Alternate ProjectDelivery
Opportunities
April 21, 2010
-
8/9/2019 Alt Proj Delivery 4-10
2/25
2
Master Builder
-
8/9/2019 Alt Proj Delivery 4-10
3/25
-
8/9/2019 Alt Proj Delivery 4-10
4/25
4
The 60s
Time and theHandshake
Aerial views ofEast Los Angeles College
-
8/9/2019 Alt Proj Delivery 4-10
5/25
5
70s and 80s
AdversarialRegulation
Craft Talent
Building Systems
Users Requirements
Edison Center for the Arts /ELAC auditorium (left) Mural by Roberto Chavez in 1970s (right)
-
8/9/2019 Alt Proj Delivery 4-10
6/25
6
The 90s and Present
Stop the Conflicts
Design-Build
ConstructionManagement
-
8/9/2019 Alt Proj Delivery 4-10
7/25
7
Technological Revolution
Communication
Design
Construction
-
8/9/2019 Alt Proj Delivery 4-10
8/25
8
Technological Revolution:
SustainabilityMaterials and TechniquesCode Requirements
Construction
-
8/9/2019 Alt Proj Delivery 4-10
9/25
9
3D Models
Lines vs. Objects
Technological Revolution:
Building InformationModeling (BIM)
Material Lists
Cost Estimating
Personnel Scheduling
Funding Schedules
Clash Detection
-
8/9/2019 Alt Proj Delivery 4-10
10/25
10
BIM Storm
BIM
Brain Storming
Design Charrettes
-
8/9/2019 Alt Proj Delivery 4-10
11/25
11
Back to the Master Builder
Eliminate Conflicts
Changes in Designand Construction
Technology
Fluid Changes inOwners Needs
-
8/9/2019 Alt Proj Delivery 4-10
12/25
12
Project Delivery Methods
Design Bid Build
CPM-AdvisorCPM-At Risk
Design Build
DB
A/E B
CPM
O
A/E B
O
CPM
A/E CM
O
Sub-contractors
A/E CPM
O
Sub-contractors
-
8/9/2019 Alt Proj Delivery 4-10
13/25
13
DB
A/E Builder
CPM
Owner
CPM
A/E Builder
Owner
LACCD Project Delivery Methods
Design Bid Build Design Build
-
8/9/2019 Alt Proj Delivery 4-10
14/25
14
Design Bid Build Delivery Process
NeedA/E TeamSelection
Progra
Owner
A/E B
O
CPM
-
8/9/2019 Alt Proj Delivery 4-10
15/25
15
Design Bid Build
PROS:
Independent A/E
Low Bid Focus
Owner: Maximum Design Control
CONS:
Lengthy Linear Process
No Pre-Qualification of BuilderExtensive finger pointing
No constructability input by Builders
Owner: Maximum Design Risk
A/E B
O
CPM
-
8/9/2019 Alt Proj Delivery 4-10
16/25
16
Design Build Delivery ProcessDesi Buil Delivery ro ess
Neero ra iA E Tea
ele tio
ro ra
Crit
BA/E
O
DB
CPM
-
8/9/2019 Alt Proj Delivery 4-10
17/25
17
Design Build
PROS:
Single Sources of Responsibility
Pre-Qualification ofENTIREENTIRE Team
Constructability Input by Builders
CONS:
Independence of A/E Team
BA/E
O
DB
CPM
-
8/9/2019 Alt Proj Delivery 4-10
18/25
18
Current Design Build Process Results
Schematic Design/ Design Development
Fixed Price
Design Fees
Construction Costs
Builders Fees
RFP Issuance to Award: 100 120 Days
-
8/9/2019 Alt Proj Delivery 4-10
19/25
19
Construction Cost Comparison
WLAC Parking Structure #8
Harbor Parking Structure
Harbor FMO
Pierce FMO
9/6/07 DBB $83.14/sq.ft.
1/14/09 DB $81.50/sq.ft.
Trade Tech South Campus
Mission East Campus
4/20/06 DBB $342.51/sq.ft.
8/6/09 DB $269.27/sq.ft.
3/22/07 DBB $658.01/sq.ft.
1/14/09 DB $646.71/sq.ft.
-
8/9/2019 Alt Proj Delivery 4-10
20/25
20
TeamBack to the Master Builder
-
8/9/2019 Alt Proj Delivery 4-10
21/25
Integrated Project Delivery
Partnered process
All participants
A / E
Contractor
Subcontractor
Suppliers
Owners
Open book
Shared savings
21
-
8/9/2019 Alt Proj Delivery 4-10
22/25
22
LACC Student Union
-
8/9/2019 Alt Proj Delivery 4-10
23/25
23
Current Design Build Projects
LAPC Facilities Maintenance & Operations
LASC Student Services Center WLAC Athletic Campus
LAHC Science Complex
-
8/9/2019 Alt Proj Delivery 4-10
24/25
24
Current Design Build Projects
LASC Student Services Center
WLAC Watson Center
LAMC East Campus
LACC Student Union
-