1As of 7 Jan 04
Enable Theater Access (ETA) Update
JLOTS R&D SymposiumForce Projection from the Sea
27-29 January 2004
MANSCEN
DPMO
![Page 2: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/2.jpg)
2As of 7 Jan 04
Purpose
Provide an update on efforts to establish the Enable Theater Access (ETA) construct as a “Lynchpin” initiative for developing Joint theater infrastructure and throughput capabilities.
![Page 3: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/3.jpg)
3As of 7 Jan 04
Proactive means to ensure forces can deploy and freely enter the theater of operations by enhancing
entry capabilities and infrastructure, mitigating adverse effects of the environment (terrain, weather,
enemy action, infrastructure, hazards and local population), and protecting/facilitating multiple
POD’s, LOC’s, and theater entry points.
TRADOC PAM 525-3-25 (24 December 2003) Future Force Maneuver Support Concept
TRADOC PAM 525-3-35 (DRAFT 31 Jan 03)Force Projection of the Transforming Army
Mitigate Anti-Access Strategies
Increase Throughput Create Higher OPTEMPO
ETA Working Definition
Reduce Force Closure Timelines
![Page 4: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/4.jpg)
4As of 7 Jan 04
Theater Entry Points:
Intermediate Staging Bases
Strategic POD’s
Tactical POD’s
Critical Considerations:
Facilities/Infrastructure/Nodes
Land, Sea, Air LOC’s
Deploying Force Mix
Support Requirements
Threat Anti-Access Strategy
Joint Interoperability
Integrated C4ISRMultiple Austere
Locations
Rapid Projection of Capability to JTF/CombatantCommanders and Joint HQs
![Page 5: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/5.jpg)
PROBLEM:Anti Access
RPE ObjectivesRPE Objectives - -
• Maximize TSV utility Maximize TSV utility
• Increase number of potential port sitesIncrease number of potential port sites
• Increase number of lanes per site Increase number of lanes per site
• Decrease cube/volume and times per Decrease cube/volume and times per deployment of systemsdeployment of systems
JRACJRACJoint Rapid Airfield ConstructionJoint Rapid Airfield Construction
RPE RPE Rapid Port EnhancementRapid Port Enhancement
PROBLEM:
Lack of
Infrastructure
rampJRAC ObjectivesJRAC Objectives - -
• Increase airfield MOG capacityIncrease airfield MOG capacity• Increase airfield location optionsIncrease airfield location options• Decrease engineering timelines Decrease engineering timelines
and logistical and logistical
requirementsrequirements
6.2 STO
6.3 STO
Enable Theater AccessEnable Theater Access
![Page 6: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/6.jpg)
6As of 7 Jan 04
The ChallengesIdentify and develop Army and Joint warfighting requirements and capabilities to gain theater access for the rapid deployment of Joint forces.
Increase throughput capability and capacity at multiple, austere:
Aerial Ports of Debarkation (APOD)
Seaports of Debarkation (SPOD)
![Page 7: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/7.jpg)
7As of 7 Jan 04
Formed Tier II Integrated Concept Team (ICT)
ICT Charter approved May 2003.
Co-chaired by MANSCEN & Transportation School.
Conducted ICT meetings (March & September 2003).
Initially collaborated and integrated with:
- CASCOM - ERDC - TARDEC - SBCCOM
- PM Force Projection - P2COC - USTRANSCOM
- HQDA (G3/G4/G8) - HQ TRADOC
- Army/Joint Battle Labs/Proponent DCD’s/Other services
Developed draft ETA Concept (September 2003); currently re-writing into an O&O Plan.
Briefed Power Projection CoC (June & October 2003).
Accomplishments
![Page 8: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/8.jpg)
8As of 7 Jan 04
Form Tier I Integrated Concept Team (ICT) Conduct Tier I ICT Strategy Meeting at JFCOM in February 2003. Include Joint Partners (JFCOM, Air Force, Navy, Marines). Gain Tier I ICT approval (HQ TRADOC). Develop strategy for ETA to support Joint Operating and Joint Functional Concepts using ETA O&O Plan. Develop requirements documents and strategy to influence Joint Capabilities Boards for materiel. acquisition of ETA enablers through JCIDS process. Conduct semiannual ICT meetings. Continue to participate in Power Projection CoC and other appropriate venues.
Road Ahead
![Page 9: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/9.jpg)
9As of 7 Jan 04
15 Jan 2004 FPIC Summit, Fort Eustis, VA
27-29 Jan 2004 JLOTS Symposium, Duck, NC
Feb 2004 (TBD) Tier I ETA ICT Strategy Meeting, JFCOM, Norfolk, VA
Apr-May 2004 Gain Tier I ICT Approval
18-20 May 2004 Force Projection Symposium V Norfolk, VA
Jul-Aug 2004 JRAC Tech Demonstration Fort Bragg, NC
Aug 2004 Tier I ETA ICT Meeting
Ongoing (2004) Develop JCIDS Requirements Documents
Timelines
![Page 10: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/10.jpg)
10As of 7 Jan 04
ETA and its associated ICT will provide the necessary framework and forum to develop Joint and Army warfighting capabilities and enablers across the DOTMLPF to gain theater access for deployment of Joint forces through multiple austere air and sea ports of debarkation.
“Supports Strategic Responsiveness of Current, and Future Army Forces and Sustainment.”
Bottomline
![Page 11: 1 As of 7 Jan 04 Enable Theater Access (ETA) Update JLOTS R&D Symposium Force Projection from the Sea 27-29 January 2004 MANSCEN DPMO](https://reader038.vdocuments.net/reader038/viewer/2022110211/56649efe5503460f94c12ed2/html5/thumbnails/11.jpg)
11As of 7 Jan 04
Questions
Discussion