dongah geological company brochure
DESCRIPTION
Dong-Ah Geological Engineering Company Ltd. is a Korea-based company engaged in the construction business. The Company's principal activities consist of soil surveys and tests, which include ground drilling investigations, maritime drilling investigations, physical explorations, pile load tests, plate bearing tests, permeability tests and others; design services, which include design of civil engineering structures, roads, airports, water supplies, harbors, railroads and others, and construction and civil engineering works, which are engaged in the construction of subways, railroads, roads, power plants, sewage treatment plants, power transmission lines, industrial complexes and others. It is also engaged in environment business, including manufacture of water treatment systems, wastewater reclamation and reusing systems, as well as treatment and recycling systems for tunnel wastewater.TRANSCRIPT
Dongah Geological Dongah Geological g gEngineering Co.
g gEngineering Co. g gg g
Since 1971 in Busan, Korea,
ContentsContents
I C P filC P filI Company ProfileCompany Profile
II AccreditationAccreditation
III Business ActivitiesBusiness Activities
IV Performance in OverseasPerformance in Overseas
Page 2
I Company ProfileCompany Profile
Key Organizationy g
Global Network
Human Resources
Major Fields of Services
Major Construction Equipment Owned
Page 3
I. Company ProfileI. Company Profile
Key Organization
CEO CEO CEO
DOMESTICDIVISION
OVERSEASDIVISION ENGINEERINGDIVISION DIVISION
Page 4
I. Company ProfileI. Company Profile
Global Network
Libya
EgyptAbu Dhabi
Korea
Nigeria
y
Palau
Cambodia
Philippines
PalauQatar India
Singapore
Vietnam
:Completed Projects
: Ongoing Projects & Overseas offices
Page 5
I. Company ProfileI. Company Profile
Major Fields of ServicesConstructionConstruction
Trenchless Tunneling Work
Drill & Blast Works
ConstructionConstruction
Ground Improvement
Ground Support & Structure Foundationpp
Existing Road Crossing Passage
EngineeringEngineeringGeotechnical Investigation
Design
g gg g
g
W t E i i
Water EngineeringWater Engineering
Page 6
Water Engineering
I. Company ProfileI. Company Profile
Human Resources( 443 Persons)
E i Q lifi i H d( )Expertise Qualification Head(s)
PROFESSIONAL ENGINEER
GEOTECHNICAL & CIVIL ENG GEOLOGICAL SCIENCE 7ENGINEER GEOLOGICAL SCIENCE
PH. DR ENGINEERING SCIENCE 6
ENGINEER & STAFF CIVIL AND ENVIRONMENT ETC. 167
TECHNICIAN SURVEY, LAB. 63
OPERATOR VARIOUS TYPES OF EQUIPMENT 200
Page 7
Q
I. Company ProfileI. Company Profile
Major Construction Equipment
( )
Trenchless Tunneling Works
Equipment Specification Unit(s)
SEMI-SHIELD MACHINE SLURRY TYPE(Φ400~2400) 30
SEMI-SHIELD MACHINE OPEN TYPE(Φ2600) 1
SHIELD MACHINE SLURRY TYPE(Φ3.53/7.83) 3
SHIELD MACHINE EPB(Φ 4 34/ 7 83/ 7 93) 3SHIELD MACHINE EPB(Φ 4.34/ 7.83/ 7.93) 3
DOUBLE SHIELD MACHINE OPEN (Φ3.55/4.55) 3
Page 8
I. Company ProfileI. Company Profile
Major Construction Equipment
i S i i i i ( )
Drill & Blast Works
Equipment Specification Unit(s)
JUMBO DRILL 2-BOOM/3-BOOM 3
CHARGING CAR 1~2-BOOM BASKET 3
SHOTCRETE MACHINE 25㎥/HR 1
COMPRESSOR 600~825 cfm 3COMPRESSOR 600~825 cfm 3
Page 9
I. Company ProfileI. Company Profile
Major Construction Equipment
( )
Ground Improvement
Equipment Specification Unit(s)
PILE DRIVER 135 P 7
PILE DRIVER 170 P 1
OFF SHORE PILE DRIVER 67×32×5m/66×23×3.5m 2
EARTH AUGER 300 250 240 200 HP 25EARTH AUGER 300, 250, 240, 200 HP 25
UJS MACHINE PILE MAN 1
Page 10
I. Company ProfileI. Company Profile
Major Construction Equipment
Ground Support & Structure Foundation
E i S ifi i U i ( )Equipment Specification Unit(s)
DRILLING RIG BG 28,36,40/SD515/DBM18S 6
CASING ROTATOR SCR-1500/RT 2
OSCILLATOR MAX 3 000 mm 6OSCILLATOR MAX 3,000 mm 6
RCD MACHINE MAX 3,000 mm 5
TRENCH CUTTER Wide : 650~1,900 mmDepth : 80~100m 5
HYDROLIC GRAB Wide : 600~1200 mm 2
Page 11
HYDROLIC GRAB Depth : 60m 2
I. Company ProfileI. Company Profile
Major Construction Equipment
Existing Road Crossing Passage
( )Equipment Specification Unit(s)
JES MACHINE □ 850~1,200 mm 1
Page 12
I. Company ProfileI. Company Profile
Major Construction Equipment
Geotechnical Investigation
( )Equipment Specification Unit(s)
S.E.P BARGE 163 / 120 TON 2
TEST APPARATUS Fully Equipped 1
TEST INSTRUMENT Fully Equipped 1
Page 13
II AccreditationAccreditation
Lloyd’sy
Singapore BCA
Safety Award
Page 14
II. AccreditationII. Accreditation
Lloyd’s Singapore BCA Safety Award
Page 15
III Business ActivitiesBusiness Activities
Trenchless Tunneling Work
Drill & Blast Works
ConstructionConstruction
Drill & Blast Works
Ground Improvement
G d S t & St t F d tiGround Support & Structure Foundation
Existing Road Crossing Passage
E i iE i iGeotechnical Investigation
D i
EngineeringEngineering
Design
Water EngineeringWater Engineering
Page 16
Water Engineering
III. Business ActivitiesIII. Business Activities
Trenchless Tunneling Works
1. Shielded TBM (EPB/Slurry)
2 Pipe Jacking (EPB/Slurry)2. Pipe Jacking (EPB/Slurry)
Page 17
III. Business ActivitiesIII. Business Activities
Shield TBM
Seoul Subway Line 704Seoul Subway Line 909
Page 18 Yong-Ho Sewage Treatment Line DTSS- Kimchun (Singapore)
III. Business ActivitiesIII. Business Activities
Pipe Jacking
Page 19
III. Business ActivitiesIII. Business Activities
Drill & Blast Works
NATM
Including
Fore-Poling Fore Poling
Pipe Roof – Under Pinning Pipe Roof Under Pinning
Probingg
Page 20
III. Business ActivitiesIII. Business Activities
Drill & Blast Works
Page 21
III. Business ActivitiesIII. Business Activities
Ground Improvement
1. DSM (DCM)
2. JGP / UJS
3. Chemical Grouting
4. Vacuum Consolidation
5. PVD
Page 22
III. Business ActivitiesIII. Business Activities
DSM
Page 23
III. Business ActivitiesIII. Business Activities
Ultra Jetting SystemJet Grouting
Prefabricated Vertical Drain Vacuum Consolidation
Page 24
III. Business ActivitiesIII. Business Activities
Ground Support & Structure Foundation
◆ Diaphragm Wall
◆ Soil Nailing
◆ Sheet Piling
◆ Soil Nailing
◆ Secant Pile : CBP
◆ Case In-situ Pile
◆ DSM
◆ Geopier
Page 25
◆ Geopier
III. Business ActivitiesIII. Business Activities
Diaphragm Wall Soil Nailing
Contiguous Bored Pile Deep Soil Mixing
Page 26
III. Business ActivitiesIII. Business Activities
Geopier
Cast In-Situ Pile
Page 27
III. Business ActivitiesIII. Business Activities
Existing Road Crossing Passage
1. JES (Joint Element System)
2 Di id d Shi ld M th d (DSM)2. Divided Shield Method (DSM)
Page 28
III. Business ActivitiesIII. Business Activities
JES Method Divided Shield M h dMethod
Page 29
III. Business ActivitiesIII. Business Activities
Geotechnical Investigation
1. Boring and Laboratory Test
2. Exploratory Investigation
3. Pile Load Test & Integrity Test
4. Instrumentation & Monitoring
Page 30
III. Business ActivitiesIII. Business Activities
On Shore Exploration Off Shore Exploration
Horizontal Boring
Page 31
III. Business ActivitiesIII. Business Activities
Static Pile Load Test Lateral Load Test
Osterberg Cell Dynamic Pile load test
Page 32
III. Business ActivitiesIII. Business Activities
Design
1. Ground Support
2. Ground Improvement
3. Slope Stability Assessment
4. Structure Foundation
5. Trenchless Tunneling
Page 33
III. Business ActivitiesIII. Business Activities
Water Engineering: DAF SYSTEM
1. RO System1. RO System
2 Sewage Treatment2. Sewage Treatment
3. Potable Water Treatment
Page 34
III. Business ActivitiesIII. Business Activities
Desalination ProcessDesalination Process
RO IntakeRO Intake
MF/UF DMFDesalination
Dual Media FilterMicro Filter/Ultra Filter
H.E DAFHigh Efficiency
Page 35
High Efficiency
III. Business ActivitiesIII. Business Activities
Q 10 000㎥/d
High Rate DAF System: Sewage TreatmentHigh Rate DAF System: Sewage Treatment
Q : 10,000㎥/day
Hydraulic Loading Rate : 20m/hr
Page 36
III. Business ActivitiesIII. Business Activities
Backwash
High Rate DAFFilterTM System
Effl t
Sludge ScraperBackwash
Blower
Effluent
Fl l i
Influent
Flocculation Flotation Fiber Filter
SaturatorRecycle PumpRecycle Pump
Air Compressor
Page 37
Air Compressor
IV Performance in OverseasPerformance in Overseas
On Going ProjectOn Going Project
Completed ProjectCompleted Project
Page 38
IV. Performance in OverseasIV. Performance in Overseas
On Going Project
Qatar
India
Korea
Cambodia
India
Singapore
Page 39
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : Shield TBMSingapore Downtown Line Stage2 Contract 915
Scope of work : Shield TBM Client : Land Transport Authority Main Contractor : SK E&C
Page 40
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : Shield TBMSingapore Downtown Line Stage2 Contract 913
Scope of work : Shield TBM Client : Land Transport Authority Main Contractor : GS E&C
C 912
C 913 C913用
Cashew Station
TBM Launching
Shaft
C 915
C915用
TBM Retrieval Shaft Hillview Station
Page 41
C 915
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : Pipe JackingQatar Doha North Sewerage Treatment & Associated Works
Scope of work : Pipe Jacking Client : Public Works Authority Main Contractor : Ultra E&C
Page 42
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : NATMIndia Rampur Hydroelectric Project (412MW)
Scope of work : NATM Client : Satlaj Jal Vidyutnigam Ltd. Main Contractor : Gammon India Pte., Ltd.
Page 43
IV. Performance in OverseasIV. Performance in Overseas
Singapore Marina Costal Expressway C 485
Scope of work : Ground Improvement Work(DSM) Scope of work : Ground Improvement Work(DSM) Client : Land Transport Authority Main Contractor : Penta Ocean
C486
C 487Contract 481
C 482C 483
C486
C485
Page 44
IV. Performance in OverseasIV. Performance in Overseas
Singapore Marina Costal Expressway C 486
Scope of work : Ground Improvement Work(DSM) Scope of work : Ground Improvement Work(DSM) Client : Land Transport Authority Main Contractor : Samsung E&Cg
Page 45
IV. Performance in OverseasIV. Performance in Overseas
Singapore Marina Costal Expressway C 487
Scope of work : Ground Improvement Work(DSM) Scope of work : Ground Improvement Work(DSM) Client : Land Transport Authority Main Contractor : Daelim E&C
Page 46
IV. Performance in OverseasIV. Performance in Overseas
Singapore Marina Costal Expressway C 482
Scope of work : Ground Improvement Work(DSM) Scope of work : Ground Improvement Work(DSM) Client : Land Transport Authority Main Contractor : Ssanyong E&Cy g
Page 47
IV. Performance in OverseasIV. Performance in Overseas
Cambodia The Star River Project
Scope of work : CBP and Earth Works Scope of work : CBP and Earth Works Client : Land Transport Authority Main Contractor : Ssanyong E&Cy g
Page 48
I. Company ProfileI. Company Profile
Completed Project
LibyaEgypt
India
Korea
Cambodia
Philippine
NigeriaVietnam
Palau
India
Singapore
Page 49
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : Micro Tunneling & NATMSingapore DTSS Kim Chuan Link Sewers Contract-01
Scope of work : Micro Tunneling & NATM Client : Public Utilities Board Main Contractor : Tiong Seng & Dongah JVg g g
Page 50
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : Pipe JackingPhilippines Davao International Airport Development,PKG1
Scope of work : Pipe Jacking Client : Davao Airport Consultant Main Contractor : Hanjin Heavy Industry Co.j y y
Page 51
IV. Performance in OverseasIV. Performance in Overseas
Scope of work : NATMIndia Dhauliganga Hydroelectric Project Stage-1 Lot 1&2
Scope of work : NATM Client : National Hydroelectric Power C/L Main Contractor : Daewoo E&C
Page 52
IV. Performance in OverseasIV. Performance in Overseas
Singapore Business and Financial Centre Development
Scope of work : DSM & Secant Pile Scope of work : DSM & Secant Pile Client : BFC Development Main Contractor : Tiong Seng P/Lg g
Page 53
IV. Performance in OverseasIV. Performance in Overseas
Singapore Marina Bay Financial Centre Phase -T3
Scope of work : DSM & JGP Scope of work : DSM & JGP Client : Central Boulevard Development Pte Ltd Main Contractor : L&M Foundation Specialist Pte Ltd
Page 54
IV. Performance in OverseasIV. Performance in Overseas
Singapore Downtown Line Stage 1 C907
Scope of work : DSM Scope of work : DSM Client : Land Transport Authority Main Contractor : Taisei Co.
Page 55
IV. Performance in OverseasIV. Performance in Overseas
Singapore Amber Residences Project
Scope of work : DSM Scope of work : DSM Client : Voda Land P/L Main Contractor : Lian Beng / L.S. JVg
Page 56
IV. Performance in OverseasIV. Performance in Overseas
Egypt Damietta Port-Extension of Grand Berth No.13
Scope of work : JGP Scope of work : JGP Client : Damietta Port Authority Main Contractor : Samsung E&Cg
Page 57
IV. Performance in OverseasIV. Performance in Overseas
Singapore Pharos Condominium Development
Scope of work : Diaphragm Wall Scope of work : Diaphragm Wall Client : Guan Realty P/L Main Contractor : Tiong Seng P/Lg g
Page 58
IV. Performance in OverseasIV. Performance in Overseas
Singapore Redevelopment of Overseas Union & Change Alley Aerial Plaza
Scope of work : Diaphragm wall and Bored Pile Scope of work : Diaphragm wall and Bored Pile Client : Clifford Development P/L Main Contractor : Hyun Dai E&Cy
Page 59
IV. Performance in OverseasIV. Performance in Overseas
Singapore CAPELLA Hotel Resort Development
Scope of work : Soil Nailing Scope of work : Soil Nailing Client : Millenia Hotel P/L Main Contractor : Tiong Seng P/Lg g
Page 60 Initially After
IV. Performance in OverseasIV. Performance in Overseas
Cambodia Gold Tower 42 Project
Scope of work : CBP and Earth Works Scope of work : CBP and Earth Works Client : Yon Woo Cambodia Co. Main Contractor : Hanil E&C
Page 61
IV. Performance in OverseasIV. Performance in Overseas
Vietnam Hanoi City Complex of 65 Stories Tower
Scope of work : CBP & Diaphragm Wall Scope of work : CBP & Diaphragm Wall Client : Corails Vietnam Co. Main Contractor : Daewoo Motor Sales Co.
Page 62
IV. Performance in OverseasIV. Performance in Overseas
Palau Compact Road Project
Scope of work : Cast In-Situ Pile Scope of work : Cast In-Situ Pile Client : U.S.Army Corps of Engineers Main Contractor : Daewoo E&C
Page 63
Thank youThank youThank youThank youwww.dage.co.kr
Page 64