KIA 3G Optimisation
3G OPTIMISATION PROCESS
Version 1.0
10th Decemer !003
I 1 0 P 1 f 17
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 2/17
KIA 3G Optimisation
Ta"e o# Contents
1. Introduction.....................................................................................................................3
2. Process overview..............................................................................................................5
3. Preparation process.........................................................................................................6
4. Cluster Tuning process....................................................................................................8
5. Cluster Optimisation process.........................................................................................12
6. etwor! "eri#ication process.........................................................................................15
I 1 0 P 2 f 17
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 3/17
KIA 3G Optimisation
1. INTROD$CTION
This document describes the optimization process for the o!ia 3" #$. Theoptimization process is di%ided into the follo&ing sub processes that areseparatel' described(
• Preparation phase &here the ob)ecti%e is to set the
correct en%ironment for starting the tuning and optimization process.There are certain prere*uisites that need to be fulfilled before the actual&or! can start.
• Cluster tuning process &here the purpose is to
meet a minimum le%el of radio performance. It is based on hard&arechanges+ i.e. antenna t'pe+ tilt and orientation+ or changes in the neighbor
lists. It does not include changes on parameters be'ond neighbor definitions.
• Cluster optimization process &here the purpose is
to raise the le%el of net&or! performance to the targets set bet&eeno!ia and the operator. Performance increase is achie%ed b' parameter changes and a test area &ill be selected and different parameter sets &illbe tested.
• et&or! %erification process &here the purpose is
to %erif' that the changes implemented at the cluster le%el maintain theo%erall net&or! performance to the targets set bet&een the operator ando!ia.
The tools are mapped to the different processes on an o%er%ie& le%el.
#e%ision Date ,ditor -ummar'0.1 Phil Pic!ering irst draft
0.2 /i!!oamberg
-uggestions for impro%ements
1.0 10th Dec 2003 ogdanCorcio%a
irst appro%ed %ersion
I 1 0 P 3 f 17
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 4/17
KIA 3G Optimisation
I 1 0 P f 17
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 5/17
KIA 3G Optimisation
!. PROCESS OVERVIE%
RE&. DESCRIPTION
2.0 This process describes the o%erall process for meeting the %erification targets &ithin the o!ia#$.
3.0 It &ill be necessar' to identif' a number of aspects in ad%ance of the main tuning and optimizationprocesses.
.0 The Cluster Tuning process describes ho& to achie%e basic radio performance o%er the cluster.
.0 The Cluster 4ptimization process describes ho& to raise the le%el of net&or! *ualit' to the targetsset out bet&een the customer and o!ia.
5.0 The et&or! 6erification process describes ho& to chec! the achie%ement of the *ualit' targetsfor the entire #$.
Issue 1.010th December 2003
Page of 17
Confidential
3.0
Preparation
.0
Cluster
Tuning
.0
Cluster
4ptimization
5.0
et&or!
6erification
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 6/17
KIA 3G Optimisation
3. PREPARATION PROCESS
The purpose of the preparation phase is to set the correct en%ironment for starting the tuning and optimization process. There are certainprere*uisites that need to be fulfilled before the actual &or! can start.-ome of the prere*uisites are rather rollout related processes that need to be in place for a smooth net&or! de%elopment(
• ell defined configuration management processes that enable unambiguous recording and implementation of net&or! changes
• le8ible parameter management processes+ allo&ing small scale or e%en indi%idual parameter changes to be performed rapidl'
$t the start of the optimization process+ all sites concerned need to be 9on air9. Therefore+ a continuous feedbac! from the optimization team tothe rollout is needed in order to ensure there is enough s'nchronization and a feasible cluster prioritization is achie%ed.
RE&. DESCRIPTION RE'$IREMENTS
3.0 It &ill be necessar' to identif' a number of aspects in ad%ance of the maintuning and optimization processes
Issue 1.010th December 2003
Page 5 of 17
Confidential
3.1
Cluster
Identification
3.3
#oute Planning
3.
Cluster
-cheduling
3.2
Design
Implementation
$udit
3.
#eference #oute
Definition
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 7/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENTS
3.1 C"(ster i)enti#ication.
-electing the sites : area for tuning :optimization
$ cluster is a geographicall' contiguousarea &ith an agreed number of sitesselected in such a &a' that the centerof the cluster is interfered from sitesinside the same cluster.
Definition of interference;cluster is made using one of the follo&ing methods(
/ethod 1Planning tool e8port of interference matri8+ tuned planning model incorporating -$ onaccurate site plan < -ite ID+ Cell ID+ Prop /odel+ ocation+ =eight+ $zimuth+ Do&n tilt+CPIC= Po&er : -crambling Code
/ethod 2Pol'gon around or inside to&ns : cities
3.2 As*(i"t )ra+in,s an) inte,rationreports a()it
It is necessar' to ensure that the design is correctl' implemented into the net&or!. This &illre*uire chec!ing the site related documents for the entire cluster. $n' de%iations &ill benotified before commencing an' tuning;optimization acti%it'. -ubstantial de%iation &ill li!el'lead to degradation of the ma8imum achie%able net&or! *ualit'.
3.3 Ro(te P"annin,
Identif'ing appropriate roads on &hichto perform the dri%e sur%e'.
It is needed to include the most important areas and roads in order for the dri%e test to ha%estatisticall' reliable data.-pecial interest locations < airport routes+ corporate routes < need to be specified in order tobe included in the dri%e route.
3. C"(ster Sche)("in,
Definition and maintenance of cluster
tuning schedule
De%elop and maintain a schedule for cluster tuning. The schedule is based on integration of appropriate sites;site densit'. There should be a feedbac! loop to rollout planning so thattuning acti%ities are not perturbed b' the rollout acti%ities.
3. Re#erence Ro(te -Go")en Ro(teDe#inition
$ reference route should be defined to demonstrate !e' performance. $dditionall' thereference route can be used to trial optimization parameter recommendations
Issue 1.010th December 2003
Page 7 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 8/17
KIA 3G Optimisation
/. C$STER T$NING PROCESS
The purpose of this process is to meet a minimum le%el of radio performance. It is based on hard&are changes+ i.e. antenna t'pe+ tilt andorientation+ or changes in the neighbor lists. It does not include changes on parameters be'ond neighbor definitions >e.g. no T8 po&er changes?.
The tools that can be used to achie%e this tas! are di%ided into three categories( measurement tools+ post<processing tools and operation andmaintenance tools. $ir interface measurement tools usuall' consist of a scanner or a phone and logging soft&are capable of recordinginformation related to the radio en%ironment and the call e%olution. Data is then anal'zed &ith post<processing soft&are. Planning tools+ such aset$ct Planner+ can be also used for predictions.
• -canners( $nritsu+ $gilent+ DTI+ #ohde : -ch&artz
• Phones( o!ia 550+ @ualcomm+ ,C+ -an'o+ /otorola
• ogging tools( T4/+ #omes+ T,/-+ DimensionA+ B<C$
• Post processing( $cti8+ /apInfo+ "$ >te8t processing tool?
4peration and maintenance tas!s can be achie%ed &ith o!ia Plan,dit+ o!ia ,lement /anager >,/?+ and T- /anager.
Issue 1.010th December 2003
Page E of 17
Confidential
.1
Cluster Preparation
.2
Dri%eTest
.3
$nal'sis
.
#eportF
F
.5
#ecommendation
.E
#ecommendationImplementation :
Configuration/anagement
4ptimization
.
TuningCriteria metG
.7
urther Tuning6iableG
Preparation
3.0
.0
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 9/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENT
.0 The cluster tuning process describesho& to achie%e basic radio performancefor a single cluster.
.1 C"(ster Preparation
Cluster %erification.Cluster Information Pac!.-ite $udit %erification.Dri%e Test #outes agreed.Test ,*uipment chec!s
Confirm rele%ant Cluster has been identified and that the integration percentage criterionhas been met. $ percentage of 70H to E0H is considered ade*uate. 6erif' data a%ailablefrom Cluster and confirm that the area has been planned to the re*uired le%el using theguidelines from the design phases. If sites are missing due to construction orimplementation problems e8clusion zones can be agreed to a%oid the respecti%e affectedareas.
Confirm that Dri%e Test #outes are agreed and documented as per section 3.3 for Clustersand section 3. for the "olden #oute.
6erif' Dri%e Test ,*uipment >%ehicle+ e*uipment calibration+ etc.?.Chec! sites for cross feeder and azimuth;tilt problems >due to incorrect installation? andrectif' e%entual discrepancies prior to the Dri%e Test. This acti%it' &ill re*uire site %isits+therefore the site %isit protocol need to be respected.
Implement et&or! reeze( no changes &ill be made in the respecti%e Cluster and itsneighbors+ unless specified b' the optimization team. This applies to both hard&are andsoft&are >parameter? changes and &ill last for the entire tuning and optimization process.
,nsure all sites are radiating and notif' an' possible problems. $ll 2 : 3 star alarms mustbe cleared prior to commencement of Dri%e Test.
$ll 3" neighbors must be %erified as per Plan+ discrepancies rectified prior tocommencement of Dri%e Test.
Issue 1.010th December 2003
Page of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 10/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENT
Pro%ide Cluster information Pac!+ to include(
• Dominance Plot
• -imulated best ser%er ,c;Io plot
• -oft hando%er plot
• Configuration data >e.g. scrambling Codes+ tilts : $zimuths+ data build?
.2 Drie Test,nsure the maintenance of et&or! reeze as initiated in section .1.
,nsure maintenance of radiating sites+ immediate notification of problems and clearance of 2 : 3 star alarms.
Perform agreed measurements along defined route. /easurements can include scanning+ $/# >%oice? calls+ C- data >e.g. %ideo calls? and P- data >ftp+ streaming+ http?.
Collect ra& data+ highlighting problem areas and areas affected b' issues outside ofplanning control >e.g. sites do&n?.
/ost of the cases+ onl' scanner measurements are enough for this phase.
.3 Ana"2sis
Process and $nal'ze #a& DataProcess ra& data and anal'ze to pro%ide an assessment of et&or! Performance &ithinthe associated Cluster. $n e8ample of a measurement anal'sis tool to be used is $cti8.
,8clusion of data from aspects outside planning;optimization control.
Pro%ision of $larm =istor' and 4:/ Data as re*uired+ to assist $nal'sis.
. Report
ormal report of et&or! Performance.Pro%ide formal report of et&or! Performance and gi%e comparison &ith re*uiredperformance criteria.
Issue 1.010th December 2003
Page 10 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 11/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENT
. T(nin, Criteria Met rom information pro%ided in the #eport >section .?+ a decision is made &hether theagreed le%el of performance has been achie%ed or not at this stage.
.5 Recommen)ation
Performance impro%ement proposals
$ proposal for net&or! performance impro%ement is made+ along &ith supporting data. Ifthere are still issues outside planning;optimization control affecting areas in the cluster+the' must be escalated.
The recommendations and supporting data &ill need to be presented for appro%al.
.7 &(rther T(nin, Via"e #e%ie& of report content and assessment of the %iabilit' of proposed recommendation>s?. $ppro%al gi%en to go ahead &ith the Implementation of the agreed recommendation>s?.If it is considered that the solution is not feasible or the changes &ill not impro%e thenet&or! performance significantl'+ then tuning is considered achie%ed and &e go to thene8t step J 4ptimization.
.E Recommen)ation Imp"ementationan) con#i,(ration mana,ement
-ite configurations modified as perrecommendations.
/odif' net&or! configuration changes proposed &ithin 8 &or!ing da's. The number ofda's+ 8+ needs to be agreed &ith the customer.
Dail' reporting to tuning team on implementation : configuration management progressand completion+ to initiate re<dri%e.
Issue 1.010th December 2003
Page 11 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 12/17
KIA 3G Optimisation
4. C$STER OPTIMISATION PROCESS
The optimization process describes ho& to raise the le%el of net&or! performance to the targets set bet&een o!ia and the operator.Performance increase is achie%ed b' parameter changesK a test area &ill be selected and different parameter sets &ill be tested.The scope of this process(
• ine tuning J further impro%ing the performance after the tuning acti%ities+ based on hard&are changes >antenna tilt;pan?K
• 6alidation of global parameter settings < find best performing settings and e8tend them to the &hole net&or! >&here applicable+
based on the net&or! morpholog' t'pe?K
• 6alidation of site<specific parameters that can be optimized >e.g. -=4 parameters+ CPIC= po&er?.
Compared &ith the tuning process+ the optimization re*uires information that is more detailedK therefore+ ne& tools &ill be used in this phase.The measurement tools can be no& di%ided in tools for the air interface and tools for the Iu+ IuC-+ and IuP- interfaces. The air interface+ post<processing and 4:/ tools remain the same as for the tuning phase. $ ne& tool+ for the Iu+ IuC-+ IuP- interfaces can be used no&( etha&!>protocol anal'zer?.et&or! performance statistics can be obtained through counters >et$ct #eporter?+ ,4-B+ # /easurement /anagement+ and T$4.
Issue 1.010th December 2003
Page 12 of 17
Confidential
.1
Preparation
.3
Dri%e Test
.5
$nal'sis
.7
#eport
F
.10
#ecommendation $nd $ppro%al
.11#ecommendationImplemented and
Configuration/anagement
5.0
6erification
.E
4ptimizationCriteria
/et
.12urther
4ptimization6iableG
F
.et&or!oading
.2
Trial
.Interface
/onitoring
.et&or!
ideImplementation
/adeG
F
Tuning
.0
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 13/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENT
.0 The 4ptimization Process describesho& to raise the le%el of net&or! *ualit'to the target criteria. It is primaril'based on measured call data o%er anagreed route and net&or! statistics.The dri%e tests &ill pro%ide the formale%aluation for each cluster.
.1 Optimi5ation Preparation The optimization process must follo& the tuning process. $ll prere*uisites needed for thetuning process must be fulfilled and the initial tuning e8ecuted.
Information related to the cluster performance from the end of the tuning phase is re%ie&edat this stage. Clear ob)ecti%es for this process are re*uired. The PIs >call success rate+throughput etc? are agreed at this stage.
.2 Tria"ased upon 3g best practices andcurrent !no&ledge of the en%ironmentof the net&or! a trial plan is constructedand implemented.
$ trial area is determined and a plan is created. The trial area can be either a cluster or agolden route.
The trial plan must co%er the parameter changes to be implemented. Configurationmanagement and loading of features into the net&or! ha%e to be defined here.
.3 Drie Test Perform agreed measurements along defined routeK collect ra& data+ highlighting problemareas and areas affected b' issues outside of planning control.
,nsure the maintenance of et&or! reeze as initiated in section .1.
. Net+or6 "oa)in,The et&or! might need to be loaded&ith traffic so that statisticall'meaningful decisions can be made.
There is a re*uirement to specif' the re*uired le%el of calls in the cluster and ensure thatenough load of the net&or! occurs+ either %ia the pro%ision of Dri%e Teams or othersubscriber acti%it'. oth and D load has to be considered.
. Inter#ace Monitorin,It ma' be necessar' to collect interfacelogs from &ithin the net&or! for
-pecif' the interfaces re*uired for monitoring and allo& access to them in a timel' manner+consistent &ith the 4ptimization process. The tool used is etha&! J can monitor ma'beone site at a time >*uite specific monitoring?K therefore it cannot be used in &ide scale
Issue 1.010th December 2003
Page 13 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 14/17
KIA 3G Optimisation
RE&. DESCRIPTION RE'$IREMENT
anal'sis. optimization.
.5 Ana"2sis #a& data is processed and anal'zed to e%aluate the net&or! performance. If applicable+e8clusion zones are ta!en into account.Pro%ide recommendations and supporting data for Performance impro%ement &ithin that
Cluster .7 ReportPro%ide formal report of et&or! Performance and gi%e comparison &ith re*uiredperformance criteria.
.E Optimi5ation criteria met $ logical test is performed to %alidate if the optimization criterion is met.
. Net+or6*+i)e imp"ementation ma)e If the report recommendations ha%e been appro%ed pre%iousl' and implemented on the&ide scale then %erification process is started.
.10 Recommen)ation an) Approa" #ecommended changes to net&or! configuration need to be presented for appro%al.Possible impact needs to be e%aluated. $re there compromises on other performance andconfiguration areas >e.g. capacit'?G
.11 Recommen)ation Imp"ementation 7Con#i,(ration Mana,ement
$ppropriate changes are implemented. $ consistenc' chec! for the correct implementationof changes is carried out. Plan,dit tools can be used for this tas!.
.12 &(rther Optimi5ation ia"e If it is possible for further optimization to close the gap bet&een current performance andtarget performance using 3g best practices then further trial &or! &ill be considered. If not+the issue &ill be escalated and the %erification process can be started.
Issue 1.010th December 2003
Page 1 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 15/17
KIA 3G Optimisation
8. NET%OR9 VERI&ICATION PROCESS
The purpose of this process is to %erif' that the changes implemented at the cluster le%el maintain the o%erall net&or! performance to thetargets set bet&een the operator and o!ia. -ince it is mainl' a %erification of the optimization process+ same tools as in the optimization phase&ill be used here.
RE&. DESCRIPTION RESPONSI:IIT;
5.0 This process describes ho& %erification&ill be performed for the area as a&hole.
5.1 niform PerformanceG ,nsure that no indi%idual cluster is more that 10H &orse than the o%erall net&or!. If suchclusters e8ist+ consider optimizing them once more.
Issue 1.010th December 2003
Page 1 of 17
Confidential
5.35.
$nal'se
#esults
5.
PassGPerform
Dri%eTest
5.
$nal'ze#esults
5.
PIs metG
5.E
#eporting
F
5.7
#emedial $ctionDecision
F
4ptimization
e& Dri%eTest
DefinitionF
5.1
niformPerformanceG
5.2
ailure/echanismCollection
5.5
4ptimization
.0
4ptimization
.0
.0
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 16/17
KIA 3G Optimisation
RE&. DESCRIPTION RESPONSI:IIT;
5.2 e& dri%e route definit ion The ne& focus is inter<cluster inter&or!ingK a ne& dri%e test route &ill be defined across theclusters. e' routes in the cit' &ill be ta!en into account.
5.3 Dri%e Test $ ne& Dri%e Test is scheduled and e8ecuted in line &ith the re*uirements of the contract. Iftuning and optimization phases are done properl' there should be %er' little dri%ing left forthe %erification phase.
5. $nal'ze results The test results are anal'zed and failures outside of planning;optimization control areremo%ed from the statistics.
5. PIs metG ased on the anal'sis report a decision is made on &hether the o%erall net&or!performance is at the re*uired le%el.
5.5 ailure mechanism collection If the *ualit' of the cluster is not satisfactor' an in%estigation is underta!en to classif' thereasons &h' the *ualit' cannot be achie%ed. Classification e8amples are(
• neconomic rectification re*uired due to sub<optimal site placement.
• It is estimated that the performance can be achie%ed &hen a future change note or
feature is loaded;implemented into the net&or!.
• The implementation of parameters re*uired to achie%e the performance is outside
o!iaLs control.
5.7 #emedial action decision If further remedial actions are li!el' to close performance gap and can be )ustified these&ill be scheduled through the optimization process
5.E #eporting $ collection of supporting information for the performance &ithin the net&or! is pro%ided for reference.
Issue 1.010th December 2003
Page 15 of 17
Confidential
7/18/2019 3G Radio Optimisation Process (2003)
http://slidepdf.com/reader/full/3g-radio-optimisation-process-2003 17/17
KIA 3G Optimisation
Issue 0.13rd -eptember 2003
Page 17 of 17
Confidential