Download - 17 AET - GCE & IQA
4/5/2013 Cummins Confidential 4
Fill out this form with all the mandatory (*) required information.
Read the privacy Policy and clck
“Continue”
4/5/2013 Cummins Confidential 5
Once you have the Cummins WWID and access code, go to:
tps://gce.cummins.com/
How to access GCE?
4/5/2013 Cummins Confidential 13
PowerGen
DQKAB
PowerGen
Distributor code
End customer name
Project name
Power Generation
Engine used @ genset
Distributor’s name
4/5/2013 Cummins Confidential 14
Genset Sinzing calculation
IQA review at Design phase
(shaded area of IQA form)
IQA review after Installation completed
Attaching the IQA file
IQA is an excel spreadsheet with all the infomation collected along the reviews:
– For sizing tab, it can be any document/fomat with the selection of the genset model.
– Desing review must contain all the shaded fields at IQA form. – Installation review must contain the other fiels of the IQA form.
Submitting the IQA for audit
After attached the IQA file and add desired comments, submit for audit.
Select the appropriated phase of your IQA for audit.
How looks like the IQA tool!!!!!
Commercial IQA 9th-Mar-2011 (version 2).xlsm
4/5/2013 Cummins Confidential 17