2011 Seven Year Electricity Planning Statement (2012-2018) Attachments
Power Network Development Department Asset Management Directorate
November 2011
400 kV OHL
220 kV OHL
Power Station
400kV Grid Station
220kV Substation
400 kV Cable
220 kV Cable
132 kV Cable
Legend
KSA Border
Liwa
Madinat Zayed
Sila
ShuweihatS1 & S2
Ruwais
Mirfa
Central
SAS
Mussafah
AAPS
Dahma
Al Hayer
Maziyad
Al Wagon
Sanaiya
Arad
Sultanate of Oman
Dhaid
GIC
E48
City Centre
Asab
BuHasa
Central & Western Region
Abu
Dhab
i Islan
ds
Al AinRegion
SalamatKhazna
Mahawi
Sweihan
ADST
Dabiya
Rumaithy
E19
Gaithy
Bab
UAN
Bahia
SASN
REEM
ADST
E48
E19
To TANE
SADIYAT
Abu Dhabi Islands400 kV OHL
400 kV U/G Cable
To
GCC
Inte
rcon
nect
ion
ICAD
Steel I
Qidfa
Umm Al Oush
To Mahawi
Bahia
Sadiyat
ReemDelma Island
Ras Al Khaimah
QusahwiraShah- SGD
Masdar Shams
Ghantoot
Emal
AAIC
Ajman
New Fujairah
To TWPS
Sir Baniyas
AASW
Al FoahRamah
Zakher
WASIT(OMAN)
Al Maqam
Shamkha
SamhaTANE
Taweela-P.S
Ain Al Faydha
Masdar Hydrogen
Braka
Hameem
Warsan
Sharjah
Steel II
Asab
Switching
Shahama
Gasco-Elixier
400 kV OHL
220 kV OHL
Power Station
400kV Grid Station
220kV Substation
400 kV Cable
220 kV Cable
132 kV Cable
Legend
KSA Border
Liwa
Madinat Zayed
Sila
ShuweihatS1 & S2
Ruwais
Mirfa
Central
SAS
Mussafah
AAPS
Dahma
Al Hayer
Maziyad
Al Wagon
Sanaiya
Arad
Sultanate of Oman
Dhaid
GIC
E48
City Centre
Asab
BuHasa
Central & Western Region
Abu
Dhab
i Islan
ds
Al AinRegion
SalamatKhazna
Mahawi
Sweihan
ADST
Dabiya
Rumaithy
E19
Gaithy
Bab
UAN
Bahia
SASN
REEM
ADST
E48
E19
To TANE
SADIYAT
Abu Dhabi Islands400 kV OHL
400 kV U/G Cable
To
GCC
Inte
rcon
nect
ion
ICAD
Steel I
Qidfa
Umm Al Oush
To Mahawi
Bahia
Sadiyat
ReemDelma Island
Ras Al Khaimah
QusahwiraShah- SGD
Masdar Shams
Ghantoot
Emal
AAIC
Ajman
New Fujairah
To TWPS
Sir Baniyas
AASW
Al FoahRamah
Zakher
WASIT(OMAN)
Al Maqam
Shamkha
SamhaTANE
Taweela-P.S
Ain Al Faydha
Masdar Hydrogen
Braka
Hameem
Warsan
Sharjah
Steel II
Asab
Switching
Shahama
Gasco-Elixier
400 kV OHL
220 kV OHL
Power Station
400kV Grid Station
220kV Substation
400 kV Cable
220 kV Cable
132 kV Cable
Legend
KSA Border
Liwa
Madinat Zayed
Sila
ShuweihatS1 & S2
Ruwais
Mirfa
Central
SAS
Mussafah
AAPS
Dahma
Al Hayer
Maziyad
Al Wagon
Sanaiya
Arad
Sultanate of Oman
Dhaid
GIC
E48
City Centre
Asab
BuHasa
Central & Western Region
Abu
Dhab
i Islan
ds
Al AinRegion
SalamatKhazna
Mahawi
Sweihan
ADST
Dabiya
Rumaithy
E19
Gaithy
Bab
UAN
Bahia
SASN
REEM
ADST
E48
E19
To TANE
SADIYAT
Abu Dhabi Islands400 kV OHL
400 kV U/G Cable
To
GCC
Inte
rcon
nect
ion
ICAD
Steel I
Qidfa
Umm Al Oush
To Mahawi
Bahia
Sadiyat
ReemDelma Island
Ras Al Khaimah
QusahwiraShah- SGD
Masdar Shams
Ghantoot
Emal
AAIC
Ajman
New Fujairah
To TWPS
Sir Baniyas
AASW
Al FoahRamah
Zakher
WASIT(OMAN)
Al Maqam
Shamkha
SamhaTANE
Taweela-P.S
Ain Al Faydha
Masdar Hydrogen
Braka
Hameem
Warsan
Sharjah
Steel II
Asab
Switching
Shahama
Gasco-Elixier
-
TRANSCO 2011 7YPS (2012-2018) November 2011 AMD/PNDD Attachments
Table of Contents
Attachment-A
Electricity demand forecast at the grid supply points and demand supply exit points.
Electricity generation capacity expansion plan.
Attachment-B
Electricity transmission network topology (400kV, 220kV, 132kV system).
Geo-map of transmission network topology (400kV and 220kV system) for Year 2011 & 2018.
Attachment-C
Forecast power flows and loading on the transmission system for Year 2011-2018.
Attachment-D
Fault levels at the transmission nodes for Year 2011-2018.
Attachment-E
Transmission system dataset.
Attachment-F
Major existing generation plants and planned committed generation projects.
-
Attachment-AElectricity Demand Forecast, Electricity Generation Capacity Expansion Plan
Table-A1 Summary of regio-wise peak demand forecast for 16GW scenario, 20GW scenario and 24GW scenario(MW)
Table-A2 Area-wise/zone-wise peak demand forecast for16GW scenario, 20GW scenario and 24GW scenario(MW)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit poits(MW)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit poits(MW)
Table-A5 Sum of region-wise peak demand forecast for 20GW scenario(MW)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points(MW)
Table-A7 Northern Emirates peak demand forecast for 20GW scenario(MW)
Table-A8 Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast(Gross MW)
Table-A9 List of substations transferred from one gid zone to another for 20GW scenario
Table-A10 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations before transfer for 20GW scenario
Table-A11 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations after transfer for 20GW scenario
Attachment-B Electricity Transmission Network Topology (400kV,220kV,132kV System), Geo-Map of Transmission Network Topology (400kV,220kV System) for Year 2011 & 2018
Fig.B1 400kV & 220kV Electrical Power System Topology - Yr 2011
Fig.B2 400kV & 220kV Electrical Power System Topology - Yr 2012
Fig.B3 400kV & 220kV Electrical Power System Topology - Yr 2013
Fig.B4 400kV & 220kV Electrical Power System Topology - Yr 2014
Fig.B5 400kV & 220kV Electrical Power System Topology - Yr 2015
Fig.B6 400kV & 220kV Electrical Power System Topology - Yr 2016
Fig.B7 400kV & 220kV Electrical Power System Topology - Yr 2017
Fig.B8 400kV & 220kV Electrical Power System Topology - Yr 2018
Fig.B9 132kV Electrical Power System Topology - Yr 2011
Fig.B10 132kV Electrical Power System Topology - Yr 2012
Fig.B11 132kV Electrical Power System Topology - Yr 2013
Fig.B12 132kV Electrical Power System Topology - Yr 2014
Fig.B13 132kV Electrical Power System Topology - Yr 2015
Fig.B14 132kV Electrical Power System Topology - Yr 2016
Fig.B15 132kV Electrical Power System Topology - Yr 2017
Fig.B16 132kV Electrical Power System Topology - Yr 2018
Fig.B17 TRANSCO 400kV & 220kV Transmission System (Year 2011)
Fig.B18 TRANSCO 400kV & 220kV Transmission System (Year 2018)
List of Tables and Figures
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 1 of 3
-
List of Tables and Figures
Attachment-C Forecast Power Flows and Loading on the Transmission System for Year 2011-2018
Fig.C1 LF for Year 2011; 400kV Network- Peak Load
Fig.C2 LF for Year 2011; 220kV Network- Peak Load
Fig.C3 LF for Year 2011; 132kV Network- Peak Load
Fig.C4 LF for Year 2012; 400kV Network- Peak Load
Fig.C5 LF for Year 2012; 220kV Network- Peak Load
Fig.C6 LF for Year 2012; 132kV Network- Peak Load
Fig.C7 LF for Year 2013; 400kV Network- Peak Load
Fig.C8 LF for Year 2013; 220kV Network- Peak Load
Fig.C9 LF for Year 2013; 132kV Network- Peak Load
Fig.C10 LF for Year 2014; 400kV Network- Peak Load
Fig.C11 LF for Year 2014; 220kV Network- Peak Load
Fig.C12 LF for Year 2014; 132kV Network- Peak Load
Fig.C13 LF for Year 2015; 400kV Network- Peak Load
Fig.C14 LF for Year 2015; 220kV Network- Peak Load
Fig.C15 LF for Year 2015; 132kV Network- Peak Load
Fig.C16 LF for Year 2016; 400kV Network- Peak Load
Fig.C17 LF for Year 2016; 220kV Network- Peak Load
Fig.C18 LF for Year 2016; 132kV Network- Peak Load
Fig.C19 LF for Year 2017; 400kV Network- Peak Load
Fig.C20 LF for Year 2017; 220kV Network- Peak Load
Fig.C21 LF for Year 2017; 132kV Network- Peak Load
Fig.C22 LF for Year 2018; 400kV Network- Peak Load
Fig.C23 LF for Year 2018; 220kV Network- Peak Load
Fig.C24 LF for Year 2018; 132kV Network- Peak Load
Fig.C25 LF for Year 2018; 400kV Network- Peak Load; Option ( Hamria)
Fig.C26 LF for Year 2018; 400kV Network- Peak Load; Option ( Mirfa)
Fig.C27 LF for Year 2012; 400kV Network- Off Peak Load
Fig.C28 LF for Year 2012; 220kV Network- Off Peak Load
Fig.C29 LF for Year 2012; 132kV Network- Off Peak Load
Fig.C30 LF for Year 2018; 400kV Network- Off Peak Load
Fig.C31 LF for Year 2018; 220kV Network- Off Peak Load
Fig.C32 LF for Year 2018; 132kV Network- Off Peak Load
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 2 of 3
-
List of Tables and Figures
Attachment-D Fault Levels at the Transmission Nodes for Year 2011-2018
Table-D1 3-Phase and 1-Phase Short Circuit Levels(kA) for Peak Load Condition
Table-D2 3-Phase and 1-Phase Short Circuit Levels(kA) for Off Peak Load Condition(Year 2012 & 2018)
Table-D3 Maximum 3-ph Fault Contribution from 220/33kV Transformer at 33kV Level
Table-D4 Maximum 3-ph Fault Contribution from132/33kV, 132/22kV & 132/11kV Transformer at LV
Attachment-E Transmission System Dataset
Table-E1 Generators & Generator Step-up Transformers Dataset Summary
Table-E2 400kV Grid Transformers Dataset Summary
Table-E3 220kV Transformers Dataset Summary
Table-E4 132kV Transformers Dataset Summary
Table-E5 Line Data Type(Year 2011/2018)
Table-E6 Line Dataset Summary - Year 2011
Table-E7 Line Dataset Summary - Year 2018
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) List of Tables and Figures Sheet 3 of 3
-
Transco 2011 7YPS (2012-2018), Attachments
TRANSCO/AMD/PNDD November 2011
ATTACHMENT-A
Electricity Demand Forecast Electricity Generation Capacity Expansion Plan
-
Attachment - A
2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018
Abu Dhabi Island 1,970 2,110 2,300 2,410 2,087 2,359 2,657 3,031 2,140 2,480 2,830 3,580
Eastern Region 3,060 3,625 4,235 4,465 3,197 3,786 4,845 5,678 3,270 4,070 5,725 6,875
Al-Ain Region 1,745 1,800 1,930 1,980 2,000 2,182 2,349 2,522 2,030 2,285 2,465 2,820
Gharbia Region 1,245 2,095 2,520 2,800 1,375 2,454 3,019 3,345 1,425 2,940 3,710 4,700
Northern Emirates 2,270 3,295 3,720 3,810 2,385 3,755 4,460 5,040 2,390 4,380 4,935 5,595
Losses 106 146 200 210 123 194 252 430 150 212 440 550
Total Demand 10,396 13,071 14,905 15,675 11,167 14,730 17,582 20,046 11,405 16,367 20,105 24,120
Table-A1 Summary of region-wise peak demand forecast(MW) for 16GW scenario, 20GW scenario and 24GW scenario
16GW Scenario 20GW Scenario 24GW ScenarioRegion
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A1 Sheet 1 of 1
-
Attachment - A
2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018
1 ADST 575 600 625 650 603 702 758 823 625 750 800 825
2 Al-Qurm (E19) 700 740 775 800 731 754 821 909 750 800 850 910
3 Beach (E48) 650 675 725 735 694 784 887 925 700 800 890 925
4 Reem Island 30 60 125 150 40 75 131 260 45 85 155 320
5 Sadiyat Island 15 35 50 75 19 44 60 114 20 45 135 200
6 Zayed Sports City 400
1,970 2,110 2,300 2,410 2,087 2,359 2,657 3,031 2,140 2,480 2,830 3,580
1 SASN/UAN 425 550 575 600 428 564 638 816 465 620 700 850
2 Mahawi 550 650 700 725 586 654 730 812 600 700 800 900
3 North Watbha/Capital Dist
4 Bahia 150 300 350 375 160 345 477 636 160 400 500 600
5 Shamkha 100 125 150 175 100 125 151 204 100 125 150 250
6 Shahama 160 175 200 225 198 228 259 320 200 250 300 350
7 Mussafah 500 550 850 875 525 550 800 900 525 600 850 900
8 ICAD 475 525 585 640 480 545 850 900 500 600 850 900
9 Hameem Jun 400 750
10 Taweela/KPIZ 50 100 175 200 70 125 290 440 70 125 400 600
11 Aux & Desal loads at TWPS/TANE 520 520 520 520 520 520 520 520 520 520 520 520
12 Aux & Desal loads at Taweela-C 125 125
13 Aux & Desal loads at SASN/UAN 130 130 130 130 130 130 130 130 130 130 130 130
3,060 3,625 4,235 4,465 3,197 3,786 4,845 5,678 3,270 4,070 5,725 6,875
1 Al-Ain South West 575 600 625 655 654 747 816 900 655 750 815 900
2 Sweihan 450 475 520 525 561 610 666 722 575 685 750 800
3 Dahma 720 725 785 800 785 825 867 900 800 850 900 900
4 Al-Ain Airport 220
1,745 1,800 1,930 1,980 2,000 2,182 2,349 2,522 2,030 2,285 2,465 2,820Al-Ain Region (MW)
Table-A2 Area-wise/zone-wise peak demand forecast(MW) for for 16GW scenario, 20GW scenario and 24GW scenario
Zone/Area
Abu Dhabi Islands (MW)
Eastern Region (MW)
16GW Scenario 20GW Scenario 24GW ScenarioS.N
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A2 Sheet 1 of 2
-
Attachment - A
2012 2014 2016 2018 2012 2014 2016 2018 2012 2014 2016 2018
Table-A2 Area-wise/zone-wise peak demand forecast(MW) for for 16GW scenario, 20GW scenario and 24GW scenario
Zone/Area16GW Scenario 20GW Scenario 24GW Scenario
S.N
1 Bab 200 225 250 275 220 225 330 340 245 285 560 565
2 Buhasa 80 100 110 125 100 100 131 135 100 105 245 250
3 ASAB 125 150 175 200 153 155 260 300 155 155 360 380
4 Mirfa-NGI 190 190 190 190 190 190 190 190 190 190 190 190
5 Shah-SGD 295 295 100 295 295 330 330 330
6 Central 80 90 100 120 105 110 135 173 110 110 140 175
7 Ruwais 650 650 650 800 800 800 885 885 885
8 ChemawEyaat 50 110 800
9 Mirfa 40 55 60 70 55 65 75 90 55 65 75 100
10 Shuweihat 200 250 275 300 210 314 373 402 220 350 375 405
11 Madinat Zayed 200 220 250 275 212 230 265 320 220 250 275 320
12 Aux & Desal loads at Shuweihat (S1/S2/S3) 130 165 165 165 130 165 165 165 130 165 165 165
13 Aux & Desal loads at Braka 135 135 135
1,245 2,095 2,520 2,800 1,375 2,454 3,019 3,345 1,425 2,940 3,710 4,700
1 Dhaid 910 910 910 910 910 910 910 910 910 910 910 910
2 Fujairah-Qidfa 375 400 450 450 390 450 450 450 395 450 450 450
3 Ras Al Khaimah 425 450 500 525 470 545 655 745 470 700 750 900
5 Ajman 150 400 425 450 180 465 570 765 180 650 740 900
6 Fujairah City 125 300 335 350 150 540 655 790 150 625 700 900
7 Sharjah 500 650 675 510 660 820 600 750 900
8 Aux & Pumping loads in NE 285 335 450 450 285 335 450 450 285 335 450 450
9 Aux loads in F3 75 75
10 Aux & Desal loads in Hamria 110 110 110 110 110
2,270 3,295 3,720 3,810 2,385 3,755 4,460 5,040 2,390 4,380 4,935 5,595
92 146 200 210 123 194 252 430 150 212 440 550
10,382 13,071 14,905 15,675 11,167 14,730 17,582 20,046 11,405 16,367 20,105 24,120Grand Total (MW)
Western Region (MW)
Northern Emirates (MW)
Losses (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A2 Sheet 2 of 2
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
1 ADST (132/33kV S/S) 2 x 120 120 71 75 45 35 35 32
2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 50 55 55 60 55
3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 90 96 80 80 73
4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 60 65 65 70 64
5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 85 90 90 90 82
6 Tourist Club-TCLB (E15) - 132/11kV 4 x 40 120 71 75 82 85 85 78
7 Port (E14) - 132/11kV 4 x 40 120 46 50 65 65 65 60
8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48
9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 60 67 68 70 64
10 Souq (E01) - 132/11kV 4 x 40 120 30 35 37 40 37
11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 25 25 23
12 E03 - 132/11kV 4 x 40 120 20 30 27
528 575 600 625 650
1 QURM (E19) - 132/11kV 4 x 40 120 64 73 80 85 85 78
2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 99 61 67 70 64
B) AL-QURM (E19) Zone (1000MVA firm capacity)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
A) ADST Zone (1000MVA firm capacity)
ADST Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 1 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 95 103 103 105 96
4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 100 95 90 90 82
5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 90 98 95 95 87
6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 85 91 95 95 87
7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 50 55 60 66 60
8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 28 34 40 44 40
9 CLNS (E16/02) - 132/11kV 4 x 40 120 54 55 67 70 75 69
10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 25 28 40 45 41
11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 28 30 30 41
652 700 740 775 800
1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 90 95 95 100 92
2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 65 55 50 50 69
3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 85 90 90 95 87
4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81
5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 85 85 90 85 78
C) BEACH (E48) Zone (1000MVA firm capacity)
E19 Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 2 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 90 90 95 96 88
7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 90 75 80 81 74
8 GLFA (W47) - 132/11kV 4 x 40 120 98 100 100 100 100 92
9 Khalifa Park-KHPK - 132/11kV 4 x 40 120 4 25 52 55 58 53
10 DANET-DANT (E40) - 132/11kV 4 x 40 120 20 33 40 40 37
11 ADNEC (W59/02)- 132/11kV 4 x 40 120 30 30 27
609 650 675 725 735
1Reem Island - 132/22kV S/S (each 4 x 80MVA)
[T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 15 35 90 100 11
2 Suwa Island - 132/22kV 4 x 80 240 15 25 35 50 23
30 60 125 150
1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)
[SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 15 35 50 75 9
15 35 50 75
1,789 1,970 2,110 2,300 2,410Abu Dhabi Islands' Grand Total (MW)
D) REEM Zone (1500MVA firm capacity)
E) SADIYAT Zone (1500MVA firm capacity)
REEM Zone Total (MW)
E48 Zone Total (MW)
SADIYAT Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 3 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 42 52 55 55 76
2 S18 (JSRN) - 132/11kV 4 x 40 120 79 67 77 80 80 73
3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 100 91 95 100 92
4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 100 92
5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 56 61 61 65 60
6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 55 70 75 80 73
7 Capital District/Mafraq -132/22kV 4 x 80 240 50 50 60 27
8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 43 54 60 55
379 425 550 575 600
1 Watbha (WATH) - 220/33kV - existing 2 x 100 + 140+140 200 235 235 150
2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 98
3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 271 200
4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 310 320 98
5 220/33kV Mobile Station at Mafraq (F1/ F2) 140 N/A 44 N/A
F) SASN Zone (500MVA firm capacity upto Yr 2013; 1000MVA firm capacity from Yr 2014)
G) MAHAWI Zone (1000MVA firm capacity)
SASN Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 4 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
6 Mussafah M12 - 132/11kV 4 x 40 120 27 36 45 41
7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 14 47 50 23
8 Al Nahda -132/33kV 3 x 120 240 59 92 95 43
440 550 650 700 725
1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 83 85 90 95 75
2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 52 55 60 65 30
3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 15 40 48 50 23
4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL 20 24 25 11
5 Al Falah S1 -132/22kV 4 x 80 240 30 35 95 43
6 New Airport-132/22kV 4 x 80 240 40 45 45 21
112 150 270 303 375
1 220/33kV Mobile Stations 90 + 2 x 80 N/A 80 100 125
2 Shamkha-132/33kV 3 x 120 240 98 105 48
3 South Shamkha/Shamkha Housing-132/22kV 4 x 80 240 52 70 32
80 100 125 150 175
MAHAWI Zone Total (MW)
BAHIA Zone Total (MW)
I) SHAMKHA Zone (500MVA firm capacity)
SHAMKHA Zone Total (MW)
H) BAHIA Zone (1500MVA firm capacity)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 5 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 250 250 250 250 98
2 MGIC - 220/33kV 4 x 140 420 186 246 280 290 300 78
3ICAD Steel -GHC & Emirates (MOSF) - 220/11kV (40+2x60+2x90) &
220/33kV (2x180+2x60+63)
(40+2x60+2x90)+
(2x180+2x60+63)TBC 140 450 450 450 450 TBC
4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 29 95 100 170 47
5 ICAD/Emirates Steel Extension TBC TBC 345 345 N/A
610 975 1,075 1,435 1,515
1 Taweela A -132/33kV (KPIZ loads) 3x100 + 2x140 200+140 35 50 100 175 200 65
35 50 100 175 200
1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 115 120 140 150 59
2 Samha (SMHG) - 220/33kV 2 x 140 140 44 45 45 50 55 43
3 Ghantoot - 220/33kV 2 x 140 140 10 10 20 16
158 160 175 200 225
1,814 2,410 2,945 3,537 3,815
L) Other 220/33kV Substations in Abu Dhabi Mainland
J) MUSSAFAH (1000MVA firm capacity) & ICAD Zone (1000MVA firm capacity)
Eastern Region Grand Total ( MW)
Others (MW)
K) TAWEELA/KPIZ Zone
TAWEELA/KPIZ Zone Total (MW)
MUSSAFAH & ICAD Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 6 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 105 138 150 180 99
2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 95 95 100 120 66
3 Sila (SLWR) - 220/33kV 2 x 80 + 80 160 24 40 50 55 55 38
4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 40 55 60 70 77
5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 75 82 95 95 75
6 Central (CNTG)-220/33kV 2 x 140 140 8 15 22 26 30 24
7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 N/A
8 Ghayathi - 220/33kV 2 x 140 140 4 26 45 45 45 35
9 Delma Island (132/11kV) 2 x 40 40 14 21 22 22 22 60
10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 N/A
11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 15 15 15 15 N/A
12 Sir Baniyas Island - 132/11kV 3 x 40 80 20 20 27
407 475 567 631 695
1 DABIYA 220/33kV 2 x 110 110 47 50 53 54 70 70
Sub-Total-1 (MW)
M) 220kV and 132kV Substations in Western Region
N) 220kV Substations in Western Region for ADNOC Group
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 7 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 20 20 44
3 BUHASA 220/33kV 2x140 + 2x140 280 58 80 100 110 125 49
4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab
compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150+2x140 320+150+140 88 200 225 250 275 50
5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 65 90 95 100 55
6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 20 20 40 60
7 AL HOSN GAS (SHAH-SGD) TBC TBC 295 295
8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 75
9 RUWAIS TBC TBC 650 650 650
251 620 1,343 1,704 1,785
658 1,095 1,910 2,335 2,480
1 Sweihan (SWHG) 2x80+140 160 81 90 95 98 98 67
2 Al-Hayer (AHYG) 3 x 80 160 62 70 75 77 77 53
3 Ramah (RMAG) 3 x 140 280 106 110 115 115 115 45
4 Al Khazna (KHZG) 2 x 140 140 38 50 55 55 55 43
5 Al Salamat (SLMG) 3 x 140 280 117 130 135 140 140 55
O) Sweihan Grid (1000MVA firm capacity)
Gharbia Region Grand Total (MW)
Sub-Total-2 (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 8 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
6 Al-Mukkam 3 x 120 240 35 40 18
404 450 475 520 525
1 Al Foah (AOHG) 2 x 140 140 76 76 78 80 80 63
2 Dahma (DHMG) 3 x 80 160 108 110 110 115 120 82
3 AAPS (2x100+2x80+2x80) (2x100+2x80+2x80) 100+80+80 182 182 182 182 182 77
4 City Centre (CTCG) 3 x 140 280 140 142 145 148 148 58
5 Zakher (ZAKG) 3x120 + 2x140 380 211 210 210 210 220 64
6 New Grid Station in Al-Ain Power House 3 x 120 240 50 50 23
717 720 725 785 800
1 Mazyad (MZDG) 2x140+140 280 97 100 105 110 110 43
2 Sanaiya (SNYG) 3 x 140 280 185 185 200 215 215 84
3 Al-Ain South West (ASWG) 3 x 140 280 58 60 65 70 70 27
5 Al-Arad (ARDG) 2 x 140 140 84 85 85 85 85 67
Q) Al-Ain South West Grid (1000MVA firm capacity)
Subtotal (Sweihan Grid Zone)
P) Dahma Grid (1000MVA firm capacity)
Subtotal (Dahma Grid Zone)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 9 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A3 Abu Dhabi Emirate peak demand forecast for 16GW scenario at demand supply exit points(MW)
6 Al-Wagon (AWGG) 3 x 80 160 103 60 60 60 60 41
7 Umn Al Oush 2 x 140 140 35 35 35 35 27
8 Al-Ain Industrial City (AAIC) 3 x 140 280 50 50 50 50 20
9 Ain Al Fydha 3 x 120 240 30 14
527 575 600 625 655
1,648 1,745 1,800 1,930 1,980
Subtotal (Al-Ain South West Grid Zone)
Al-Ain Region Grand Total (MW)
TRANSCO/AMD/PNDDNovember 2011
Transco 2011 7YPS (2012-2018) Table A3 Sheet 10 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
1 ADST (132/33kV S/S) 2 x 120 120 71 77 46 37 37 34
2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 50 56 63 65 60
3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 95 96 90 95 87
4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 65 70 78 80 73
5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 90 100 105 105 96
6 Tourist Club-TCLB (E15) - 132/11kV 4 x 40 120 71 78 82 86 90 82
7 Port (E14) - 132/11kV - See Note 1 4 x 40 120 46 60 70 83 85 78
8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48
9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 65 70 80 85 78
10 Souq (E01) - 132/11kV 4 x 40 120 45 55 68 70 64
11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 50 53 58 53
12 E03 - 132/11kV 4 x 40 120 55 57 60 54
528 625 750 800 830
1 QURM (E19) - 132/11kV 4 x 40 120 64 74 90 99 109 100
2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 99 65 68 73 67
B) AL-QURM (E19) Zone (Firm capacity 1000MVA)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
A) ADST Zone (Firm capacity 1000MVA)
ADST Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 1 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 100 103 105 105 96
4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 102 95 92 100 92
5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 95 97 100 103 94
6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 90 95 100 103 94
7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 53 60 65 72 66
8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 38 50 65 71 65
9 CLNS (E16/02) - 132/11kV 4 x 40 120 54 65 70 75 80 73
10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 35 40 55 60 55
11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 35 35 35 48
652 750 800 860 911
1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 93 103 105 105 96
2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 67 63 58 60 82
3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 85 90 95 95 87
4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81
C) BEACH (E48) Zone (Firm capacity 1000MVA)
E19 Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 2 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 95 104 82 85 78
6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 95 90 99 100 92
7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 100 75 83 85 78
8 GLFA (W47) - 132/11kV 4 x 40 120 98 103 103 103 103 94
9 Khalifa Park-KHPK - 132/11kV 4 x 40 120 4 32 52 66 67 61
10 DANET-DANT (E40) - 132/11kV 4 x 40 120 30 50 70 70 64
11 ADNEC (W59/02)- 132/11kV 4 x 40 120 50 74 75 69
12 E25/02 - 132/11kV 4 x 40 120 20 28 30 27
13 W24/02 - 132/11kV 4 x 40 120 28 30 27
14 Zayed Sports City (W57) - 132/11kV 4 x 40 120 20 18
609 700 800 890 925
1132/11kV Substations (4 Nos) to meet demand requirements in
E48 & SASN/UAN Zone4 x (4 x 40) 480 400
1Reem Island - 132/22kV S/S (each 4 x 80MVA)
[T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 30 60 120 260 30
2 Suwa Island - 132/22kV 4 x 80 240 15 25 35 60 27
45 85 155 320
E) REEM Zone (Firm capacity 1500MVA)
REEM Zone Total (MW)
D) Zyed City Zone (Firm capacity 1000MVA)
E48 Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 3 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)
[SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 20 45 135 200 23
20 45 135 200
1,789 2,140 2,480 2,840 3,586
1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 50 52 60 70 96
2 S18 (JSRN) - 132/11kV 4 x 40 120 79 75 77 90 105 96
3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 100 91 105 105 96
4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 100 92
5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 56 61 68 74 68
6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 79 70 82 100 92
7 Capital District/Mafraq -132/22kV 4 x 80 240 80 100 120 55
8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 83 90 100 92
9 Khalifa D (MKDD) - 132/11kV 4 x 40 120 76 70
379 465 620 700 850
F) SADIYAT Zone (Firm capacity 1500MVA)
Abu Dhabi Islands' Grand Total (MW)
SASN Zone Total (MW)
SADIYAT Zone Total (MW)
F) SASN Zone (Firm capacity 500MVA upto Yr 2013; 1000MVA firm capacity from Yr 2013)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 4 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
1 Watbha (WATH) - 220/33kV - existing 2 x 100 + 140+ 140 200 235 235 150
2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 98
3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 270 200
4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 310 320 98
5 220/33kV Mobile Station for Mafraq F1/ F2 140 N/A 70 N/A
6 Mussafah M12 - 132/11kV 4 x 40 120 30 55 80 73
7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 55 100 125 57
8 Al Nahda -132/33kV 3 x 120 240 65 120 160 73
440 575 700 800 900
1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 83 103 115 125 98
2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 62 96 110 135 62
3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 15 46 56 70 32
4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL 20 24 30 14
5 Al Falah S2 (Global Foundaries) - 132/22kV 4 x 60 180 50 100 61
G) MAHAWI Zone (Firm capacity 1000MVA)
H) BAHIA Zone (Firm capacity 1500MVA)
MAHAWI Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 5 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
6 Al Falah S1 -132/22kV 4 x 80 240 40 55 100 46
7 New Airport-132/22kV 4 x 80 240 40 70 80 37
112 160 345 480 640
1 220/33kV Mobile Stations 90 + 2 x 80 N/A 80 100 125
2 Shamkha-132/33kV 3 x 120 240 98 135 62
3 South Shamkha/Shamkha housing-132/22kV 4 x 80 240 52 115 53
80 100 125 150 250
1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 250 250 250 250 98
2 MGIC - 220/33kV: See Note 8 4 x 140 420 186 275 300 330 360 94
3ICAD Steel -GHC & Emirates (MOSF) -220/11kV (40+2x60+2x90)
& 220/33kV (2x180+2x60+63)
(40+2x60+2x90)+
(2x180+2x60+63)TBC 140 450 450 450 450 TBC
4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 50 200 220 290 80
5 ICAD/Emirates Steel Extension TBC TBC 450 450 N/A
6 Hameem Junction 400 750
610 1,025 1,200 2,100 2,550
BAHIA Zone Total (MW)
J) MUSSAFAH & ICAD Zone (Firm Capacity 1000MVA + 1000MVA)
I) SHAMKHA Zone (Firm capacity 500MVA)
SHAMKHA Zone Total (MW)
MUSSAFAH & ICAD Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 6 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
1 TaweelahA -132/33kV (KPIZ loads) 3x100 + 2x140+140 200+280 35 70 125 400 450 103
2 Taweela - 220/33kV 3 x 100 200 150 150 82
35 70 125 550 600
1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 128 145 166 191 75
2 Samha (SMHG) - 220/33kV 2 x 140 140 44 73 85 95 100 78
3 Ghantoot - 220/33kV 2 x 140 140 20 40 60 47
158 201 250 301 351
1,814 2,596 3,365 5,081 6,141
1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 117 131 141 175 96
2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 97 122 129 151 83
3 Sila (SLWR) - 220/33kV 2 x 80 + 80 160 24 40 90 99 109 75
4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 57 70 75 90 99
5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 75 86 95 106 83
Eastern Region Grand Total -MW
Others (MW)
K) TAWEELA/KPIZ Zone
TAWEELA/KPIZ Zone Total (MW)
L) Other 220/33kV Substations in Abu Dhabi Mainland
M) 220kV and 132kV Substations in Western Region
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 7 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
6 Central (CNTG)-220/33kV 2 x 140 140 8 45 45 48 79 62
7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 N/A
8 Ghayathi - 220/33kV 2 x 140 140 4 49 66 73 84 66
9 Delma Island (132/11kV) 2 x 40 40 14 21 22 22 22 60
10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 N/A
11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 15 15 15 15 N/A
12 Sir Baniyas Island - 132/11kV 3 x 40 80 40 45 45 62
13 ChemawEyaat 50 110 800
407 559 780 895 1,720
1 DABIYA 220/33kV 2 x 110 110 47 50 50 72 76 76
2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 20 20 44
3 BUHASA 220/33kV 2x140 + 2x140 280 58 105 105 245 250 98
4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab
compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150+2x140 320+150+140 88 245 285 560 565 102
5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 125 125 300 300 165
6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 30 30 60 80
Sub-Total-1 (MW)
N) 220kV Substations in Western Region for ADNOC Group
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 8 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
7 AL HOSN GAS (SHAH-SGD) TBC TBC 330 330 330
8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 75
9 RUWAIS TBC TBC 885 885 885
251 760 2,015 2,662 2,696
658 1,319 2,795 3,557 4,416
1 Sweihan (SWHG) 2x80 + 140 160 81 115 120 130 141 97
2 Al-Hayer (AHYG) 3 x 80 160 62 75 85 95 100 69
3 Ramah (RMAG) 3 x 140 280 106 110 120 135 145 57
4 Al Khazna (KHZG) 2 x 140 140 38 75 80 90 95 74
5 Al Salamat (SLMG) 3 x 140 280 117 200 180 190 200 78
6 Al-Mukkam 3 x 120 240 100 110 120 55
404 575 685 750 800
1 Al Foah (AOHG) 2 x 140 140 76 95 100 115 115 90
2 Dahma (DHMG) 3 x 80 160 108 140 140 145 145 100
O) Sweihan Grid (1000MVA firm capacity)
Subtotal (Sweihan Grid Zone)
P) Dahma Grid (1000MVA firm capacity)
Gharbia Region Grand Total (MW)
Sub-Total-2 (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 9 of 10
-
Attachment-A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2012 2014 2016 2018
Utilisation
in 2018 (%)
Table-A4 Abu Dhabi Emirate peak demand forecast for 24GW scenario at demand supply exit points(MW)
3 AAPS (2x100+2x80+2x80) N/A 260 182 210 190 175 175 74
4 City Centre (CTCG) 3 x 140 280 140 145 150 160 160 63
5 Zakher (ZAKG) 3x120 + 2x140 380 211 210 210 240 240 69
6 New Grid Station in Al-Ain Power House 3 x 120 240 60 65 65 30
717 800 850 900 900
1 Mazyad (MZDG) 2 x 140 + 140 280 97 115 120 139 150 59
2 Sanaiya (SNYG) 3 x 140 280 185 190 200 215 220 86
3 Al-Ain South West (ASWG) 3 x 140 280 58 90 95 100 115 45
4 Al-Arad (ARDG) 2 x 140 140 84 95 100 110 120 94
5 Al-Wagon (AWGG) 3 x 80 160 103 60 70 80 85 58
6 Umn Al Oush 2 x 140 140 35 45 50 85 67
7 Al-Ain Industrial City (AAIC) 3 x 140 280 70 70 70 70 27
8 Ain Al Fydha 3 x 120 240 50 50 55 25
527 655 750 815 900
220
1,648 2,030 2,285 2,465 2,820
Q) Al-Ain South West Grid (1000MVA firm capacity)
Subtotal (Dahma Grid Zone)
Al-Ain Region Grand Total (MW)
Al-Ain Airport
Subtotal (Dahma Grid Zone)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A4 Sheet 10 of 10
-
Attachment-A
2010 2011 2012 2013 2014 2015 2016 2017 2018
1,789 1,981 2,086 2,239 2,359 2,472 2,657 2,835 3,031
1,814 2,129 2,547 2,811 3,136 3,968 4,195 4,530 5,028
658 1,031 1,247 1,710 2,289 2,765 2,840 2,980 3,030
1,648 1,835 2,000 2,094 2,182 2,249 2,350 2,421 2,522
5,909 6,976 7,879 8,854 9,966 11,454 12,041 12,765 13,611
757 780 780 780 815 940 940 990 1,075
6,666 7,756 8,659 9,634 10,781 12,394 12,981 13,755 14,686
1,445 1,700 2,100 3,324 3,420 3,790 3,899 4,236 4,480
270 285 285 323 335 450 450 450 450
1,715 1,985 2,385 3,647 3,755 4,240 4,349 4,686 4,930
104 104 123 155 194 217 252 342 430
8,485 9,845 11,167 13,436 14,730 16,851 17,582 18,783 20,046
Table-A5 Sum of region-wise peak demand forecast for 20GW scenario (MW)
Grand Total (MW)
C) Estimated Transmission Losses (MW)
1) Northern Emirates (MW)
Sub-Total1 (MW)
Description/Region
2) Eastern Region
3) Gharbia (Western) Region
4) Al-Ain Region
Total - Northern Emirates (MW)
Total -Abu Dhabi Emirate (MW)
A) Abu Dhabi Emirate
Aux & Desal Loads in Abu Dhabi Emirate (MW)
2) Water pumping & Aux Loads in N.E (MW)
B) Northern Emirates
1) Abu Dhabi Islands
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A5 Sheet 1 of 1
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
1 ADST (132/33kV S/S) 2 x 120 120 71 74 77 51 46 37 37 37 37 34
2 Market 1-MKT1 (W1) - 132/11kV 4 x 40 120 74 70 50 53 55 58 61 64 65 60
3 Capital Gardens-CPGR (E08) - 132/11kV 4 x 40 120 89 92 95 98 96 83 87 92 95 87
4 Firdous-FRDS (E09) - 132/11kV 4 x 40 120 53 58 63 59 60 65 73 77 80 74
5 Zayed 2nd St-ZYD2 (E11) - 132/11kV 4 x 40 120 76 83 87 92 96 100 105 105 105 96
6 Tourist Club-TCLB (E15) - 132/11kV - See Note 1 4 x 40 120 71 74 78 82 82 82 86 90 90 82
7 Port (E14) - 132/11kV - See Note 1 4 x 40 120 46 51 56 61 67 70 73 77 80 74
8 Market-MRKT (W02) - 132/11kV 3 x 40 80 48 35
9 New W02 (Replacement of old W02) - 132/11kV 4 x 40 120 28 66 67 70 73 77 80 85 77
10 Souq (E01) - 132/11kV 4 x 40 120 29 30 32 44 59 62 65 68 63
11 Corniche Hosp/Saraya (E12) - 132/11kV 4 x 40 120 43 48 50 51 54 57 53
12 E03 - 132/11kV 4 x 40 120 21 38 40 46 57 60 54
528 594 603 658 702 717 758 798 823
1 QURM (E19) - 132/11kV 4 x 40 120 64 70 74 77 81 85 89 94 98 90
2 Madinat Zayed-MDZD (E04) - 132/11kV 4 x 40 120 98 101 99 78 61 64 67 71 74 68
3 Khalidiya-KLDY (W09) - 132/11kV 4 x 40 120 93 98 100 100 103 103 105 105 105 96
4 Al Jazeira Hosp-JZRH (W13) - 132/11kV 4 x 40 120 98 99 103 90 95 88 92 97 102 93
5 Bateen-BATN (W16) - 132/11kV 4 x 40 120 88 94 95 95 98 98 100 100 103 94
6 Bateen Bus Station-BSTN (W17) - 132/11kV 4 x 40 120 84 87 90 91 91 95 100 100 103 94
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
A) ADST Zone (Firm capacity 1000MVA)
ADST Zone Total (MW)
B) AL-QURM (E19) Zone (Firm capacity 1000MVA)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 1 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
7 Conference Palace (CONH) - 132/11kV 4 x 40 120 46 50 53 55 58 61 64 67 70 64
8 Marina Mall-MRML - 132/11kV 4 x 40 120 27 28 28 32 34 38 41 43 78 71
9 CLNS (E16/02) - 132/11kV - See Note 1 4 x 40 120 54 58 61 64 67 70 74 77 81 74
10 Green Head-GRHD (W41) - 132/11kV 4 x 40 120 9 29 30 32 41 54 57 60 55
11 Presidential Palace (Ras Al Akdar) - 132/11kV 3 x 40 80 20 35 35 35 35 35 48
652 694 731 733 754 778 821 845 909
1 Beach-BECH (E48) - 132/11kV 4 x 40 120 100 91 93 100 103 105 105 105 105 96
2 Al Salam-ALSM (E18) - 132/11kV 3 x 40 80 64 65 67 69 63 55 58 59 60 82
3 Falah-FLAH (E18/02) - 132/11kV 4 x 40 120 90 95 85 87 90 90 95 95 95 87
4 Mushrif -MSRF (W24) - 132/11kV 4 x 40 120 81
5 New W24 (Replacement of Old W24) - 132/11kV 4 x 40 120 85 95 104 104 94 82 84 85 78
6 Embassy-EMBS (W59) - 132/11kV 4 x 40 120 85 90 95 80 89 94 99 99 100 92
7 Higher Tech. College-HTCO (E25) - 132/11kV 4 x 40 120 87 94 100 103 75 79 83 83 85 78
8 GLFA (W47) - 132/11kV 4 x 40 120 98 100 103 103 103 103 103 103 103 94
9 Khalifa Park-KHPK - 132/11kV - See Note 2 4 x 40 120 4 16 31 41 52 63 66 66 67 61
10 DANET-DANT (E40) - 132/11kV 4 x 40 120 15 25 40 42 44 67 70 70 64
11 ADNEC (W59/02)- 132/11kV - See Note 2 4 x 40 120 20 45 59 74 74 75 69
12 E25/02 - 132/11kV 4 x 40 120 5 18 22 28 28 30 27
E19 Zone Total (MW)
C) BEACH (E48) Zone (Firm capacity 1000MVA)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 2 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
13 W24/02 - 132/11kV 4 x 40 120 15 28 28 30 27
14 Zayed Sports City (W57) - 132/11kV - See Note 2 4 x 40 120 20 18
609 651 694 752 784 823 887 894 925
1Reem Island - 132/22kV S/S (each 4 x 80MVA)
[T1-REEM; S1-SRUH; R1-RMDV; T2-Tomouh] 1280 960 18 25 40 50 72 96 160 200 23
2 Suwa Island - 132/22kV 4 x 80 240 10 15 20 25 30 35 50 60 27
28 40 60 75 102 131 210 260
1Sadiyat Island - 132/22kV S/S (each 4 x 80MVA)
[SS1-SDYT; SS4-SDBB; SS5-SDCC; SS6-SDDD] 1280 960 14 19 36 44 52 60 88 114 13
14 19 36 44 52 60 88 114
1,789 1,981 2,086 2,239 2,359 2,472 2,657 2,835 3,031
1 Salt & Chlorine (SLTC) - 132/11kV 3 x 40 80 21 38 45 50 52 54 60 70 70 96
2 S18 (JSRN) - 132/11kV 4 x 40 120 79 64 67 70 77 85 90 99 105 96
3 Mussafah (MOS1) - 132/11kV 4 x 40 120 98 98 100 83 91 100 105 105 105 96
4 Khalifa A (MKAA) - 132/11kV 4 x 40 120 109 105 105 105 105 105 105 90 100 92
5 Old Airport (NADIA) - 132/11kV 4 x 40 120 44 53 56 58 61 64 68 70 74 68
6 Khalifa B (MKBB) - 132/11kV 4 x 40 120 28 43 55 60 70 78 80 90 100 92
7 Capital District/Mafraq -132/22kV 4 x 80 240 22 50 56 60 73 112 51
F) SASN Zone (Firm capacity 500MVA upto Yr 2013; 1000MVA firm capacity from Yr 2014)
REEM Zone Total (MW)
E) SADIYAT Zone (Firm capacity 1500MVA)
SADIYAT Zone Total (MW)
Abu Dhabi Islands' Total (MW)
E48 Zone Total (MW)
D) REEM Zone (Firm capacity 1500MVA)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 3 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
8 Khalifa C (MKCC) [Watani & others]- 132/11kV 4 x 40 120 29 57 62 70 80 100 92
9 Khalifa D (MKDD) - 132/11kV 4 x 40 120 30 50 46
379 401 428 477 564 604 638 707 816
1 Watbha (WATH) - 220/33kV - existing see Note 9 2 x 100 + 140+140 200 235 235 235 235 150
2 Watbha (WATH) - 132/33kV 3 x 120 240 100 215 215 215 215 98
3 Mahawi (MHWG) - 220/33kV - existing 3 x 140 280 205 236 271 275 200
4 Mahawi (MHWG) - 132/33kV 4 x 120 360 100 300 310 320 320 98
5 220/33kV Mobile Station for Mafraq F1/ F2 140 N/A 35 55 60 N/A
6 Mussafah M12 - 132/11kV - See Note 12 4 x 40 120 25 27 31 36 41 47 54 50
7 Mohd Bin Zayed (MBZ) - 132/22kV 4 x 80 240 14 28 47 52 66 73 33
8 Al Nahda -132/33kV 3 x 120 240 45 100 112 140 150 69
440 506 586 611 654 697 730 788 812
1 BAHYA (BHYA)-132/33kV 2 x 140 140 86 70 83 91 103 113 115 125 125 98
2 Yas Island S1 (YAS1)- 132/22kV 4 x 80 240 24 35 62 81 96 106 110 121 133 61
3 Raha-B (RBBB) - 132/22kV 4 x 80 240 2 7 15 31 46 51 56 61 67 31
4 Raha-A (RBAA) - 132/22kV 4 x 80 240 NL NL 12 20 22 24 27 29 13
5 Al Falah S2 (Global Foundaries) - 132/22kV 4 x 60 180 30 50 70 100 61
H) BAHIA Zone (Firm capacity 1500MVA)
SASN Zone Total (MW)
G) MAHAWI Zone (Firm capacity 1000MVA upto Yr 2016; firm capacity 1500MVA from Yr 2017)
MAHAWI Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 4 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
6 Al Falah S1 -132/22kV 4 x 80 240 28 40 45 55 70 100 46
7 New Airport-132/22kV 4 x 80 240 35 40 62 68 74 82 37
112 112 160 278 345 428 477 548 636
1 220/33kV Mobile Stations - See Note 3 90 + 2 x 80 N/A 80 90 100 110 125
2 Shamkha-132/33kV 3 x 120 240 94 95 102 112 51
3 South Shamkha/Shamkha housing-132/22kV 4 x 80 240 55 56 68 92 42
80 90 100 110 125 149 151 170 204
1 Mussafah (MOSG) - 220/33kV 3 x 140 280 284 263 250 250 250 250 250 250 250 98
2 MGIC - 220/33kV: See Note 4 4 x 140 420 186 235 276 286 300 310 320 342 360 94
3ICAD Steel -GHC & Emirates (MOSF) - 220/11kV
(40+2x60+2x90) & 220/33kV (2x180+2x60+63)
(40+2x60+2x90)+
(2x180+2x60+63)TBC 140 300 450 450 450 450 450 450 450 TBC
4 ICAD - 220/33kV 2 x 3 x 100 200 + 200 29 30 95 139 180 200 290 80
5 ICAD/Emirates Steel Extension (Phase-3/4) N/A N/A 450 450 450 450 N/A
610 798 1,005 1,016 1,095 1,599 1,650 1,692 1,800
1 TaweelahA -132/33kV (KPIZ loads) - See Note 5 3x100 + 2x140+140 200+280 35 47 70 100 125 250 290 345 440 101
35 47 70 100 125 250 290 345 440
1 Shahama East (SHME) - 220/33kV 3 x 140 280 114 120 126 132 135 138 145 152 160 63
L) Other 220/33kV Substations in Abu Dhabi Mainland
J) MUSSAFAH & ICAD Zone (Firm capacity 1000MVA + 1000MVA)
MUSSAFAH & ICAD Zone Total (MW)
K) TAWEELA/KPIZ Zone
TAWEELA/KPIZ Zone Total (MW)
BAHIA Zone Total (MW)
I) SHAMKHA Zone (Firm capacity 500MVA)
SHAMKHA Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 5 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
2 Samha (SMHG) - 220/33kV 2 x 140 140 44 56 72 82 83 88 92 97 102 80
3 Ghantoot - 220/33kV 2 x 140 140 5 10 15 22 31 58 46
158 176 198 219 228 241 259 280 320
1,814 2,129 2,547 2,811 3,136 3,968 4,195 4,530 5,028
1 Liwa (LWWR) - 220/33kV 3 x 100 200 141 110 117 123 128 135 135 155 160 88
2 Madinat Zayed (WMZD) - 220/33kV 2x100+140 200 93 98 103 108 112 124 125 138 140 77
3 Sila (SLWR) - 220/33kV - See Note 6 2 x 80 + 80 160 24 27 30 57 60 80 85 89 105 72
4 Mirfa (MRWR) - 220/33kV 2 x 100 100 36 40 45 59 64 70 70 77 85 93
5 Ruwais (RWWR) - 220/33kV 2 x 140 140 71 71 75 78 82 86 90 102 103 81
6 Central (CNTG)-220/33kV 2 x 140 140 8 23 40 45 45 59 61 70 77 60
7 Liwa West 220/33kV Mobile Station 80 N/A 16 18 18 18 18 18 18 18 18 N/A
8 Ghayathi - 220/33kV 2 x 140 140 4 24 30 32 55 58 70 74 80 63
9 Delma Island (132/11kV) 2 x 40 40 14 20 21 21 22 22 22 22 22 60
10 Hameem 220/33kV Mobile Station (Qasr Al Sarab) 80 N/A 25 25 25 25 25 25 25 25 N/A
11 220/33kV Mobile (Qusahwira/Umm Al Zamool) 100 N/A 10 15 15 15 15 15 15 15 N/A
12 Sir Baniyas Island - 132/11kV 3 x 40 80 16 30 46 46 46 46 63
407 466 519 597 656 738 762 831 876
1 DABIYA 220/33kV 2 x 110 110 47 47 50 50 50 54 54 73 76 76
Sub-Total-1 (MW)
N) 220kV Substations in Gharbia Region for ADNOC Group
Others (MW)
Eastern Region Total -MW
M) 220kV and 132kV Substations in Gharbia Region
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 6 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
2 RUMAITHY 220/33kV 2 x 50 50 14 15 15 15 15 15 20 20 20 44
3 BUHASA 220/33kV 2x140 + 2x140 280 58 99 100 100 100 130 131 133 135 53
4BAB- 220/132kV (2x320MVA); 220/33kV (2x150MVA)-Bab
compressor; 220/33kV (2x140MVA)-OGD III2x320+2x150 +2x140 320+150+140 88 139 220 225 225 330 330 340 340 61
5 ASAB - 220/132kV (2 x 200MVA) 2 x 200 200 44 75 123 125 125 156 200 220 220 121
6 Qusahwira - 220/33kV (for ADCO 1.8MMBD Proj) TBC TBC 30 30 30 60 60 80 80
7 AL HOSN GAS (SHAH-SGD) TBC TBC 100 295 295 295 295
8 ELIXIER-II GASCO (Near Mirfa P.S) - 220/33kV 2x140 + 2x140 280 190 190 190 190 190 190 190 190 75
9 RUWAIS TBC TBC 378 797 797 797 797 797
251 565 728 1,113 1,632 2,028 2,078 2,149 2,154
658 1,031 1,247 1,710 2,289 2,765 2,840 2,980 3,030
1 Sweihan (SWHG) - See Note 11 2x80 + 140 160 81 95 110 100 100 105 110 115 121 83
2 Al-Hayer (AHYG) 3 x 80 160 62 72 70 75 80 85 90 95 100 69
3 Ramah (RMAG) 3 x 140 280 106 108 110 115 120 120 125 130 137 54
4 Al Khazna (KHZG) 2 x 140 140 38 55 70 75 80 80 90 90 95 74
5 Al Salamat (SLMG) 3 x 140 280 117 125 201 230 170 175 180 185 194 76
6 Al-Mukkam 3 x 120 240 60 68 71 72 76 35
404 455 561 595 610 633 666 687 722
O) Sweihan Grid (Firm capacity 1000MVA)
Sweihan Zone Total (MW)
Sub-Total-2 (MW)
Gharbia Region Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 7 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
1 Al Foah (AOHG) 2 x 140 140 76 85 95 95 100 105 110 115 115 90
2 Dahma (DHMG) 3 x 80 160 108 113 125 130 135 140 140 140 145 100
3 AAPS (2x100+2x80+2x80) 2x100+2x80+2x80 100+80+80 182 182 210 230 190 170 175 175 175 74
4 City Centre (CTCG) 3 x 140 280 140 143 145 160 140 145 150 155 160 63
5 Zakher (ZAKG) - See Note 7 3x120 + 2x140 380 211 210 210 210 210 219 230 240 240 69
6 New Grid Station in Al-Ain Power House 3 x 120 240 50 60 62 64 65 30
717 733 785 825 825 839 867 889 900
1 Mazyad (MZDG) - See Note 8 2 x 140 + 140 280 97 118 115 115 120 126 132 139 150 59
2 Sanaiya (SNYG) 3 x 140 280 185 194 190 190 200 205 215 215 220 86
3 Al-Ain South West (ASWG) 3 x 140 280 58 65 90 95 95 100 105 110 115 45
4 Al-Arad (ARDG) 2 x 140 140 84 90 94 95 100 105 110 115 120 94
5 Al-Wagon (AWGG) 3x80 160 103 77 60 70 70 75 80 85 85 58
6 Umn Al Oush 2 x 140 140 32 35 39 43 47 52 57 85 67
Q) Al-Ain South West Grid (Firm capacity 1000MVA)
P) Dahma Grid (Firm capacity 1000MVA)
Dahma Zone Total (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 8 of 9
-
Attachment - A
S.N Substation Name/Code Capacity (MVA)Firm Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
Utilisation
in 2018 (%)
Table-A6 Abu Dhabi Emirate peak demand forecast for 20GW scenario at demand supply exit points (MW)
7 Al-Ain Industrial City (AAIC) 3 x 140 280 70 70 70 70 70 70 70 70 27
8 Ain Al Fydha 3 x 120 240 50 50 52 54 55 25
527 646 654 674 747 777 816 845 900
1,648 1,835 2,000 2,094 2,182 2,249 2,350 2,421 2,522
12) M12 demand will be initially fed from a temporary 132/11kV 40MVA mobile station for the period 2012-2014
9) Existing Watbha 220/33kV S/S is planned to be converted to 132/33kV (3x120MVA) by Yr 2014 as part of Mahawi Scheme. Existing Mahawi 220/33kV S/S shall be phased out.
New Mahawi 132/33kV (4x120MVA) S/S shall be built as part of Mahawi 400/132/33kV G.S Works by Yr 2014. Existing 220/33kV S/S Capacity in Mahawi is 3x140MVA and in Watbha is 2x100MVA+140MVA. Additional 140MVA transfomer is
planned to be connected at existing Watbha 220/33kV S/S in 2012.
10) NL - no load; TBC - To be confirmed.
11) Additional capacity 140MVA at Sweihan 220/33kV S/S is planned in Yr 2011.
5) Additional Capacity 132/33kV S/S (3x100MVA) @ Taweela A is planned in Year 2013 to meet the demand requirements of KPIZ. Additional capacity (3rd 140MVA transformer) is required in 2017 if Taweela-C generation or new 400/220kV grid
station does not materialize by 2018.
6) 3rd 220/33kV 80MVA transformer is planned in Yr 2013.
7) Existing capacity at Zakher (2x90MVA + 2x140MVA) is planned to be converted to 3x120MVA + 2x140MVA in Yr 2014.
8) 3rd 220/33kV 140MVA transformer is planned in Yr 2014.
1) Planned to be transferred to Reem Zone in Yr 2016.
2) Planned to be transferred to SASN Zone in Yr 2018.
3) Shamkha 220/33kV Mobile Station-3 (80MVA) is planned in Yr 2013.
4) 4th 220/33kV 140MVA transformer is planned in Yr 2011.
Al-Ain South West Zone Total (MW)
Al-Ain Region Total (MW)
Notes
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A6 Sheet 9 of 9
-
Attachment-A
S.N Grid Station Capacity
(MVA)2010 2011 2012 2013 2014 2015 2016 2017 2018
1 Dhaid 400/220kV 3 x 500 905 910 910 910 910 910 910 910 910
2 Fujairah (Qidfa) 400/132kV 2 x 500 315 365 390 450 450 450 450 450 450
3 Ras Al Khaimah 400/132kV 3 x 500 225 425 470 520 545 639 655 675 745
4 Ajman 400/132kV 3 x 500 180 444 465 540 570 743 765
5 Fujairah City 400/132kV 3 x 500 150 520 540 630 655 720 790
6 Sharjah 400/132kV 3 x 500 480 510 621 660 738 820
1,445 1,700 2,100 3,324 3,420 3,790 3,899 4,236 4,480Grand Total - Northern Emirates (MW)
Table-A7 Northern Emirates peak demand forecast for 20GW scenario (MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A7 Sheet 1 of 1
-
Attachment-A
S.N Power Stations/IWPPs/IPPs 2010 2011 2012 2013 2014 2015 2016 2017 2018
1 UAN Plant - APC 778 778 778 778 778 778 778 778 778
2 SASN Plant - APC 1,652 1,652 1,652 1,652 1,652 1,652 1,652 1,652 1,652
3 TAW B1 + TAW B2 (TAPCO) - Total 1,183 1,183 1,183 1,183 1,183 1,183 1,183 1,183 1,183
4 TANE (TAPCO) 1,037 1,037 1,037 1,037 1,037 1,037 1,037 1,037 1,037
5 TAW A1 + TAW A10 (GTTPC) - Total 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670
6 TAW A2 (ECPC) 760 760 760 760 760 760 760 760 760
7,080 7,080 7,080 7,080 7,080 7,080 7,080 7,080 7,080
1 Al Ain Power Station (AAPS) - AMPC 256 256 256 256 256 256 256 256 256
256 256 256 256 256 256 256 256 256
1 Al Mirfa Power Station - AMPC 186 186 186 186 186 186 186 186 186
2 Madinat Zayed Power Station - AMPC 109 109 109 109 109 109 109 109 109
3 Shuweihat Power Co (SCIPCO) S1 1,615 1,615 1,615 1,615 1,615 1,615 1,615 1,615 1,615
4 Shuweihat S2 (RSTPC) 1,627 1,623 1,621 1,619 1,618 1,616 1,616 1,616
5 Shuweihat S3 490 1645 1645 1645 1645 1645
TableA8- Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast (Gross MW)
Eastern Region
Subtotal 1- Eastern Region (MW)
Al-Ain Region
Subtotal 2- Al-Ain Region (MW)
Gharbia (Western) Region
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A8 Sheet 1 of 2
-
Attachment-A
S.N Power Stations/IWPPs/IPPs 2010 2011 2012 2013 2014 2015 2016 2017 2018
TableA8- Electricity generation capacity expansion plan to meet the 20GW scenario demand forecast (Gross MW)
6 Al Mirfa P.S Retrofit [Al Zawra Relocation + Conversion to CC] 400 400 400 400
7 Masdar Hydrogen (net capacity) 380 380
8 Nuclear Power Station at Braka (each unit 1400MW) 1,400 2,800
1,910 3,537 3,533 4,021 5,174 5,573 5,571 7,351 8,751
1 Fujairah F1 + F1 Extension - ESWPC 861 861 861 861 861 861 861 861 861
2 Fujairah F2 (FAPCO) 2,114 2,114 2,114 2,114 2,114 2,114 2,114 2,114 2,114
3 Existing FEWA Reserve standby generation 700 700 700 700
4 Potential generation in Northern Emirates (e.g. Hamria/RAK) See Note 1 2,100 2,100 2,100 2,100
2,975 2,975 2,975 3,675 3,675 5,775 5,775 5,075 5,075
1 IWPP Peak capacity in excess of PWPA contracted capacity 200 200 200 200
2Potential Renewables available at peak
(e.g. Concentric solar power) 50 50 50 150 250 350 450
50 250 250 350 450 350 450
12,221 13,848 13,894 15,282 16,435 19,034 19,132 20,112 21,612
1Potential additional renewables ( e.g. CSP, Wind & PV, Solar Roof Program ) -
non firm capacity (MW)50 150 300 450 600 650 700 750
Note-1: Potential other generation sites could be Mirfa(in Gharbia Region) or Taweelah C(in Eastern Region)
Subtotal 5 (Others)
Capacity Lifetime Extension
Subtotal 3- Gharbia Region (MW)
Northern Emirates
Subtotal 4- Northern Emirates (MW)
Others
Grand Total (Gross MW)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A8 Sheet 2 of 2
-
Attachment-A
Yr 2011 Yr 2018
1Tourist Club-TCLB (E15) -
132/11kV 4 x 40 120 81 99 ADST Reem Yr 2016
2 Port (E14) - 132/11kV 4 x 40 120 56 88 ADST Reem Yr 2016
3 CLNS (E16/02) - 132/11kV 4 x 40 120 64 89 Al Qurm (E19) Reem Yr 2016
4Khalifa Park-KHPK -
132/11kV 4 x 40 120 18 74 Beach (E48) SASN Yr 2018
5Zayed Sports City (W57) -
132/11kV 4 x 40 120 - 22 Beach (E48) SASN Yr 2018
6ADNEC (W59/02)-
132/11kV 4 x 40 120 - 82 Beach (E48) SASN Yr 2018
7Mussafah (MOS1) -
132/11kV4 x 40 120 108 115 SASN Mahawi Yr 2014
8New Capital District -
132/22kV4 x 80 240 - 123 SASN Mahawi Yr 2017
Table-A9 List of substations transferred from one grid zone to another for 20GW scenario
S.N Substation Name/CodeCapacity
(MVA)
Firm
Capacity
(MVA)
Peak Demand (MVA) Year of
TransferTransferred From Transferred To
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A9 Sheet 1 of 1
-
Attachment-A
Capacity Deficit/
Surplus (MVA)
Yr 2011 Yr 2018 Yr 2018
1 ADST 3 x 500 1,000 653 904 96 90.4
2 Al Qurm (E19) 3 x 500 1,000 763 999 1 99.9
3 Beach (E48) 3 x 500 1,000 715 1016 -16 101.6
4 Reem 4 x 500 1,500 31 286 1214 19.1
5 SASN 2 x 500 + (500 in Yr 2014) 1,000 441 897 103 89.7
6 Mahawi 3 x 500 + (500 in Yr 2017) 1,500 - 892 608 59.5
Table-A10 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations before
transfer for 20GW scenario
% Utilisation in
Yr 2018
Peak Demand (MVA)
S.N Grid Station Capacity (MVA)
Firm
Capacity
(MVA)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A10 Sheet 1 of 1
-
Attachment-A
Capacity Deficit/
Surplus (MVA)
Yr 2010 Yr 2018 Yr 2018
1 ADST 3 x 500 1,000 653 717 283 71.7
2 Al Qurm (E19) 3 x 500 1,000 763 910 90 91.0
3 Beach (E48) 3 x 500 1,000 715 838 162 83.8
4 Reem 4 x 500 1,500 31 562 938 37.5
5 SASN 2 x 500 + (500 in Yr 2014) 1,000 441 837 163 83.7
6 Mahawi 3 x 500 + (500 in Yr 2017) 1,500 - 1130 370 75.3
Table-A11 Capacity deficit/ surplus of ADST, E19, E48,Reem,SASN & Mahawi 400/132kV grid stations after transfer
for 20GW scenario
% Utilisation in
Yr 2018
Peak Demand (MVA)S.N Grid Station Capacity (MVA)
Firm
Capacity
(MVA)
TRANSCO/AMD/PNDDNovember 2011 Transco 2011 7YPS (2012-2018) Table A11 Sheet 1 of 1
-
Transco 2011 7YPS (2012-2018), Attachments
TRANSCO/AMD/PNDD November 2011
ATTACHMENT-B
Electricity Transmission Network Topology (400kV, 220kV, 132kV System) Geo-Map of Transmission Network Topology (400kV and 220kV System) for Year 2011 & 2018
-
RUWAIS
(RUWS)
SILA
(SLWR)
MADINAT ZAYED
(WMZD)
BUHASA
(BHSA)
LIWA
(LWWR)
2 x 320MVA
4 x 140MVA
220/33kV
80MVA Mobile
2 x 80MVA
2 x 500MVA
2 x 36MVAr
3 x 500MVA
3 x 36MVAr
3 x 100MVA
2 x 100MVA
2x100MVA +
140MVA
SAS AL NAKHEL
(SASN)
Al QURM (E19)
BEACH (E48)
CENTRAL
(CNTG)
2 x 140MVA
3 x 500MVA
3 x 36 MVAr
SAMHA
2x140MVA
3 x 140MVA
AL-AIN SOUTH WEST
(AASW)
SALAMAT (SLMG)
RAMAH (RMAG)
KHAZNA (KHZG)
3 x 140MVA
2 x 140MVA
3 x 140MVA
3 x 500 MVA
3 x 36MVAr
3 x 500MVA
3 x 36MVAr
WRSN (DEWA)
DHAID
(DHID)
SHAHAMA
(SHME)
ZAKHER
(ZAKG)
ARAD (ARDG)
AL WAGON (AWGG)
MAZIYAD (MZDG)
SANAIYA (SNYG)
AL HAYER (AHYG)
AL FOAH
(AOHG)
3 x 80MVA
2 x 140MVA
2 x 140MVA
3 x 140MVA
3 x 80MVA
2 x 140MVA
3 x 80MVA
3 x 140MVA
TANE
SWEIHAN (SWHN)
3 x 500MVA
3 x 500MVA
3 x 500MVA
RAS AL KHAIMAH
(FILA)
MGIC
3 x 140MVA
+ 140MVA
2 x 140MVA
2 x 140MVA RUMAITHY
(RMTH)
2 x 50MVA
STEEL (MOSF)
SVC
SVC
UMM Al OUSH
2 x 500MVA
SAJJA
2 x 140MVA
2 x 200MVA
REEM
ADST
ABU DHABI ISLANDS REGION
WESTERN REGION
NORTHERN EMIRATES
Al-AIN REGION
2 x 500MVA
4 x 500MVA
4 x 50 MVAr
4 x 500MVA
4 x 50MVAr
3 x 500MVA
2 x 100MVAr
2 x 100MVAr
2 x 100 MVAr
DABIYA (DBYA)
2 x 110MVA
DAHMA (DHMG)
TAWEELA P.S
TAW-BTAW-A
2 x 500 MVA
2x140 MVA
EMAL
3 x 140MVA
2 x 500MVA
2 x 36 MVAr
3 x 275MVA
2 x 20MVAr
2 x 50MVAr
3 x 500MVA
3 x 300MVA
AL-AIN
INDUSTRIAL CITY
(AAIC)
3 x 140MVA
2 x 80MVA+140MVA
3 x 500MVA
3 x 36MVAr
BAB
2 x 40MVA
DELMA Island
OGD III
2 x 140MVA
2 x 70MVAr
2 x 20MVAr
SHUWEIHAT S1 & S2
(SHPS)
2 x 140MVA
+ 2 x 90MVA
ASAB
220/132kV
2 x 200MVA
2 x 140MVA
ASGS
To Salwa
GCC Interconnection
KSA
SILA-400 CITY CENTRE
(CTCG)
3 x 140MVA
320MVA
2 x 100MVA
2 x 80MVA
2 x 80MVA
SVC
+ 2 x 90 MVAr
- 2 x 45 MVAr
AL AIN POWER HOUSE
LEGEND
400kV XLPE
220kV XLPE
400kV OHL
220kV OHL
132kV System
Attachment-B
Fig. B1 400kV & 220kV Electrical Power System Topology- Yr 2011AMD/PNDD, TRANSCO
Transco 2011 7YPS (2012-2018) November 2011
SADIYAT (SDYT)
GAITHY
(GTHY)
MIRFA
(MRFA)
Gasco-Elixier-II
2 x 70MVAr
Khor
Khwair
3 x 140MVA
RAK Main
132kV XLPE
Qusayidat Main
(QSMN)
UMM AL NAR
(UAN)
2 x 250MVA
ADNOC
220/33kV
140MVA Mobile
for Mafraq
2 x 36MVAr
MAHAWI (MHWG)
3 x 140MVA
2 x 100MVA
+ 140MVA
220/33kV
90MVA Mobile-2
(Shamkha Area)
FUJAIRAH QIDFA
(QDFA) F1Ext + F2
2x150MVA
(For ADCO Gas
Compression Project)
Fujairah Main
(FUMN)
F1PS
FEWA
NEW ASSETS
220/33kV
80MVA Mobile-1
(Shamkha Area)
Toshiba
Siemens
Calor Emag
220/33kV
80MVA Mobile
(Hameem-Qsr Al Sarab)
WATHBA
(WATH)
Sheet 1 of 16
220/33kV
100MVA Mobile
(Umm Al Zamool)
Mahadha
(OMAN)
ICAD
3 x 100MVA
MUSSAFAH (MOSG)
Qidfa Main
(QDMN)
-
RUWAIS
(RUWS)
SILA
(SLWR)
MADINAT ZAYED
(WMZD)
BUHASA
(BHSA)
LIWA
(LWWR)
2x320MVA
4x140MVA
220/33kV
80MVA Mobile
2x80MVA
2x500MVA
2x36MVAr
3x500MVA
3x36MVAr
3 x 100MVA
2x100MVA
2x100MVA +
140MVA
SAS AL NAKHEL
(SASN)
Al QURM (E19)
BEACH (E48)
Mussafah (MOSG)
CENTRAL
(CNTG)
2x140MVA
3x500MVA
3x36 MVAr
Samha
2x140MVA
3x140MVA
Al-Ain South West
(AASW)
Salamat (SLMG)
Ramah (RMAG)
Khazna (KHZG)
3x140MVA
2x140MVA
3x140MVA
3x500MVA
3x36MVAr
3x500MVA
3x36MVAr
WRSN (DEWA)
DHAID (DHID)
Shahama
(SHME)
Zakher
(ZAKG)
Arad (ARDG)
Al Wagon (AWGG)
Maziyad (MZDG)
Sanaiya (SNYG)
Al Hayer (AHYG)
Al Foah
(AOHG)
3x80MVA
2x140MVA
2x140MVA
3x140MVA
3x80MVA
2x140MVA
3x80MVA
3x140MVA
TANE
Sweihan (SWHN)
3x500MVA
3x500MVA
3x500MVA
RAS AL KHAIMAH
(FILA)
FUJAIRAH QIDFA
(QDFA) F1Ext + F2
MGIC
4x140MVA
2x140MVA
2x140MVARUMAITHY (RMTH)
ICAD
2 x 50MVA
3x500MVA
Steel (MOSF)
SVC
SVC
Umm Al Oush
2x500MVA
SAJJA
2x140MVA
2x200MVA
REEM
ADST
ABU DHABI ISLANDS REGION
WESTERN REGION
NORTHERN EMIRATES
Al-AIN REGION
2x500MVA
4x500MVA
4x50 MVAr
4x500MVA
4x50MVAr
3x500MVA
2x100MVAr
2x100MVAr
2x100 MVAr
DABIYA (DBYA)
2 x 110MVA
Dahma (DHMG)
TAWEELA P.S
2x500 MVA
2x140 MVA
EMAL
3x140MVA
2x500MVA
2x36 MVAr
3x275MVA
AJMAN
2x20MVAr
2x50MVAr
New Fujairah
3x500MVA
3x500MVA
3x500MVA
3x300MVA
Al-Ain Industrial City
(AAIC)
3x140MVA
2x80MVA+140MVA
3x500MVA
3x36MVAr
BAB
2 x (3 x 100MVA)
2x40MVA DELMA Island
OGD III
2x140MVA
2x70MVAr
2x20MVAr
SHUWEIHAT S1 & S2
(SHPS)
2x140MVA+2x90MVA
ASAB220/132kV
2 x 200MVA
220/33kV
80MVA Mobile
(Hameem -Qsr Al Sarab)
QUSAHWIRA
2 x 140MVA
ASGS
220/33kV
100MVA Mobile
(Umm Al Zamool)
To Salwa
GCC Interconnection
KSA
SILA-400City Centre
(CTCG)
3x140MVA
2 x 320MVA
2x100MVA
2x80MVA
2x80MVA
SVC
+ 2x90 MVAr
- 2x45 MVAr
Al-Ain Power House (AAPS)
LEGEND
400kV XLPE
220kV XLPE
400kV OHL
220kV OHL
132kV System
Attachment-B
Fig. B2 400kV & 220kV Electrical Power System Topology- Yr 2012
SADIYAT (SDYT)
GAITHY
(GTHY)
Gasco-Elixier-II
2x70MVAr
Khor
Khwair
3x140MVA
2x100MVA
Al Hayl
132/33kV
Sudah Port
132/33kV
3x100MVA
RAK Main
132kV XLPE
Qusayidat Main
(QSMN)
FUMN
GHMN
UMM AL NAR
(UAN)
2x250MVA
ADNOC
220/33kV
140MVA Mobile for
Mafraq
2x36MVAr
Mahawi (MHWG)
3x140MVA
2x150MVA
220/33kV
90MVA Mobile-2
(Shamkha Area)
220/33kV
80MVA Mobile-1
(Shamkha Area)
Toshiba
Siemens
Calor Emag
NEW ASSETS
WATHBA
(WATH)
2x100MVA
140MVA+
140MVA
MIRFA
(MRFA)
Sheet 2 of 16
Mahadha
(OMAN)
ADCO 1.8MMBD
Project
Masdar Shams
To FEWA/SEWA Network To
FEWA
Network
TAW-BTAW-A
Qidfa Main
(QDMN)
F1PS
To FEWA Network
165MVA
AMD/PNDD, TRANSCO
Transco 2011 7YPS (2012-2018) November 2011
-
SILA
(SLWR)
Madinat Zayed
(WMZD)
Buhasa (BHSA)
Liwa
(LWWR)
2x320MVA
4x140MVA
220/33kV
80MVA Mobile
2x80MVA + 80MVA
2x500MVA
2x36MVAr
3x500MVA
3x36MVAr
3x100MVA
2x100MVA
2x100MVA +
140MVA
Sas Al Nakheel
(SASN)
Al Qurm (E19)
Beach (E48)
Mussafah (MOSG)
Central
(CNTG)
2x140MVA
3x500MVA
3x36 MVAr
Samha
2x140MVA
3x140MVA
Al-Ain South West
(AASW)
Salamat (SLMG)
Ramah (RMAG)
Khazna (KHZG)
3x140MVA
2x140MVA
3x140MVA
3x500MVA
3x36MVAr
3x500MVA
3x36MVAr
WRSN (DEWA)
Dhaid
(DHID)
Shahama (SHME)
Zakher
(ZAKG)
Arad (ARDG)
Al Wagon (AWGG)
Maziyad (MZDG)
Sanaiya (SNYG)
Al Hayer (AHYG)
Al Foah
(AOHG)
3x80MVA
2x140MVA
2x140MVA
3x140MVA
3x80MVA
2x140MVA
3x80MVA
3x140MVA
TANE
Sweihan (SWHN)
3x500MVA
3x500MVA
3x500MVA
Ras Al Khaimah
(FILA)
Fujairah Qidfa (QDFA)
F1Ext + F2
MGIC
4x140MVA
2x140MVA
2x140MVA
Rumaithy
(RMTH)
Bahia
ICAD
2x50MVA
3x500MVA
Steel (MOSF)
SVC
SVC
Umm Al Oush
Sajja
2x140MVA
2x200MVA
Reem
ADST
4x500MVA
4x50MVAr
ABU DHABI ISLANDS REGION
WESTERN REGION
NORTHERN EMIRATES
Al-AIN REGION
2x500MVA
4x500MVA
4x50 MVAr
4x500MVA
4x50MVAr
3x500MVA
2x100MVAr
2x100MVAr
2x100 MVAr
Dabiya (DBYA)
2x110MVA
Dahma (DHMG)
TAWEELA P.S
EMAL
3x140MVA
2x500MVA
2x36MVAr
2x20MVAr
3x500MVA
3x500MVA
3x300MVA
Al-Ain Industrial City
(AAIC)
3x140MVA
2x80MVA+140MVA
3x500MVA
3x36MVAr
BAB
2x(3x100MVA)
2x40MVADELMA Island
OGD III
2x140MVA
2x70MVAr
2x20MVAr
Shuweihat S1 & S2 (SHPS)
Masdar Shams
2x140MVA+2x90MVA
ASAB
220/132kV
2x200MVA
2x140MVA
ASGS
To Salwa
GCC Interconnection
KSA
SILA-400
City Centre
(CTCG)
3x140MVA
2x320MVA
Sir Baniyas Island
2x100MVA
2x80MVA
2x80MVA
SVC
+ 2x90 MVAr
- 2x45 MVAr
Al Ain Power House
LEGEND
400kV XLPE
220kV XLPE
400kV OHL
220kV OHL
132kV System
Attachment-B
Fig. B3 400kV & 220kV Electrical Power System Topology- Yr 2013
Sadiyat (SDYT)
Gaithy (GTHY)
Gasco-Elixier-II
2x70MVAr
Khor
Khwair
3x140MVA
RAK Main
132kV XLPE
Qusayidat Main
(QSMN)
Umn Al Nar
(UAN)
220/33kV
140MVA Mobile for
Mafraq
2x36MVAr
2x140MVA
Ghantoot
2x150MVA
Mahadha
(OMAN)
Shuweihat S3
Takreer Loads
(Ruwais Refinery
Expansion & GUP)
3x500MVA
ADCO 1.8MMBD
Project
220/33kV
80MVA Mobile
(Hameem -Qsr Al
Sarab)
220/33kV
100MVA Mobile
(Umm Al Zamool)
3x40MVA
Toshiba
Siemens
Calor Emag
220/33kV
80MVA Mobile-1
(Shamkha Area) 220/33kV
90MVA Mobile-2
(Shamkha Area)
NEW ASSETS
Sheet 3 of 16
MIRFA
(MRFA)
2x500MVA2x50MVAr
New Fujairah
3x500MVA
2x100MVA
Al Hayl
132/33kV
FJMN
GHMN
Kalba
132/33kV
2x100MVA
Masdar Noor
AJMAN
To FEWA/SEWA Network
Tawyeen
132/33kV
To Shaggi
Dadnh
3x100MVA
Sudah Port
132/33kV
2x100MVA
2x140MVA
WATHBA
(WATH)
Mahawi (MHWG)
3x140MVA
To
FEWA
Network
2x250MVA
220/33kV
80MVA Mobile-3
(Shamkha Area)
New Ruwais
Grid Station
Existing Ruwais
(RUWS)
KHFK
132/33kV
2x120MVA
2x120MVA
Dibba
120MVA
165MVA
2x500 MVA
2x140 MVA
3x275MVA
3x100 MVA
TAW-BTAW-A
AMD/PNDD, TRANSCO
Transco 2011 7YPS (2012-2018) November 2011
-
Existing Ruwais
(RUWS)
Sila
(SLWR)
Madinat Zayed
(WMZD)
Liwa
(LWWR)
220/33kV
80MVA Mobile
3x80MVA
2x500MVA
2x36MVAr
3x500MVA
3x36MVAr
3x100MVA
2x100MVA
2x100MVA+140MVA
Sas Al Nakheel -
SASN
Al Qurm (E19)
Beach (E48)
Mussafah (MOSG)
Central (CNTG)
2x140MVA
3x500MVA
3x36 MVAr
Mahawi
Samha
2x140MVA
3x140MVA
Al-Ain South West
(AASW)
Salamat (SLMG)
Ramah (RMAG)
Khazna (KHZG)
3x140MVA
2x140MVA
3x140MVA
3x500 MVA
3x36MVAr
3x500MVA
3x36MVAr
WRSN (DEWA)
Dhaid
(DHID)
Shahama (SHME)
Zakher
(ZAKG)
Arad (ARDG)
Al Wagon (AWGG)
Maziyad (MZDG)
Sanaiya (SNYG)
Al Hayer (AHYG)
Al Foah
(AOHG)
3x80MVA
2x140MVA
3x140MVA
3x140MVA
3x80MVA
2x140MVA
3x80MVA
3x140MVA
TANE
Sweihan (SWHN)
3x500MVA
3x500MVA
3x500MVA
Ras Al Khaimah
(FILA)
Fujairah Qidfa (QDFA)
MGIC
4x140MVA
2x140MVA
2x140MVARumaithy (RMTH)
Bahia
ICAD
2x50MVA
3x500MVA
Steel (MOSF)
SVC
SVC
Umm Al Oush
Sajja
2x140MVA
2x200MVA
Reem
ADST
ABU DHABI ISLANDS REGION
WESTERN REGION
NORTHERN EMIRATES
Al-AIN REGION
4x500MVA
4x50MVAr
4x500MVA
4x50MVAr
3x500MVA
2x100MVAr
2x100MVAr
2x100 MVAr
Dabiya (DBYA)
2x110MVA
Dahma (DHMG)
TAWEELA P.S
2x500 MVA
2x140 MVA
EMAL
3x140MVA
2x500MVA
2x36 MVAr
3x275MVA
Ajman
2x20MVAr
3x500MVA
3x500MVA
3x300MVA
Al-Ain Industrial City
(AAIC)
3x140MVA
Al-Maqam
3x120MVA
2x80MVA+140MVA
3x500MVA
3x36MVAr
2x(3x100MVA)
3x100MVAr
2x40MVADELMA Island
3x100 MVA
2x70MVAr
2x20MVAr
Shuweihat S1&S2
(SHPS)
Masdar Shams
3x100 MVAr
3x500MVA
3x50MVAr
2x140MVA+ 3x120MVA
To Salwa
GCC Interconnection
KSA
SILA-400City Centre
(CTCG)
3x140MVA
3x120MVA
2x320MVA
3x40MVA
Sir Baniyas Island
Toshiba
Siemens
2x100MVA
2x80MVA
2x80MVA
SVC
+ 2x90 MVAr
- 2x45 MVAr
Calor Emag
Al Ain Power House
(AAPS)
LEGEND
400kV XLPE
220kV XLPE
400kV OHL
220kV OHL
132kV System
Attachment-B
Fig. B4 400kV & 220kV Electrical Power System Topology- Yr 2014
Sadiyat (SDYT)
Gaithy
(GTHY)
2x150MVAr
New 220kV G.S in AAPS
Gasco-Elixier-II
2x70MVAr
2x140MVA
Ghantoot
3x500MVA
Khor
Khwair
3x140MVA
RAK Main
Takreer Loads
(Ruwais Refinery
Expansion & GUP)
132kV XLPE
Qusayidat Main
(QSMN)
Shuweihat S3
Ain Al Faydha
3x120MVA
2x500MVA
2x36MVAr
Masdar Noor
Umn Al Nar
(UAN)
NEW ASSETS
Sheet 4 of 16
2x36MVAr
2x500MVA2x50MVAr
New Fujairah
3x500MVA
2x100MVA
Al Hayl
132/33kV
Sudah Port
132/33kV
3x100MVA
FJMN
GHMN
Kalba
132/33kV
2x100MVA
Buhasa
(BHSA)
2x320MVA
4x140MVA
2x150MVA
BAB
OGD III
2x140MVA
3x500MVA
SHAH-SGD
ASAB
220/132kV
2x200MVA
2x140MVA
ASGS
220/33kV
80MVA Mobile
(Hameem -Qsr Al Sarab)
ADCO 1.8MMBD
Project
3x100 MVAr MSC
ASAB
Switching Station
To Habshan
Fields
Sharjah
3x500MVA
Wasit/
Mahadha
(OMAN)
MIRFA
(MRFA)
TAW-A TAW-B
4x500MVA
4x50MVAr
To SEWA Network
220/33kV
100MVA Mobile
(Umm Al Zamool)
To FEWA/SEWA Network
2x100MVA
New Ruwais
Grid Station
To
FEWA
Network
220/33kV
80MVA Mobile-1
(Shamkha Area) 220/33kV
90MVA Mobile-2
(Shamkha Area)
220/33kV
80MVA Mobile-3
(Shamkha Area)
2x100MVA
2x140MVA
WATHBA
(WATH)
Mahawi (MHWG)
3x140MVA
220/33kV
140MVA Mobile for
Mafraq
Dadnh
KHFK
132/33kV
2x120MVA
2x120MVA
Dibba
Tawyeen
132/33kV
To Shaggi
open
3x500MVA
2x250MVA
Open
Open
Wasit/
Mahadha
(OMAN)
120MVA
165MVA
AMD/PNDD, TRANSCO
Transco 2011 7YPS (2012-2018) November 2011
-
Ruwais
(RUWS)
Sila
(SLWR)
Madinat Zayed
(WMZD)
Liwa
(LWWR)
220/33kV
80MVA Mobile
3x80MVA
2x500MVA
2x36MVAr
3x500MVA
3x36MVAr
3x100MVA
2x100MVA
2x100MVA+140MVA
Sas Al Nakheel - SASN
Al Qurm (E19)
Beach (E48)
Mussafah (MOSG)
Central (CNTG)
2x140MVA
3x500MVA
3x36 MVAr
Mahawi
Samha
2x140MVA
3x140MVA
Al-Ain South West
(AASW)
Salamat (SLMG)
Ramah (RMAG)
Khazna (KHZG)
3x140MVA
2x140MVA
3x140MVA
3x500 MVA
3x36MVAr
3 x 500MVA
3 x 36MVAr
WRSN (DEWA)
Dhaid
(DHID)
Shahama (SHME)
Zakher
(ZAKG)
Arad (ARDG)
Al Wagon (AWGG)
Maziyad (MZDG)
Sanaiya (SNYG)
Al Hayer (AHYG)
A