Engineering Excellence Delivered Globally
Alfa Tech VestAsia Pte Ltd.
Zach Wilson +6598249604
[email protected]://www.atce.com.sg
ALFA TECH VestAsia
![Page 2: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/2.jpg)
Outline of Presentation
• History of Alfa Tech• Alfa Tech Services• Our Approach to Project Design & Management• Partial Client List and 2010-2012 Singapore
Projects• Selected Relevant Projects Worldwide• Key Team Members
![Page 3: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/3.jpg)
Alfa Tech VestAsia Background
Established in Silicon Valley in 1987 Headquartered in San Jose, CA ASEAN and Asia HQ, Singapore: 75 Bukit Timah Road Over 250 employees and affiliates worldwide Other Offices:
• San Francisco• Los Angeles• Singapore• Bangkok• Sydney• Dublin• Melbourne• London
![Page 4: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/4.jpg)
Alfa Tech VestAsia Services Overview
Design Architectural programming Sustainable design & documentation Mechanical design Electrical design Plumbing design
Technology IT Program Requirements Data Center Layout Infrastructure Planning Low Voltage Network Topology Security Server Migration Equipment procurement and install
Project Delivery Program development Site selection & due
diligence Budgeting & cost
estimating Scheduling Constructability Review Turnkey project
management
Facility Management Ongoing care and support 24/7/365 BMS monitoring 24 Hour attendant service Comprehensive service and
warranty Preventative maintenance
![Page 5: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/5.jpg)
Our Integrated Project Delivery
Seamless Management
Through a Project’s Lifecycle
![Page 6: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/6.jpg)
Our Approach for the Optimal Project
Teamwork – integrate all stakeholders Prioritizing the “Drivers”
Program and plan around your business applications Establish measureable project objectives
Identify the “controllable risks” and manage them Creative Problem Solving
Develop the base-line criteria Evaluate innovations and emerging technologies
Cost vs. Benefit Analysis Evaluate capital cost vs. operating expense savings
Make Critical Decisions early Don’t lose focus on the objectives
![Page 7: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/7.jpg)
Why Alfa Tech VestAsia?
Integrated Project Services Permanent Physical
Presence in Asia-Pac and US Knowledge and Experience Proven Track Record Awards in Sustainable and
Mission Critical Design Focus on Emerging
Technologies Risk and Cost/Benefit
Management
Strong Industry Relationships
Commitment to Our Clients
Alternate Project Delivery Methods
![Page 8: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/8.jpg)
Alfa Tech in Asia-Pac
Facebook - Prineville, OR
JDSU– Singapore, Malaysia, Beijing
Ultratech – Singapore Ultratech Phase II – Singapore Seagate – Bangkok, Thailand,
Singapore Lucasfilms – Singapore Cable & Wireless – Singapore Oracle – Sydney, Bangalore,
Seoul Advanced Micro Devices –
Suzhou, China Symantec – China Logitech – China
![Page 9: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/9.jpg)
Partial Client List• Genentech• Abbott Labs• JDSU• Symantec• Seagate • Facebook• Ultratech • Adobe• Savvis• Lucas Films• Stanford University• Embry Riddle Aeronautical University• Silecs• Ichor Systems• Cummins
![Page 10: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/10.jpg)
Selected Portfolio
2012, IN PROGRESSProject Role Type/Size Completion
Ichor Systems, Singapore At Risk, Turnkey Design Builder US 10 Million Cleanroom and regional HQ Phase 1, Q3 ’12Phase 2, Q1 ’13
Cummins Power Generation, Singapore
Project Coordinator and Full Technical Design of MEPS, Architecture and Process
US 3.5 Million factory upgrade and placement of new business unit
Q2 ’12
Savvis, Singapore Project Coordinator and Full Technical Design of MEPS, Technology and Architecture
US 20 Million 3.6 MW Tier 3 datacenter. Q4 ‘ 12
Silecs, Singapore At Risk, Turnkey Design Builder Boutique chemical production, Class 10 Cleanroom
Q2 ‘12
Embry Riddle Aeronautical University
At Risk, Turnkey Design Builder Regional HQ and Seminar Facility Q3 ‘ 12
JDSU, Singapore At Risk, Turnkey Design Builder Datacenter consolidation and design build of lab area
Q3 ‘ 12
Charles Schwab, Singapore Project Manager Office renovation Q3 ‘ 12
UltraTech, Singapore At Risk, Turnkey Design Builder 10,000 square foot Cleanroom expansion and utility upgrade
Q1 ‘ 13
KLA Tencor Development Manager 1 additional storey on existing building for 50,000sf of Cleanroom and ancillary space.
Q4 ‘ 13
![Page 11: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/11.jpg)
2012 Portfolio / JDSU
JDS Uniphase• 830 SF Datacenter• 600 SF Lab are
Scope of Work• Consolidation of
datacenter• Design build of lab
area• Turnkey design and
project delivery at risk
![Page 12: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/12.jpg)
2012 Portfolio / JDSU
JDSU Project Highlights• Tier 1 Data center• Consolidation from 2600
SF to 830 SF• Relocation of full IT
Equipment Suite and integration throughout the project
• Completely redesigned MEP systems
• Project completed in 4 weeks on 24/7 work schedule
![Page 13: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/13.jpg)
2012 Portfolio / Savvis
Savvis• 53,000 SF facility• 3.6 MW datacenter
Scope of Work• Turnkey design and
construction administration
![Page 14: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/14.jpg)
2012 Portfolio / Savvis
Savvis Project Highlights
• Tier 3 Data center• IT Capacity of 3.6 MW• 32,000 SF of raised
floor space• Enterprise-class co-
location, managed hosting, cloud computing and network services
![Page 15: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/15.jpg)
2012 Portfolio / Embry Riddle Aeronautical University HQ
Embry Riddle• 5,000 SF • Regional
Headquarters • Seminar Center
Scope of Work• Turnkey Design and
Build
![Page 16: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/16.jpg)
Embry Riddle Project Highlights
• Full IT integration for the project
• Aviation based theme throughout
• Completely customized carpentry package library and student processing areas
2012 Portfolio / Embry Riddle Aeronautical University HQ
![Page 17: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/17.jpg)
2012 Portfolio / Silecs
Silecs International• 10,000 SF Cleanroom• 1,500 SF Support
Office Scope of Work
• Turnkey Design and Build
• Complete authority approvals
• Facility management
![Page 18: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/18.jpg)
2012 Portfolio / Silecs
Silecs International Project Highlights
• Class 100 Cleanroom• Class 1 electronics
RO/DI system• Process chilled water• Multiple hazardous
storage groups• Water treatment
system• Process gas delivery
systems
![Page 19: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/19.jpg)
2012 Portfolio / Ichor
Ichor systems• 20,000 SF Cleanroom• 20,000 SF Support
Office Scope of Work
• Turnkey design and project delivery at risk
• Complete authority approvals
• Facility management
![Page 20: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/20.jpg)
2012 Portfolio / Ichor
Ichor Systems Project Highlights
• Class 10,000 Cleanroom
• Full Quantitative-risk analysis for Hydrogen process gas
• Multiple hazardous storage groups
• Process gas delivery systems
![Page 21: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/21.jpg)
2012 Portfolio / Charles Schwab
Charles Schwab•OptionsXpress – subsidiary in Singapore
Scope of Work•Renovation of office; IT consultation
Project Highlights•Heightened brand visibility•Total office migration•Access control system
![Page 22: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/22.jpg)
2011 Portfolio / Ultratech Phase 2
Ultratech Singapore• Full Production
Facility Expansion
Scope of Work• 5,000sf facility expansion,
cleanroom and utility• Executed full turnkey
design, project delivery and facility management
• Environmental Licensing
![Page 23: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/23.jpg)
2011 Portfolio / Ultratech Phase 2
Ultratech Project Highlights
• N2 Gas• Clean Dry Air System• Process vacuum• RO/DI Water System
![Page 24: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/24.jpg)
2011 Portfolio / Jotun Regional HQ
Jotun Singapore• 70,000 SF Facility• Regional Headquarters• Central Offices, Training
Center, Quality Lab, Warehousing Facility
Scope of Work• MEP, Fire Suppression• Vertical Transportation
![Page 25: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/25.jpg)
2011 Portfolio / Jotun Regional HQ
Jotun Singapore Project Highlights
• 30,000 SF High Bay Chem Storage
• Sand blasting and spray booths
• Foam Based Fire Suppression
• Stringent Indoor Air Quality System
• Green Mark Certified
![Page 26: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/26.jpg)
2011 Portfolio / Ngee Ann Polytechnic
Ngee Ann Polytechnic• Higher Education• Classrooms, Digital
Arts, Media Center
Scope of Work• MEP, Fire Suppression• Vertical Transportation
![Page 27: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/27.jpg)
2010 Portfolio / Ultratech
Ultratech Singapore• Regional Headquarters• Full Production Facility
Scope of Work• 17,000sf facility• 7,000sf Headquarter office• 10,000sf Cleanroom and
Utility• Executed full turnkey
design, project delivery and facility management
• Environmental Licensing
![Page 28: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/28.jpg)
2010 Portfolio / Ultratech
Ultratech Project Highlights
• N2 Gas• Clean Dry Air System• Process vacuum• RO/DI Water System• Class 10,000
Cleanroom• Full Production Facility• Construction Complete
in 7 Weeks
![Page 29: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/29.jpg)
2010 Portfolio / Ultratech
![Page 30: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/30.jpg)
2010 Portfolio / JDSU Singapore
JDSU Singapore• Regional Headquarters• R&D Lab• Mission Critical
Scope of Work• 20,000sf Facility with 500KW
Server Room and R&D Lab• Architecture, MEP,
Technology, Migration Plan, Const. Assist
• Complete Data, Lab and Systems Migration
![Page 31: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/31.jpg)
2010 Portfolio / JDSU Singapore
JDSU Singapore Project Highlights
• 66 Racks• Close Coupled Cooling• Separate IT
Infrastructure• Completed in 8 Weeks• Move Management
![Page 32: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/32.jpg)
2010 Portfolio / JDSU Singapore
![Page 33: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/33.jpg)
2010 Portfolio / JDSU Penang
JDSU Penang• Country Headquarters• Business Services Unit
Scope of Work• 20,000sf Office• Arch, MEP, Technology,
Migration Plan, Construction Assistance
![Page 34: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/34.jpg)
2010 Portfolio / JDSU Penang
![Page 35: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/35.jpg)
2010 Portfolio / JDSU Beijing
JDSU Beijing• Regional Headquarters• R&D Lab• Mission Critical
Scope of Work• 50,000sf Facility with 1MW
Server Room and R&D Lab• Architecture, MEP,
Technology, Migration Plan, Const. Assist
• Complete Data, Lab and Systems Migration
![Page 36: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/36.jpg)
2010 Portfolio / JDSU Beijing
JDSU Beijing Project Highlights
• 150 Racks• Raised Floor with CRAC
Units• Independent• Complete Planning and
Execution of a Critical Server Migration
![Page 37: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/37.jpg)
2010 Portfolio / JDSU Beijing
![Page 38: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/38.jpg)
Alfa Tech Singapore : Management
Zach Wilson is managing director of the Singapore offices of Alfa Tech Consulting Enterprise a US based engineering and project management firm that designs and builds over US $1 Billion in projects each year. He has over 10 years of experience in practical engineering, construction and real estate development related to infrastructure works and projects.
He has a specialization in cleantech, energy efficiency and hi-tech challenges such as for manufacturing, cleanrooms, data centers, medical facilities, and project execution in emerging markets. In addition to his projects in Singapore, Malaysia and China Mr. Wilson developed over 2 million square feet of mixed use real estate projects in San Francisco prior to his immigration to SE Asia. He also acts as an advisor to a regional infrastructure fund and is a director of a renewable energy firm called Greenpower Fuels. In this capacity he has worked to develop varying projects throughout Asia including a biomass power plant, biofuel commoditization supply chain, algal based energy development and biological water treatments projects.
He is a LEED (Leadership in Energy and Environmental Design) Accredited Professional and has an MS in Civil and Environmental Engineering from Stanford University and a B.S. in Construction Engineering Technology from Montana State University.
Paul Lim, Director: As a trained mechanical and fire safety engineer and manager, Mr. Lim brings over twenty years of professional experience to every project. He has conducted engineering and project management in Singapore, Malaysia and China. Having started and operated his engineering firm Gims and Associates since 1994, he has established his name in the marketplace as a trustworthy, mechanical building services specialist. Eric Ng, Advisor: With twenty years of experience in project, facilities and real estate management Mr. Ng is a veteran in his field. The first seven years of his career in the project development and construction industry as coordination engineer and project manager for design, planning, cost control and construction of office, infrastructure and residential developments representing OCBC Property Services and Nishimatsu Construction Co. He served as head of project management at Jones Lang and DTZ. At Citigroup Mr. Ng held the position of cluster head in Malaysia, Indonesia and Thailand (with 1.5 million sq ft space) and senior asset manager for Asia Pacific (10 million sq ft space). Mr. Ng holds both a Bachelors and a Masters in Science in building and project management respectively. Ashley Wee, Advisor: An expert property consultant with nineteen years experience in the real estate industry and a strong history of directorial success makes Mr. Wee a critical asset to Alfa Tech Singapore. Mr. Wee has served as Director for DTZ Debenham Tie Leung, Associate Director for JLW and currently is Managing Director of VestAsia. Mr. Wee’s work experience is international having worked in Singapore, Indonesia, Australia and New Zealand. Mr. Lee’s consultation experience is also extremely extensive, he has advised UOB, The United States Government and DTZ in marketing, business development and serving on their financial evaluation panel among other services. MR. Wee graduated from the National University of Singapore with a Bachelor Degree in Real Estate Management.
![Page 39: Alfa Tech VestAsia 2012](https://reader036.vdocuments.net/reader036/viewer/2022081413/546ac820af795979438b59f1/html5/thumbnails/39.jpg)
Engineering Excellence Delivered Globally
Alfa Tech VestAsia Pte Ltd.
Zach Wilson: +65 9824 9604Singapore: www.atce.com.sgUSA: www.atce.com