Hormigon de replanillo F'C 140 Kg/cm2Agua lts
cemento arena piedra m. humedo m. seco1 m3 3 m3 5 m3
4.5 sacos 0.555 m3 0.92 m3 0.17 0.15costo 7.01 saco 10.5 m3 11.51 m3 2.6 2.6total 31.545 $ 5.8275 $ 10.5892 $ 0.442 0.39
hormigon estructural 1:3:3 F'c 170 kg/cm2
cemento arena piedra volumen1 m3 3 m3 3 m3 7.63
6*5 309.73 sacos 0.671 m3 0.671 m31400 kg 4.47 m3 4.47 m3
hormigon estructural 1:2:2 F'c 250 kg/cm2Agua lts
cemento arena piedra m. humedo m. seco1 m3 2 m3 2 m3
8.5 sacos 0.67 m3 0.67 m3 0.17 0.19costo 7.01 saco 10.5 m3 11.51 m3 2.6 2.6total 59.585 $ 7.035 $ 7.7117 $ 0.442 0.494
hormigon estructural 1:2:2,5 F'c 240 kg/cm2Agua lts
cemento arena piedra m. humedo m. seco1 m3 2 m3 2 m3
7.5 sacos 0.6 m3 0.67 0.76 0.16 0.18costo 7.01 saco 10.5 m3 11.51 m3 2.6 2.6total 52.575 6.3 7.7117 0.416 0.468
hormigon estructural 1:2:3,5 F'c 210 kg/cm2Agua M3
cemento arena piedra m. humedo m. seco1 m3 2 m3 2 m3
320 kg6.5 sacos b m3 0.67 0.76 0.16 0.18
costo 7.01 saco 10.5 m3 11.51 m3 2.6 2.6
costos HOR. 45.565 $ #VALUE! $ 7.7117 $ 0.416 0.468
![Page 2: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/2.jpg)
Hormigon de replanillo F'C 180 Kg/cm2Agua lts
cemento arena piedra m. humedo m. seco1 m3 2.5 m3 4.5 m3
5.5 sacos 0.52 m3 0.94 m3 0.13 0.15costo 7.01 saco 10.5 m3 11.51 m3 2.6 2.6total 38.555 $ 5.46 $ 10.8194 $ 0.338 0.39
![Page 3: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/3.jpg)
$ 48.3517 m3
volumenm3
$ 74.8257 m3
$ 67.0547 m3
$ #VALUE! m3
![Page 4: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/4.jpg)
$ 55.2244 m3
![Page 5: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/5.jpg)
concretera 14mano de obra
![Page 6: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/6.jpg)
![Page 7: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/7.jpg)
![Page 8: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/8.jpg)
![Page 9: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/9.jpg)
Cuadro de plintos
Tipo No.Dimensiones
Ubicación ArmaduraA B H
![Page 10: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/10.jpg)
volumenpeso según el diametro
area nominal peso nominal
6 28.2744 0.2228 50.2656 0.395
10 78.54 0.61712 113.0976 0.88814 153.9384 1.20816 201.0624 1.57818 254.4696 1.99820 314.16 2.46622 380.1336 2.984
diametro (mm)
![Page 11: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/11.jpg)
Planilla de Hierro
Marca Tipo diametro No.Dimensiones
a b c g
101102103104105
longitud Desarrollo
![Page 12: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/12.jpg)
Planilla de Hierro
peso
5
5
No de varillas
![Page 13: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/13.jpg)
Diámetro Perímetro Peso Peso Número de Barras
Nominal Nominal Nominal Por barra 1 2 3 4
mm cm kg/m kg secciones nominales en cm2
4.2 1.32 0.109 1.310 0.14 0.28 0.42 0.55
6 1.88 0.222 2.664 0.28 0.57 0.85 1.13
8 2.51 0.395 4.740 0.50 1.01 1.51 2.01
10 3.14 0.617 7.404 0.79 1.57 2.36 3.14
12 3.77 0.888 10.656 1.13 2.26 3.39 4.52
14 4.40 1.208 14.496 1.54 3.08 4.62 6.16
16 5.03 1.578 18.936 2.01 4.02 6.03 8.04
20 6.28 2.466 29.592 3.14 6.28 9.42 12.57
25 7.85 3.853 46.236 4.91 9.82 14.73 19.63
32 10.05 6.313 75.756 8.04 16.08 24.13 32.17
40 12.57 9.865 118.380 12.57 25.13 37.70 50.27
Kg./m3 7850.0
![Page 14: Dosificacion de Hormigon-Precios](https://reader036.vdocuments.net/reader036/viewer/2022081506/563db7d1550346aa9a8e3d00/html5/thumbnails/14.jpg)
Número de Barras
5 6 7 8 9 10
secciones nominales en cm2
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00