EXISTING ELEVATION

unstable &unsafe brickwork

modern brickwork

PROPOSED ELEVATION

remove top brickwork courses and setaside for reuse, lay new half-roundterracotta tiles as capping (see detail)

demolish modern pier &replace with new (see detail)

modern brickwork withinadequate capping

1.9m approx

remove capping course and raise withadditional course of reused brick, lay newhalf-round terracotta tiles as capping (seedetail), check flashings and redress asappropriate, check stability and tooth-in orprovide tie-backs as recommended by SE make good to facework

with re-used brickwork

3.7m approx

new 328x328mm brick pierconstructed in accordance withMethod Statement

'tooth in' pier to existing brickwork

1000

450 Helibar joint reinforcement

set into joints with Helibond

new reconstituted stone piercapping to match, set on dpcHalf-round terracotta

tiles set in limemortar (see detail)

Existing 215mm gardenwall retained

1000

450 Helibar joint reinforcement

set into joints with Helibond

cut out broken bricks and"tooth in" to existing soundbrickwork with reclaimedbricks to match existing(english garden wall) bond

varie

s

The Cottage

DP

DPDP

54.61

54.6654.61Tank

54.3054.3254.52

54.63

54.78

54.82

54.98

54.86

54.75

54.5354.59

54.59

54.59

54.6154.57

54.58

DP

DP

PDC 1 level. 54.58

DP

DPDPDP

DP

DPElectricity Pole

Electricity Pole

DP

Wetheringsett Manor

Administration Block

EXISTING ELEVATIONS

NORTH WEST EAST SOUTH

PROPOSED ELEVATIONS

NORTH WEST EAST SOUTH

clear away vegetation, clean, inspect,replace damaged bricks and cappingsto match and repoint where required(see method statement)

clear away vegetation, clean, inspect,replace damaged bricks and cappingsto match and repoint where required(see method statement)

SECTION

collapsed section collapsed section (sincepartially demolished)

parapet reinstated withrecovered, or identicalreplacement bricks setin lime mortarreplacement timber window tomatch original with double archformed with recovered bricks orsuitable matching replacements

replacement timber door tomatch original with double archformed with recovered bricks orsuitable matching replacements

rebuild wall with reclaimed bricksto match, or identicalreplacement set in lime mortar

parapet reinstated withrecovered, or identicalreplacement bricks setin lime mortar

rebuild wall with reclaimed bricksto match, or identicalreplacement set in lime mortar

NEW ROOF:Strip out remnants of existing roof,retaining lead flashings where possibleReplace with new (near) flat code 5lead roof, complete with flashings(re-dressed or new as required), rollsand hidden gutter, all to leadassociation standards, sat on 18mmmarine grade plywood, on timber joistsin galvanised joist hangersSet roof to discharge through wallinto existing hopper / drainage, orwhere this is lost, replace with newcast iron to match

Support new brick arches abovewindow and door on galvanised steellintol, not to project to the exterior

NORTH

SOUTH

EAST WEST

NORTH

EAST

new 328x328mm brick pierconstructed in accordancewith Method Statement

PROPOSED NORTH ELEVATION PROPOSED EAST ELEVATION

new reconstituted stonepier capping, set on dpc

new reconstituted stone capping tomatch profile on hall wall, laid on dpc

new wall to replaceoriginal lost by demolition,using reclaimed bricksfrom elsewhere on site

cut out and clean outsockets in existing walland tooth in new work

.

215 brickwork wall

265 x 165 terracotta tilecreasings laid in mortarwith staggered joints

256 dia half-roundterracotta wall coping

NORTH

PLANNING S3-FOR REVIEW AND COMMENTP1 12/10/21 Issue for Planning

Architects, Engineersand Cost Consultants

51 Yarmouth Road,Norwich,NR7 0ET01603 [email protected]

Also at:Cambridge and Winchester

www.chaplinfarrant.com

CF JOB NO.

DRAWING NO. REVISION

STATUS

DRAWING TITLECLIENT

PROJECT

NOTES DRAWING USE

REV. DESCRIPTIONDATE

REVISION LOGThis drawing is produced as a document for use in this project only and may notbe used for any other purpose. The license is granted only to the specificrecipients of the drawing directly from Chaplin Farrant Ltd. Chaplin Farrant Ltdaccepts no liability for the use of this drawing other than the purpose for which itwas intended in connection with this project as recorded on the title block and'File Status Code' and 'Revision'. If also issued in digital format, the data withinthis file may not be used for any purpose other than the information present onthe paper copy of the document.

Chaplin Farrant Copyright © 2021. This drawing may not be reproduced in anyform without Chaplin Farrant's prior written agreement.

ADDRESS

Date Plotted: 12 October 2021 17:36:28, by user: Peter Blois File Path: \\cf6\DATA\CF Projects\5500 - 5999\5955_WM_SWeatheringsettManorStowmarket\01_WIP\A_Architect\DR_Drawing\WM-CF-ZZ-XX-DR-A-5955WetheringsettManor_211012.dwg

This drawing contains the following:

SIZE

A1

CREATED BY CHECKED BY APPROVED BY

NFA GROUP

OUTSIDE WORKS AT WETHERINGSETT MANOR

WETHERINGSETT STOWMARKET IP14 SQX

WORKS ADJACENT TO HALL

P1

PB PB MN

5955

2002

WORKS LOCATION 1:200

WALL RECON

STRUCTIO

N

OF O

RIGINAL W

ALL

REBUILDINGOUTHOUSE

NEW PIER DETAIL (1:50)

WALL ADJACENT ADMIN BLOCK (1:100) REBUILDING OUTHOUSE (1:50)

RECONSTRUCTED WALL ATTACHED TO HALL (1:50) CRACK REPAIR (1:50)COPING DETAIL (1:10)