Transcript
PowerPoint Par t -1 Gan t ry Assembly - - - - - - - - - - - - - - - - - - - - - - - - 1
Par t -2 Con t ro l Boa rd Assembly - - - - - - - - - - - - - - - - - - - - - - - - 3
Par t -3 W i r ing D iagram - - - - - - - - - - - - - - - - - - - - - - - - 4
Par t -4 Case Assembly -Lef t Pane l - - - - - - - - - - - - - - - - - - - - - - - 7
Par t -5 Magnet Suc t ion B lock Assembly - - - - - - - - - - - - - - - - - - - - - - - 8
Par t -6 Case Assembly -Righ t Pane l - - - - - - - - - - - - - - - - - - - - 9
Par t -7 Emergency S top Swi t ch Assembly - - - - - - - - - - - - - - - - - - - - - - - 10
Par t -8 Coo l ing Fan Assembly - - - - - - - - - - - - - - - - - - - - - -11
Par t -9 Case Assembly - Back Pane l - - - - - - - - - - - - - - - - - - - - - - - 12
Par t -10 Corner Connec to r Assembly - - - - - - - - - - - - - - - - - - - - - - - 14
Par t -11 Case Assembly -F ron t Pane l - - - - - - - - - - - - - - - - - - - - - - 15
Par t -12 Case Assembly - Top Pane l - - - - - - - - - - - - - - - - - - - - - - 17
I I . Sof tw are & Debugging
Par t -1 Dr i ve r I ns ta l la t ion - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 19
Par t -2 Debugging - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20
Par t -3 How to Use Z -P robe - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 23
I I I . Warranty Terms - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 25
Catalog
-1-
(2) Y-axis Base 1
(18) Φ5 Gasket 8
(19) Elastic Nut 8
Step 1: Place the elastic nuts into the aluminum profiles, adjust the position. And then fix the gantry
right next to the pads on the base with M5*14 bolts and gaskets.
I. Hardware Assembly
Lean the elastic nut to insert into the profile, then it will be fixed
-2-
Part-1 Gantry Assembly
I. Hardware Assembly
Step 2: Fix the gantry right next to the pads on the base with M5*14 bolts and gaskets.
-3-
No. Name QTY Picture
(4) Control board 1
Step 1: Assemble the control board to the back of the machine, right next to the side panel. First
loosen the T-nuts, insert them to the aluminum profile, and then tighten the screws.
I. Hardware Assembly
Limit
Switch
Y
Limit
Switch
Z
Limit
Switch
Power
Indicator
USB
Indicator
(17) M5*10 Modified Truss Screw 2
Step 1: Use M5*10 Modified Truss Screws to fix the left acrylic sheet to the transparent pads which
are pre-installed on the base.
I. Hardware Assembly
Required
Parts
(17) M5*10 Modified Truss Screw 1
Step 1: Fix the magnet suction block to the left panel with M5*10 Modified Truss Screw.
I. Hardware Assembly
(17) M5*10 Modified Truss Screw 2
Step 1: Use M5*10 Modified Truss Screws to fix the right acrylic sheet to the transparent pads which
are pre-installed on the base.
I. Hardware Assembly
Required
Parts
(12) Emergency Stop Switch 1
Step 1: As following picture, first to loosen the gasket and the nut from the emergency stop switch, and
then put it through the acrylic sheet, and fasten the gasket and nut again.
I. Hardware Assembly
(15) M3*16 Truss Head Bolt 4
Step 1: Use 4pcs M3*16 Truss Head Bolt to fix the cooling fan to the back acrylic sheet.
I. Hardware Assembly
Required
Parts
(17) M5*10 Modified Truss Screw 2
Step 1: First, wire the fan to the mainboard; and then use M5*10 Modified Truss Screws to fix the back
acrylic sheet to the transparent pads.
I. Hardware Assembly
Step 2: Finished.
I. Hardware Assembly
(17) M5*10 Modified Truss Screw 4
Step 1: Put the corner connector inside the case, fix it with M5*10 Modified Truss Screw from outside.
I. Hardware Assembly
Handle 1
(10) Corner Connector 1
(17) M5*10 Modified Truss Screw 3
Step 1: Use M5*10 Modified Truss Screws to fix the corner connector to right acrylic sheet.
I. Hardware Assembly
Part-11 Case Assembly-Front Panel
Step 2: Fix the front side acrylic sheet to the hinges with M4*8 Flat Head Screw.
I. Hardware Assembly
Required
Parts
(11) Corner Connector 4
(17) M5*10 Modified Truss Screw 8
Step 1: Fix the 4pcs corner connectors to the sides panels, adjust their position to make sure they are
leveled.
-18-
Step 2: Put the top panel above the connectors and fix it with M5*10 modified truss screw.
I. Hardware Assembly
Step 2: To Determine your Machine's COM port
• For Windows XP: Right click "My Computer"→ Select "Manage"→ Select "Device Manager".
• For Windows 7: Right click "Computer"→ Select "Manage" → Select "Device Manager" from left
pane.
• For Windows 10: Right click “This PC"→ Select "Manage" → Select "Device Manager" from left
pane.
• In the tree, expand "Ports (COM & LPT)“ , your machine will be the USB Serial Port (COMX), where
the “X” represents the COM number, for example COM6.
• If there are multiple USB serial ports, right click each one and check the manufacturer, the machine
will be "CH340“.
II. Software & Debugging
Step 1: Open “Grblcontrol” and connect USB
• Console window prints “[CTRL+X] < Grbl 1.1f [‘$’ for help]” if the connection is successful.
• Console window prints “Serial port error 1: No such file or directory” indicates that the connection is
failed.
successful
1
2
unsuccessful
II. Software & Debugging
Step 2: Enter Step and Feed value, and then click the arrow keys to move X, Y, Z axis. If succeed, the
machine is functioning.
E.g.: Step value=10 means moving distance is 10mm. Feed value=500 means 500mm/min
Step 3: Spindle test. Click the button to start the spindle, and adjust the speed to test.
Step 4: Open G-code file
Step 5: Preview Code
represents the ratio.
II. Software & Debugging
-21-
-22-
Step 6: Click the direction button to move the bit to the surface of the object. The proper gap between
the bit and object’s surface is that only an A4 paper can move through tightly.
Click “Zero XY” & “Zero Z” (as below picture shows) to set zero.
(Z-probe will be introduced in Part-3)
Step 7: Close the door, click “Send” to start engraving.
Step 8: Engraving Finished.
Step 1: Measure the thickness of Z-probe.
Step 2: Modify Z-probe parameter. Default value is Z15, change it to Z15.04 base of the parameter
measured in step 1.
-24-
Step 3: First set the X&Y-axis zero point (follow Part-2, Step 6), and then place the Z-probe.
Step 4: Click Z-probe button to start detecting.
Step 5: Z-probe detection finished. Remove Z-probe, click “Send” to start engraving.
II. Software & Debugging
I. This Limited Warranty covers a period of 12 months from delivery to Recipient.
II. This Limited Warranty covers any defects in material or workmanship under normal
use during the Warranty Period.
III. This warranty covers the repair or replacement of the broken parts at our discretion.
If there is any difficulty during using, feel free to contact us for tech support.
E-mail: [email protected]. We will response within 1 business day.
Facebook Group Foxalien.com
III. Warranty Terms

Top Related