Transcript
![Page 1: 6859(< - Maxitool Group · 6859(< (92/87,21 0,1,1* MAXITOOL AUSTRALIA Certainty in Safety — scale. 1 Meters 2550 OATE Transparent Overlay from 25 June 2014 su Certainty in Quality](https://reader035.vdocuments.net/reader035/viewer/2022071017/5fd0b0977804ce203f022c59/html5/thumbnails/1.jpg)
CAIRNSBRISBANEPAPUA NEW GUINEA
P 07 4045 3433 E [email protected] www.maxitool.com.au
PROJECT: Mt Carlton - Survey Tailings Storage Facility
SCOPE: Carry out Bathymetric survey in Tailings Storage Facility and analyse data to provide information relating to quantity of ingress since last survey.
CHALLENGECHALLENGES: Water level was very low so as a result the same 'surface' area could not be surveyed. Danger of 'beaching' RC vessel due to low water level.
ACHIEVEMENTS: The data output was able to determine the ingress of product by comparing surveys carried out 12 months apart. Client received detailed technical report including volume curve.
SURVEYEVOLUTION MINING