Page 1: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 2: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 3: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 4: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 5: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 6: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 7: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 8: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 9: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 10: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 11: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 12: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 13: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 14: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 15: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 16: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 17: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 18: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 19: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 20: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 21: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 22: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 23: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 24: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 25: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 26: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 27: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 28: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 29: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The
Page 30: RE: Tom, Culkin2 Floor Estimate Based on the concept drawings that I reviewed and the following scope I came up with an lid estimate (labor and material) of about $474,000. The

Top Related