1
Screen Shots
BOM Details
Lot Sizing Constraints
Alternate Items
Produced Item
Consumed Item
Routing Used
Consumption Ratio
Operation Details
Alternate and Additional Resource
List of Operation-Resource for
Selected Route
Production Rate
Calendar
Individual Resource Calendar
Working Shift, Over Time, Non
Working Shift
Workflow
Running Production
Plan
Sales Order Plan
Explosion of BOM Considering both
Material and Capacity Constraints
Material Plan
Capacity Plan
Capacity Plan in Minutes at Operation-
Resource Level
Operation Plan
Allocation Details for
Work Order
Operation Plan for Selected Work Order
Procurement Plan
Generated Purchase Orders
Proposed Sourcing Dates based on Production Plan
Resource Load
Used Capacity by Available
Capacity
List of Resources
Individual Resource Load
Capacity Attributes
Load Graph with automatically balanced
load
Critical Resource
Load Between Two Dates
Inventory Report
Ending on Hand at Different
DatesList of Items
Item Status
Item Status Between Two
Dates
Problem Summary - Sales Order Late
List of sales orders where Planned End Time is greater than due date
and thereby late
Problem Summary – Shortage Report with Available Vs Required Date
List of material where available date is greater than required date and
shortage quantity
Automated SchedulingAutomated Scheduling
Automatically schedule all jobs
for selected resource
Automatically schedule or un-
schedule a selected job
Schedule all jobs for all resource either based on just-in-time or resource utilization strategy for
given scheduling horizon
Interactive SchedulerInteractive Scheduler
Resource List
Jobs list for the selected
resource
Non working time
Schedule jobs
Information on selected job in
Gantt chart
Zoom optionMove timeline
Manual SchedulingManual Scheduling
Action on individual
scheduled job
Moving job through drag and drop or can be
drawn on Gantt window
While moving job, if there is violation, provides an alert
Upstream and Downstream LinksUpstream and Downstream Links
Show upstream and downstream links for selected customer order or
job order
21
Thank You