A CASE STUDY OF S A N G A T H P O S H
WHAT MAKES ME GREEN?
IGBC PLATINUM RATED PROJECT
IGBC PLATINUM
P E
O P
L E
Basic amenities near site
Shopping Mall
Convenience store
Fuel station
Police station
Places of worship
BRTS
Hospital
Chemist
ATM
School
S I
T E
Conservation of top soil
S I
T E
Covered by
Geotextile fabric Water sprayed on soil
Site Barricading
Akash neem
Badam
Mango
Pangara
Sevan
Silver oak
S I
T E
Over 82% landscape with local species
Tulsi
Shatavari
Brahmi
Barahmasi
S I
T E
Herbal plants
S I
T E
Planter beds in balconies
Water efficient irrigation
Irrigation need based segregation of plant beds
Drip irrigation
Soil moisture sensor
W A
T E
R
Sewage treatment plant
50 kl system processes 100% grey water
generated on site
STP converts to clean water
Treated water takes care of 100%
Landscaping requirement
Car and floor wash requirement
W A
T E
R
Water efficiency
Treated water used for
100%
Landscaping requirement
Car and floor wash
Dual flushing 3/6l systems installed
All faucets have restricted flowrate of
8lpm at 3 bar pressure, consuming
30% less water than base case
W A
T E
R
100% water falling on site is captured
& used to charge ground water table
By percolation wells
Any water overrun from site pass through
sedimentation tank to make sure that site
contaminants and pollutants do not
breach site perimeter
W A
T E
R
Water conservation & RWH
Reflective glass TO reduce solar
gain
Saint gobain ST 167
Light transmittance 67%
Shading coeff 0.78
U value 5.86 w/sqmt k
Untreated Treated glassE
N E
R G
Y
Heat reflective glass
Sri kept high on roof to
Minimise roof heating
& Consequential thermal
Emittance
China mosaic is used
With average SRI of 0.8
Solar reflective index – China mosaic
E N
E R
G Y
Over 95% OF LIVABLE AREAS RECEIVE DAYLIGHT FACTOR OF 2 EXCEEDING
IAQ CREDIT 6 OF 75%
Sufficient supply of fresh air exceeds ashrae standard 62 requirement by 30%
E N
E R
G Y
Daylight & Ventilation
LPD calculated for common areas kept under .6
w/m2 which is 20% more efficient than
specified
All motors and pumps have minimum
65% efficiency
Dg set is CPCB certified for emissions
All light fixtures are led
Energy and water flow meters installed on
different circuits for post occupancy monitoring
Energy strategy & monitoring
E N
E R
G Y
CFC free Airconditioning with Inverter
technology / BEE star rating
Airconditioning
E N
E R
G Y
Vehicle charging points
E N
E R
G Y
Electric vehicle charging points for minimum
10% of total parking
95% material
sourced from
manufacturers
based under 500
kms away
minimum recycled
content of 30%POSH
M A
T E
R I
A L
S
Material efficiency
M A
T E
R I
A L
S
Waste Management
75% Waste
segregated during
construction
diverted to other
Sangath sites
Salvaged SS used
for handrail
Salvaged rebar
used in basement
raft
Waste segregation at apartment level
Individual bins planned for each
apartment. This is further segregated
at community level by fm team
Colour coded bins provided in
common areas
100% of organic waste generated is
treated on site
Waste Segregation & treatment
M A
T E
R I
A L
S
Common amenities
Gymnasium
Skating Rink
Games room
Sitout zone
Home theatre
P E
O P
L E
Parking free ground floor
S I
T E
Amenities for differently abled
Common toilet on ground floor has
fittings for DA
Ramps at all points of level change
Elevators with braile buttons and
voice assistance
Signage for user convenience
Suitably positioned sitouts
P E
O P
L E
On Site school
P E
O P
L E
ARCHITECTURE
INTERIORS
ENERGY EFFICIENCY
AW DESIGN
IGBC CONSULTING
ARCHITECT
STRUCTURAL
ENGINEER
PROJECT
ARCHITECT
The team
P E
O P
L EThank you
T H A N K Y O U