Northern Corridor 1. Establishment of Observatory
Data Collection Methodology and First Trial
40 Questionnaires returned out of 500+
Suitability of the process ? Implementation of an Adjusted
Methodology
3
Northern Corridor (2) 2. Updating of the NC Treaty
Consultants being hired Workshop to be held in second quarter of
2005 Completion expected in June 2005 Adoption aimed for 2006
3. Mombasa Port Security Bids for Security Assessment to be Received
Oct 1
4
Dar es Salaam Corridor 1. Establishment of Observatory
ToRs drafted in May, 2004 ToRs to be adjusted following review
of other observatory projects. Procurement to start in November,
2004 2. Dar Port Security
THA expected to draft ToRs
5
Dar es Salaam Corridor (2) 3. Road safety pamphlet
Lack of a champion on the ground: to be linked to the road safety action plan
4. Future actions: assistance to the
Dar Corridor Management Committee?
6
North-South Corridor 1. Beit Bridge pilot project
Started in June 2004 Continuation of an earlier effort by public and
private stakeholders to solve emergency problems in 2003
Intends to reduce transit time at border Facilitates stakeholders consultation to
design and implement an Action Plan Matrix Matrix already in place To be continued through 2005 Identified the need for observatory
7
LocationLocation
Barney Curtis SSATP September 2004
Beit Bridge
8
LocationLocation
Barney Curtis SSATP September 2004
9
Current Situation cont…Current Situation cont…
Barney Curtis SSATP September 2004
10
North-South Corridor (2) 2 Establishment of Observatory
ToRs drafted in May, 2004 ToRs to be adjusted following review of other
observatory projects. Procurement to start in November, 2004
3. Study on best practices in axle load control ToRs prepared by ECA and under review by
SADC and COMESA Procurement to start in November, 2004
11
North-South Corridor (3) 4. Design of an HIV/AIDS transport
program Review ongoing and proposed
interventions and value added of SSATP; Ways forward and ToRs for program
design to be agreed upon by November, 2004
5. Future actions: support to the set up of a Corridor Management Committee?
12
Douala-Ndjamena/Bangui Corridors 1. Establishment of Observatory
Methodology still to be elaborated, and request by stakeholders for preliminary consultation
Financing by existing WB Grant to CEMAC Start expected for early 2005
2. Douala Port Facilitation & Security Regional consultation ongoing for
implementation of ISPS code CEMAC/ECCAS to propose SSATP priority
Actions by December 2004 Implementation to start in 2005
13
Pointe-Noire-Brazza-Bangui and Matadi-Kinshasa-Bangui corridors (2) 1. Establishment of Observatory
Objectives different from the other observatories (multimodal rail-river and road-river corridors)
Methodology still to be elaborated by CEMAC, ECCAS and CICOS
ToRs to be drafted by Dec 2004 2. Future actions: set up of corridor
management committee? Need for a baseline survey of corridor operations Need to further investigate regulatory implications CEMAC/ECCAS to propose SSATP set of actions by
December 2004
14
West African Corridors 1. Observatories
Pilot trial completed on two corridors (end 2003) Methodological and data collection issues Revised methodology to be devised Additional support expected from USAID on data
collection design and IT set up Next round of surveys to be carried out early in
2005, with validation workshop by April 2005 SSATP support required for data collection,
processing and dissemination Extension of the scope to other corridors during 2nd
half of 2005
15Capitale d’Etat
Ville Importante
Limite zone UEMOA
Réseau Inter-Etats (RIE)
UEMOA
Hors UEMOA
Réseau d’interconnexion (RI)
UEMOA
Hors UEMOACode communautaire CU1
Réalisation TAS: [email protected]
CLASSIFICATION DU RESEAU ROUTIER COMMUNAUTAIRE UEMOA
CU
4
CU
7b
CU
7a
CU
7a
CU
7a
CU
5
CU5
CU5
CU5
CU
3b
CU
3a
CU
3a
CU
3a
CU
9
CU
9
CU
9
CU
10C
U10
CU
10
CU
13C
U26
CU13
CU
17
CU16
CU16
CU14
CU
15C
U20
CU
23
CU24
CU
12
CU
21
CU25
CU19c
CU
6C
U6
CU19b
CU19a
CU
11
CU11
CU
22
LOME
COTONOU
DAKAR
BAMAKO
NIAMEY
OUAGADOUGOU
BISSAU
YAMOUS-SOUKRO
NOUAKCHOTT
ACCRAMONROVIA
FREETOW
N
CONAKRY
N ’DJAMENA
BANJUL
ABUJA
CU27
CU18
CU18
CU18CU18
CU
8
Po
N ’dali
Abidjan
Bouaké
Ferké
Sikasso
Kankan
Mamou
Man
Ziguinchor
Tambacounda
St Louis
Kayes
N ’zérékoré
Gbarnga
Ségou
Gao
Ouahigouya
Kita
Tamalé
Kumassi
Ibadan
Lagos
Mopti
Bougouni
Tilabéri
Atakpamé
Bambadica
Kaduna
Kano
Maradi
Agadez
Bobo-Dioulasso
Zinder
Bouna
Savé
Parakou
SanPedro
KaraOdienné
CU2b
CU2b
CU
2a
CU2a
CU2a
CU2a
CU2a
CU2a
CU2a
CU2a
CU2a
CU1
CU1
CU1CU
1
CU
1
16
missions des Chargés de liaison & structuration moyens mis à disposition des Chargés de liaison structuration des fiches d’enquête méthode de conduite des enquêtes ;communication entre parties prenantes au projet rapports avec le Consultant conduite des enquêtes modalités de restitution des données d’enquêtes ;conduite des contre enquêtes modalités de restitution des résultats des contre enquêtes ;modalités de rapprochement des résultats des contre-enquêtes avec ceux des enquêtes diffusion des informations pérennité du projet problèmes financiers
Problèmes identifiés
17
Revoir l’approche méthodologique 2
Revoir le programme informatique
3
Réorganiser les mécanismes de coordination1
Revoir la stratégie de communication4
Solutions
18
Téma – Ouaga – Niamey - Bamako 2
Lomé - Cotonou
3
Lomé – Ouaga – Niamey - Bamako1
Extension future à Abidjan – Lagos après atelier
de validation
4
L’OPA / PRF
19
West African Corridors (2) 2. Study/workshop on institutional and legal
framework Three ongoing studies on transit system and
guarantee regime, border posts and corridor management legal status (NEPAD and AfDB financing)
Validation workshops will be organized before end of 2004 (RECs and donors financing)
Support from SSATP may be sought to help update of national regulations to comply with agreed regional legal provisions.
ToRs to be drafted by January 2005
20
Multi Corridor issues/Inter REC Cooperation 1. Areas of inter-REC cooperation:
status of actions SADC-COMESA-FESARTA-PMAESA-ECA
consultation in May 2004 on observatories and overload control;
Internal coordination ECOWAS-UEMOA now complete in almost every subject
No progress on ECCAS-CEMAC No action undertaken involving Africa wide
inter REC cooperation or multi corridor issues since the Nairobi Feb 2004 meeting.
21
Multi Corridor issues/inter REC Cooperation (2) 1. Areas of inter-REC cooperation: next steps
Facilitation action by SSATP and ECA to improve CEMAC-ECCAS coordination by December 2004
Global reconsideration of the observatories (during ongoing SSATP meeting)
Information sharing to be developed on one stop border posts issues (legal-management- procedures- infrastructure)?
Develop the process of inter REC trade facilitation cooperation involving Customs (starting with COMESA-SADC on regional bond guarantees)
22
Inter REC Coordination Draft Terms of Reference for a
coordination mechanism to be discussed during ongoing meeting
Relationships with NEPAD, AU, etc… to be clarified, proposals to be done during the meeting
23
Improve SSATP response Long procurement procedures Clarification required in role of the