Sr. Criteria
Power Cable Protection & Penetration
Panel Contents Operation ( Relays-Timers-Contactors-CB's )
Electrical Cables Penetration & Arrangement
Power cabinet chasses earthing
PSI Panel
Main Distribution Board (MDB)
Wires Color Code & Size
Electrical Terminal Connections
Surge Arrestor Status
Cabinet Cleaning , Lock & Chasses Fixation Status
Power Meter Exist & Function
Power Meter Reading
Power System
Power Meter Enclosure Status (Clean - Rust - Lock - Sealed)
Power Meter - PDB Enclosure
Presence & Operation of 63 Amp CB
Electrical Terminals Connection
Power Meter Enclosure Installation & Earthing
Enclosure Status ( Clean - Rust - Lock - Sealed )
Enclosure Installation & Earthing
Wrong Connection or CB Rating
Rectifier
The 3 input phases connected to the cabinet
All CB's has Labels
Existing of the Schematic Power Diagram
Alarms appearance on the PMU ,PSUs & reported to the NOC
Rectifier Cabinet / Fuses / DC breakers / Alarms Labels
Positive output (0 vdc) grounding
All power Cables AC / DC had Terminals & well tight ( to the battery fuse For Saft ) / Cables
PSI C.B labeling ( when there more than one 125A C.Bs )
Batteries
Batteries are surface clean , no leakage , poles clean
Power Cables arrangement, Color code , terminals & labels
PSI Panel ( Lock , Cleaning, Corrosion , sealing & grounding )
Strings labels exist & correct
Batteries poles well tighten and covered well & all cables are organized
SQI 89.50%
Site Name
Date
Office
Site ID
mohamed sa
Audit Check List (Weighting Table)
For Macro => ID GF Sites
Region
Auditor
-
8/2/2019 4263 SQI New ID- RT GD
2/102
A-5-4
A-5-5
A-5-6
A-5-7
A-6
A-6-1
A-6-2
A-6-3
A-6-4
BB-1
B-1-1
B-1-2
B-1-3
B-1-4
B-1-5
B-1-6
B-1-7
B-1-8
B-1-9
B-1-10
B-2
B-2-1
B-2-2
B-2-3
B-3
B-3-1
B-3-2
B-3-3
C
C-1C-2
C-3
C-4
C-5
C-6
DD-1
D-2
D-3
D-4
D-5
D-6
D-7
D-8
EE-1
E-2
E-3
E-4
E-5
Battery Temp. Sensor existence & operation
IBBS Smoke Sensor existence & operation
Inter-cell shrouds exist and not damaged
BE Rack fixation and earthing
Solar Cell System earthing
System Batteries status & cables connectors
Cooling System
Collectors / modules cleaning
Collectors operation status
Solar System
ODU's vibration level & power Socket covers existence
Drain pipes route condition
ODU's base fixation and earthing
A/C's operation
A/C system
Cleaning [ OD/ID units - IDU's filters - ODU's condenser ]
Automatic control switch (operation, timer operation & 6 hours adjustment for each A/C)
Refrigerant lines Status and Isolation
DC Ventilation System
Control panel operation & Remotes
A/C controller ( control panel ) wiring diagram
ODU's Compressors / IDU's fan Freezing
Fire Alarm and Fighting System
DC Ventilation sys. Existence & operation
BTS (IBBS) Cabinet Heat Exchanger Fans Cleaning
Fire Alarm control panel operation & Batteries Status
Heat Exchanger
BTS (IBBS) Cabinet Heat Exchanger's operation
Fan DC Power Cables arrangement & laying
DC cables route , ducting & terminals
System Fans operation & Stainless guards Corrosion percentage
Fire Extinguisher validity Certificate
Fire Extinguisher Fixation & Holder existence
Transmission Equipments
Fire panel had alarms
Fire detectors ( Heat/ Smoke ) exist / operation
Fire Extinguisher existence / check gas
IDU / IF Cable / ODU / PWR cables labels
IDUs / ODUs Fixation & earthing
each IDU has its' Own power source (TM C.B not shared by many links)
MW dish >= 1.2M Struts, Antenna Bracket , Side Arm, wave guide fixation
RTN links protected by 2 PXC boards & powered by different C.Bs
All links Power Cables had terminals
All BTSs, MW rack fixation and earthing
DDF/ODF : arrangement & E1's cables labels
DDF/ODF : labels and appearance
IF Connectors tightness & cables laying
link management & current Alarms
Equipments & DDF
Feeders, RF Jumpers ,TRX's Connectors tightness
Equipments Cables arrangement and laying
-
8/2/2019 4263 SQI New ID- RT GD
3/102
E-6
E-7
E-8
FF-1
F-1-1
F-1-2
F-1-3F-1-4
F-1-5
F-1-6
F-1-7
F-1-8
F-1-9
F-2
F-2-1
F-2-2
F-2-3
F-2-4
F-2-5
F-2-6
F-2-7
F-2-8
F-3
F-3-1
F-3-2
F-3-3
F-3-4
F-3-5
G
G-1G-2
G-3
G-4
G-5
G-6
G-7
G-8
HH-1
H-1-1
H-1-2
H-1-3
H-1-4
H-1-5
H-1-6
H-1-7
H-1-8
H-1-9
H-1-10
Cabinets cleaning ,sealing and general appearance
Equipments had missing parts need to be installed ( Ex: Dummy panels )
Civil
Unused cables in the DDF need to be removed
Shelter / OD Cabinets Door hinge, Sealing, holder , earthing StatusDoor Sensor operation
Roxtec fixation , earthing and sealing
Shelter Body / Outdoor Grillage
Shelter/OD Cabinets I-Beam Fixation, galvanization, grounding and its' anchor Bolts Status
Shelter Double Roof / OD Canopy Fixation and Sealing (Sika Flux) Status
A/Cs & power cable glands on the shelter body earthing, sealing status
General
Site lights inside/outside operation
Copper belt, buss bars inside Shelter & earthing continuity Status
All earthing plates are cleaning and coating with antistatic grease
RF/IF cables entrance isolation
the temperature sensor of the A/C controller operation
1 (or) 2 step ladder for shelter galvanized and earthing
AC outlets operation and status
Emergency light Status & Battery condition
Junk materials & unused Spare parts existence in the site area
Humidity & water sensors operation status
Fence barbed wire system continuity status
Fence light/ halogen system operation
Fence gate connected to the main earth painting & lock status
Site equipments, area cleaning
Fence
Site Fence (bricks / mesh wire) had crack or holes
Cable Ducts fixation and sealing
Cable Trays & its' supports segments fixation and earthing
Cable Tray galvanization & corrosion status
Fence gate connected to the main earth
Cable ladder / Ducts / Trays [ Inside & Outside ]
Cable ladder segments fixation, earthing
Fly cables existence (all should pass through Ducts or ladder or Cable Tray)
TowerPylon , RDU , Mast(s) , Side Arm(s)
Cable Trays cover fixation by metal tie warps
all feeders and cables inside Cable Trays arrangement
earthing plates fixation on the Cable Trays & earthing cable tightness
all earthing plates on the Tower are coating with antistatic grease
all cables are attached to the tower ( there is no fly cables )
Safety Wire fixation , galvanization & corrosion status
Tower Verticality and galvanization
all Anchor bolts fixation , tighten and coated by grease for tower / mast legs
all RDU wires tension & fixation
Antennas Brackets fixation , galvanization and grounding
Tower platform existence and fixation
Tower painting condition
Tower members bolts fixation
-
8/2/2019 4263 SQI New ID- RT GD
4/102
H-2
H-2-1
H-2-2
H-2-3
H-2-4
H-2-5
H-2-6
H-2-7
H-2-8
H-2-9
I
I-1
I-2
I-3
I-4
I-5
I-6
I-7
I-8I-9
I-10
I-11
I-12
I-13
I-14
I-15
I-16
I-17
I-18
I-19I-20
I-21
220
86.27%
8
111
96.52%
1
331
89.46%
9
Total SQIscore
Score %
NCR raised
telecom SQIscore
Score %
NCR raised
CW SQIscore
Score %
NCR raised
Palm Tree , Mono-pole
Palm step Bolts / (Palm - Mono pole) ladder condition [ missing-loose-rusty ]
Access door [ exist - locked ]
Water Drain pipe installation and route
Camouflage status [ Scratch / damage ]
Anchor Bolts for the base [ missing - loose - rusty ]
Safety Wire fixation , galvanization , tension & corrosion status
Feeders holder wires installation [ tension - corrosion ] status
Genset(s) operation status
Automatic start response to the Main power fail or other fail
engine Leakages : water, oil and Fuel
Palm Tree leaves installation far from the MW Dish & Antennas
Antennas Jumpers & IF cable arrangement
Generator
Battery voltage & Dynamo operation Status
Exhaust pipe isolation, fixation, gas leakageFuel tank : leakage, appearance, fixation & gauges
Main generator cables arrangement & protection ( inside Cable Tray - PVC )
ATS panel connections, cables terminals, operation, labels and indicator lamps
Battery poles condition , terminals, Covers, fixation and cleaning status
Belts condition and tension
Filters Status : Oil, water , fuel
ATS & generator(s) Control panels wiring diagram existence and matching
Earthing system : generator components, Chassis & fuel tank
Genset(s) : vibration, sound , Rubber Bases and fixation
Exhaust gas color
Generator Doors & locks statusFuel Leakage from the Fuel lines
generator concrete base cleaning
Ventilations fans operation & appearance
Generator chassis cleaning, fixation to the concrete base
Generator alarms status Connection and operation
-
8/2/2019 4263 SQI New ID- RT GD
5/102
-
8/2/2019 4263 SQI New ID- RT GD
6/102
-
8/2/2019 4263 SQI New ID- RT GD
7/102
-
8/2/2019 4263 SQI New ID- RT GD
8/102
result score Severitiy SOW
Yes N/A critical N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes N/A major N/A
Yes N/A major N/A
Yes N/A major N/A
Yes N/A critical N/A
Yes N/A critical N/A
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 minor Yes
Yes 5 major Yes
Yes 5 minor Yes
Yes 5 major Yes
No 1 major Yes
No 0 critical Yes
Yes 5 critical Yes
Yes 5 minor Yes
Yes N/A minor N/A
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 major Yes
Yes N/A critical N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes 5 major Yes
Yes 5 critical Yes
No 1 major Yes
Severity
record it
Comment
1 surge arrestor is burne
schematic diagram is not fo
battaries not in it's positio
eed
Scoring Description
OK : No Deduction on Site Weight
Minor : Total Site Weight will decreased by 1
Major : Total Site Weight will decreased by 5
Critical : Total Site Weight will decreased by 10
-
8/2/2019 4263 SQI New ID- RT GD
9/102
No 1 major Yes
Yes 5 critical Yes
No 1 major Yes
Yes 5 critical Yes
Yes N/A major N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes N/A critical N/A
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 critical Yes
No 1 major Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes N/A critical N/A
Yes N/A major N/A
Yes N/A major N/A
Yes N/A critical N/AYes 5 major Yes
Yes N/A critical N/A
No 0 critical Yes
Yes N/A major N/A
Yes N/A major N/A
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 major Yes
No 0 critical Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 major Yes
not found
battaries not in it's positio
remotes not found
fire extinguiser is damag
not connected to earth
-
8/2/2019 4263 SQI New ID- RT GD
10/102
Yes 5 major Yes
Yes 5 major Yes
No N/A minor N/A
Yes N/A critical N/A
Yes N/A critical N/A
Yes N/A critical N/AYes N/A critical N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes 5 major Yes
Yes 5 major Yes
Yes N/A major N/A
Yes N/A minor N/A
Yes N/A minor N/A
Yes 5 major Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes 5 major Yes
Yes 5 major Yes
Yes N/A major N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes N/A critical N/A
Yes N/A major N/A
Yes 5 major YesYes 5 major Yes
Yes 5 major Yes
Yes 5 major Yes
No 1 major Yes
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 major Yes
Yes N/A critical N/A
Yes 5 major Yes
Yes N/A critical N/A
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 critical Yes
Yes N/A critical N/A
Yes 5 major Yes
Yes 5 critical Yes
Yes 5 critical Yes
need dummy boards
cable tray cover stolen
-
8/2/2019 4263 SQI New ID- RT GD
11/102
N/A N/A critical N/A
N/A N/A critical N/A
N/A N/A critical N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/AN/A N/A critical N/A
N/A N/A major N/A
N/A N/A critical N/A
N/A N/A critical N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/AN/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/A
N/A N/A major N/AN/A N/A major N/A
N/A N/A major N/A
OK MN MJ CR
43 0 5 3
OK MN MJ CR
22 0 1 0
OK MN MJ CR
65 0 6 3
Score 331total Score 370
Score 220total Score 255
Score 111total Score 115
-
8/2/2019 4263 SQI New ID- RT GD
12/102
-
8/2/2019 4263 SQI New ID- RT GD
13/102
-
8/2/2019 4263 SQI New ID- RT GD
14/102
-
8/2/2019 4263 SQI New ID- RT GD
15/102
Vendor / Contractor Action
d
und
n
-
8/2/2019 4263 SQI New ID- RT GD
16/102
n
d
-
8/2/2019 4263 SQI New ID- RT GD
17/102
-
8/2/2019 4263 SQI New ID- RT GD
18/102
-
8/2/2019 4263 SQI New ID- RT GD
19/102
-
8/2/2019 4263 SQI New ID- RT GD
20/102
-
8/2/2019 4263 SQI New ID- RT GD
21/102
-
8/2/2019 4263 SQI New ID- RT GD
22/102
-
8/2/2019 4263 SQI New ID- RT GD
23/102
-
8/2/2019 4263 SQI New ID- RT GD
24/102
-
8/2/2019 4263 SQI New ID- RT GD
25/102
-
8/2/2019 4263 SQI New ID- RT GD
26/102
-
8/2/2019 4263 SQI New ID- RT GD
27/102
-
8/2/2019 4263 SQI New ID- RT GD
28/102
-
8/2/2019 4263 SQI New ID- RT GD
29/102
-
8/2/2019 4263 SQI New ID- RT GD
30/102
-
8/2/2019 4263 SQI New ID- RT GD
31/102
-
8/2/2019 4263 SQI New ID- RT GD
32/102
-
8/2/2019 4263 SQI New ID- RT GD
33/102
-
8/2/2019 4263 SQI New ID- RT GD
34/102
-
8/2/2019 4263 SQI New ID- RT GD
35/102
-
8/2/2019 4263 SQI New ID- RT GD
36/102
-
8/2/2019 4263 SQI New ID- RT GD
37/102
-
8/2/2019 4263 SQI New ID- RT GD
38/102
-
8/2/2019 4263 SQI New ID- RT GD
39/102
-
8/2/2019 4263 SQI New ID- RT GD
40/102
-
8/2/2019 4263 SQI New ID- RT GD
41/102
-
8/2/2019 4263 SQI New ID- RT GD
42/102
-
8/2/2019 4263 SQI New ID- RT GD
43/102
-
8/2/2019 4263 SQI New ID- RT GD
44/102
-
8/2/2019 4263 SQI New ID- RT GD
45/102
-
8/2/2019 4263 SQI New ID- RT GD
46/102
-
8/2/2019 4263 SQI New ID- RT GD
47/102
-
8/2/2019 4263 SQI New ID- RT GD
48/102
-
8/2/2019 4263 SQI New ID- RT GD
49/102
-
8/2/2019 4263 SQI New ID- RT GD
50/102
-
8/2/2019 4263 SQI New ID- RT GD
51/102
-
8/2/2019 4263 SQI New ID- RT GD
52/102
-
8/2/2019 4263 SQI New ID- RT GD
53/102
-
8/2/2019 4263 SQI New ID- RT GD
54/102
-
8/2/2019 4263 SQI New ID- RT GD
55/102
-
8/2/2019 4263 SQI New ID- RT GD
56/102
-
8/2/2019 4263 SQI New ID- RT GD
57/102
-
8/2/2019 4263 SQI New ID- RT GD
58/102
-
8/2/2019 4263 SQI New ID- RT GD
59/102
-
8/2/2019 4263 SQI New ID- RT GD
60/102
-
8/2/2019 4263 SQI New ID- RT GD
61/102
-
8/2/2019 4263 SQI New ID- RT GD
62/102
-
8/2/2019 4263 SQI New ID- RT GD
63/102
-
8/2/2019 4263 SQI New ID- RT GD
64/102
-
8/2/2019 4263 SQI New ID- RT GD
65/102
-
8/2/2019 4263 SQI New ID- RT GD
66/102
-
8/2/2019 4263 SQI New ID- RT GD
67/102
-
8/2/2019 4263 SQI New ID- RT GD
68/102
-
8/2/2019 4263 SQI New ID- RT GD
69/102
-
8/2/2019 4263 SQI New ID- RT GD
70/102
YesNo
N/A
-
8/2/2019 4263 SQI New ID- RT GD
71/102
Photo
Comments
need cover
waiting spare
Picture record of
Photo
-
8/2/2019 4263 SQI New ID- RT GD
72/102
Photo
Commentscables need arrangement,missing labels
arranged ,label above diagram
Photo
Commentsschemtaic diagram not found
done
Photo
Commentsmissing labels
already exist
-
8/2/2019 4263 SQI New ID- RT GD
73/102
Photo
Commentsneed dummy boards
waiting spare
Photo
Commentshas alarm
cleared
-
8/2/2019 4263 SQI New ID- RT GD
74/102
cables need arrangement
Photo
Commentscables need arrangement
already arranged
Photo
Comments has alarmnot exist during PM and now clear
-
8/2/2019 4263 SQI New ID- RT GD
75/102
Photo
Commentscables need arrangement
already arranged
Photo
Commentscables need duct
waiting spare
Photo
arranged
-
8/2/2019 4263 SQI New ID- RT GD
76/102
Photo
Commentsearth cable not connected
stolen
Photo
Commentshas alarm
audit team opened the door so by default give alarm
-
8/2/2019 4263 SQI New ID- RT GD
77/102
Commentsbad isolation,need metal labels
already isolated,labeled with color code
Photo
Commentsbad isolation
already isolated
Photo
Commentsneed cover and metal tie wraps
stolen and waiting spare
-
8/2/2019 4263 SQI New ID- RT GD
78/102
Photo
Comments
Photo
Commentsbad isolation,missing labels and cables need arrangement
isolated,labeled
Photo
-
8/2/2019 4263 SQI New ID- RT GD
79/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
80/102
Comments
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
81/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
82/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
83/102
Comments
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
84/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
85/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
86/102
Comments
-
8/2/2019 4263 SQI New ID- RT GD
87/102
Photo
1 surge arrestoe is burned
waiting spare
he site snag
Photo
-
8/2/2019 4263 SQI New ID- RT GD
88/102
Photo
Commentsmissing labels and terminals
labeled,terminaled
Photo
Commentscables need arrangement
arranged
Photo
Commentsmissing labels
-
8/2/2019 4263 SQI New ID- RT GD
89/102
Photo
Commentscables need more arrangement,need dummy boards
arranged and waiting dummy spare
Photo
Commentsneed string labels
already labeled from the other side
-
8/2/2019 4263 SQI New ID- RT GD
90/102
cables need arrangement
Photo
Commentshas alarm
audit team opened the door so by default give alarm
Photo
Comments need dummy boardswaiting spare
-
8/2/2019 4263 SQI New ID- RT GD
91/102
Photo
Commentsremotes not found and holdera
stolen and waiting spare
Photo
Commentsneed covers and labels E1 cables missing labels
cover stolen
Photo
arranged
-
8/2/2019 4263 SQI New ID- RT GD
92/102
Photo
Commentsneed covers
stolen
Photo
Commentsfire extinguisher is damaged and need holder
stolen and waiting spare
-
8/2/2019 4263 SQI New ID- RT GD
93/102
Commentsbad isolation and need labels,not connected to earth
already isolated,labeled and earth stolen
Photo
Commentscables need arrangement on tower
long IF cable and already arranged
Photo
Commentsneed clambs
waiting spare
-
8/2/2019 4263 SQI New ID- RT GD
94/102
Photo
Photo
Commentsmissing labels,not connected to earth
labeled,earth stolen
Photo
-
8/2/2019 4263 SQI New ID- RT GD
95/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
96/102
Comments
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
97/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
98/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
99/102
Comments
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
100/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
101/102
Photo
Comments
Photo
Comments
-
8/2/2019 4263 SQI New ID- RT GD
102/102
Comments