Alternative Alignments
![Page 2: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/2.jpg)
FRESNO TO BAKERSFIELD EIR/EIS• 114-Mile Corridor• Final EIR/EIS Certified in May 2014
• Preferred Alternative Includes:» Parts of the BNSF Alternative» Corcoran Bypass Alternative» Allensworth Bypass Alternative» Bakersfield Hybrid Alternative
• Three Stations:» Downtown Fresno (Mariposa St.)» Kings/Tulare Regional Station» Downtown Bakersfield (Truxtun Ave.)
![Page 3: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/3.jpg)
3
BAKERSFIELD HYBRID ALTERNATIVE• Selected as the Preferred Alternative
in the Fresno to Bakersfield SectionFinal EIR/EIS
» Follows the Bakersfield South Alternative Alignment from Hageman Road to a station in downtown Bakersfield
» Swings North of the BNSF Alternative alignment through East Bakersfield to Oswell Street
• Fewest Impacts to Water Resources,Churches & Residential PropertiesCompared to BNSF North & SouthAlignments
![Page 4: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/4.jpg)
4
• 23-Mile Corridor from PoplarAvenue to Oswell Street
• 14-Miles of Viaduct (Bridge)
• Will Include a Station inBakersfield at F Street andGolden State Avenue
• Parallels BNSF & UPRR RailroadCorridors
• Transitions Between RailCorridors Mainly Through RuralAreas
BENEFITS OF FRESNO TO BAKERSFIELD LOCALLY GENERATED ALTERNATIVE
![Page 5: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/5.jpg)
5
BENEFITS OF FRESNO TO BAKERSFIELD LOCALLY GENERATED ALTERNATIVE
• Shorter Alignment in Miles andTravel Times
• Reduction of Impacts toResidential Development andSchools
• F Street Station LocationStimulates EconomicDevelopment
• Connection to California UrbanCenters
• Closes Rail Passenger Gapbetween Central Valley andSouthern California
![Page 6: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/6.jpg)
• Viaduct Option
» Current LGA design
» Begins at Shafter Ave. and extends to E. Los Angeles Ave.
• Benefits» No impacts to roadways
CURRENT LOCALLY GENERATED ALTERNATIVE
![Page 7: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/7.jpg)
• Retained Fill Option» Proposed by the City of Shafter
» Grade separates HSR and BNSF from local roads
• Benefits» Improved safety
» Reduction in freight railroad noise
» Improved traffic circulation
• Does not affect May 2016Board action
POTENTIAL VERTICAL ALIGNMENT REFINEMENT TO SHAFTER
![Page 8: Alternative Alignments - State of California · Golden State Avenue ... • Connection to California Ur ban Centers • Closes Rail Passenger G ap ... » Lower HSR profile at 7 th](https://reader034.vdocuments.net/reader034/viewer/2022051601/5ad990387f8b9a6d318b7de9/html5/thumbnails/8.jpg)
• 7th Standard Road, KernCounty
» Proposed by Kern County
» Raises 7th Standard over HSR, creating an interchange with SR-99
• Differences» Lower HSR profile at 7th
Standard Road
» Reconstructs interchange
POTENTIAL VERTICAL ALIGNMENT REFINEMENT AT 7TH STANDARD ROAD