double shield rock tbm of seli make, used for kishanganga...

1
Double Shield Rock TBM of SELI make, used for Kishanganga HEP for sale The double Shield Rock TBM used for tunneling the Head Race tunnel of Kishanganga Hydel Power Project in Jammu and Kashmir, India, is for sale with the complete back-up system. Hindustan Construction Company (HCC) had deployed this TBM in May 2011 and will be completing the tunneling in April 2014. Make SELI Year of Manufacture May, 2010 (New) Boring Distance 14,750 Meters Duration of Usage May 2011 to April 2014 Suitable for Boring Diameter 6.1 m to 6.3 m (involving double shield rock TBM). Availability July, 2014 Allied Equipment Available Segment Cars(14nos), Passenger Cars(5nos), Diesel Locomotives(6nos), Muck Cars(50nos), Flat Cars(5nos), Ventilation Fans(3nos), Special Dolly 100 t for TBM in tunnel disassembly, Electrical and Telephone systems, Workshop, Precast Plant, Lighting system etc. Further technical specification along with drawing and list of other equipment / materials, which are offered for sale along with TBM, will be made available on request. Interested parties may get in touch with: Srikumar Warrier | Manager – Supply Chain Tel: +91 22 2575 1000 / 1441 | Email: [email protected] Sachin Joshirao | Manager – Supply Chain Tel: +91 22 2575 1000 / 1444 | Email: [email protected]

Upload: truongkhue

Post on 03-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Double Shield Rock TBM of SELI make, used for Kishanganga ...tunnellingjournal.com/files/2014/02/Double-Shield-Rock-TBM-for... · Double Shield Rock TBM of SELI make, used for Kishanganga

Double Shield Rock TBM of SELI make, used for Kishanganga HEP for sale

The double Shield Rock TBM used for tunneling the Head Race tunnel of Kishanganga Hydel Power Project in Jammu and Kashmir, India, is for sale with the complete back-up system. Hindustan Construction Company (HCC) had deployed this TBM in May 2011 and will be completing the tunneling in April 2014. Make SELI

Year of Manufacture May, 2010 (New)

Boring Distance 14,750 Meters

Duration of Usage May 2011 to April 2014

Suitable for Boring Diameter 6.1 m to 6.3 m (involving double shield rock TBM).

Availability July, 2014

Allied Equipment Available Segment Cars(14nos), Passenger Cars(5nos), Diesel Locomotives(6nos), Muck Cars(50nos), Flat Cars(5nos), Ventilation Fans(3nos), Special Dolly 100 t for TBM in tunnel disassembly, Electrical and Telephone systems, Workshop, Precast Plant, Lighting system etc.

Further technical specification along with drawing and list of other equipment / materials, which are offered for sale along with TBM, will be made available on request.

Interested parties may get in touch with:

Srikumar Warrier | Manager – Supply Chain Tel: +91 22 2575 1000 / 1441 | Email: [email protected]

Sachin Joshirao | Manager – Supply Chain Tel: +91 22 2575 1000 / 1444 | Email: [email protected]