    CHAPTER 4

    The Technical Aspect

    This chapter presents the production aspect as it refers to the

    whole operation of the business. It is concerned with estimating the total

    product cost and enumerating the major items of the capital cost. This

    aspect also includes the discussion of the planned specifications, raw

    materials, manufacturing process, buildings and facilities, machinery and

    equipment, labor requirements for production, plant and office location

    with layouts, production schedule and annual production capacity, utilities

    needed, methods of waste disposal, and unit production cost.

    Objectives of the Technical Aspect

    1. To determine the components needed to produce the product.

    2. To determine the steps in manufacturing the product.

    3. To identify the machines are required for production.

    4. To know the facilities required by the business.

    5. To establish the factorys layout where the production will be

    facilitated.

    6. To determine the schedule of production.

    7. To identify where the raw materials come from.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    2/27

    85Technical Specifications of the Product

    The product, MaiSpot, a biodegradable shopping bag, will take the

    usual form of those plastics that are already available in the market which

    has rectangular shape with a handle on one edge of the plastic as it

    deemed to be the most efficient design. 60 pieces of biodegradable

    shopping bags will compose a pack and it will be placed in another

    packaging bag. This comes in different colors like red, blue, green and

    yellow depending on the order of the customer. The size also depends on

    the order of the customer; small, medium, large are all available.

    Raw Materials

    The process of making biodegradable plastics is the same as the

    process of making a non-biodegradable plastic. The proposed product

    only differed in its main content which is starch, in order to make the

    plastic biodegrade. The proposed product in a simple saying is a starch

    bag. The raw materials needed in making biodegradable shopping bags

    from corn kernels are the following:

    1. Corn Kernels

    Granules are in light yellow and come in cylinder and round

    shape obtained from the plant corn. It has starch, protein and fiber

    content rich in polylactid acid (PLA), an essential part of a starch-

    based plastic.

    2. Sulfuric Acid

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    3/27

    86This extends the time for corn kernels to be heated which

    loses bond within the kernel breaking it down to starch, protein and

    fiber.

    3. Ethylene Vinyl Acetate (EVA)

    Ethylene vinyl acetate (also known as EVA) is theco-

    polymer ofethylene andvinyl acetate. The weight percent vinyl

    acetate usually varies from 10 to 40%, with the remainder being

    ethylene. Synthesis means that "something is put together," and

    synthetic materials are made of building blocks that are put

    together in factories. EVA will stand as the Synthetic Polymer. Such

    properties as density and molecular weight, and they can be made

    into a huge variety of plastic products. A number of Ethylene will

    create a polyethylene.

    It is apolymer that approacheselastomeric materials in

    softness and flexibility, yet can be processed like

    otherthermoplastics. The material has good clarity and gloss, low-

    temperaturetoughness, stress-crack resistance, hot-

    meltadhesive water proof properties, and resistance toUV

    radiation

    4. Water

    It is used to mix all the dried ingredients at the desired level

    of concentration.

    http://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Ethylenehttp://en.wikipedia.org/wiki/Vinyl_acetatehttp://en.wikipedia.org/wiki/Polymerhttp://en.wikipedia.org/wiki/Elastomerhttp://en.wikipedia.org/wiki/Thermoplastichttp://en.wikipedia.org/wiki/Toughnesshttp://en.wikipedia.org/wiki/Adhesivehttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/UV_radiationhttp://en.wikipedia.org/wiki/Adhesivehttp://en.wikipedia.org/wiki/Toughnesshttp://en.wikipedia.org/wiki/Thermoplastichttp://en.wikipedia.org/wiki/Elastomerhttp://en.wikipedia.org/wiki/Polymerhttp://en.wikipedia.org/wiki/Vinyl_acetatehttp://en.wikipedia.org/wiki/Ethylenehttp://en.wikipedia.org/wiki/Heteropolymerhttp://en.wikipedia.org/wiki/Heteropolymer
  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    4/27

    87TABLE 4.1

    Raw Materials Required for Annual Production

    Description Quantity Unit Cost

    (per kilo)

    Total Cost

    Corn Kernels 48,000 kgs Php 11.58 Php 555,840.00

    Sulfuric Acid 24,000 kgs 10.78 258,728.00

    VinylAcetate/Ethylene

    24,000 kgs 60.00 1,440,000.00

    TOTAL Php 2,254,568.00

    Manufacturing Process

    Below is the manufacturing process for producing the product:

    1. Preparation of Raw Materials

    Corn pellets must be prepared first. In order to have corn

    pellets, the corn kernels should be heated with water with

    sulfuric acid with more than 100 degrees. This will make the

    kernels loose a tight bond breaking it down to fiber, protein and

    starch.

    2. Material Blending

    After the corn kernels

    have been heated up, it will

    be mixed with ethylene vinyl

    acetate and some water

    afterwards making it a liquid

    mixture.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    5/27

    883. Corn Pellet Making

    When the mixture is

    done, it will be put inside a

    pellet mill to make it look like

    pellets that will be used for

    the production of the

    shopping bags. The pellets

    now contain all the materials

    needed to produce the plastic

    films.

    4. Extrusion

    The corn pellets will be

    treated into molten form at

    high temperature. It goes out

    at the shape of a bubble full of

    cool air that comes from the

    air ring. This air stream helps

    to blow the bubble up and cool

    down the plastic. The step is very important because it can

    affect the strength, thickness consistence and transparency of

    the film. The bubble goes through cooling tower of 25 - 35 feet

    tall. At the top of the tower, it is guided to be flattened gradually

    to form flat shape. The lay-flat film travels over a number of

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    6/27

    89rollers. With simple bag, it is often printed, sealed and

    perforated at the same time of extrusion.

    The device used in this step is called an extruder, it

    forces softened plastic through a shaped dye from which it may

    emerge in almost any form, including a circular rod or tube, and

    a wide, flat sheet. The driving force is supplied by a screw which

    provides constant pressure. All extrusion products have a

    regular cross section. A variation on this method is extrusion

    blow molding, in which a plastic tube produced by extrusion is

    sealed around a blowing tube and expanded to the shape of a

    mold with compressed air.

    5. Printing

    The films will be

    printed right away after it

    has gone extrusion because

    it is a 2 in 1 extruding and

    printing machine. It will be

    printed with its brand name

    MaiSupot. The plastic bag

    will be treated by flexo- printing because its just in small

    quantity. Flexo printing is a form ofprinting process which

    utilizes a flexiblerelief plate, it means that it will be embossed

    on the shopping bag. It is essentially a modern version of

    http://en.wikipedia.org/wiki/Printinghttp://en.wikipedia.org/wiki/Relief_printhttp://en.wikipedia.org/wiki/Relief_printhttp://en.wikipedia.org/wiki/Printing
  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    7/27

    90letterpress which can be used for printing on almost any type of

    substrate, including plastic, metallic films, cellophane, and

    paper.

    6. Plastic Bag Shaping

    Here, the printed plastic films are shaped into a bag with

    their corresponding sizes, small, medium and large.

    7. Quality Control Inspection

    Each product will pass through inspection. The

    acceptance or rejection of plastic bags will take place here

    through the production supervisor. This will depend on how the

    plastic bag looks like, its durability, appearance, etc.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    8/27

    918. Packaging

    The workers are needed to be packaged in the plastic

    shopping bags considering 60 pieces of plastic bags per pack. It

    will be put inside a recycled paper and ready for purchase or

    delivery

    9. Storing

    The plastic shopping bags will be stored in the storage

    room after it has been packaged and assured of good quality.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    9/27

    92

    FIGURE 4.1

    Production Process Flowchart

    Building and Facilities

    The proposed company will be renting a one-story building located

    at Doa Remedios Trinidad Highway, Baliuag, Gitnang Luzon. The

    proponents will rent the building with a monthly rental fee of Php50,000.

    The floor area is 324 square meters. The manufacturing site is an old one

    so it will undergo renovation. The renovation will require lumber, plywood,

    Preparation of RawMaterials

    Materials Blending

    Corn Pellet making

    Extrusion

    Printing

    Plastic Bag Making

    Quality ControlInspection

    Packaging

    Storing

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    10/27

    93cement, bricks, sand and gravel, window, door, electrical wire and outlet,

    sink and faucet, and toilet bowl. Dividers will be used to construct the

    different offices and rooms. A stock room for raw materials and finished

    goods will be located beside the office area together with the machines,

    preparation, sanitary area, toilet and wash area which is main plant site.

    TABLE 4.2

    Materials Required for Renovation

    Description Quantity Unit Cost Total Cost

    Lumber 10 Php 100 Php 1,000

    Ply Wood 15 250 3,750

    Cement 3 1,250 3,750

    Bricks 30 80 2,400

    Sand and Gravel 5 250 1,250

    Window 15 230 3,450

    Door 8 500 4,000

    Electrical Wire 5m 20 100

    Electrical outlet 10 20 200

    Sink 5 200 1,000

    Faucet 5 70 350

    TOTAL Php 21,250

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    11/27

    94

    FIGURE 4.2

    Office (Front View)

    FIGURE 4.3

    Manufacturing Site (Side View)

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    12/27

    95Machinery and Equipment

    The following are the machineries and equipment needed to

    manufacture the biodegradable plastic shopping bag.

    TABLE 4.3

    Office Supplies

    Description Quantity Unit Cost Total Cost

    Ball Pen 1 box (50pcs) Php 137.50 Php 137.50

    Bond Paper (short) 1 ream (500pcs) 155.00 155.00

    Bond Paper (long) 1 ream (500pcs) 175.00 175.00

    Column Journal 2 pads 25.00 50.00

    Columnar Ledger 2 pads 22.00 44.00

    Fastener 2 boxes 25.00 50.00

    File Folder (short) 25 pcs 3.50 87.50

    File Folder (long) 25 pcs 4.00 100.00

    Packaging Tape 6 rolls 25.00 75.00

    Paper Clip 2 boxes 8.00 16.00

    Pencil 1 box (12pcs) 68.75 68.75

    Permanent Marker 3 pcs 39.00 117.00

    Puncher 1 pc 85.00 85.00

    Record Book 2pcs(1000leaves)

    80.00 160.00

    Scotch Tape 3pcs 20.00 60.00

    Staple Wire 3 boxes 5.00 15.00

    Stapler 3 pcs 45.00 135.00

    Scissor 3 pairs 16.00 48.00

    Yellow Paper 3 pads 22.00 66.00

    TOTAL Php 1,644.75

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    13/27

    96TABLE 4.4

    Office Equipment

    Description Quantity Unit Cost Total Cost

    Desktop Computer(HP Compaq)

    1 Php 10,000.00 Php 10,000.00

    Printer (CanonPIXMA Ip2770)

    1 2,195.00 2,195.00

    Calculator 3 150.00 450.00

    TOTAL Php 12,645.00

    TABLE 4.5

    Office Furniture and Fixtures

    Description Quantity Unit Cost Total Cost

    Air Conditioner(Abenson)

    1 Php 11,000.00 Php 11,000.00

    Computer Tableand Chair

    1 1,115.00 1,115.00

    Filing Cabinet 1 1000.00 1000.00

    Fire Extinguisher 1 1,500.00 1,500.00

    Office Chair 4 500.00 2,000.00

    Office Table 4 1,000.00 4,000.00

    Plastic Chairs 3 100.00 300.00

    Trash Can 1 75.00 75.00

    TOTAL Php 20,990.00

    TABLE 4.6

    Factory Equipment

    Description Quantity Unit Cost Total Cost

    Knives 3 pcs Php 100.00 Php 300.00

    Weighing Scale 2 pcs 2500.00 5,000.00

    Corn Kernels 4000 kgs(160sacks)

    11.58 (per kilo) 46,320.00

    Sulphuric Acid 2000 kgs 10.78 (per kilo) 21,560.00

    VinylAcetate/Ethylene

    2000 kgs 60.00 (per kilo) 120,000.00

    TOTAL Php 193,180.00

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    14/27

    97TABLE 4.7

    Factory Machinery

    Description Quantity Unit cost Total cost

    Blending Machine 1 Php60,000.00 Php60,000.002 in 1 Plastic FilmBlowing Extruderand PrintingMachine

    1 400,000.00 400,000.00

    Plastic Bag MakingMachine

    1 134,000.00 134,000.00

    Pellet Mill 1 43,000 43,000

    TOTAL Php 637,000.00

    TABLE 4.8

    Factory Furniture and Fixtures

    Description Quantity Unit Cost Total Cost

    Ceiling Fan 3 Php 800.00 Php 2,400.00

    Exhaust Fan 2 500.00 1,000.00

    Fire Extinguisher 1 1,500.00 1,500.00

    Plastic Chairs 3 100.00 300.00

    Working Table 1 500.00 500.00

    TOTAL Php 5,700.00

    TABLE 4.9

    Factory Supplies

    Description Quantity Unit Cost Total Cost

    Gloves 12 pairs Php 25.00 Php 300.00

    Face Mask 12 pieces 25.00 300.00

    TOTAL Php 600.00

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    15/27

    98

    FIGURE 4.4

    Factory Machinery

    Blending Machine Big cooling tank Double speed motor Electric heating

    Total Volume(L) 300/1000

    Stirring Speed(rpm) 475/950/80

    Pellet Mill

    No water/binder/drying

    Hydraulic/physical press

    High strength/pressure

    Dimension (l*w*h)(mm)

    1850*1500*1650

    Total Weight (t) 7-8

    2 in 1 Plastic Film Blowing Extruder and

    Printing Machine

    Screw diameter: 50mm

    Ratio: 28:1

    Die head: 50-100mm

    Total Power 32kw

    Blow Film Motor Power 11kw

    Max. Extruded Quantity 50kg/h

    Plastic Bag Making Machine

    High speed: 440 bags per minute

    bag with Printed logo

    To work in double line

    Cutting thickness0.01 ~ 0.04

    (single layer)

    Max. Cutting length(MM):

    800

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    16/27

    99Labor Requirements for Production

    The production of biodegradable plastic shopping bag made from

    corn kernels requires both direct and indirect labor together with the

    designated positions, hourly rates, and required hours in month, total

    salaries and total labor cost.

    TABLE 4.10

    Total Annual Labor Cost

    Position No. HourlyRate

    Hours ofWorking

    (per year)

    Total AnnualCost

    Production Workers(Direct Labor) 6 Php 42.00 2,304 Php 580,608

    Production Supervisor(Indirect Labor) 1 95.75 2,304 216,000

    Total Labor Cost Php 796,608

    Table 4.10 shows the total labor cost of direct and indirect workers

    of the proposed business. The direct labor cost consists of six (6)

    production workers who do the labor directly in the production process

    while indirect labor consist of one (1) production supervisor. The direct

    and indirect labor costs were computed by multiplying the hours of

    working per year (8 hours per day x 6 days per week x 4 weeks per month

    x 12 months per year), hourly rate and the number of the workers.

    All production workers together with the production supervisor will

    undergo a one-month training in order to be familiar and expert in the

    production process. The training includes briefing of their jobs, details of

    the companys mission & vision, familiarization of the company rules and

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    17/27

    100policies and also all the additional benefits and rewards that will be entitled

    to them after meeting the requirements of their work.

    TABLE 4.11

    Labor and Machinery per step

    Table 4.11 shows the various processes needed to produce the

    product with the needed worker for each and the machine needed as well.

    1. Preparation of Raw Materials

    One (1) worker is needed to prepare the corn pellets needed

    in making biodegradable plastics; one to heat the corn kernels and

    one to prepare it for the next step.

    2. Corn Pellet Making

    Two (2) workers are needed in this step. When the mixture is

    done, it will be put inside a pellet mill to make it look like pellets

    that will be used for the production of the shopping bags. The

    ProcedureRequirement per step

    Labor Machine requirement

    Preparation of Raw Material 1 worker --

    Corn Pellet Making 2 workers Pellet mill

    Material Blending 2 workers Blending machine

    Extrusion and Printing 2 workers 2 in 1 Plastic filmblowing extruder andprinting machine

    Plastic Bag Shaping 2 workers Plastic bag makingmachine

    Quality Control Inspection 1 worker --

    Packaging 3 workers --

    Storing 3 workers --

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    18/27

    101pellets now contain all the materials needed to produce the plastic

    films.

    2. Material Blending

    Two (2) workers are needed in this step. All the raw

    materials with their proper amount will be mixed all together using

    the blending machine to be operated by one worker and supported

    and directed by the other two workers.

    4. Extrusion

    Two (2) workers are needed in extrusion, one will operate

    the machine, and the other will be the support and the lookout of

    the process. In this process, the raw materials are being

    transformed into a plastic.

    5. Printing

    Two (2) workers are needed in the printing process, one

    worker will operate the machine and the other will be the supporter

    and the lookout of the process. This process includes the printing of

    the brand logo in the plastic shopping bag.

    6. Plastic Bag shaping

    Two (2) workers are needed as well to complete the

    process. The plastic are being shaped into bags in these step and

    one worker will be operating the machine and the other will be the

    support.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    19/27

    1027. Quality Control Inspection

    The production supervisor will be the one to do the

    inspection; the product will be inspected and tested for its quality

    assurance.

    8. Packaging

    When there are orders already, three (3) workers are

    needed to package the plastic shopping bags considering the

    proper sizes and proper number needed to be packaged. It will be

    put inside a box and ready for its delivery.

    9. Storing

    After the quality has been ensured, the plastic shopping

    bags will now be stored in the storage room and ready for sale. All

    the three workers are in charged for its storage.

    Office and Plant Location

    The location of the proposed business will be at Doa Remedios

    Trinidad Highway, Baliuag, Bulacan. The place can accommodate all

    production requirements as well as the office where the proponents will do

    office works.

    With regard to the raw materials, the proponents already contacted

    the supplier for the corn kernels from Mr. Edgardo H. Cruz, a Corn and

    Vegetable Dealer at 0035 National Road, Sulucan, Angat, Bulacan. The

    chosen place of the proponents can be one of their advantages since the

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    20/27

    103supplier and the plant is located in only one city and the transportation of

    the raw materials will not be difficult for the proponents.

    To Manila To SM Baliuag

    Dona Trinidad Remedios Highway

    FreewayMitsubishi

    Motors Corp

    FIGURE 4.4

    Vicinity Map

    Office and Plant Layout

    The manufacturing plant will be located at the backside while the

    office will be located in front of the manufacturing plant. To ensure smooth

    flow of operations, the production areas on the first floor are arranged

    according to the chronological order of the manufacturing process. There

    will be stock rooms for the raw materials and finished goods. There are

    also wash areas for the staff. There will be fire exits and comfort rooms

    located in the manufacturing plant and office.

    The top and middle management will have their respective offices

    in front of the manufacturing plant. There will be a lounging area for the

    managers and the staff.

    CAMADA Ltd.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    21/27

    104

    FIGURE 4.5

    Office and Plant Layout

    A = 324 Square Meters

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    22/27

    105Office/ Workers Quarter

    This is a room used for business activity of the managers,

    supervisors, officers and staffs. Each personnel will have his/her

    corresponding area division in the office to facilitate different tasks and

    responsibilities. Ordering, turnover of sales, compensation, purchasing,

    business meeting, and different business transactions will be held here.

    Production workers will also have separate area for resting and eating.

    Production Area

    This is the most important part of the site which should give a good

    working atmosphere for better production of product. Most of the

    machineries and equipment are here for conducting the different

    production process. Each area is provided with enough space and it is

    placed strategically based on the flow of production process.

    Comfort Room

    The comfort room will only have a toilet bowl, urinals and sink. All

    the employees are obliged to properly use the comfort room for

    everyones convenience.

    Warehouse

    This is where basically the finished product are being stored for

    delivery. This is strategically placed beside the parking lot which serves as

    landing dock in loading the package product to the delivery truck.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    23/27

    106Stockroom

    The stockroom will be divided for the raw materials: corn,

    chemicals, and rejected products. The rejected product with a light defects

    will be sold for a low cost. The stock room is 100 square meter and has

    the capacity to store 100 sacks of corn a month.

    Parking Lot

    This is where the truck parks and also for loading purposes. This is

    strategically placed near the warehouse for faster loading of the boxes for

    the delivery. It measures 20 square meters that can occupy a truck and 3

    cars.

    Production Schedule

    This is the area where it identifies the production capacity of the

    proposed business. It also indicates the time to be consumed for every

    step of the process and the total time it takes to produce a unit.

    The business will start to operate from 8:00 in the morning up to

    5:00 in the afternoon, with one (1) hour break, from Monday to Saturday.

    A worker can produce 43 units of biodegradable shopping bags per

    minute. In an 8-hour work a day, a worker can produce 20,833 units per

    day (43 units per minute x 480 minutes per work day). For one year, it is

    assumed to have 314 days since the company implements a 6-day work a

    week. So in one year a worker can produce approximately 6,541,562 units

    (20,833 units per day x 314 days in a year). Since there are 6 production

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    24/27

    107workers in the company and each one can produce 6,541,562 units per

    year, the annual production capacity of the company is 39,249,372.

    ANNUAL PRODUCTION CAPACITY

    20,833 units per day x 314 days in a year x 6 workers= 39,249,372 pieces

    of biodegradable shopping bags

    Steps Time allotted

    Material blending 15 seconds

    Corn pellet making 10 seconds

    Extrusion 10 seconds

    Printing 15 seconds

    Bag making 10 seconds

    Total 60 seconds

    In a minute, 43 units of plastic bags can be produced. The process

    to produce the product will start at the material blending (15 seconds),

    followed by corn pellet making (10 seconds), then extrusion (10 seconds),

    next is printing (15 seconds), lastly, bag making (10 seconds), and the

    total is 60 seconds. Each process can produce 43 units, this estimate was

    from a plastic manufacturer, because in one roll of plastic film, is 430

    inches, and each plastic bag (small) is 10 inches, so 43 units of plastic can

    be produced in a minute.

    Utilities and Waste Disposal

    Operation of the business necessitates the usage of utilities.

    Utilities include telephone and internet connection, power and water

    consumption. These are all important requirements for the manufacturer to

    operate its production.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    25/27

    108Telephone and internet connection work together and are important

    in a business. These are vital in every business as means of reaching out

    and transacting to consumers and suppliers, and for the purpose of

    promotion.

    Water supply is also necessary to a business. Water will be used

    for mixing of raw materials and also for cleaning and hygiene purposes.

    Thus, it is essential for the production of biodegradable shopping bags

    from corn kernels keeping the establishments clean.

    The following are the estimated monthly utilities expense of the

    business:

    TABLE 4.12

    Utilities Expenses

    Utility Company Monthly Bill Total (Annual)

    Telephone andDSL Connection

    PLDT Php 999.00 Php 11,988.00

    Electricity MERALCO 10,000.00 120,000.00Water BWD 6,570. 00 78,840

    TOTAL Php 210,828.00

    Zero-waste management will be observed by the proposed

    business. Accordingly, Residual of material produced after the production

    will be properly disposed. The Company should observe the policies and

    regulations of proper waste disposal in the place. Recycled wastes such

    as papers, cartons and boxes will be reused or will be bought by its

    supplier for reprocessing.

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    26/27

    109Unit Production Cost

    TABLE 4.15

    Unit Production Cost

    Manufacturing Overhead Costper Piece

    Total Cost

    Direct Materials (per piece)Corn KernelsSulfuric AcidVinyl Acetate/EthylenePrinting CostTotal

    Php 0.090.040.240.25

    Php 0.62

    Direct LaborNumber of Direct Labor

    Number of Working DaysMinimum WageDirect Labor CostPieces Produced per MonthTotal

    6

    24336

    48,384500,000

    0.10

    Direct Utilities (per piece)ElectricityWaterTotal

    0.100.090.25 0.44

    Total Manufacturing Cost Per Piece 0.91

    Manufacturing overhead consists of direct materials, direct labor

    and direct utilities. The proponent have asked a plastic producer for some

    estimates regarding the production of the product.

    In direct materials, the raw materials are the corn kernels which

    when bought will cost Php289.50 per sack. 160 sacks with the price of

    Php46,320 divided into 500,000 pieces of plastic made in a month will be

    equal to 0.09 as shown in the table for corn kernels. 1000 kilos of

    sulphuric acid costs Php10,782. 2000 kilos are needed in a month so it is

    multiplied by 2 equal to Php21,564divided by 500,000 pieces of plastic is

  • 8/13/2019 Done-chapter 4 Pp 84-110 (1)

    27/27

    1100.04. A kilogram of vinyl acetate/ethylene costs Php60 multiplied by 2000

    kgs, because 2000 kgs of vinyl acetate is needed to produce 500,000

    pieces of plastic shopping bags per month. This will be equivalent to

    Php120,000 per month. Php120,000 was divided to 500,000 pieces per

    month equal to Php0.24per piece as shown in the table. Same as vinyl

    acetate, 2000 kgs of water are needed for 500,000 pieces of the product

    per month. Printing cost was estimated to be Php0.25.

    In direct labor, there are 6 workers that work 24 days per month

    with a minimum wage of Php336, when multiplied, direct labor cost is

    Php48,384per monthdivided by 500,000 pieces of product produced per

    month is Php0.10 as reflected on the table above.

    Lastly, for direct utilities, Baliuags water rate is Php21.90 per cubic

    meter multiplied by 300 hours is Php6,570 divided by 500,000 pieces of

    product produced in a month is Php0.09. For electricity, the rate is

    Php2.00 per kilowatt hour. According to meralco appliance calculator

    formula shown below, Php50,000 will be the cost of electricity per month

    divided by 500,000 pieces per month is Php0.10.

    Formula: Cost per hour = rate x (appliance wattage/1000)

    Cost per hour = 2.00 x (10,000 watts / 1000)= Php50 per hour

    Php50 per hour multiplied by 192 working hours per month is Php9600.

    Php9,600 multiplied by 5 machines = Php48,000

    Php48,000 + Php2,000 for office electricity = Php50,000