SBAS Implementation in the Regions of ACAC and ASECNA
FP7-GALILEO-2008-4.3.1 / FP7-GALILEO-2008-4.3.4
Project with Community research funding
WP2- Service Enablers Scenarios - ACAC
Prepared by Egis AviaPresented by Nga Bui (Egis Avia)
SIRAJ Final Workshop - Rabat 28th May 2012
Outline• Proposed ACAC implementation steps• Economical Enablers• International ACAC cooperation• ACAC objectives and strategy• Technical solution for EGNOS extension over ACAC
Region• System Funding & Owner• System Operator & Service Provider• Certification• Operations
2
SIRAJ Final Workshop - Rabat 28th May 2012
Proposed ACAC Implementation Steps
3
System Operator(s) Service Provider(s)
Technical solution for EGNOS extension over ACAC Region
Can be coupled
System Owner
LiabilityWorking Agreements
Contract
Economical Enablers ACAC Strategy
Certification
Operations
International ACAC
cooperation
System Funding
SIRAJ Final Workshop - Rabat 28th May 2012
Economical Enablers
4
SBAS applications CBACost allocation and
cost recovery scheme
Evidence of demand
Initiatives in the region?
Depends on the technical solution
In Europe, EC funds the service, free of charge for airspace users
High operational interest: APV
approaches available without any additional
equipment on the airport
SIRAJ Final Workshop - Rabat 28th May 2012
International ACAC cooperation
5
Coordination with EC: Following ACAC General Assembly decision n° 24 & 29 (2004):
• Open discussion with European Commission to prospect for cooperation in the use of EGNOS and GALILEO in the Arab region
• 3 ACAC / EC meetings during which the technical solutions for EGNOS extension have been reviewed
ACAC General Assembly decision 25 (2006): To organize a ACAC / EC meeting on the study sponsored by the GJU regarding the expansion of EGNOS to Middle East region
GNSS Workshop Riyadh – Saudi Arabia (2008) organised by ACAC: provided latest development on EGNOS extension over ACAC area.
ACAC General Assembly decision n° 9 (2010): ACAC participation to the SIRAJ project approved & Designation of a representative from each members state to work in the project
Coordination with ICAO: ACAC coordinates with the International Civil Aviation Organization (ICAO) MoC ICAO/ACAC have been signed on 27 September 2010
SIRAJ Final Workshop - Rabat 28th May 2012
ACAC objectives and strategy
6
6
Operational:To assist and coordinate with members states to implement
ICAO objectives
ACAC Strategy
ACAC Objectives
ApproachThe policy context for the GNSS service implementation over ACAC is being developed around the following major axes:• ICAO GNSS policy - A37• ICAO office and PIRG GNSS policy• The Euro-Med PROJECT RTAP (Regional Transport Action Plan) action 27
SIRAJ Final Workshop - Rabat 28th May 2012
ACAC objectives and strategy
77
ACAC Strategy (Approach and Landing)
APIRG GNSS Strategy• Short term – 2008/2012
o Basic GNSS with Barometric Altimetry• Medium term – 2013/2016:
o Basic GNSS with ABASo SBAS
• Long term – 2017 onwards:o Multi-constellation GNSS with ABASo SBASo GBAS
MIDANPIRG GNSS Strategy (updated strategy)• Short term – 2008/2012
o RNP APCH (including Baro-VNAV) (30% of instrument runways by 2012)
• Medium term – 2013/2016oRNP APCH (including Baro-VNAV and SBAS) (70% of instrument runways by 2014, 100% by 2016)
• Long term – 2017 onwardso RNP AR APCH
A36-23 & A37-11 Resolutions
RTAP 2007-2013 Action 27• Collaboration with the EuroMed projects• Liaison with the European Commission regarding the progress and opportunities related to the gradual introduction of European GNSS services in the region
SIRAJ Final Workshop - Rabat 28th May 2012
Technical solution for EGNOS extension over ACAC Region
88
Phased technical solutions for EGNOS extension over ACAC Region
Short term MEDA region
Medium/Long termTo implement Regional
Extension Module
Medium termTo implement 10°
homogeneous extension
Optimal solution in terms of coverage in the medium term Long term
Independent infrastructure
SIRAJ Final Workshop - Rabat 28th May 2012
Technical solution for EGNOS extension over ACAC Region
99
Medium term possible coverage area based
on homogeneous extension (10°)
This area can only be covered thanks to REM
module in the medium term (heterogeneous extension)
MEDA
Current possible coverage area
Not Covered
?
Not Covered
?
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on short term technical solution
10
APV-I availability in December 2011 with current EGNOS system configuration
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on medium term technical solution
11
REM Concept Overview
The Regional Extension Module (REM) is the solution for the integration, monitoring and control of the additional RIMS deployed for the extension.
REM :Is linked to EGNOS core system (Europe)
Is based on additional RIMS covering a service area outside ECAC
Provides a level of monitoring and control to the Region
Is able to be isolated from European network and processing
European Processing Area
REM 1 REM 2
REM 3
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on medium term technical solution
12
Proposed architecture (based on previous study)
SIRAJ Final Workshop - Rabat 28th May 2012
System Funding & Owner
13
13
Short term Medium/ Long term Long term
MEDA program
Schedule
System funding
RIMS extension (MEDA)
REM-2 Independent SBAS
Technical solution
Homogeneous extension (10°)
4 scenarios:•EC•ACAC•GCC•EC + ACAC
2 scenarios:•GCC•ACAC + GCC
2 scenarios:•GCC•ACAC + GCCBased on Navisat project
System owner
European Commission
ACAC / GCC member States
ARG-1 region
Mauritania, Sudan and
Western part of Middle East
Coverage area
ARG-3 region
Eastern part of Middle East
ACAC and/or GCC member States
ACAC and/or GCC member States
+
* Regional Extension Module costs around 15M€ and includes 10 RIMS
European Commission
European Commission
Europe (ECAC)
or
Medium term
+
Current EGNOS
System (V2.2)
+
Operationfunding
SIRAJ Final Workshop - Rabat 28th May 2012
System Operator & Service Provider
14
Short term Medium term Long termSchedule
System operator
RIMS extension (MEDA)
REM-2 Independent SBAS
Technical solution
Homogeneous extension (10°)
Regional EGNOS Operator
System service provider
ESSP (SPU)
+
Current EGNOS
System (V2.2)
Regional EGNOS Service Provider
ESSP (SOU)
ARG-3 SBAS
Operator
ARG-3 SBAS
Service Provider
+
+
1 2
1 2
TransferTransfer
TransferTransfer
SIRAJ Final Workshop - Rabat 28th May 2012
System Operator & Service Provider
15
The Regional EGNOS Operator should be in charge of:Regional infrastructure (RIMS, network, control center)
Managing regional sites hosting the infrastructures and associated logistics aspects
Some maintenance activities
• First line maintenance and troubleshooting activities• Planned maintenance activities
Regional system performance monitoring
The Regional EGNOS Service Provider should be in charge of:
Relationship with regional users
NOTAM generation
Regional end user performance monitoring
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationReminder of the European Model
16
ESSP certified as ANSP
Audits to maintain certificate
Certificate
EC
EC, ICAO
EC, ICAO
EASA
Industry
ESSP
ICAO, RTCA
ANSP NSA
EASA
NSA
Mutual recognition
(SES)
NSA
NSA ↔ NSA
ESSP
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationSystem ICAO and SES
Service Provider SES
Application ICAO and SES
Airworthiness EASA
System and application certification can rely on ICAO Applicable to ACAC
Airworthiness: Based on each State regulations?
Based on new common regulations?
Based on other regulations (Europe, US…)?
As from regulatory view point, in the ACAC Region:Each country has its own regulatory framework
ACAC does policy and assists States in its application
ACAC has Arabic institutional legal aspects but no common regulation over ACAC States
The only common entity is the Arab League, but does nor address aviation at regulatory level
17
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationIn the medium term, case of a regional operator and service provider (case of REM implementation in Region 3):
Will it be certified?
Based on which regulations?
In case of regional service provider, depending on certification processA Regional Supervisory Entity may be created for
Certification of Service Provision
Application certification
18
Short term Medium term Long termSchedule
System service provider
ESSP (SPU)
Regional EGNOS Service Provider
ARG-3 SBAS
Service Provider
TransferTransfer
Certification French NSA
Recognition by States out
of ECAC
To be defined at ACAC level
To be defined at ACAC level
SIRAJ Final Workshop - Rabat 28th May 2012
OperationsEach ANSP in ACAC will be in charge of
Procedure availability (from design to publication)
Training (ATC)
Procedures (ATC)
Validation and broadcast of NOTAM for APV EGNOS operations
NOTAM generation to be clarified:2 Alternatives for NOTAM generation in ACAC
Short Term: Upgrade of EURONOTAM to consider EGNOS extension
Longer Term: Own ACAC dedicated Tool
• If a dedicated tool is developed for ACAC region, who will operate it?
Regional Service Provider?
Validation and validation of those NOTAM by each AIS? Central AIS?