Download - AHCAL Mechanics and test beam setups
![Page 1: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/1.jpg)
AHCALMechanics and test beam setups
status report
Karsten GadowAHCAL Main MeetingDESY, 09.12.2013
![Page 2: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/2.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 2
Outline AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 3: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/3.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 3
AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 4: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/4.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 4
AHCAL DESY II test beam setup
15 pieces 1xHBU housings are produced at DESY
15 HBU´s with CIB´s has to be mounted and commissioned
all 15 layers will be tested with air stack
![Page 5: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/5.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 5
AHCAL DESY II test beam setup
DESYII TB22
1 t Stage
Air Stack
Absorber stack with 5 layers
![Page 6: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/6.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 6
Task list (Summary):
> Test beam setup position inside the TB 22 allows parasitic measurements up to KW10 2014
test beam schedule fixed KW1+2 2014
supply and read out hardware ongoing
15 layer absorber structure installed
1 t DESY II Stage installed
15 layer air stack ready
>Detector layer production production of 15 pieces 1xHBU housings ready
production of 15 HBU´s and install tiles 6 done
commission and beam test in air ongoing
AHCAL DESY II test beam setup
![Page 7: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/7.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 7
AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 8: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/8.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 8
AHCALPS/SPS AHCAL test beam setup
Movable Stage with 2 x absorber stack
Air stack
2 x absorber stack stand alone
Tungsten setup layers
Movable stage with 1 x absorber stack
![Page 9: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/9.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 9
Task list (Summary):
> Test beam setup position inside PS/SPS ?
test beam schedule ?
supply, read out and cooling scheme ongoing
install absorber structure self standing or with Movable Stage ?
install new GUI for Movable Stage controlongoing
>Detector layer production production of 2 x 50 x 2xHBU-extended housings (MPI) ongoing
production of 2 x 48 x 2 HBU´s and install tiles ?
production of 10 x HBU dummy's ?
commission and test ?
AHCALPS/SPS AHCAL test beam setup
![Page 10: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/10.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 10
AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 11: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/11.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 11
AHCALPS/SPS AHCAL Tungsten test beam setup
aluminum frame with 2 x 1 mm FR4 cover to center the housing
tungsten area
Al frame parts produced at MPI
![Page 12: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/12.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 12
AHCALPS/SPS AHCAL Tungsten test beam setup
housing with SIB
housing with CIB
SIB
CIB
production of 0,5 mm thin stainless steel housings by MPI
![Page 13: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/13.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 13
AHCALPS/SPS AHCAL Tungsten test beam setup
special configuration with extender board
4 HBU´s per layer
![Page 14: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/14.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 14
AHCALPS/SPS AHCAL Tungsten test beam setup
50 frames
frame with housings
closed housings
removed cover plate
![Page 15: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/15.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 15
AHCALPS/SPS AHCAL Tungsten test beam setup
40 tungsten absorber plates are installed
Install Tail catcher ?
Tail Catcher Instrumentation?
add 8 tungsten absorber plates ?
![Page 16: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/16.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 16
AHCALPS/SPS AHCAL Tungsten test beam setup
Modification of the tungsten absorber structure ?
![Page 17: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/17.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 17
Task list (Summary):
> Test beam setup configuration 48 layers ?
test beam schedule ?
supply, read out and cooling preparation ongoing
modify tungsten absorber structure ?
Tail Catcher installation ?
>Detector layer production production of 50 frame parts (MPI) and mounting with facing (DESY) ready
production of 2 x 50 x 2xHBU-extended housings (MPI) ongoing
production of 2 x 48 x 2 HBU´s and install tiles ?
commission and test ?
AHCALPS/SPS AHCAL Tungsten test beam setup
![Page 18: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/18.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 18
AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 19: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/19.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 19
AHCAL cabling and cooling setup
power distribution
Power cabling for 1 x submodul
LDA
![Page 20: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/20.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 20
AHCAL Status Report Mechanics and test beam setups
1. DESY II test beam setup
2. PS/SPS AHCAL test beam setup
3. PS/SPS AHCAL Tungsten test beam setup
4. AHCAL cabling and cooling setup
5. AHCAL absorber structure modification (earth quake)
![Page 21: AHCAL Mechanics and test beam setups](https://reader035.vdocuments.net/reader035/viewer/2022062304/5681358c550346895d9cf580/html5/thumbnails/21.jpg)
Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 21
AHCALabsorber structure modification (earth quake)
Simulation for AHCAL barrel and end cap structure must be done soon!
ILD workshop, Cracow, 24-26 September 2013