO DE PAUJILZAPA

Obra Liquidada con Res. Ejecutiva Regional Nº 369-2010-GRSM/PGRContrato N° 010-2007-GRSM/PGR

AMPLIACION DEL SISTEMA DE ELECTRIFICACION RURAL DE LOS BARRIOS LA UNION, SAN JUAN Y SANTA TRINIDAD PROVINCIA DE PICOTA - SAN MARTIN

MD SHAMBOYACU/S. CENTRAL

AD-ENCARGO-CONVENIO

Obra culminada y puesta en operación.Ejecutado por la MD Shamboyacu, mediante CONVENIO Nº 030-2008-GRSM/PGR

INSTALACION DE REDES SECUNDARIAS EN EL CENTRO POBLADO CHINCHA ALTA, DISTRITO PUCACACA, PROVINCIA PICOTA, REGION DE SAN MARTIN

P.S.E. (PEQ. SIST. ELECT.) AWAJUN PROV. RIOJA: CC. NN. ALTO Y BAJO NARANJILLO, SHAMPUYACU, CC. PP. SAN FRANCISCO Y SAN CARLOS; Y ANGAIZA, VISTA ALEGRE, RICARDO PALMA, BUENOS AIRES NVA. STA. CRUZ DE NVA. CAJAMARCA

NVA. CAJAMARCA

CULMINADA/EN ARBITRAJE

Contrato Nº 007-2007-GRSM/PGRLP Nº 007-2007-GRSM/PGRContrato en ArbitrajeLos gastos se realizaron por:DIREC. EJECUT. DE PROY.-DEP ENER. Y MINAS - M. DE ENERGIA Y MINAS : 44,411.74MEM - DIRECCION GENERAL DE ELECTRIFICACION RURAL: 78,801.83REGION SAN MARTIN-SEDE CENTRAL: 1,583,051.75

ELECTRIFICACIÓN DEL VALLE DEL ALTO MAYO, SECTOR NOR OESTE – DISTRITOS DE RIOJA, NUEVA CAJAMARCA, AWAJUN Y PARDO MIGUEL; JURISDICCIÓN DE LA PROVINCIA DE RIOJA, DEPARTAMENTO DE SAN MARTÍN

MOYOBAMBA, AWAJUN, NVA. CAJAMARCA, RIOJA, PARDO

MIGUEL

MOYOBAMBA Y RIOJA

4'424,072.794'125,809.04

ELECTRIFICACION DE LAS LOCALIDADES RIBEREÑAS DEL RIO HUALLAGA COMPRENDIDAS EN EL TRAMO CHAZUTA-SAN PABLO DE TIPISHCA

HUIMBAYOC Y CHIPURANA

LIQUIDADA/EN ARBITRAJE

Obra Culminada con Contrato N° 007-2010-GRSM/GGR-LiquidadoCulminó el año 2010

SALDO DE OBRA, ELECTRIFICACIÓN DE LAS LOCALIDADES RIBEREÑAS DEL RIO HUALLAGA, COMPRENDIDAS EN EL TRAMO CHAZUTA - SAN PABLO DE TIPISHCA

HUIMBAYOC Y CHIPURANA

Obra Liquidada con: RGGR Nº 018-2012-GRSM/GGRContrato de ejecucion de Obra Nº 007-2010-GRSM/GGR - Consorcio Huallaga

IMPLEMENTACION DEL SUBSISTEMA DE REDES SECUNDARIAS DE LA LOCALIDAD DE TANANTA, DISTRITO DE TOCACHE

MP TOCACHE/S. CENTRAL

ELECTRIFICACION DEL PEQUEÑO SISTEMA ELECTRICO TOCACHE II ETAPA / RAMAL UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN

Culminó el año 2008CONVENIO Nº 228-2008-GRSM-PGR

INSTALACION DEL SERVICIO DE NERGIA ELECTRICA MEDIANTE SISTEMA CONVENCIONAL PARA LA ELECTRIFICACION RURAL DEL SECTOR FLOR DE MAYO, DISTRITO Y PROVINCIA DE MOYOBAMBA, DEPARTAMENTO DE SAN MARTIN

Contrato de Ejecución de Obra Nº 038-2013-GRSM/GGR Servicios y Construcciones S.A.C.

AMPLIACION SISTEMA ELECTRICO TOCACHE II ETAPA RAMAL UCHIZA, PROVINCIA DE TOCACHE - SAN MARTIN

IMPLEMENTACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL - COER - DE LA REGION DE SAN MARTIN

El componente sistema de utilización esta culminada,liquidada y operativa, por lo que, lo correspondiente a infraestructura se encuentra ejecutada al 100%. El resto corresponde a otra área

SISTEMA DE UTILIZACION A TENSION DE DISTRIBUCION PRIMARIA EN 22,9-10KV, PARA EL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL SAN MARTIN

Obra Liquidada con: RGR Nº 028-2011-GRSM/GRIAdicional: RER N° 310-2011-GRSM/PGRAmpliación de P.: RER N° 176-2011-GRSM/PGRContrato Nº 061-2011-GRSM/GGR -- 443,130.99ADS N° 037-2010-GRSM

ELECTRIFICACIÓN RURAL DEL SECTOR SAN LORENZO, PERTENECIENTE AL DISTRITO Y PROVINCIA DE MOYOBAMBA, REGIÓN DE SAN MARTÍN

Liquidación pendiente.Obra Culminada en proceso de Liquidación

ELECTRIFICACION RURAL DEL CASERIO RAMIRO PRIALE, JURISDICCION DEL DISTRITO DE RIOJA, PROVINCIA DE RIOJA, REGION SAN MARTIN ELECTRIFICACIÓN RURAL DEL DEPARTAMENTO SAN MARTIN - ITEM 02: ELECTRIFICACIÓN RURAL DE CACERIO RAMIRO PRIALÉ.

Contrato N° 009-2007-GRSM/PGR- Consorcio Luz Para Todos.

F398
jlinares: PICOTA
H398
jlinares: FICHA SNIP= MP PICOTA
M398
jlinares: DECIA= 206,945.00
K399
jlinares: SIMILAR AL MONTO DEL PERFIL
M399
jlinares: DECIA= 511,929.00
N399
jlinares: SEDE C.
O399
jlinares: DEP+DGER(MEN)
K400
jlinares: DECIA: 452,962.00
M400
jlinares: DECIA= 361,111.00 MONTO ACTUAL SEGÚN SOSEM
N400
jlinares: SOSEM
M401
jlinares: DECIA= 237,316.00 SEGÚN SOSEM
K404
jlinares: DECIA: 3'154,729.10 SNIP 15 y SOSEM: 3'589,673.44
K406
jlinares: MONTO DEL PERFIL:SOSEM
M406
jlinares: DECIA= 119,453.00
M409
jlinares: DECIA= 1'733,653.00 MONTO ACTUAL SEGÚN SOSEM:MONTO DEL PERFIL
S410
jlinares: SEGÚN SOSEM
S412
USER: DECIA: 466,524.50 SOSEM: 475,196.00
Page 21: Documento 1647

ITEM SECTOR DENOMINACION DISTRITO PROVINCIA UE/EJECUTOR ESTADO

PRESUPUESTO PRINCIPAL

INVERSIÓN TOTAL OBSERVACIONES GENERALESCODIGO

SNIPMODALIDAD EJECUCION

PIM DEL AÑO

EJECUCION DEL AÑO

AVAN. % DEL AÑO

AVAN % TOTAL

BASE/REF. (F-15/Exp. Tec.)

370 ENERGIA 105360 SAN APABLO BELLAVISTA SEDE CENTRAL LIQUIDADA CONTRATA S/. 1,010,392.94 S/. 0.00 S/. 0.00 0.00% S/. 1,022,805.00 100.00%

371 ENERGIA 6762 SEDE CENTRAL CERRADO CONTRATA S/. 63,336,161.00 S/. 0.00 S/. 0.00 0.00% S/. 65,130,358.00 102.83%

372 ENERGIA 53733 RIOJA CULMINADA - S/. 1,832,863.00 S/. 0.00 S/. 0.00 0.00% S/. 1,816,111.00 99.09% -

374 ENERGIA 141342 SAN MARTIN SEDE CENTRAL CULMINADA CONTRATA S/. 7,596,049.68 S/. 0.00 S/. 68,062.71 #DIV/0! S/. 6,234,984.46 99.72%

375 ENERGIA 12970 SAN HILARION PICOTA SEDE CENTRAL CONTRATA S/. 82,466.49 S/. 82,466.49 S/. 35,040.88 90.94% S/. 35,040.88 100.00%

376 ENERGIA 69241 CHAZUTA SAN MARTIN SEDE CENTRAL CULMINADA CONTRATA S/. 206,122.88 S/. 0.00 S/. 129,563.85 #DIV/0! S/. 136,563.85 82.37%

377 ENERGIA 161639 HUIMBAYOC SAN MARTIN SEDE CENTRAL CULMINADA CONTRATA S/. 306,690.71 S/. 386,171.00 S/. 297,588.40 77.06% S/. 301,588.40 100.00% -

378 ENERGIA 216266 SHAMBOYACU PICOTA PEHCBM CULMINADA CONTRATA S/. 348,215.06 S/. 49,435.00 S/. 31,645.15 64.01% S/. 247,830.59 100.00% -

379 ENERGIA 172733 HUIMBAYOC SAN MARTIN SEDE CENTRAL LIQUIDADA CONTRATA S/. 97,409.81 S/. 0.00 S/. 0.00 0.00% S/. 74,099.15 100.00%

380 TURISMO - HUALLAGA HUALLAGA SEDE CENTRAL LIQUIDADA CONTRATA S/. 129,807.53 S/. 0.00 S/. 0.00 0.00% S/. 129,807.53 - CONTRATO Nº 006-2008-GRSM/PGR

382 VIVIENDA - VARIOS VARIOS SEDE CENTRAL CULMINADA CONTRATA S/. 214,925.53 S/. 0.00 S/. 0.00 0.00% S/. 214,925.53 -

AMPLIACIÓN DE LA FRONTERA ELÉCTRICA RURAL DEL VALLE YSHANGAYACU, DISTRITO DE SAN PABLO, BELLAVISTA - SAN MARTIN

Obra Liquidada con: RGGR Nº 019-2012-GRSM/GGRContrato de ejecucion de Obra Nº 075-2010-GRSM/GGR

INTERCONEXION DEL SISTEMA ELECTRICO SAN MARTIN AL SEIN

TOCACHE, POLVORA,

BELLAVISTA, HUALLAGA

TOCACHE, BELLAVISTA

ELECTRO ORIENTE SA es la entidad encargada de la operación y mantenimiento.La tranferencia se llevó a cabo el 14-09-09 mediente CONVENIO GRSM-FONAFE.El expediente técnico de CONSEC

INSTALACION DEL SISTEMA DE ELECTRIFICACION RURAL DE LOS CASERIOS LA VICTORIA, PUERTO BAGAZAN, SANTA FE Y NACIENTE RIO NEGRO, DISTRITO DE ELIAS SOPLIN VARGAS - RIOJA - SAN MARTIN

ELIAS SOPLIN VARGAS

MD ELIAS SOPLIN VARGAS

ELECTRFICACION RURAL DE LAS LOCALIDADES DEL BAJO HUALLAGA, DISTRITOS DE CHIPURANA, HUIMBAYOC Y CHAZUTA, PROVINCIA DE SAN MARTIN, DEPARTAMENTO DE SAN MARTIN

CRIPURANA, HUIMBAYOC Y

CHAZUTA

Ejecución de obra: CONTRATO Nº 037-2012-GRSM/GGR, Supervisión de obra: CONSORCIO SAN MARTINOBRA EN PROCESO DE RECEPCIÓN Y LIQUIDACIÓNMediante Resolución Gerencial General Regional N°003-2014-GRSM/GGR, del 21 de Enero del 2014, se designa el COMITÉ DE RECEPCIÓN DE OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA ELECTRICA DEL SISTEMA DE UTILIZACIÓN A DISTRIBUCION PRIMARIA EN 22.9 KV PARA EL SUMINISTRO ELECTRICO DEL PREDIO: INSTALACION DEL SISTEMA DE ALCANTARILLADO EN LA LOCALIDAD DE SAN HILARION

CULMINADA/EN ARBITRAJE

La obra, fisicamente se culminó, sin embargo aun falta cancelar al contratista pagos relacionados con adicionales, por lo que se continua considerando como "en ejecución".Paralizado por falta de disponibilidad de terreno y errores en el expediente técnico.OBRA EN PROCESO DE LIQUIDACIÓN

ELECTRIFICACION RURAL DE LA LOCALIDAD DE RAMON CASTILLA - DISTRITO DE CHAZUTA, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN

AMPLIACION Y MEJORAMIENTO DE ELECTRIFICACION RURAL EN BAJA TENSION EN LA LOCALIDAD DE HUIMBAYOC, DISTRITO DE HUIMBAYOC, PROVINCIA Y DEPARTAMENTO DE SAN MARTIN

INSTALACION .DE LA ELECTRIFICACION RURAL DE LA LOCALIDAD DEL MIRADOR, DISTRITO DE SHAMBOYACU - PICOTA - SAN MARTIN

IMPLEMENTACION DE LAS REDES ELECTRICAS DE DISTRIBUCION SECUNDARIA EN LA LOCALIDAD DE SANTA ROSILLO, DISTRITO HUIMBAYOC, PROVINCIA Y DEPARTAMENTO SAN MARTIN

CONTRATO N° 020-2012-GRSM/GGRCONSULSAM SACAMC N° 005-2012-GRSM (Suma Alzada)

MEJORA DE LA ORIENTACIÓN TURISTICA NACIONAL MEDIANTE UNA SEÑALIZACIÓN ESTANDARIZADA MR - 01 REGION SAN MARTIN

ADQUISICIÓN, TRANSPORTE E INSTALACIÓN DE MODULOS DE VIVIENDA DE EMERGENCIA REGIONAL SAN MARTIN

Contrato Nº GRSM/GGRLiquición en levantamiento de observaciones - GRI

P423
jans Linares: SOSEM
Q423
jans Linares: SOSEM
R423
jans Linares: SOSEM
S423
jans Linares: SOSEM
T423
jans Linares: SOSEM
C424
jans Linares: EXISTE EL CODIGO SNIP 21247, PERO NO CONTEMPLA SAN MARTIN