done-chapter 4 pp 84-110 (1)
TRANSCRIPT
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
1/27
CHAPTER 4
The Technical Aspect
This chapter presents the production aspect as it refers to the
whole operation of the business. It is concerned with estimating the total
product cost and enumerating the major items of the capital cost. This
aspect also includes the discussion of the planned specifications, raw
materials, manufacturing process, buildings and facilities, machinery and
equipment, labor requirements for production, plant and office location
with layouts, production schedule and annual production capacity, utilities
needed, methods of waste disposal, and unit production cost.
Objectives of the Technical Aspect
1. To determine the components needed to produce the product.
2. To determine the steps in manufacturing the product.
3. To identify the machines are required for production.
4. To know the facilities required by the business.
5. To establish the factorys layout where the production will be
facilitated.
6. To determine the schedule of production.
7. To identify where the raw materials come from.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
2/27
85Technical Specifications of the Product
The product, MaiSpot, a biodegradable shopping bag, will take the
usual form of those plastics that are already available in the market which
has rectangular shape with a handle on one edge of the plastic as it
deemed to be the most efficient design. 60 pieces of biodegradable
shopping bags will compose a pack and it will be placed in another
packaging bag. This comes in different colors like red, blue, green and
yellow depending on the order of the customer. The size also depends on
the order of the customer; small, medium, large are all available.
Raw Materials
The process of making biodegradable plastics is the same as the
process of making a non-biodegradable plastic. The proposed product
only differed in its main content which is starch, in order to make the
plastic biodegrade. The proposed product in a simple saying is a starch
bag. The raw materials needed in making biodegradable shopping bags
from corn kernels are the following:
1. Corn Kernels
Granules are in light yellow and come in cylinder and round
shape obtained from the plant corn. It has starch, protein and fiber
content rich in polylactid acid (PLA), an essential part of a starch-
based plastic.
2. Sulfuric Acid
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
3/27
86This extends the time for corn kernels to be heated which
loses bond within the kernel breaking it down to starch, protein and
fiber.
3. Ethylene Vinyl Acetate (EVA)
Ethylene vinyl acetate (also known as EVA) is theco-
polymer ofethylene andvinyl acetate. The weight percent vinyl
acetate usually varies from 10 to 40%, with the remainder being
ethylene. Synthesis means that "something is put together," and
synthetic materials are made of building blocks that are put
together in factories. EVA will stand as the Synthetic Polymer. Such
properties as density and molecular weight, and they can be made
into a huge variety of plastic products. A number of Ethylene will
create a polyethylene.
It is apolymer that approacheselastomeric materials in
softness and flexibility, yet can be processed like
otherthermoplastics. The material has good clarity and gloss, low-
temperaturetoughness, stress-crack resistance, hot-
meltadhesive water proof properties, and resistance toUV
radiation
4. Water
It is used to mix all the dried ingredients at the desired level
of concentration.
http://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Ethylenehttp://en.wikipedia.org/wiki/Vinyl_acetatehttp://en.wikipedia.org/wiki/Polymerhttp://en.wikipedia.org/wiki/Elastomerhttp://en.wikipedia.org/wiki/Thermoplastichttp://en.wikipedia.org/wiki/Toughnesshttp://en.wikipedia.org/wiki/Adhesivehttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/Adhesivehttp://en.wikipedia.org/wiki/Toughnesshttp://en.wikipedia.org/wiki/Thermoplastichttp://en.wikipedia.org/wiki/Elastomerhttp://en.wikipedia.org/wiki/Polymerhttp://en.wikipedia.org/wiki/Vinyl_acetatehttp://en.wikipedia.org/wiki/Ethylenehttp://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Heteropolymer -
8/13/2019 Done-chapter 4 Pp 84-110 (1)
4/27
87TABLE 4.1
Raw Materials Required for Annual Production
Description Quantity Unit Cost
(per kilo)
Total Cost
Corn Kernels 48,000 kgs Php 11.58 Php 555,840.00
Sulfuric Acid 24,000 kgs 10.78 258,728.00
VinylAcetate/Ethylene
24,000 kgs 60.00 1,440,000.00
TOTAL Php 2,254,568.00
Manufacturing Process
Below is the manufacturing process for producing the product:
1. Preparation of Raw Materials
Corn pellets must be prepared first. In order to have corn
pellets, the corn kernels should be heated with water with
sulfuric acid with more than 100 degrees. This will make the
kernels loose a tight bond breaking it down to fiber, protein and
starch.
2. Material Blending
After the corn kernels
have been heated up, it will
be mixed with ethylene vinyl
acetate and some water
afterwards making it a liquid
mixture.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
5/27
883. Corn Pellet Making
When the mixture is
done, it will be put inside a
pellet mill to make it look like
pellets that will be used for
the production of the
shopping bags. The pellets
now contain all the materials
needed to produce the plastic
films.
4. Extrusion
The corn pellets will be
treated into molten form at
high temperature. It goes out
at the shape of a bubble full of
cool air that comes from the
air ring. This air stream helps
to blow the bubble up and cool
down the plastic. The step is very important because it can
affect the strength, thickness consistence and transparency of
the film. The bubble goes through cooling tower of 25 - 35 feet
tall. At the top of the tower, it is guided to be flattened gradually
to form flat shape. The lay-flat film travels over a number of
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
6/27
89rollers. With simple bag, it is often printed, sealed and
perforated at the same time of extrusion.
The device used in this step is called an extruder, it
forces softened plastic through a shaped dye from which it may
emerge in almost any form, including a circular rod or tube, and
a wide, flat sheet. The driving force is supplied by a screw which
provides constant pressure. All extrusion products have a
regular cross section. A variation on this method is extrusion
blow molding, in which a plastic tube produced by extrusion is
sealed around a blowing tube and expanded to the shape of a
mold with compressed air.
5. Printing
The films will be
printed right away after it
has gone extrusion because
it is a 2 in 1 extruding and
printing machine. It will be
printed with its brand name
MaiSupot. The plastic bag
will be treated by flexo- printing because its just in small
quantity. Flexo printing is a form ofprinting process which
utilizes a flexiblerelief plate, it means that it will be embossed
on the shopping bag. It is essentially a modern version of
http://en.wikipedia.org/wiki/Printinghttp://en.wikipedia.org/wiki/Relief_printhttp://en.wikipedia.org/wiki/Relief_printhttp://en.wikipedia.org/wiki/Printing -
8/13/2019 Done-chapter 4 Pp 84-110 (1)
7/27
90letterpress which can be used for printing on almost any type of
substrate, including plastic, metallic films, cellophane, and
paper.
6. Plastic Bag Shaping
Here, the printed plastic films are shaped into a bag with
their corresponding sizes, small, medium and large.
7. Quality Control Inspection
Each product will pass through inspection. The
acceptance or rejection of plastic bags will take place here
through the production supervisor. This will depend on how the
plastic bag looks like, its durability, appearance, etc.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
8/27
918. Packaging
The workers are needed to be packaged in the plastic
shopping bags considering 60 pieces of plastic bags per pack. It
will be put inside a recycled paper and ready for purchase or
delivery
9. Storing
The plastic shopping bags will be stored in the storage
room after it has been packaged and assured of good quality.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
9/27
92
FIGURE 4.1
Production Process Flowchart
Building and Facilities
The proposed company will be renting a one-story building located
at Doa Remedios Trinidad Highway, Baliuag, Gitnang Luzon. The
proponents will rent the building with a monthly rental fee of Php50,000.
The floor area is 324 square meters. The manufacturing site is an old one
so it will undergo renovation. The renovation will require lumber, plywood,
Preparation of RawMaterials
Materials Blending
Corn Pellet making
Extrusion
Printing
Plastic Bag Making
Quality ControlInspection
Packaging
Storing
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
10/27
93cement, bricks, sand and gravel, window, door, electrical wire and outlet,
sink and faucet, and toilet bowl. Dividers will be used to construct the
different offices and rooms. A stock room for raw materials and finished
goods will be located beside the office area together with the machines,
preparation, sanitary area, toilet and wash area which is main plant site.
TABLE 4.2
Materials Required for Renovation
Description Quantity Unit Cost Total Cost
Lumber 10 Php 100 Php 1,000
Ply Wood 15 250 3,750
Cement 3 1,250 3,750
Bricks 30 80 2,400
Sand and Gravel 5 250 1,250
Window 15 230 3,450
Door 8 500 4,000
Electrical Wire 5m 20 100
Electrical outlet 10 20 200
Sink 5 200 1,000
Faucet 5 70 350
TOTAL Php 21,250
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
11/27
94
FIGURE 4.2
Office (Front View)
FIGURE 4.3
Manufacturing Site (Side View)
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
12/27
95Machinery and Equipment
The following are the machineries and equipment needed to
manufacture the biodegradable plastic shopping bag.
TABLE 4.3
Office Supplies
Description Quantity Unit Cost Total Cost
Ball Pen 1 box (50pcs) Php 137.50 Php 137.50
Bond Paper (short) 1 ream (500pcs) 155.00 155.00
Bond Paper (long) 1 ream (500pcs) 175.00 175.00
Column Journal 2 pads 25.00 50.00
Columnar Ledger 2 pads 22.00 44.00
Fastener 2 boxes 25.00 50.00
File Folder (short) 25 pcs 3.50 87.50
File Folder (long) 25 pcs 4.00 100.00
Packaging Tape 6 rolls 25.00 75.00
Paper Clip 2 boxes 8.00 16.00
Pencil 1 box (12pcs) 68.75 68.75
Permanent Marker 3 pcs 39.00 117.00
Puncher 1 pc 85.00 85.00
Record Book 2pcs(1000leaves)
80.00 160.00
Scotch Tape 3pcs 20.00 60.00
Staple Wire 3 boxes 5.00 15.00
Stapler 3 pcs 45.00 135.00
Scissor 3 pairs 16.00 48.00
Yellow Paper 3 pads 22.00 66.00
TOTAL Php 1,644.75
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
13/27
96TABLE 4.4
Office Equipment
Description Quantity Unit Cost Total Cost
Desktop Computer(HP Compaq)
1 Php 10,000.00 Php 10,000.00
Printer (CanonPIXMA Ip2770)
1 2,195.00 2,195.00
Calculator 3 150.00 450.00
TOTAL Php 12,645.00
TABLE 4.5
Office Furniture and Fixtures
Description Quantity Unit Cost Total Cost
Air Conditioner(Abenson)
1 Php 11,000.00 Php 11,000.00
Computer Tableand Chair
1 1,115.00 1,115.00
Filing Cabinet 1 1000.00 1000.00
Fire Extinguisher 1 1,500.00 1,500.00
Office Chair 4 500.00 2,000.00
Office Table 4 1,000.00 4,000.00
Plastic Chairs 3 100.00 300.00
Trash Can 1 75.00 75.00
TOTAL Php 20,990.00
TABLE 4.6
Factory Equipment
Description Quantity Unit Cost Total Cost
Knives 3 pcs Php 100.00 Php 300.00
Weighing Scale 2 pcs 2500.00 5,000.00
Corn Kernels 4000 kgs(160sacks)
11.58 (per kilo) 46,320.00
Sulphuric Acid 2000 kgs 10.78 (per kilo) 21,560.00
VinylAcetate/Ethylene
2000 kgs 60.00 (per kilo) 120,000.00
TOTAL Php 193,180.00
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
14/27
97TABLE 4.7
Factory Machinery
Description Quantity Unit cost Total cost
Blending Machine 1 Php60,000.00 Php60,000.002 in 1 Plastic FilmBlowing Extruderand PrintingMachine
1 400,000.00 400,000.00
Plastic Bag MakingMachine
1 134,000.00 134,000.00
Pellet Mill 1 43,000 43,000
TOTAL Php 637,000.00
TABLE 4.8
Factory Furniture and Fixtures
Description Quantity Unit Cost Total Cost
Ceiling Fan 3 Php 800.00 Php 2,400.00
Exhaust Fan 2 500.00 1,000.00
Fire Extinguisher 1 1,500.00 1,500.00
Plastic Chairs 3 100.00 300.00
Working Table 1 500.00 500.00
TOTAL Php 5,700.00
TABLE 4.9
Factory Supplies
Description Quantity Unit Cost Total Cost
Gloves 12 pairs Php 25.00 Php 300.00
Face Mask 12 pieces 25.00 300.00
TOTAL Php 600.00
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
15/27
98
FIGURE 4.4
Factory Machinery
Blending Machine Big cooling tank Double speed motor Electric heating
Total Volume(L) 300/1000
Stirring Speed(rpm) 475/950/80
Pellet Mill
No water/binder/drying
Hydraulic/physical press
High strength/pressure
Dimension (l*w*h)(mm)
1850*1500*1650
Total Weight (t) 7-8
2 in 1 Plastic Film Blowing Extruder and
Printing Machine
Screw diameter: 50mm
Ratio: 28:1
Die head: 50-100mm
Total Power 32kw
Blow Film Motor Power 11kw
Max. Extruded Quantity 50kg/h
Plastic Bag Making Machine
High speed: 440 bags per minute
bag with Printed logo
To work in double line
Cutting thickness0.01 ~ 0.04
(single layer)
Max. Cutting length(MM):
800
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
16/27
99Labor Requirements for Production
The production of biodegradable plastic shopping bag made from
corn kernels requires both direct and indirect labor together with the
designated positions, hourly rates, and required hours in month, total
salaries and total labor cost.
TABLE 4.10
Total Annual Labor Cost
Position No. HourlyRate
Hours ofWorking
(per year)
Total AnnualCost
Production Workers(Direct Labor) 6 Php 42.00 2,304 Php 580,608
Production Supervisor(Indirect Labor) 1 95.75 2,304 216,000
Total Labor Cost Php 796,608
Table 4.10 shows the total labor cost of direct and indirect workers
of the proposed business. The direct labor cost consists of six (6)
production workers who do the labor directly in the production process
while indirect labor consist of one (1) production supervisor. The direct
and indirect labor costs were computed by multiplying the hours of
working per year (8 hours per day x 6 days per week x 4 weeks per month
x 12 months per year), hourly rate and the number of the workers.
All production workers together with the production supervisor will
undergo a one-month training in order to be familiar and expert in the
production process. The training includes briefing of their jobs, details of
the companys mission & vision, familiarization of the company rules and
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
17/27
100policies and also all the additional benefits and rewards that will be entitled
to them after meeting the requirements of their work.
TABLE 4.11
Labor and Machinery per step
Table 4.11 shows the various processes needed to produce the
product with the needed worker for each and the machine needed as well.
1. Preparation of Raw Materials
One (1) worker is needed to prepare the corn pellets needed
in making biodegradable plastics; one to heat the corn kernels and
one to prepare it for the next step.
2. Corn Pellet Making
Two (2) workers are needed in this step. When the mixture is
done, it will be put inside a pellet mill to make it look like pellets
that will be used for the production of the shopping bags. The
ProcedureRequirement per step
Labor Machine requirement
Preparation of Raw Material 1 worker --
Corn Pellet Making 2 workers Pellet mill
Material Blending 2 workers Blending machine
Extrusion and Printing 2 workers 2 in 1 Plastic filmblowing extruder andprinting machine
Plastic Bag Shaping 2 workers Plastic bag makingmachine
Quality Control Inspection 1 worker --
Packaging 3 workers --
Storing 3 workers --
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
18/27
101pellets now contain all the materials needed to produce the plastic
films.
2. Material Blending
Two (2) workers are needed in this step. All the raw
materials with their proper amount will be mixed all together using
the blending machine to be operated by one worker and supported
and directed by the other two workers.
4. Extrusion
Two (2) workers are needed in extrusion, one will operate
the machine, and the other will be the support and the lookout of
the process. In this process, the raw materials are being
transformed into a plastic.
5. Printing
Two (2) workers are needed in the printing process, one
worker will operate the machine and the other will be the supporter
and the lookout of the process. This process includes the printing of
the brand logo in the plastic shopping bag.
6. Plastic Bag shaping
Two (2) workers are needed as well to complete the
process. The plastic are being shaped into bags in these step and
one worker will be operating the machine and the other will be the
support.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
19/27
1027. Quality Control Inspection
The production supervisor will be the one to do the
inspection; the product will be inspected and tested for its quality
assurance.
8. Packaging
When there are orders already, three (3) workers are
needed to package the plastic shopping bags considering the
proper sizes and proper number needed to be packaged. It will be
put inside a box and ready for its delivery.
9. Storing
After the quality has been ensured, the plastic shopping
bags will now be stored in the storage room and ready for sale. All
the three workers are in charged for its storage.
Office and Plant Location
The location of the proposed business will be at Doa Remedios
Trinidad Highway, Baliuag, Bulacan. The place can accommodate all
production requirements as well as the office where the proponents will do
office works.
With regard to the raw materials, the proponents already contacted
the supplier for the corn kernels from Mr. Edgardo H. Cruz, a Corn and
Vegetable Dealer at 0035 National Road, Sulucan, Angat, Bulacan. The
chosen place of the proponents can be one of their advantages since the
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
20/27
103supplier and the plant is located in only one city and the transportation of
the raw materials will not be difficult for the proponents.
To Manila To SM Baliuag
Dona Trinidad Remedios Highway
FreewayMitsubishi
Motors Corp
FIGURE 4.4
Vicinity Map
Office and Plant Layout
The manufacturing plant will be located at the backside while the
office will be located in front of the manufacturing plant. To ensure smooth
flow of operations, the production areas on the first floor are arranged
according to the chronological order of the manufacturing process. There
will be stock rooms for the raw materials and finished goods. There are
also wash areas for the staff. There will be fire exits and comfort rooms
located in the manufacturing plant and office.
The top and middle management will have their respective offices
in front of the manufacturing plant. There will be a lounging area for the
managers and the staff.
CAMADA Ltd.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
21/27
104
FIGURE 4.5
Office and Plant Layout
A = 324 Square Meters
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
22/27
105Office/ Workers Quarter
This is a room used for business activity of the managers,
supervisors, officers and staffs. Each personnel will have his/her
corresponding area division in the office to facilitate different tasks and
responsibilities. Ordering, turnover of sales, compensation, purchasing,
business meeting, and different business transactions will be held here.
Production workers will also have separate area for resting and eating.
Production Area
This is the most important part of the site which should give a good
working atmosphere for better production of product. Most of the
machineries and equipment are here for conducting the different
production process. Each area is provided with enough space and it is
placed strategically based on the flow of production process.
Comfort Room
The comfort room will only have a toilet bowl, urinals and sink. All
the employees are obliged to properly use the comfort room for
everyones convenience.
Warehouse
This is where basically the finished product are being stored for
delivery. This is strategically placed beside the parking lot which serves as
landing dock in loading the package product to the delivery truck.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
23/27
106Stockroom
The stockroom will be divided for the raw materials: corn,
chemicals, and rejected products. The rejected product with a light defects
will be sold for a low cost. The stock room is 100 square meter and has
the capacity to store 100 sacks of corn a month.
Parking Lot
This is where the truck parks and also for loading purposes. This is
strategically placed near the warehouse for faster loading of the boxes for
the delivery. It measures 20 square meters that can occupy a truck and 3
cars.
Production Schedule
This is the area where it identifies the production capacity of the
proposed business. It also indicates the time to be consumed for every
step of the process and the total time it takes to produce a unit.
The business will start to operate from 8:00 in the morning up to
5:00 in the afternoon, with one (1) hour break, from Monday to Saturday.
A worker can produce 43 units of biodegradable shopping bags per
minute. In an 8-hour work a day, a worker can produce 20,833 units per
day (43 units per minute x 480 minutes per work day). For one year, it is
assumed to have 314 days since the company implements a 6-day work a
week. So in one year a worker can produce approximately 6,541,562 units
(20,833 units per day x 314 days in a year). Since there are 6 production
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
24/27
107workers in the company and each one can produce 6,541,562 units per
year, the annual production capacity of the company is 39,249,372.
ANNUAL PRODUCTION CAPACITY
20,833 units per day x 314 days in a year x 6 workers= 39,249,372 pieces
of biodegradable shopping bags
Steps Time allotted
Material blending 15 seconds
Corn pellet making 10 seconds
Extrusion 10 seconds
Printing 15 seconds
Bag making 10 seconds
Total 60 seconds
In a minute, 43 units of plastic bags can be produced. The process
to produce the product will start at the material blending (15 seconds),
followed by corn pellet making (10 seconds), then extrusion (10 seconds),
next is printing (15 seconds), lastly, bag making (10 seconds), and the
total is 60 seconds. Each process can produce 43 units, this estimate was
from a plastic manufacturer, because in one roll of plastic film, is 430
inches, and each plastic bag (small) is 10 inches, so 43 units of plastic can
be produced in a minute.
Utilities and Waste Disposal
Operation of the business necessitates the usage of utilities.
Utilities include telephone and internet connection, power and water
consumption. These are all important requirements for the manufacturer to
operate its production.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
25/27
108Telephone and internet connection work together and are important
in a business. These are vital in every business as means of reaching out
and transacting to consumers and suppliers, and for the purpose of
promotion.
Water supply is also necessary to a business. Water will be used
for mixing of raw materials and also for cleaning and hygiene purposes.
Thus, it is essential for the production of biodegradable shopping bags
from corn kernels keeping the establishments clean.
The following are the estimated monthly utilities expense of the
business:
TABLE 4.12
Utilities Expenses
Utility Company Monthly Bill Total (Annual)
Telephone andDSL Connection
PLDT Php 999.00 Php 11,988.00
Electricity MERALCO 10,000.00 120,000.00Water BWD 6,570. 00 78,840
TOTAL Php 210,828.00
Zero-waste management will be observed by the proposed
business. Accordingly, Residual of material produced after the production
will be properly disposed. The Company should observe the policies and
regulations of proper waste disposal in the place. Recycled wastes such
as papers, cartons and boxes will be reused or will be bought by its
supplier for reprocessing.
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
26/27
109Unit Production Cost
TABLE 4.15
Unit Production Cost
Manufacturing Overhead Costper Piece
Total Cost
Direct Materials (per piece)Corn KernelsSulfuric AcidVinyl Acetate/EthylenePrinting CostTotal
Php 0.090.040.240.25
Php 0.62
Direct LaborNumber of Direct Labor
Number of Working DaysMinimum WageDirect Labor CostPieces Produced per MonthTotal
6
24336
48,384500,000
0.10
Direct Utilities (per piece)ElectricityWaterTotal
0.100.090.25 0.44
Total Manufacturing Cost Per Piece 0.91
Manufacturing overhead consists of direct materials, direct labor
and direct utilities. The proponent have asked a plastic producer for some
estimates regarding the production of the product.
In direct materials, the raw materials are the corn kernels which
when bought will cost Php289.50 per sack. 160 sacks with the price of
Php46,320 divided into 500,000 pieces of plastic made in a month will be
equal to 0.09 as shown in the table for corn kernels. 1000 kilos of
sulphuric acid costs Php10,782. 2000 kilos are needed in a month so it is
multiplied by 2 equal to Php21,564divided by 500,000 pieces of plastic is
-
8/13/2019 Done-chapter 4 Pp 84-110 (1)
27/27
1100.04. A kilogram of vinyl acetate/ethylene costs Php60 multiplied by 2000
kgs, because 2000 kgs of vinyl acetate is needed to produce 500,000
pieces of plastic shopping bags per month. This will be equivalent to
Php120,000 per month. Php120,000 was divided to 500,000 pieces per
month equal to Php0.24per piece as shown in the table. Same as vinyl
acetate, 2000 kgs of water are needed for 500,000 pieces of the product
per month. Printing cost was estimated to be Php0.25.
In direct labor, there are 6 workers that work 24 days per month
with a minimum wage of Php336, when multiplied, direct labor cost is
Php48,384per monthdivided by 500,000 pieces of product produced per
month is Php0.10 as reflected on the table above.
Lastly, for direct utilities, Baliuags water rate is Php21.90 per cubic
meter multiplied by 300 hours is Php6,570 divided by 500,000 pieces of
product produced in a month is Php0.09. For electricity, the rate is
Php2.00 per kilowatt hour. According to meralco appliance calculator
formula shown below, Php50,000 will be the cost of electricity per month
divided by 500,000 pieces per month is Php0.10.
Formula: Cost per hour = rate x (appliance wattage/1000)
Cost per hour = 2.00 x (10,000 watts / 1000)= Php50 per hour
Php50 per hour multiplied by 192 working hours per month is Php9600.
Php9,600 multiplied by 5 machines = Php48,000
Php48,000 + Php2,000 for office electricity = Php50,000