The mission of AGC of Alaska is to advocate for our members and the Alaskan construction industry; to provide educational opportunities for our members; and to make the public aware of our members’ skills, responsibility, and integrity. DOD Packet 2017 Associated General Contractors of Alaska 8005 Schoon Street Anchorage, Alaska 99518 Ph. (907) 561-5354 | Fax (907) 562-6118 www.agcak.org

Upload: truongnhan

Post on 07-May-2018

223 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

The mission of AGC of Alaska is to advocate for our members and the Alaskan construction industry; to provide educational opportunities for our members; and to make the public aware of our members’ skills, responsibility, and integrity.

DOD Packet 2017

Associated General Contractors of Alaska

8005 Schoon Street

Anchorage, Alaska 99518

Ph. (907) 561-5354 | Fax (907) 562-6118

www.agcak.org

Page 2: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

The mission of AGC of Alaska is to advocate for our members and the Alaskan construction industry; to provide educational opportunities for our members; and to make the public aware of our members’ skills, responsibility, and integrity.

Table of Contents

Section Page #

Building and Preserving Alaska’s Future 3 F-35A Beddown Program 19 LRDR Program Overview 36 The Fine Art of Proposal Writing 46

Page 3: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report arethose of the authors(s) and should not be construed as anofficial Department of the Army position, policy or decision,unless so designated by other official documentation.”

Jim JeffordsChief of Engineering, Construction and Operations DivisionU.S. Army Corps of Engineers – Alaska District9 Nov 2017

“BUILDING AND PRESERVING ALASKA’S FUTURE”

District Overview

3

Page 4: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

2

SENIOR LEADERS

COL Michael BrooksDistrict CommanderOffice: CEPOA-DEPhone: 907-753-2504

LTC Jason BuursmaDeputy CommanderOffice: CEPOA-DEPhone: 907-753-2505

Randy BowkerDeputy District EngineerChief, Program Mgt DivOffice: CEPOA-PMPhone: 907-753-5770

Jackie LesemanExecutive AssistantOffice: CEPOA-EAPhone: 907-753-2505

Jim JeffordsChief, Engineering, Construction & Operations DivisionOffice: CEPOA-ECPhone: 907-753-2662

Dave HobbieChief, Regulatory DivisionOffice: CEPOA-RDPhone: 907-753-2712

Mike GilbertChief, Office of CounselOffice: CEPOA-OCPhone: 907-753-2534

Chris TewChief, Contracting DivisionOffice: CEPOA-CTPhone: 907-753-2540

Karen FarmerChief, Resource Management OfficeOffice: CEPOA-RMPhone: 907-753-2762

4

Page 5: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

ANCHORAGEHARBOR

DREDGING

UMIAT AIR

FORCE STATION

KIVALINA EROSION

ST PAUL HARBOR

SAVANNAH, GA

3

WHERE WE WORKMilitary Installations Civil Works Projects Environmental Projects

JOINT BASE ELMENDORF-RICHARDSON

FORT WAINWRIGHT

EIELSON AIR FORCE

BASECLEAR

AIR FORCE STATION

FORT GREELY

NOME

UNALAKLEET

CHENA FLOOD

CONTROL PROJECT

INTERNATIONAL PROJECTS• Bangladesh• Cambodia• India• Laos• Mongolia• Myanmar• Nepal• Sri Lanka• Vietnam

LOS ANGELES, CA

ATTU FORMERLY

USED DEFENSE

SITE

MISSIONThe Alaska District provides a full spectrum of quality engineering,

technical and construction support services in support of peacetime and contingency operations in Alaska, throughout the Pacific Region

and the world.

5

Page 6: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

4

MAJOR PROGRAMSCIVIL WORKS ENVIRONMENTALMILITARY

REGULATORY EMERGENCY MANAGEMENT

INTERAGENCY & INTERNATIONAL

Wetlands Delineation

Levee Inspection in Galena

Blood Bank in Nepal

F-35A Program at Eielson AFB

Dredging Cook Inlet near Anchorage

Soil Excavation at Northeast Cape

6

Page 7: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

5

MILITARY PROGRAMMission Support, Infrastructure & Quality of Life

Central Heat and Power Plant at Eielson Air Force Base

Dormitory at Eielson Air Force Base

F-35A Beddown Program at Eielson Air Force Base

“Gray Eagle” Unmanned Aircraft Systemat Fort Wainwright

7

Page 8: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

6

MISSILE DEFENSE PROGRAM

Early Warning Radar for Ballistic Missile Defense System at Clear Air Force Station

Long Range Discrimination Radar at Clear Air Force Station

Ground-Based Interceptor Missile Silo

at Fort Greely

Mechanical-Electrical Building at Missile Field 1 on Fort Greely

8

Page 9: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

7

CIVIL WORKS PROGRAM

Current Activities• Navigation

• Flood Risk Management

• Coastal and Storm Damage Reduction

• Emergency Response

• Water Supply

• Recreation

Shoreline Protection at Unalakleet

Navigation Improvements at Valdez Harbor

Annual Maintenance Dredging at Homer Harbor

9

Page 10: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

8

• Built after 1967 flood disaster in Fairbanks

• Construction completed in 1979

• Features 71/2-mile earthen dam, floodway and 26-mile levee

• Moose Creek Dam operations reduce flood risk from spring through fall in the greater Fairbanks area

• Implemented interim risk reduction measures and developing long-term solutions to address concerns identified in 2009 Corps-wide dam safety assessment

Tim Feavel, Project Manager

Relief Well during Operations

CHENA RIVER LAKES FLOOD CONTROL PROJECT

Debris Bailing Operations at Dam Control Works

10

Page 11: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

9

ENVIRONMENTAL PROGRAM

• Formerly Used Defense Sites Program

• Native American Lands Environmental Mitigation Program

• Army and Air Force Environmental Programs

• Interagency Environmental Program

Base Camp at Tanaga Island

Remediation at Umiat Test Well #9

Remediation at Attu Island

11

Page 12: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

10

INTERAGENCY PROGRAMPartners• Denali Commission • Coast Guard• Federal Aviation Administration • National Oceanic and Atmospheric Administration • Department of Energy• Bureau of Indian Affairs • Bureau of Land Management

U.S. Coast Guard in Arctic

Mooring Points in Rural Alaska

for Denali Commission

Red Devil Mine with BLM as Lead Agency

12

Page 13: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

INTERNATIONAL PROGRAM

LaosHumanitarian Assistance • Construction of schools, medical clinics and large nutrition center• Ten projects in design or construction

VietnamHumanitarian Assistance • Disaster response centers, schools,                    clinics and communications projects• Twelve projects in design or construction

CambodiaHumanitarian Assistance• Blood banks and schools.  Four projects in procurement, design or constructionDefense Threat Reduction Agency• Cooling tower replacement

Sri Lanka & MaldivesHumanitarian Assistance• Hospitals, schools• Eleven projects in procurement, design or construction.Foreign Military Financing• Materials supply for boat storage and ramps

MongoliaGlobal Peace Operations Initiative• Recently completed Five Hills Training Centerat $5.8M

Humanitarian Assistance • Three schools and workshops in planning

NepalHumanitarian Assistance•Warehouses, emergency      response centers• Six projects in procurement, design or constructionU.S. Agency for International Development• Design and construction of one primary health care center

India Foreign Military Sales       • C‐17 Beddown Project• Programmed amount: $285M• Contract amount: $230M• 61% complete as of Jan 2016• Prime contractor: Boeing

BangladeshHumanitarian Assistance• Coastal crisis management centers• Two in procurement, design or constructionU.S. Agency for International Development• Multipurpose cyclone shelters/schools• Three‐year program at $40.5M• 16 projects in construction• Agriculture Infrastructure Program supporting roads, markets and irrigation projectsGlobal Peace Operations Initiative• Design and construction of multipurpose training facility and upgrades to academic building  at $4.6M

BUILDING STRONG®

Philippines

Defense Threat Reduction Agency• Laboratory standard design development

11

13

Page 14: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

12

REGULATORY PROGRAM

Mission• To protect the Nation’s aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions

Authorities• Section 10 Rivers and Harbors Act of 1899• Section 404 Clean Water Act (1972)• Section 103 Marine, Protection, Research and Sanctuaries Act (1972)

Activities Requiring Permits

• Filling wetlands, streams, marine waters, lakes and other waters

• Mechanized land clearing in wetlands

• Work in or affecting navigable waters, such as dredging or pile-supported structures

14

Page 15: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

13

EMERGENCY MANAGEMENT

• Public Law 84-99: Flood Control and Coastal Emergencies

• Stafford Act

• National Response Framework

• Section 302, Water Resource Act of 1990 and Amended Public Law 84-99

62nd

Engineer Detach-ment(Forward Engineer Support Team –Advance)

New construction

at Galena following

devastating flood event

along Yukon River in

Spring 2013

Installation of backup generator to provide emergency power at critical facility

15

Page 16: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

14

Summary for FY17 Awards to Small Businesses

• USACE Alaska District awarded 75.38% of dollars to Small Business Firms in FY17

PROGRAM ACTIONS % ACTIONS DOLLARS % DOLLARS

SB Eligible 852 $465.6 M

Small Business 494 57.98% $350.9 M 75.38%

SDB (includes8(a)

289 33.92% $182.4 M 39.17%

SDVOSB 41 4.81% $8.5 M 1.82%

Woman Owned 48 5.63% $9.0 M 1.93%

HubZone 98 11.50% $18.2 M 3.91%

16

Page 17: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

15

FY18 Goal for Awards to Small Businesses

Program FY18 GoalSmall Business 58%

SDB (includes 8(a) 45%

SDVOSB 3%

Woman Owned 5%

HubZone 5%

17

Page 18: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

16

SUMMARY• We are the nation’s experts in arctic engineering and construction.

• We are the design and construction agent for the Army, Air Force and Missile Defense Agency in Alaska.

• We are partnering with the State of Alaska to support the ongoing need for deep-draft navigation in the Arctic.

• Our programs have become more complex, diverse and globally oriented.

• We are prepared to provide response and recovery assistance for any natural or manmade disaster within the Pacific Region.

Alaska District Workforce

18

Page 19: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

F-35A BEDDOWN PROGRAM

19

Page 20: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

F-35 PROJECTED CONSTRUCTION SCHEDULE

Awarded Projects

Awarded Projects

20

Page 21: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE365F-35A FLIGHT SIMULATOR FACILITY

AWARDED – DECEMBER 2016

FY16 MILCONAcquisition Strategy – Design Bid

Build, Full and Open Competition Estimated Value – $20M - $25MConstruct 32,387 SF Flight

Simulator Facility

21

Page 22: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE376F-35A HANGAR/PROPULSION MX/DISPATCH

FACILITY

AWARDED – JUNE 2017

FY17 MILCONAcquisition Strategy – Design Bid

Build, Full and Open Competition Estimated Value – $33M - $39MConstruct 20,796 SF 2-Bay Hangar;

4,004 SF Propulsion MX: 9,139 SF CC Dispatch

22

Page 23: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE377F-35A ADAL FIELD TRAINING DETACHMENT

FACILITY

FY17 MILCONAcquisition Strategy – Design Bid

Build, Small Business Set-asideEstimated Value – $17M - $20MAlter 713 SM bldg. 4280; and 2,280

SM classrooms; add high-bay area to support engine maintenance training

AWARDED – JUNE 2017

23

Page 24: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE381F-35A EARTH COVERED MAGAZINES

FY17 MILCONAcquisition Strategy – Design Bid

Build, Small Business Set-asideEstimated Value – $8M - $10MConstruct 6 magazines with a total

13,197 SF

AWARDED – APRIL 2017

24

Page 25: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE375Renovate Building 4110

FY16 SRMAcquisition Strategy – Design-Build,

AlphaEstimated Value – $3M - $5MDesign and Construct the

Renovation of Building 4110 for Squad Ops / AMU

EIE392Renovate Building 1337 for

F-35 Squad Ops/AMU

FY17 SRMAcquisition Strategy – Design-Build,

Small Business Set-asideEstimated Value – $8M - $12MDesign and Construct the

Renovation of Building 1337 for F-35 Squad Ops / AMU

AWARDED – SEPT 2016CONSTRUCTION SUBSTANTIALLY

COMPLETE

AWARDED – SEPT 2017

25

Page 26: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE378F-35A AIRCRAFT WEATHER SHELTERS

SQUAD #1

FY17 MILCONAcquisition Strategy – Design-Build,

Full and Open CompetitionEstimated Value – $50M - $71MConstruct 77,385 SF 16-Bay aircraft

weather shelter Projected Award Date – 2Q FY18

SOLICITATION(PHASE 2)

26

Page 27: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE384F-35A AGE Facility/Fillstand

FY18 MILCONAcquisition Strategy – Design-Build,

Small Business Set-asideEstimated Value – $15M - $20MDesign and Construct 2,328 SM

Aerospace Ground Equipment (AGE) Facility and 166 SM Fuel Fillstand and Covered Storage

Projected Award Date – 2Q FY18

EIE385F-35A OSS/Weapons/Intel

Facility

FY18 MILCONAcquisition Strategy – Design-Build,

Small Business Set-asideEstimated Value – $6M - $10MDesign and Construct 1,128 SM

Operations Support Squadron/Weapons & Tactics/Intelligence Facility

Projected Award Date – 2Q FY18

SOLICITATION(PHASE 2)

SOLICITATION(PHASE 2)

27

Page 28: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE388F-35A R-11 Fuel Truck

Shelter

FY18 MILCONAcquisition Strategy – Design Build,

Small Business Set-asideEstimated Value – $5M - $10MDesign and Construct 540 SM 6-bay

R-11 Fuel Truck Shelter.Projected Award Date – 2Q FY18

SOLICITATION(PHASE 1)

EIE386F-35A Consolidated

Munitions Admin Facility

FY18 MILCONAcquisition Strategy – Design-Build,

Small Business Set-asideEstimated Value – $15M - $24MDesign and Construct 1,951 SM

Consolidated Munitions Facility with administration facility, heated vehicle storage, munitions training bay, and equipment maintenance bay.

Projected Award Date – 2Q FY18

SOLICITATION(PHASE 1)

28

Page 29: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE405SOUTH LOOP UTILIDUCT

FY18 MILCONAcquisition Strategy – Design Bid

Build, Full and OpenEstimated Value – $35M - $45MConstruct new utilidor to South

Loop with steam, condensate, and water providing an additional 50,000 lb/hr steam to the south loop area to support new F-35 complex.

Projected Award Date – 2Q FY18

SOLICITATION

29

Page 30: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE379F-35A HANGAR/SQUAD OPS/AMU

SQUAD #2

FY17 MILCONAcquisition Strategy – Design Bid

Build, Full and Open CompetitionEstimated Value – $35M - $45MConstruct 2-bay 20,753 SF Hangar;

18,901 SF squadron operations and 18,858 SF AMU

Projected Award Date – 2Q FY18

PROJECTED SOLICITATION –NOVEMBER 2017

30

Page 31: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE380F-35A MISSILE MAINTENANCE FACILITY

FY17 MILCONAcquisition Strategy – Design Bid

Build, Small Business Set-asideEstimated Value – $10M - $20MConstruct 11,300 SF Missile

maintenance facility Projected Award Date – 3Q FY18

PROJECTED SOLICITATION –JANUARY 2018

31

Page 32: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE382F-35A AIRCRAFT WEATHER SHELTERS

SQUAD #2

FY17 MILCONAcquisition Strategy – Design Bid

Build, Full and Open CompetitionEstimated Value – $65M - $80MConstruct 81,700 SF 16-Bay aircraft

weather shelterProjected Award Date – 3Q FY18

PROJECTED SOLICITATION –JANUARY 2018

32

Page 33: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIE389SATELLITE DINING FACILITY

FY18 MILCONAcquisition Strategy – Design-Build,

Small Business Set-asideEstimated Value – $5M - $6MDesign and construct 975 SM Dining

FacilityProjected Award Date – 4Q FY18

PROJECTED SOLICITATION –JANUARY 2018 (Phase 1)

33

Page 34: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

EIELSON AFB PROJECTS

EIE393 – Renovate B1338 AMU/Weather Shelter

FY18 SRMAcquisition Strategy – Design Bid

Build, Small Business Set-asideEstimated Value – $15M - $25MDesign and renovate Bldg 1338 to

support AMU and Weather Shelter Facilities

Projected Award Date – 3Q FY18

EIE394 – Renovate 4-Bay Weather Shelter

FY18 SRMAcquisition Strategy – Design Bid

Build, Small Business Set-asideEstimated Value – $10M - $15MDesign and renovate existing 4-bay

Weather ShelterProjected Award Date – 3Q FY18

PROJECTED SOLICITATION –DECEMBER 2017

PROJECTED SOLICITATION –DECEMBER 2017

34

Page 35: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

FUTURE F-35 PROJECTS

Future USACE Program– School Age Center (FY19)– AMU Admin Facility– Construct Conventional

Munitions Maintenance Facility– AME Storage– Combat Arms Training and

Maintenance (CATM) Range (14 pt Indoor)

USAF SRM Requirements~25 projects from FY18 – FY19 not

covered by briefingMay or may not be executed by

USACE

35

Page 36: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

LRDR PROGRAM OVERVIEW

1

LES by Radar Prime (FY19)CP#5, LES Foundation (FY17)

CP#1, Mission Control Facility, Site, Substation (FY17)

CP#4, Maintenance Facility,Misc. Site Improvements (FY19)

CP#2, Entry Control Facility,SSL-A Boundary (FY17) CP#3, LRDR Power Plant,

Fuel Storage Vault (FY19)

36

Page 37: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

LRDR DESIGN & CONSTRUCTION SCHEDULE

FY17 FY18 FY19 FY20 FY21ConstructionPackage

CP#1

MCF, Substation,Interim Fuel Storage

CP#2SSL-A Fence, ECF

CP#3LPP, Fuel Storage Vault, Fuel Offload

CP#4Maint. Fac.,

Paving; RoadImprovements

LES

MCF

Legend: Contract Award Joint/Beneficial Occupancy Date

JOD 1

30 Nov 18

JOD 2

30JUN19

SSLA Fence; ECF

LRDR Power Plant

Maint Facility; Final Site

FY 19 MILCONBOD

31AUG21

FY 19 MILCONBOD

31AUG21

FY 17 MILCONBOD

31AUG19

TBD

CP#5LES Foundation

Acq.28 Apr 17

Design1 Feb 18

Design12 MAR 19

Design28 Feb 2018

Design15 Oct 19

37

Page 38: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR039a – Mission Control Facility

Acquisition Strategy – DBB, Full and Open Competition

Construction Package #1Scope Construct New MCF with

related Site Infrastructure and new supporting substation

Projected Award Date – 28 April 2017 to UNIT - ASRC

38

Page 39: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR039b – LRDR Site SecurityAcquisition Strategy – DBB, SB Set-

asideConstruction Package #2Construct building and perimeter

security (fencing, sensors, lighting) with Entry Control Facility

Estimated Value – Between $5M and more than $10M

Projected Award Date – Feb ‘18

39

Page 40: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR039e – LRDR Equipment Shelter Foundation

Acquisition Strategy – DBB, 8a Sole Source

Construction Package #5Construct foundation for the Radar

and adjoining Equipment ShelterEstimated Value – Between $5M and

$10MProjected Award Date – Feb /18

40

Page 41: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR039c – LRDR Power PlantAcquisition Strategy – DBB, Full and

OpenConstruction Package #3Construct Back-up Power Plant to

support LRDREstimated Value – More than $10M Projected Award Date – 2Q FY19

41

Page 42: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR039d – Maintenance Facility and Final Site Improvements

Acquisition Strategy – DBB, SB Set-aside

Construction Package #4Construct a Maintenance Facility

outside the secure area, landscape and road improvements.

Estimated Value – Between $5M and more than $10M

Projected Award Date – 1Q FY20

42

Page 43: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA LRDR, CLEAR AFS PROJECTS

CLR033d – Sprung Structure and Laydown Area

Acquisition Strategy – DBB, SB Set-aside

Construct a sprung structure gravel pad and install matting. Construct an approximately 2 acre laydown area.

Estimated Value – Between $500K and $1M

Projected Award Date – SRM MATOC

43

Page 44: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

MDA MISSILE FIELD 4, FT. GREELY PROJECTS

Acquisition Strategy – 4 D/B/B Construction PackagesA. Clear, grub, and grade the missile field site; 8a Sole SourceB. Mechanical Electrical Building; 1 step D/B/B after Pre-qualification poolC. Missile Field Infrastructure; 1 step D/B/B after Pre-qualification poolD. Site Security; D/B/B SB Set-Aside

Projected Award Dates:CP A – April ‘18CP B – July ‘18CP C – Feb ‘19CP D – 3 Qtr ’21

Industry day to explain pre-qualification process will be scheduled later in the month.

44

Page 45: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Alaska District U.S. Army Corps of Engineers

“Building and Preserving Alaska’s Future”

QUESTIONS?

45

Page 46: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

The Fine Artof Proposal Writing

Welcome

Aldone Graham, Contracting Officer, POA , USACE

31 October 2017

46

Page 47: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Review of proposals for federal acquisitions

Best Value Continuum Lowest Price Technically Acceptable (LPTA) and Tradeoff

The Fine Art of Proposal Writing47

Page 48: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

LPTA: Best value is expected to result from selection of a technically acceptable proposal with the lowest evaluated price.

The Fine Art of Proposal Writing48

Page 49: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Tradeoff: A tradeoff process is appropriate when it may be in the best interest of the Government to consider award to other than the lowest priced offeror or other than the highest technically rated offeror.

The Fine Art of Proposal Writing49

Page 50: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Acquisition Strategy

Market Research: It all starts with a “Sources Sought” Announcement

If you are qualified and interested –DO submit a capabilities briefing that answers the items called out in the announcement.

The Fine Art of Proposal Writing50

Page 51: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Solicitation Process

Solicitations could be one-phase or two-phase.

In construction projects, one-phase is generally for fully designed,“Design-Bid-Build” projects.

The Fine Art of Proposal Writing51

Page 52: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Two-phase solicitations are for“Design-Build” construction projects.

• Phase one is qualifications-based and results in a short list of most highly qualified offerors who go on to

• phase two, which is for the technical, design solution proposal.

The Fine Art of Proposal Writing52

Page 53: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Batallion HQ BuildingJBER

53

Page 54: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Proposal Review

• Offerors must review and address all RFP’s requirements

• Clear and concise • Pictures are GOOD• Know your proposal submission

The Fine Art of Proposal Writing54

Page 55: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

• Keep a list, spreadsheet, pie chart, table – organize every item that should be submitted

• Some requirements have multiple elements! For example: Project Experience - Supplemental Narrative

• Be mindful of the “Relative Importance” of each factor!

The Fine Art of Proposal Writing55

Page 56: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

• Beware of boilerplate templates

• Watch copy/paste functions – artifact languagecauses problems

• Pay attention to PAGE LIMITATIONS!

The Fine Art of Proposal Writing56

Page 57: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

It may seem trivial, but…• Make sure the binder is not

overfilled• The binder rings close tightly• The cover opens easily• Pages turn smoothly• Tabs are clearly marked and

match the evaluation factors

The Fine Art of Proposal Writing57

Page 58: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

It may seem trivial, but…

• Make sure you use fonts and font sizes that are easy to read

• Avoid light text colors such as light blue, yellow

The Fine Art of Proposal Writing58

Page 59: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Ask for Debriefings

• The primary value of a debriefing is to learn from mistakes and

• get better at putting proposals together

The Fine Art of Proposal Writing59

Page 60: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Batallion HQ BuildingJBER

60

Page 61: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Writing persuasively• The three most important qualities

of a proposal:

– Complete– Accurate and– Persuasive

The Fine Art of Proposal Writing61

Page 62: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

• Avoid clichés• Use a natural, conversational

tone in your writing• A proposal is a persuasive

document that helps you justify price and show value

• Identify the client's needs, issues, and/or concerns

The Fine Art of Proposal Writing62

Page 63: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

• Identify the outcomes they're looking to achieve

• Recommend a solution that solves/satisfies client's needs, issues, and/or concerns

• Present evidence that your team can deliver that solution on time and on budget (case studies!)

The Fine Art of Proposal Writing63

Page 64: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Batallion HQ BuildingJBER

64

Page 65: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Case studies• Only use relevant case studies. • Determine relevance based on

scope of work, location of work, contract value, level of difficulty, client work history

The Fine Art of Proposal Writing65

Page 66: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

What a proposal isn't:

• a price quote• a statement of work• your company history

The Fine Art of Proposal Writing66

Page 67: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Generic proposal

• Watch out for “artifact" language• Boilerplate language is a place to

start generating content, not the content itself

The Fine Art of Proposal Writing67

Page 68: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Generic proposal

• Use the client's name in the proposal • Identify their specific challenges• Present your specific solutions

The Fine Art of Proposal Writing68

Page 69: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Generic proposal

• Avoid marketing fluff, technical jargon, and outrageous claims

• Beware of death by copy and paste/search and replace

The Fine Art of Proposal Writing69

Page 70: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Make it user friendly

• Does it "look" like you put forth an effort, or just slapped it together?

• Is it easy to flip through? • Did you use headings, subheadings,

bullets, graphics, and other meaningful ways to present the information organized?

The Fine Art of Proposal Writing70

Page 71: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Make it user friendly• Is it grammatically correct?• Are there images where

appropriate?• Look at other types of publications

for inspiration on presenting content in interesting ways - Newspapers, blogs, infographics, books

The Fine Art of Proposal Writing71

Page 72: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Don't just tell...show!• Use pictures with descriptions• Support claims such as "best", "first",

and "most...“• Use measurable or quantifiable

evidence

The Fine Art of Proposal Writing72

Page 73: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Batallion HQ BuildingJBER

73

Page 74: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Client-centered proposalQuick self-centered test: • How many times do you include the

client's name in the proposal? How many times do you include yours?

The Fine Art of Proposal Writing74

Page 75: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Client-centered proposal• Create a chart identifying client's

needs side by side with your solutions

• Aim to understand the real reason for the RFP

• Keep asking why to get to the root of the client's problem

The Fine Art of Proposal Writing75

Page 76: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Offer a value proposition the client actually wants! Generate more revenueConserve more energyIncrease reliability

The Fine Art of Proposal Writing76

Page 77: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Eielson Airforce BaseFitness Center

Kodiak Police Station and Jail

77

Page 78: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Common large business challenges• Investment and risk• Administrative costs• Construction partner• Attention to detail• Timeline of all team members

The Fine Art of Proposal Writing78

Page 79: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Common small business challenges• Team experience• Project examples together• Estimating accurately• Control of time • Price shopping

The Fine Art of Proposal Writing79

Page 80: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

TeamsTips• Rigorous Go-NoGo process• Hire a marketing person• Break up the RFP for each expert• Red teaming – requires time• Calculate buffers for setbacks• Firm pencils down• Final QC by non-involved staff

The Fine Art of Proposal Writing80

Page 81: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

The Fine Art of Proposal Writing

ProcrastinationWatch out• Stress at the last minute results in

an inferior product and can lead to unsafe driving

• One minute too late is TOO LATE• Getting on base takes time• USACE does not pick up

81

Page 82: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

Batallion HQ BuildingJBER

82

Page 83: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392

The Fine Artof Proposal Writing

Questions?

83

Page 84: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392
Page 85: DOD Packet - AGC of Alaska - The Associated General ... · unless so designated by other official documentation. ... Dormitory at Eielson ... Squad Ops / AMU EIE392