Transcript
  • Annexure-IList of OCC Members

    Fax No.1. Chief Engineer (L D), GETCO, Gotri 0265-23520192. Chief Engineer (Generation), GSECL, Vadodara 0265-2344734/23388473. Superintendent Engineer (CP & SS), GETCO, Vadodara 0265-2337918, 23381644. Chief Engineer (L D), MPPTCL, Jabalpur 0761-26643435. Chief Engineer (O&M:Gen), MPPGCL, Jabalpur 0761-2664572/26680506. Chief Engineer (L D), MSETCL, Kalwa 022–276017697. Chief Engineer (PP), MSEDCL, Mumbai8. Chief Engineer (Works),MSPGCL, Mumbai 022-264738969. Superintending Engineer (LD), MSETCL Ambazari 07104-22027510. Chief Engineer (L D), CSPTCL /Raipur 0771-257417411. Chief Engineer (O&M:GEN), CSPGCL, Raipur 0771-257442512. Executive Director, PGCIL Raipur13. General Manager, POSOCO, Mumbai 022-2820263014. General Manager (WRTS-I), Powergrid, Nagpur 0712-264136615. General Manager (O & M),WRTS-II, PGCIL,Vadodara 0265-248754216. Chief Engineer (Transmission), NPCIL, Mumbai 25580741/2556335017. Station Director, TAPS, Tarapur 1 & 2 02525-282125/24412518. Station Director, TAPS, Tarapur 3 & 4 02525-244021/24416919. Station Director, KAPP, Kakrapar 02626-23123120. General Manager (OS), NTPC, Mumbai 022-2821669221. General Manager, NTPC, Korba 07759- 237462/23755222. General Manager (OS), NTPC, HQ-II Raipur 0771-254455023. General Manager, NTPC, Vindhyachal, M.P. 07805 –24771124. General Manager, NTPC, SIPAT, CG 07752-24650425. General Manager NTPC LARA26. General Manager NTPC Solapur27. General Manager, NTPC, Kawas, Surat 0261-286029028. General Manager, NTPC, Gandhar 02642-28740229. General Manager, NTPC, Mouda 07115-281221/28121930. CLD TPC, Mumbai 022-25541908/6717538531. Head (O), Dahanu TPS, Dahanu 02528-22203932. Sr V P Reliance Transmission, Pune 0124-3917982/020-

    3047155533. Vice President (Generation), Torrent Power Ltd, Ahmedabad 079-2750667934. Executive Director, Sugen CCPP, Torrent Power Ltd, Surat. 02621-66115135. Vice President (O &M), APL Mundra , Gujarat 02838-26636436. Head Operation CGPL Mundra37. Vice President (Opn), Jindal Power Ltd.,Raigarh 07767-281993/28199538. AGM(OS) NSPCL Delhi 011-26717363,2671736639. GENERAL MANAGER ( POWER), RGPPL, Ratnagiri 02359-241071/ 24101140. Member (Power), NCA, Indore 0731-255988841. Chief Engineer (PM & C), NHDC, Bhopal 0755 4030188/403013042. E. E. Elect. (Ponda), Goa 0832-231378043. Executive Engineer DD (UT), Daman 0260-/2230771/2250889/223055044. Executive Engineer DNH (UT), Silvassa 0260-264233845. Secretary, CERC, New Delhi 011-24360010/2375392346. CEO, JSW Energy ltd. 011-46032343/2618354647. VP-Power Infra-Essar Hazira Surat 0261-6688498/022-6708219848. Chief Electrical Distribution Engineer CR 022-2262106049. Vice President EPTCL Hazira Surat 0261-668274750. COO, Korba West Power Co. Ltd. Raigarh51. VP(COMML) Essar Power MP Ltd MP52. GM Torrent power grid ltd. Ahmedabad, Gujarat53. Adani Power Maharashtra Ltd Tiroda54. CGM, R K M Powergen Pvt Ltd55. ED, Athena Chattishgarh Power Ltd.56. Head(O&M) Dhariwal Infra Ltd C’pur57. Head Operation Jaypee Nigrie STPP Singrauli.58. VP(O&M), GCEL, Chhattishgarh59. Head Operation DB Power, Chhattishgarh.60. Head operation Hindustan Power, Anuppur MP61. Head operation GMR, Warora Energy ltd.62. Head O&M, Sterlite Grid Ltd Bhopal63. Head Operation Balco, Chhattishgarh.

  • 506th OCC AGENDA

    Time line for discussion of Agenda items

    SrNo.

    Agenda items/description of discussion TentativeTime

    durationMeeting to be started at 09:00 hrsTransmission element outage planning 09:00 to 11:00

    Hrs.Discussion on Regular Agenda item 11:00 Hrs

    onwards1 Opening remark by Member Secretary 5 -10 minutes2 Introduction of participants 5-10 Minutes3 Confirmation of minutes 3-5 minutes4 Review of System Operation during the month of

    March, 201815-20 minutes

    5 Presentation on operational aspects by SLDCs, RLDC& Expert talk.

    1 hrs & 30Minutes

    6 Proposed planned maintenance programme ofgenerating units.

    10-15 minutes

    7 Anticipated power supply position for the months – April2018 & May 2018

    10-15minutes

    8 Operational Statistics for the month March, 2018 5 minutes9 System disturbances in western region 5 minutes10 Healthiness status of SERs/DRs 2-3 minutes11 Status of completion of ongoing schemes in WR

    during 2017-18

    Afternoonsession

    OCC ISSUES12 Quarterly review of Crisis Management Plan (CMP)

    and Physical & Cyber Security (P&CS) in powersector(Follow-up)

    5 minutes

    13 Monitoring of Schemes funded from PSDF(Follow-up) 5 minutes14 State-wise details for Installation of capacitors to be

    furnished to WRPC(Follow-up)2-3 minutes

    15 Compliance of new Environmental norms by WRGenerators

    10-15 minutes

    16 Contingency plan to meet deficient / excess rainfallduring monsoon

    10-15 minutes

  • 506th OCC AGENDA

    WRLDC ITEMS

    20 Delay in submission of documents for first timecharging of elements by WRTS-1

    5-10 minutes

    21 Tripping of 765kV Solapur-Raichur Line Reactor dueto Ferro-resonance

    5-10 minutes

    22 Undesirable tripping of HVDC Bhadrawati pole-1 5-10 minutes

    23 Critical loading on 400/220 kV ICTs at Kala PG andGwalior PG

    5-10 minutes

    24 Emergency outage on 765kV Vindhyachal PS-Satna-1and oscillations in frequency at the time of shutdown

    5-10 minutes

    25 Installation of PMU for observability of dynamicperformance of STATCOMs

    5-10 minutes

    26 Automatic Generation Control (AGC) pilot project atNTPC Mouda

    5-10 minutes

    27 Assessment of Total Import Capability of GujaratControl Area

    5-10 minutes

    28 Primary Frequency Response 5-10 minutes

    29 Voltage Regulation in Western Region 5-10 minutes

    30 Compliance to LVRT by Wind Turbine Generatorsconnected at 66 kV and above

    5-10 minutes

    31 Synchronous Condenser Mode of Operation atGhatghar

    5-10 minutes

    32 Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and 220kV Talangade-Chikodi lines with

    other WR-SR Inter Regional lines

    5-10 minutes

    33 Parallel operation of 220kV Ponda (WR)-Ambewadi(SR) and Xeldem (WR)-Ambewadi (SR) lines with other

    WR-SR Inter Regional lines

    5-10 minutes

    34 Date and venue of next OCC meeting 2-3 minutes

    ******************

  • 506th OCC AGENDA

    Western Regional Power CommitteeMumbai

    Title: Agenda NotesMeeting no.: 506Meeting name: Operation & Coordination sub-CommitteeDate & venue: 19th April, 2018 at WRPC, Mumbai

    Item No. 1: Confirmation of the MinutesMinutes of 505th meeting of Operation & Coordination Sub-Committee

    (OCC) of WRPC held on 21st March 2018 at WRPC Mumbai were forwarded videletter No. WRPC/OPN/OCC-Minutes/2017-18/3097 dated 26.03.2018.

    No Comments have been received.

    Sub-Committee may discuss and confirm the Minutes.

    Item No. 2: Review of System Operation during the month ofMarch, 2018.

    2.1 A. Frequency ParticularsThe frequency profile was as under:

    Range01st – 31stJanuary, 2018(% time)

    01st – 28thFebruary, 2018(% time)

    01st – 31stMarch, 2018(% time)

    IEGC band(49.9 < f <50.05 Hz)

    77.94 80.25 79.29

    < 49.9 Hz 11.15 9.69 12.99

    > 50.05 Hz 10.93 10.06 7.72

    The frequency particulars is enclosed at Annex-2.1

    The Sub-Committee may kindly note.

    Particulars Frequency Date TimeMaximuminstantaneous

    50.25 Hz 21st March, 2018 13:03:20 hrs

    Minimuminstantaneous

    49.68Hz 14th March, 2018 21:19:30 hrs

    Average 49.97 Hz

  • 506th OCC AGENDA

    2.1 B. State wise Power Scenarios’ of the Region & PSP

    System operation during the month of March 2018 was satisfactory. Theregional demand (Ex-bus) was 49,006 MW. The corresponding peak shortfallwas in the range of 107 MW (peak deficit of 0.22 %). The energy requirementduring the said period was 32,565 MUs (Ex-bus).The power supply position for the month of March 2018 was as follows:

    Demand Availability/Unrestricted Requirement (Ex-Bus) In (MW)

    GUJ MP CG MAH GOA DD DNH ESIL WR

    REQUIREMENT 14,801 9,723 3,706 22,373 522 350 766 808 49,006

    AVAILABILITY 14,763 9,703 3,706 22,310 521 350 766 808 48,899

    SHORTFALL 38 21 0 64 1 0 0 0 107

    % SHORTFALL 0.26 0.21 0.00 0.29 0.21 0.00 0.00 0.00 0.22

    Energy Availability/ Requirement etc.(Ex-Bus) in (MUs)

    GUJ MP CG MAH GOA DD DNH ESIL WR

    Net ActualEnergySupplied 9,898 5,418 1,989 13,833 373 222 534 298 32,565

    UnrestrictedRequirement 9,898 5,418 1,989 13,833 373 222 534 298 32,565

    SHORTFALL 0 0 0 0 0 0 0 0 0

    %SHORTFALL 0 0 0 0 0 0 0 0 0

    2.2 Inter-Regional ExchangesThere was a net inter-regional export of 5106 MUs from WR to other regions

    against net export schedule of 4928 MUs.(Figures are in MU)

    IR link SCH DRAWL OD/UD

    WR-ER636 -434 -1070

    WR-NR-3112 -2846 266

    WR-SR-2453 -1826 626

    WR NET-4928 -5106 -178

    (+ import; - export)

    The Sub-Committee may kindly note.

  • 506th OCC AGENDA

    2.3 Voltage ProfileVoltage profile at some of 765/400 kV sub-stations furnished by WRLDC is

    enclosed at Annex-2.3.The Sub-Committee may kindly note.

    2.4 U/F Relay OperationsAs per WRLDC records the system frequency didn’t reach 49.2 Hz and no

    UFR operation was reported to WRLDC.

    The Sub-Committee may kindly note.

    2.5 Power Cuts / Load RestrictionsDetails of Power Cuts and Regulatory measures as furnished by the State

    utilities are given in Annex. 2.5.The Sub-Committee may kindly note.

    2.6 Details of Generating Units under Forced OutagesDetails of generating units under forced outages are given in Annex-2.6.The Sub-Committee may kindly note.

    2.7 Details of Generating Units under Planned Outages.The details of generating units under Planned Outages are given in

    Annex-2.7.

    The Sub-Committee may kindly note.

    2.8 Presentation on operational aspects by SLDCs & RLDC.A. An expert lecture on Operational aspects and challenges of FGD at DTPS

    Coal fired TPS by representative from DTPS, Dahanu.

    B. All SLDC’s/RLDC, NTPC & PGCIL may kindly submit the presentation onoperational aspects during last month and specific issues which needdeliberations may be highlighted separately.

    2.9 List of New Grid Elements added / list of elementsdecommissioned.The list of New Elements added in WR Grid is attached at Annexure-2.9.

    The Sub-Committee may like to note the same.

  • 506th OCC AGENDA

    2.10 List of grid elements failure.All constituents are requested to furnish the details of grid elements failure (i.e.Generators, EHV transmission elements etc.)

    During the 505th OCC meeting KWPCL representative intimated that KWPCL unitno 1 (600 MW) has been out since 22nd May 2017 due to stator earth faultprotection operated/maintenance. This Unit is under prolonged outage. KWPCLrepresentative may give the present updated status of commissioning of unit.

    The Sub-Committee may like to discuss.

    Item No. 3: Operational Planning3.1 Proposed planned maintenance programme of generating units.

    The maintenance programme of generating units for the months April &May 2018 is given in Annex 3.1.

    The Sub-Committee may kindly discuss and finalise the outage schedule ofgenerating units for the above period.

    3.2 Outage programme of transmission lines/elements.List of proposals for transmission elements outage to be availed during the

    month of May 2018 is given in Annex 3.2.

    The Sub-Committee may kindly discuss and finalise the outages of thetransmission elements.

    3.3 Anticipated power supply position for the months.Details of anticipated restricted & un-restricted demands for the months of

    April & May 2018 are given in Annex 3.3.

    The Sub-Committee may like to note/update.

    Item No. 4: Operational Statistics for the month March, 2018.The details of actual generation, demand, drawl of power from grid;

    exchanges etc. are given in the following Annexure:

    Annex 4.1 - Actual Generation and Requirement.Annex 4.2 - Peak Demand.Annex 4.3- Integrated Operation of the System and Operation of Inter State

    Tie lines.

    Annex 4.7– Details of level of Major Reservoirs in Western Region.

    The Sub-Committee may kindly note.

  • 506th OCC AGENDA

    Item No. 5: System disturbances in western region.There was no major grid disturbance in the Western Region during the

    month of March, 2018. However the details of minor incidences during the monthreceived from WRLDC are enclosed at Annexure-5.

    The Sub-Committee may like to note/discuss.

    Item No. 6: Healthiness status of SERs/DRs.The status of healthiness of SERs/DRs is given at Annexure-6.All the Constituents are requested to update the status of healthiness of

    their SERs/DRs before the meeting.

    The Sub-Committee may like to note

    Item No. 7: Status of completion of ongoing schemes in WRduring 2017-18.

    7.1 Status of Reactors.7.2 Status of Transmission schemes: 765/400 kV and above7.3 Status of Generating UnitsDetails of these items are at Annexure-7.

    The WR utilities may intimate the current status on above.

    Item no. 8: Miscellaneous Operational Items

    8.1: Quarterly review of Crisis Management Plan (CMP) and Physical &Cyber Security (P&CS) in power sectorThe current status of submission of CMP and P&CS report (constituent

    wise) for the Fourth quarter (January to March 2018) is Annexure-8.1.

    All other constituents are requested to submit the Status Report.

    8.2: Monitoring of Schemes funded from PSDFAs per the decision taken in NPC meetings, RPC may follow up with the

    utilities regularly in OCC to expedite the completion of various approved

    schemes by giving due priority. Accordingly, WRPC has been taking up this

    issue in OCC forum for discussion.

  • 506th OCC AGENDA

    In this matter, the details related to State-wise sanctioned grant and

    disbursement amount for the approved schemes to be funded from PSDF is

    attached at Annexure-8.2A.

    Also, as per the procedure, the utilities are required to furnish the

    information in the prescribed format by first week of every month on regular

    basis to Member Convener, PSDF project monitoring group (AGM, NLDC,

    POSOCO) with a copy to NPC & WRPC division. A copy of prescribed format is

    attached at Annexure–8.2B.

    The utilities may update the current status of progress of scheme under PSDF.

    8.3 State-wise details for Installation of capacitors to befurnished to WRPCIn accordance with provision in clause 1.5 (ii) of IEGC, “RPC shall file

    monthly report on installation of capacitors by states vis-a-vis the

    requirement/targets, as decided in the RPC”

    SLDC’s /DISCOMs are therefore requested to expedite the matter and

    ensure to furnish the status of capacitor report in format attached at Annexure8.3 on monthly basis regularly. SLDC’s are also requested to compile thedetails of various utilities and send the compiled report of entire state by 8th

    day of every month.

    The Sub-Committee may like to discuss the same.

    8.4 Compliance of new Environmental norms by WRGenerators:

    Chief Engineer, TPRM Div, CEA, New Delhi vide letter no.

    2/16/VIP/TPRM/2016/CEA/ 82-108 dated 01.02.2018 (Copy Enclosed) and

    subsequently WRPC letter dated 12.02.2018 (copy enclosed) requested for the

    status of progress of works of FGD installation and ESP up-gradation to meet

    the emission level as per new environmental norms (SOx, NOx and SPM).

  • 506th OCC AGENDA

    During 505th OCC meeting it was decided to monitor the installation of FGDshall be cover the following details:

    (1) The Completion of Feasibility Study,(2) NIT issued,(3) Bid Opening date,(4) Date of Award,(5) Actual date of Commission of FGD etc.

    Accordingly a format for monitoring the activities of installation andcommissioning of FGD and up-gradation of ESP is attached at Annexure-8.4.

    It is requested to all concern generators to update the status as per attached

    format.

    The Sub-Committee may like to discuss the same.

    8.5 Contingency plan to meet deficit / excess rainfall duringmonsoon:

    Chief Engineer (GM), CEA vide letter no. 1/X/Gen/GM/2018/2018 dated

    09.02.2018 (copy enclosed at Annexure 8.5) regarding Contingency plan to

    meet deficient / excess rainfall during monsoon requested that each RPC

    may prepare a contingency plan for forthcoming monsoon season to meet

    situation of increased demand-supply gap of electricity due to contingencies

    like poor monsoon, excess monsoon, excess silt in the rivers etc.

    All States/UTs are requested to estimate the impact (in terms of MW &

    MUs) on demand and availability in respect of area of your jurisdiction for

    the month of June 2018 to September 2018 taking into account the

    contingencies mentioned above.

    It is further requested that all state utilities/UTs & WRLDC, who havenot submitted the contingency plan for above period may be submittedat the earliest.

    The Sub-Committee may like to discuss the same.

  • 506th OCC AGENDA

    Item No. 9. WRLDC Agenda Items

    1. Delay in submission of documents for first time charging ofelements by WRTS-1Procedure for interconnection of a new transmission elements is briefly

    explained below.

    Intimation by Transmission Licensee to RLDC (Annexure A1-A5) : 10 days prior to anticipated date of first time charging

    Acknowledgement and comments of RLDC to Tr. Licensee(Format-II): Within 3days

    Submission of Request for First time charging by Tr. Licenseeto RLDC (Annexure B1-B5): 3 days prior to anticipated date offirst time charging

    RLDC shall issue Provisional Charging Approval for first time

    charging to licensee and in case of interregional element RLDC to

    issue consent/request to NLDC for IR lines (within 2 days)

    Licensee to submit dummy SEM reading to RLDC to ensure that

    the Meter processing Software is able to read the SEM data from

    the new Meters

    Licensee to take Operation Code from RLDC Control Room for

    switching operations. RLDC/NLDC shall issue code keeping view

    of grid reliability

    Tr. Licensee to submit Post Charging documents (Annexure C1-

    C4)

    RLDC /NLDC shall verify the post charging documents and issue

    certificate

    It is observed that first time charging request (A1-A5 and B1-B5) from

    WRTS-1 is being received at short notice. The list of elements for which

    WRTS-1 requested WRLDC for facilitating trail operation at short notice

    is given below.

  • 506th OCC AGENDA

    Element Name Date of submission of Proposed dateof First timechargingA1-A5 B1-B5

    +/- 150MVAR STATCOM-1(601 Bay), +/- 150MVAR-2(602 Bay) at Solapur

    29/03/18,

    12:49 hrs

    29/03/18,

    12:49 hrs

    29/03/18,

    18:00 hrs

    Solapur STATCOM MSR-1&2and MSC

    29/03/18,

    10:50 hrs

    29/03/18,

    10:50 hrs

    29/03/18,

    13:00 hrs

    765kV Parli Bays (701, 704)at Solapur S/S

    20/03/18 20/03/18 23/03/18

    400kV main bays (419 &422) of new parli at 400kVParli S/S

    28/03/18 28/03/18 30/03/18

    On receipt of first time charging request from transmission licensee,WRLDC is required to verify SCADA points, Metering locations, anduniqueness of meters, dummy meters data, protection and all othercompliances to issue provisional approval (Format-V) for charging oftransmission elements. Delay in submission of first time chargingdocuments by concerned licensee delays the integration process.Therefore WRTS-1 is requested to submit the request for first timecharging of transmission element with all formats (A1-A5 & B1-B5) incompliance to the approved procedure for integration of newtransmission elements.

    POWERGRID WRTS-1 to apprise the OCC regarding the actions beingtaken to ensure compliance to the procedure.

    2. Tripping of 765kV Solapur-Raichur Line Reactor due to Ferro-resonanceOn 05th April 2018 the L/R on 765kV Solapur-Raichur line-1 @ Solapurtripped reportedly on Ferro-resonance protection after successful auto-reclose operation of circuit breaker at 18:17 hrs. Subsequently, L/R wasrestored at 19:31 hrs on 05.04.18.Vide its letters dated 27.08.17 (WRTS-II) & 16.10.17 (WRTS-I),POWERGRID intimated that a scheme for tripping of switchable linereactor during line fault to avoid Ferro-resonance effect in following overcompensated lines has been implemented.

  • 506th OCC AGENDA

    Sl.No Name of Line Sl.No Name of Line

    1 765 kV Indore -Bhopal BDTCL 8 765 kV Bina-Gwalior 1

    2 765 kV Bilaspur-Dharamjaigad 9 765 kV Bina-Gwalior 23 765 kV Sholapur-Raichur 1 10 765 kV Bina-Jabalpur PS 3

    4 765 kV Sholapur-Raichur 2 11 765 kV Raipur PS(Durg)-Kotra 1

    5 765 kV Bina-Jabalpur PS 2 12 765 kV Raipur PS(Durg)-Kotra 2

    6 765 kV Jabalpur PS-Gadarwara 2 13 765 kV Dharamjaigad -Jharsugada 1

    7 765 kV Bina-Gwalior 3 14 765 kV Dharamjaigad -Jharsugada 2As per our records the other lines that are compensated above 75% is as listed

    below:

    S.No End-1 End-2 ID

    NoLoad

    MVARgenerated

    End-1LR

    Switchable

    End2 LR

    Switchable

    End-1 BR

    End2

    BR

    % ofcompens

    ation

    1 Sipat Bilaspur 1 52 240 Yes 464%2 Sipat Bilaspur 2 52 240 Yes 464%3 Tiroda* Koradi(III) 1 320 240 Yes 240 Yes 150%4 Tiroda* Koradi(III) 2 324 240 Yes 240 Yes 148%

    5 Akola(2)*Ektuni

    (Aurangabad(3))

    2 515 240 Yes 240 480 570 93%

    6 Akola(2)*Ektuni

    (Aurangabad(3))

    1 515 240 Yes 240 480 570 93%

    7 Koradi(III) Akola(2)* 1 522 240 Yes 240 Yes 240 92%

    8 Koradi(III) Akola(2)* 2 522 240 Yes 240 Yes 240 92%

    9 Satna* Vindhyachal-PS* 1 557 240 240 Yes 240 86%

    10 Satna* Vindhyachal-PS* 2 557 240 240 Yes 86%

    11 Sasan Satna* 2 571 240 Yes 240 660 480 84%12 Sasan Satna* 1 578 240 Yes 240 660 480 83%

    13 Dharamjaygarh Ranchi 1 712 330 240 Yes 240 240 80%

    14 Jabalpur-PS*Bhopal-BDTCL* 1 611 240 Yes 240 Yes 240 240 79%

    15 Seoni* Wardha 1 613 240 Yes 240 78%16 Seoni* Wardha 2 613 240 Yes 240 78%

    17 Vadodora-PSDhule-BDTCL* 1 630 240 240 Yes 76%

    18Pune-PG(Shikrap

    ur)*Solapur-PG* 1 635 240 Yes 240 Yes 240 240 76%

  • 506th OCC AGENDA

    POWERGRID to apprise OCC members regarding

    i. Reason for occurrence of Ferro-resonance

    ii. The settings adopted for tripping on Ferro-resonance

    iii. % shunt compensation above which there is risk of ferro-resonance

    iv. The other lines that are vulnerable to ferro resonance at the time of

    single phase A/R and the actions being taken thereof.

    3. Undesirable tripping of HVDC Bhadrawati pole-1HVDC Bhadrawati pole-1 tripped on 14:42 hrs of 16.03.18 and 17:51 hrs

    of 01.04.18 due to failure of auxiliary power supply as reported by

    POWERGRID. It is understood that there are three sources of auxiliary

    supply for HVDC Bhadrawati

    1. 33kV lines of Maharashtra Discom.

    2. 33kV tertiary of 250 MVA, 400/220/33kV ICT (recently shifted

    from Moga).

    3. Diesel Generator set.

    Existing 250MVA ICT (shifted from Moga of NR) was charged on 06th

    Sep’17 in place of 315 MVA ICT. However the 400/220/33kV ICT at

    Bhadrawati is out of service since 25.02.18 due to LV side bushing oil

    leakage. In case of failure of primary source and non-availability of

    secondary source, the DG supply should have come in to service

    immediately.

    POWERGRID to share the details of the event and ensureredundancy of auxiliary supply to HVDC Bhadrawati.

    4. Critical loading on 400/220 kV ICTs at Kala PG and Gwalior PGThe loading on 400/220kV 3x315 MVA ICTs at Gwalior and 2x315 MVA

    ICTs at Kala was analyzed for the last quarter (Jan’18 to Mar’18). It is

    observed that 2x315 MVA ICTs at Kala was observed to be N-1 non-

    compliant for 98% of the time and 3x315 MVA ICTs at Gwalior was

    observed to be N-1 non-compliant for 35% of the time. The duration

    curves of Gwalior and Kala 400/220kV ICTs are shown below.

  • 506th OCC AGENDA

    Sensitivity on tripping of one ICT of 3x400/220kV ICTs at Gwalior is

    observed to be 39%, 2x400/220kV ICTs at Kala is observed to be 36%

    from studies.

    OCC members may deliberate on the actions to be taken to maintainn-1 secure operation at all time as per the planning criteria.

    5. Emergency outage on 765kV Vindhyachal PS-Satna-1 andoscillations in frequency at the time of shutdownEmergency outage on 765kV Vindhyachal PS-Satna-1 for attending top

    phase open jumper conductor problem at location no. 542 (as intimated

    by Powergrid) was availed by Powergrid on 02.04.18 at 20:37 hrs. Total

    generation of Sasan (around 4000MW) and VSTSP-IV& Rihand-III

    (around 2000MW) is evacuated through 765kV Sasan-Satna D/C and

    765kV Sasan-Vindhyacha PS-Satna only. Outage of any transmission

    line in this corridor requires generation back down at Sasan, VSTPS-IV &

    Rihand-III. Therefore in order to facilitate the emergency outage on

    765kV Vindhyachal PS-Satna line-1, generation back down of 800 MW

    was implemented in Sasan, VSTPS-IV & Rihand-III. Also the tie lines

    between VSTPS-IV and VSTPS-V were closed to control the loading on

    765kV Vindhyachal PS-Satna-2.Main breakers of 400kV VSTPS-Sasan

    and 400kV REWA-Sasan were also closed prior to emergency outage.

    Oscillations in frequency of Satna PMU for about 5 seconds were

    observed during the shutdown of 765kV Vindhyacha PS-Satna line-1 on

    02.04.18.The oscillations in the frequency of Satna, Vindhyachal_PS,

    Bina_PG and VSTPS PMUs is shown below.

    506th OCC AGENDA

    Sensitivity on tripping of one ICT of 3x400/220kV ICTs at Gwalior is

    observed to be 39%, 2x400/220kV ICTs at Kala is observed to be 36%

    from studies.

    OCC members may deliberate on the actions to be taken to maintainn-1 secure operation at all time as per the planning criteria.

    5. Emergency outage on 765kV Vindhyachal PS-Satna-1 andoscillations in frequency at the time of shutdownEmergency outage on 765kV Vindhyachal PS-Satna-1 for attending top

    phase open jumper conductor problem at location no. 542 (as intimated

    by Powergrid) was availed by Powergrid on 02.04.18 at 20:37 hrs. Total

    generation of Sasan (around 4000MW) and VSTSP-IV& Rihand-III

    (around 2000MW) is evacuated through 765kV Sasan-Satna D/C and

    765kV Sasan-Vindhyacha PS-Satna only. Outage of any transmission

    line in this corridor requires generation back down at Sasan, VSTPS-IV &

    Rihand-III. Therefore in order to facilitate the emergency outage on

    765kV Vindhyachal PS-Satna line-1, generation back down of 800 MW

    was implemented in Sasan, VSTPS-IV & Rihand-III. Also the tie lines

    between VSTPS-IV and VSTPS-V were closed to control the loading on

    765kV Vindhyachal PS-Satna-2.Main breakers of 400kV VSTPS-Sasan

    and 400kV REWA-Sasan were also closed prior to emergency outage.

    Oscillations in frequency of Satna PMU for about 5 seconds were

    observed during the shutdown of 765kV Vindhyacha PS-Satna line-1 on

    02.04.18.The oscillations in the frequency of Satna, Vindhyachal_PS,

    Bina_PG and VSTPS PMUs is shown below.

    506th OCC AGENDA

    Sensitivity on tripping of one ICT of 3x400/220kV ICTs at Gwalior is

    observed to be 39%, 2x400/220kV ICTs at Kala is observed to be 36%

    from studies.

    OCC members may deliberate on the actions to be taken to maintainn-1 secure operation at all time as per the planning criteria.

    5. Emergency outage on 765kV Vindhyachal PS-Satna-1 andoscillations in frequency at the time of shutdownEmergency outage on 765kV Vindhyachal PS-Satna-1 for attending top

    phase open jumper conductor problem at location no. 542 (as intimated

    by Powergrid) was availed by Powergrid on 02.04.18 at 20:37 hrs. Total

    generation of Sasan (around 4000MW) and VSTSP-IV& Rihand-III

    (around 2000MW) is evacuated through 765kV Sasan-Satna D/C and

    765kV Sasan-Vindhyacha PS-Satna only. Outage of any transmission

    line in this corridor requires generation back down at Sasan, VSTPS-IV &

    Rihand-III. Therefore in order to facilitate the emergency outage on

    765kV Vindhyachal PS-Satna line-1, generation back down of 800 MW

    was implemented in Sasan, VSTPS-IV & Rihand-III. Also the tie lines

    between VSTPS-IV and VSTPS-V were closed to control the loading on

    765kV Vindhyachal PS-Satna-2.Main breakers of 400kV VSTPS-Sasan

    and 400kV REWA-Sasan were also closed prior to emergency outage.

    Oscillations in frequency of Satna PMU for about 5 seconds were

    observed during the shutdown of 765kV Vindhyacha PS-Satna line-1 on

    02.04.18.The oscillations in the frequency of Satna, Vindhyachal_PS,

    Bina_PG and VSTPS PMUs is shown below.

  • 506th OCC AGENDA

    Further 765kV Vindhyachal-Satna-1 again tripped on 06.04.18 at 06:51hrs on R phase to Earth fault and oscillations were observed in the grid.These oscillations damped out within 5 seconds. In similar incident on23.12.17, the oscillations during the tripping of 765kV Vindhyachal-Sasan line-2 lasted for 18 seconds. Comparison of the events indicatethat the damping of oscillations had improved after tuning of PSS atJaypee Nigrie and Sasan (on 30.01.2018).The peak to peak oscillations atSasan generating station prior and post PSS tuning are shown below.

    Tripping of 765kV Vindhyachal –Satna-2 23.12.17 at 1945Hrs

    Tripping of 765kV Vindhyachal –Satna-1 06.04.18 at 06:51

    NTPC Ltd. to apprise OCC regarding the schedule of PSS tuning atVSTPS-V, IV, III, II, I and Rihand Stage-III. POWERGRID to appriseOCC regarding status of Power system Oscillation Damper (POD) ofSatna STATCOM.

    506th OCC AGENDA

    Further 765kV Vindhyachal-Satna-1 again tripped on 06.04.18 at 06:51hrs on R phase to Earth fault and oscillations were observed in the grid.These oscillations damped out within 5 seconds. In similar incident on23.12.17, the oscillations during the tripping of 765kV Vindhyachal-Sasan line-2 lasted for 18 seconds. Comparison of the events indicatethat the damping of oscillations had improved after tuning of PSS atJaypee Nigrie and Sasan (on 30.01.2018).The peak to peak oscillations atSasan generating station prior and post PSS tuning are shown below.

    Tripping of 765kV Vindhyachal –Satna-2 23.12.17 at 1945Hrs

    Tripping of 765kV Vindhyachal –Satna-1 06.04.18 at 06:51

    NTPC Ltd. to apprise OCC regarding the schedule of PSS tuning atVSTPS-V, IV, III, II, I and Rihand Stage-III. POWERGRID to appriseOCC regarding status of Power system Oscillation Damper (POD) ofSatna STATCOM.

    506th OCC AGENDA

    Further 765kV Vindhyachal-Satna-1 again tripped on 06.04.18 at 06:51hrs on R phase to Earth fault and oscillations were observed in the grid.These oscillations damped out within 5 seconds. In similar incident on23.12.17, the oscillations during the tripping of 765kV Vindhyachal-Sasan line-2 lasted for 18 seconds. Comparison of the events indicatethat the damping of oscillations had improved after tuning of PSS atJaypee Nigrie and Sasan (on 30.01.2018).The peak to peak oscillations atSasan generating station prior and post PSS tuning are shown below.

    Tripping of 765kV Vindhyachal –Satna-2 23.12.17 at 1945Hrs

    Tripping of 765kV Vindhyachal –Satna-1 06.04.18 at 06:51

    NTPC Ltd. to apprise OCC regarding the schedule of PSS tuning atVSTPS-V, IV, III, II, I and Rihand Stage-III. POWERGRID to appriseOCC regarding status of Power system Oscillation Damper (POD) ofSatna STATCOM.

  • 506th OCC AGENDA

    6. Installation of PMU for observability of dynamic performance ofSTATCOMsFor dynamic reactive VAR compensation in Western Region, four

    STATCOM’s were approved in 36th SCM of WR. In order to monitor the

    dynamic performance of the STATCOM+ MSR / MSC, it is desired to

    install PMUs at STATCOM locations (SATNA PG, Gwalior PG,

    Aurangabad PG and Solapur PG). The matter was already discussed in

    the 505th OCC meeting. The communication from WRLDC in this regard

    sent to WRTS-I & II, POWERGRID is enclosed as Annex-9.6.

    POWERGRID may like to update the progress in this regard.

    7. Automatic Generation Control (AGC) pilot project at NTPC Mouda.A meeting to discuss the implementation of AGC at NTPC Barh,

    Simhadri, Bongaigaon and Mouda was held at NLDC on 27th March

    2018. Representatives from respective NTPC stations, NTPC WRHQ and

    WRLDC also participated. The MOM is enclosed as Annex-9.7). The

    highlights of the meetings are as below.

    i. NTPC confirmed that their units are compliant of accepting the set

    points in NTPC Dadri model

    ii. It was decided that a joint survey will be made by RLDCs / NLDC

    and POWERGRID at the RLDC and the power plant to identify the

    communication requirements

    iii. Considering the compatibility and integration issue with NLDC

    software (procured through M/S Siemens on limited tender basis

    during first pilot project at Dadri Stage-II) and the experience of

    implementation, it was proposed/suggested to award the tender to

    M/S Siemens for smooth implementation of the pilot projects in all

    the five regions. It was discussed that since this is a pilot project

    and expeditious commissioning is necessary, procurement may be

    done on single tender basis. After the discussions NTPC agreed to

    take up with M/S Siemens regarding the survey and requirements.

  • 506th OCC AGENDA

    iv. It was also decided that a local survey will be made by Mouda and

    will send the requirements to M/S Siemens

    8. Assessment of Total Import Capability of Gujarat Control AreaWith the commissioning of various transmission elements and the

    present skewed dispatch scenario of very less generation at APL

    (4x330+6x660 MW), NIL generation at Essar Vadinar (2x600 MW), CGPL

    one unit out, total import capability of Gujarat system is re-assessed for

    various contingencies. As per the Mar’18 peak case scenario studied, it

    was observed that with Gujarat demand of 15000 MW State generation of

    around 6600 MW, the system is secure if the Gujarat drawl from ISTS is

    maintained within 8800 MW. The limiting constraints is N-1 contingency

    of 765/400kV 2x1500MVA Vadodara ICT.

    1. Total Import TTC : 8800 MW

    2. Reliability Margin : 300 MW

    3. Total Import ATC : 8500

    The communication from WRLDC in this regard was sent to SLDC,

    Gujarat (Enclosed as Annex-9.8).

    For kind intimation of OCC members.

    9. Primary Frequency ResponseThe average primary response of generators for last three events are

    shown below.

    S.No

    Generator/Station

    Event-1 Event-2 Event-3 AverageResponseas % ofIdeal

    ER-1050 ER-1250 SR-93510-01-201817:34:10

    30-01-1810:46:20

    07-03-1809:38:20

    50.033 49.90 49.9849.94 49.84 50.05-0.09 -0.06 0.07

    1 Mouda-II (2x660) 75% 125% 27% 76%2 Mouda-I(2x500) 91% 134% 0% 75%3 KSTPS-II(3x500) 14% 35% 85% 45%4 VSTPS-V(1x500) 47% 36% 37% 40%5 TRN (1x300) 2% 7% 86% 31%6 DB Power(2x600) 27% 0% 53% 27%

  • 506th OCC AGENDA

    7 SKS (2x300) 0% 5% 75% 26%8 SIPAT-I(3x660) 21% 11% 19% 17%

    9GMR Warora(2x300) 0% 48% 2% 17%

    10 Jhabua (1x600) 0% 48% 0% 16%11 VSTPS-IV(2x500) 32% 0% 15% 16%

    12JPL Tamnar (StageII)(3x600) 0% 43% 1% 15%

    13Kawas(4x106+2x116) 0% 0% 40% 13%

    14 SIPAT-II(2x500) 14% 22% 0% 12%15 MB Power(2x600) 3% 14% 17% 11%16 VSTPS-II(2x500) 31% 0% 0% 10%17 KSK(2x600) 18% 10% 0% 9%18 Balco (4x300) 0% 9% 17% 8%19 SASAN(6x660) 6% 18% 0% 8%20 Lanco (2x300) 0% 24% 0% 8%

    21Gandhar(3x144+1+224) 3% 19% 0% 7%

    22 VSTPS-I (6x210) 9% 13% 0% 7%23 KSTPS-III(1x500) 9% 7% 0% 5%24 MCPL (1x300) 3% 12% 0% 5%25 CGPL(5x830) 2% 9% 3% 5%26 NSPCL (2x250) 13% 0% 1% 5%27 JPL I (4x250) 0% 5% 0% 2%28 JP NIGRIE(2x660) 0% 0% 0% 0%29 Essar Mahan(1x600) 0% 0% 0% 0%30 Solapur (1x660) 0% 0% 0% 0%

    Generating stations whose frequency response is below 40% mayapprise OCC, actions being taken to improve the frequencyresponse.

    10. Voltage Regulation in Western Region

    In the month of Mar’18, voltages were above IEGC band at 765kV Durg,400 kV Dehgam, Dhule, Kalwa, Karad, Wardha,Raigarh, Magarwada,Mapusa and Vapi. The Voltage Deviation Index of above nodes aretabulated below.S No. Voltage

    (kV)StationName

    % time Voltage is> than IEGCthreshold

    VoltageDeviationIndex

    1 765 Durg 5.0 0.05

  • 506th OCC AGENDA

    2 400 Dehgam 68.39 0.68

    3 400 Dhule 51.71 0.52

    4 400 Kalwa 40.26 0.40

    5 400 Karad 30.26 0.30

    6 400 Wardha 27.00 0.27

    7 400 Raigarh 26.19 0.26

    8 400 Magarwada 10.02 0.10

    9 400 Mapusa 7.32 0.07

    10 400 Vapi 7.12 0.07

    Concerned utilities to update the status of revival of following bus and

    line reactors that are under prolonged outage.

    S.No Element Owner Outage Date Reason

    1 80 MVAR BR atDhariwal

    DIL 22/07/2017 Oil leakage

    3 50 MVAR LR of 400kV Parli-Lonikhand_New-2@Parli (MH)

    MSETCL 30/10/2015 Fire Accident inL/R

    4 80 MVAR LR of 400kV Karad-Lonikhand-1@Karad

    MSETCL 14/09/2017 R&Y Phase LABurst

    5 LR of 400 kVBilaspur-Essar-Mahan-1 @Bilaspur

    Essar 21/03/2016 LR NGR oilleakage.

    6 LR of 400 kVBilaspur-Essar-Mahan-2 @Bilaspur

    Essar 21/03/2016 LR NGR oilleakage.

    7 50MVAR LR of400kVChandrapur-ParliCkt-3 LR at both

    MSETCL - -

  • 506th OCC AGENDA

    ends

    8 80MVAR LR of400kV Khandwa-Seoni-2 LR @ Seoni

    POWERGRID

    11/12/17 ForCommissioningof new TBEAmake LR

    9 63MVAR LR of400kV Vindhyacha-Jabalpur-1@Jabalpur

    POWERGRIS

    20/10/17 High AcetyleneGas contentissue

    OCC members may like to deliberate on the following issues

    a. All the SLDCs may apprise the OCC regarding the actions taken tocontrol the over voltages at above mentioned nodes.

    b. Concerned utilities to expedite revival of the bus reactors and linereactors under prolonged Outage LR would further help in for bettervoltage regulation.

    c. MSETCL to update the progress of commissioning of envisaged ShuntReactors in Maharashtra system at Nanded, Sholapur-MS andKholapur substations..

    d. POWERGRID to submit the detailed scheme for converting LR asSwitchable reactor without going for NGR bypass scheme.

    11. Follow-up of agenda items discussed in past OCC meeting

    i. Compliance to LVRT by Wind Turbine Generators connected at 66kV and aboveIn past OCCs, WRLDC highlighted the importance of LVRT to prevent

    simultaneous loss of generation from RES. All SLDCs were informed

    to compile the information as following.

    a. Capacity of RES in the State that is exempted from LVRT : Stall

    type / Capacity below 500 kW

    b. Capacity of RES in the State that is mandated to have LVRT

    c. Capacity of RES in the State that is LVRT compliant

    All SLDCs to update the information as mentioned above.

  • 506th OCC AGENDA

    ii. Synchronous Condenser Mode of Operation at GhatgharGhatghar pumped storage power plant in Maharashtra is connected

    to Kalwa, Jindal, Washala and Nasik through 220 kV single ckts.

    Ghatghar plant can generate 250 MW (2x125 MW) in generation mode

    and can absorb 300 MW (2x150 MW) in pumping mode.

    During 505th OCC meeting, WRLDC advised Maharashtra SLDC to

    explore the possibilities of operating Ghatghar machines in

    synchronous condenser mode of operation to improve the voltage

    profile at 220 kV Ghatghar and 220 kV Kalwa.

    SLDC Maharashtra to state the possibilities of operation ofGhatghar machines under synchronous condenser mode.

    iii. Parallel operation of 220kV Kolhapur_MS(WR)-Chikodi(SR)and220kV Talangade-Chikodi lines with other WR-SR Inter Regionallines220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines are natural interstate line between Maharashtra in WR andKarnataka in SR. These lines are operated in radial mode to supplypower from Maharashtra to Karnataka.During 505th OCC meeting, WRLDC shared the merits of utilization of220kV Kolhapur_MS(WR)-Chikodi(SR) and 220kV Talangade-Chikodilines for inter-regional power transfer with ISTS status. SLDCMaharashtra informed that they would take up the issue withMaharashtra STU and inform the forum.

    SLDC Maharashtra to apprise the OCC, regarding the actionstaken.

    iv. Parallel operation of 220kV Ponda (WR)-Ambewadi (SR) andXeldem (WR)-Ambewadi (SR) lines with other WR-SR InterRegional linesIn general 220 kV Ponda-Ambewadi S/C is kept in service and 220 kV

    Ponda-Xeldem S/C is kept out of service. 220 kV Ponda-Xeldem S/C

    is kept in service when 220 kV Ponda-Ambewadi is under forced or

  • 506th OCC AGENDA

    planned outage. N-1 contingency of Goa ISTS lines reducing reliability

    of Goa power system.

    During 505th OCC meeting WRLDC shared the merits of operation of

    220kV Ponda (WR)-Ambewadi (SR) and 220kV Xeldem (WR)-

    Ambewadi(SR) in parallel mode. SLDC Goa was requested to resolve

    the protection and telemetry related issues to operate the lines in

    parallel mode which would enhance the reliability of Goa system.

    SLDC Goa to apprise the OCC, regarding the actions taken.

    Item No. 10: Date and venue of next OCC meeting

    The date & venue of 507th OCC meeting will be intimated later on.

    The Sub- Committee may like to note as above

    **********************

  • Anaulagnak 2.1

    maah maaca- 2018

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.08 Hz. BETWEEN 0600 Hrs & 0700 Hrs Hrs. ON 31.03.2018

    AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.85 Hz. BETWEEN 1000 Hrs & 1100 Hrs Hrs. ON 09.03.2018

    nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.97 Hz.

    AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.20 Hz. AT 13:03:20 Hrs. ON 21.03.2018

    AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.68 Hz. AT 21:19:30 hrs Hrs. ON 14.03.2018

    nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS MARCH 2018 FEBRUARY 2018 JANUARY 2018

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00

    48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00

    48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00

    48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.00 0.00 0.00

    49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 12.99 9.69 11.15

    49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 79.29 80.25 77.94

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 7.72 10.06 10.92

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING MARCH 2018

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • 2018 ANNEXURE 2.3 Voltage Profile during the month of Feb'18

    Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

    1 419 406 422 408 410 399 419 406 420 406 417 403 410 394 421 415 425 4182 420 407 420 407 413 400 421 407 420 409 419 407 413 395 424 416 424 4153 418 406 420 411 410 400 419 408 421 408 417 406 410 393 422 414 422 4154 416 406 420 410 409 398 416 408 419 407 416 404 410 396 421 414 422 4155 417 406 420 410 410 399 418 408 417 406 415 404 409 396 423 415 426 4166 417 408 421 411 410 401 418 410 421 406 417 406 410 398 423 416 424 4187 418 405 422 409 410 399 419 408 420 406 417 404 412 395 420 414 421 4128 419 407 421 409 411 400 419 410 420 405 417 404 410 394 421 415 422 4169 418 402 420 407 408 395 417 407 418 405 414 403 408 394 420 413 423 41510 417 404 419 407 408 397 417 408 418 404 414 401 413 391 420 414 422 41711 418 405 422 410 410 399 419 407 420 406 416 403 410 392 421 414 424 41812 418 406 420 410 409 399 417 408 421 407 416 403 407 392 421 414 424 41513 419 407 421 409 411 399 418 408 419 406 417 404 410 395 419 413 422 41414 421 409 423 412 412 402 421 410 422 408 418 407 411 397 420 414 422 41615 418 407 421 411 409 399 419 409 420 408 416 405 409 395 418 413 421 415

    400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

    रायपुर रायगढ़Bhopal Khandwa Itarsi Damoh Nagda Indore Gwaliorभोपाल खंडवा इटारसी दमोह नागदा इंदौर

    Raipur Raigarh

    ( )

    ,Power System Operation Corporation Ltd.

    (A Government of India Enterprise)Western Regional Load Despatch Centre,Mumbai

    15 418 407 421 411 409 399 419 409 420 408 416 405 409 395 418 413 421 41516 418 405 422 409 410 399 418 409 419 405 416 404 415 393 420 414 422 41717 418 400 420 409 410 399 422 410 419 402 416 401 410 396 421 412 422 41518 414 404 423 413 413 403 425 413 422 408 418 407 410 400 421 416 423 41719 416 404 423 410 413 402 425 414 422 407 419 404 407 396 420 414 422 41720 413 400 420 409 410 400 423 412 419 404 415 402 417 396 419 413 422 41721 414 398 423 409 413 397 421 407 421 405 418 400 410 394 418 412 421 41322 411 400 418 407 409 399 417 406 417 404 413 401 409 395 417 411 421 41423 414 400 422 409 412 400 418 407 421 406 417 402 411 399 416 411 421 41024 410 400 421 407 409 398 417 406 421 403 416 400 411 395 416 410 422 41425 413 400 420 409 410 398 420 407 416 403 414 400 411 398 416 411 419 41526 413 400 420 407 410 397 419 407 417 400 414 398 411 397 417 408 420 41427 413 400 421 406 410 399 419 408 416 400 414 400 410 395 414 408 419 41428 415 400 422 409 414 399 419 407 415 402 414 402 410 398 414 409 419 41429 416 401 421 408 413 398 418 405 416 403 416 401 410 398 414 408 419 41430 413 404 420 409 410 401 421 407 417 403 415 403 409 397 417 410 419 41631 415 403 422 409 413 401 420 409 418 403 417 403 409 401 418 412 421 416

    421 398 423 406 414 395 425 405 422 400 419 398 417 391 424 408 426 410

  • Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

    1 418 411 423 413 433 409 424 404 422 403 432 407 425 410 417 403 431 4192 421 413 425 413 431 409 427 412 429 413 434 419 426 418 421 409 434 4243 419 411 422 415 431 409 422 402 426 407 434 409 424 405 419 404 434 4204 417 411 424 414 432 407 425 403 419 400 429 408 426 408 416 404 432 4205 420 411 424 415 429 407 422 403 421 401 429 402 424 407 414 401 429 4166 420 413 423 417 431 411 423 403 422 402 430 403 424 408 416 402 431 4187 417 410 421 411 431 410 424 406 420 400 428 401 423 407 414 402 429 4178 417 411 425 416 431 406 423 404 419 397 428 399 423 406 416 398 430 4169 417 409 423 413 430 407 422 403 421 406 430 408 422 407 414 398 429 414

    10 417 411 421 413 430 404 421 401 421 397 429 400 421 405 414 397 429 41311 418 410 425 415 432 410 425 407 421 403 429 409 423 410 416 401 431 41712 417 410 425 415 431 408 425 404 420 400 427 401 424 408 416 400 431 41613 416 409 423 413 433 409 425 398 420 399 430 400 425 406 414 400 428 41614 416 410 424 416 432 411 425 406 421 399 429 401 424 406 417 403 429 41515 415 410 422 416 433 410 426 405 415 399 425 404 423 408 415 402 430 41816 417 411 423 416 434 410 425 403 421 406 432 410 426 406 415 400 430 41517 418 409 423 415 429 410 423 403 422 401 431 405 423 407 416 399 431 415

    Karad Asoj Dehgam400kV 400kV 400kV 400kV 400kV 400kV 400kVBhilai Wardha Dhule Parli Boisar Kalwa

    400kV 400kV

    धुले बोईसर कलवा कराड़ असोज देहगाम

    17 418 409 423 415 429 410 423 403 422 401 431 405 423 407 416 399 431 41518 417 413 426 418 433 413 426 408 421 409 430 415 426 412 417 405 431 41919 417 411 426 414 433 407 424 401 422 399 432 401 423 405 417 399 425 41520 416 410 422 414 432 408 421 400 416 396 427 400 425 405 412 396 426 41221 416 409 422 416 431 410 420 404 419 398 430 400 424 408 415 399 427 41422 414 407 422 412 429 408 422 400 419 400 429 405 425 410 411 398 427 41423 412 406 422 412 434 409 422 399 421 406 431 410 426 409 415 400 429 41424 413 406 422 414 429 411 422 402 421 403 430 406 425 406 415 399 425 41325 412 407 420 412 429 410 422 404 418 404 426 410 425 409 415 403 428 41726 413 405 419 411 430 409 419 399 413 395 427 399 425 411 414 398 427 40527 411 404 420 410 431 407 421 397 417 393 426 395 421 401 412 398 425 41228 411 406 422 414 432 405 421 404 418 393 427 395 427 404 414 396 427 41029 411 405 423 410 432 412 422 399 419 396 429 399 427 406 414 399 426 41430 413 407 419 411 432 411 422 399 418 401 429 404 427 407 412 397 425 41131 414 409 421 413 432 412 420 404 417 398 428 401 425 407 414 398 426 410

    421 404 426 410 434 404 427 397 429 393 434 395 427 401 421 396 434 405

  • Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min

    1 419 409 412 400 419 406 423 403 424 405 419 400 423 405 420 401 786 766 782 7562 423 414 415 401 420 408 432 415 425 409 430 413 434 417 427 402 790 765 784 7593 423 411 414 401 419 406 428 407 423 399 426 405 430 409 424 401 783 758 779 7584 419 410 413 402 419 407 421 403 423 405 419 401 422 407 420 402 783 761 777 7575 418 408 412 402 418 407 420 400 427 392 416 398 422 403 419 399 784 763 781 7556 419 409 412 400 416 406 423 401 422 399 419 399 421 403 421 397 785 768 780 7597 418 410 413 400 421 405 420 401 423 400 417 398 420 403 417 399 785 763 786 7538 419 407 419 402 424 406 421 398 420 394 417 395 420 399 419 399 784 765 783 7579 418 407 417 402 421 407 421 403 420 399 417 399 422 405 418 397 780 762 788 756

    10 418 407 415 400 421 402 421 397 422 401 418 394 422 399 418 395 786 762 782 75111 419 408 414 400 418 403 422 403 426 406 418 400 422 406 417 397 785 763 785 75512 418 408 413 398 417 397 421 401 423 403 418 398 421 401 419 401 784 762 780 756

    इंदौर

    765Kv 765Kv

    IndoreBina400kV 400kV400kV 400kV 400kV 400kV 400kV 400kV

    बीनाKasor Jetpur Amreli Vapi Mapusa Kala Magarwada Haziraकासोर जेतपुर वापी मापुसा कला मगरवाड़ा हज़ीरा

    ( )

    ,Power System Operation Corporation Ltd.

    (A Government of India Enterprise)Western Regional Load Despatch Centre,Mumbai

    12 418 408 413 398 417 397 421 401 423 403 418 398 421 401 419 401 784 762 780 75613 418 408 411 396 415 402 421 399 421 398 417 395 420 400 417 395 789 763 781 75614 419 409 412 402 418 407 421 399 423 404 419 397 420 399 417 398 789 773 786 76215 418 408 413 402 419 406 419 400 424 403 415 397 417 401 418 390 785 765 780 75716 418 409 415 400 422 404 422 404 422 387 419 399 423 405 418 400 787 763 783 75417 419 406 413 399 419 405 423 402 424 404 420 399 423 404 415 391 783 762 783 75418 420 409 414 398 419 404 422 408 426 401 419 405 420 410 415 397 786 772 783 76319 419 408 413 398 417 403 424 399 423 404 420 397 423 401 416 393 783 765 784 75920 417 406 413 400 417 406 417 396 427 399 414 393 416 396 414 389 785 767 779 75721 418 408 415 401 418 407 420 398 424 395 418 396 419 398 414 388 787 759 792 75122 416 407 412 400 417 406 420 399 423 401 417 395 420 400 414 392 780 763 781 75323 418 408 413 400 417 404 421 402 421 400 416 399 420 405 415 396 785 765 789 75624 419 408 413 399 418 402 421 402 424 399 418 398 422 402 416 394 781 759 777 75225 418 408 413 400 418 403 420 402 428 404 416 400 420 406 420 401 782 760 784 75426 417 407 414 400 418 405 420 398 423 403 414 394 420 399 418 397 784 766 781 75227 417 408 415 402 420 405 417 397 421 398 414 395 417 396 415 394 782 762 785 75228 417 404 415 402 417 407 420 396 425 393 416 394 419 396 417 392 780 761 784 75329 417 408 416 401 421 405 420 397 424 397 417 396 420 399 417 391 783 763 789 75430 416 407 414 402 419 406 419 399 423 403 417 396 422 404 415 394 785 770 783 75731 417 407 415 402 418 404 419 399 421 400 417 397 419 400 414 393 788 772 784 756

    423 404 419 396 424 397 432 396 428 387 430 393 434 396 427 388 790 758 792 751

    ( )

    ,Power System Operation Corporation Ltd.

    (A Government of India Enterprise)Western Regional Load Despatch Centre,Mumbai

  • Date

    Max Min Max Min Max Max Max Min Max Min Max Min Max Min Max Min Max Min Max Min

    1 773 761 781 759 804 787 805 788 794 767 809 784 795 766 771 761 790 768 797 7722 775 761 782 758 801 781 803 783 796 774 802 776 796 767 772 759 793 768 799 7683 772 759 778 755 794 780 795 782 795 765 799 778 792 760 766 757 784 765 791 7684 772 759 777 758 793 781 795 783 791 766 798 781 794 766 769 757 786 766 793 7715 772 759 777 757 802 781 805 783 788 762 804 783 791 765 771 760 788 769 794 7716 773 764 781 764 800 786 802 789 791 767 801 787 794 770 771 762 788 770 795 7767 770 760 776 760 796 781 798 783 789 766 799 776 793 764 767 757 784 760 795 7648 770 762 777 760 798 782 800 784 790 758 803 779 792 766 768 759 788 764 802 7679 769 760 772 758 797 784 799 788 789 754 802 783 790 763 767 757 785 763 795 769

    10 771 762 778 759 796 786 798 788 787 755 801 787 792 761 769 759 785 765 794 77211 771 762 778 760 800 789 802 791 789 765 804 790 794 763 769 758 788 768 799 77812 772 760 774 757 800 784 802 785 791 761 804 786 788 762 767 756 787 769 798 777

    Sasan Satna Tamnar Kotra Vadodara765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv 765Kv

    Durg Gwalior Sipat Seoni Wardhaसासन सतना तमनार कोटरा वडोदरा

    ( )

    ,Power System Operation Corporation Ltd.

    (A Government of India Enterprise)Western Regional Load Despatch Centre,Mumbai

    12 772 760 774 757 800 784 802 785 791 761 804 786 788 762 767 756 787 769 798 77713 773 761 781 760 795 782 797 784 790 762 801 784 794 766 767 757 789 768 798 77314 774 765 781 768 798 786 800 788 794 770 804 787 795 773 768 760 790 772 800 77815 773 762 778 762 795 785 797 787 789 764 799 785 792 766 765 758 785 769 793 761

    16 771 761 780 759 797 785 799 786 790 764 801 784 792 763 766 758 788 768 799 77417 769 761 775 758 796 785 798 786 790 761 801 783 790 765 767 758 786 769 794 77518 772 763 778 765 799 786 801 787 794 771 804 793 793 771 768 761 789 774 799 779

    19 770 761 775 762 796 785 797 786 794 760 801 789 791 767 768 760 790 772 800 776

    20 771 762 777 761 797 789 798 790 786 755 801 790 795 767 770 762 787 771 793 77421 770 759 775 756 794 783 795 783 790 760 801 786 794 763 771 759 789 771 796 776

    22 771 760 780 756 795 784 796 788 783 756 800 784 791 762 768 758 786 768 794 771

    23 770 762 772 761 795 785 797 788 791 763 800 784 791 768 768 760 788 767 798 76824 769 761 772 757 796 782 797 782 790 759 801 784 789 763 769 756 788 766 800 77425 772 760 775 758 792 783 793 784 789 766 795 784 791 766 765 754 783 766 790 77026 772 762 778 759 792 782 793 782 789 759 797 782 791 769 766 753 785 763 790 769

    27 771 758 779 759 791 782 793 783 784 757 796 782 792 764 764 752 783 764 796 768

    28 765 757 770 752 792 782 793 782 787 752 799 760 788 766 765 757 787 767 801 778

    29 773 757 782 755 794 784 795 785 788 759 800 783 789 765 765 756 786 765 801 77030 774 762 782 766 793 785 794 786 786 759 796 784 790 768 765 759 783 767 789 77131 776 762 780 763 795 787 796 788 788 759 798 785 790 775 766 759 786 770 796 770

    776 757 782 752 804 780 805 782 796 752 809 760 796 760 772 752 793 760 802 761

    ( )

    ,Power System Operation Corporation Ltd.

    (A Government of India Enterprise)Western Regional Load Despatch Centre,Mumbai

  • ANNEXURE 2.5Power Cut/Restrictions in Western Region for the month of March-2018

    k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut/ Restriction on Industriesa) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice.b) All industries are required to keep their recess timings staggered.

    2 kRiYa va gaàmaINa xao~aoM kao ivaVut AapUit-2. Power supply to Agricultural & Rural Sectorsa) 08 Hrs. power supply in staggered form in rotation of day & night is given to AG. During 21.07.2017 to 28.07.2017 --10 hours AG supply given to Lunavada area for paddy crops. 10 Hrs. power supply in staggered form in rotation of day& night is given to AG from 17.08.2017 to 31.08.2017. In PGVCL area 10 Hrs. AG Supply given from 17.09.2017 to1.10.2017. In all Gujarat 10 Hrs. AG Supply given from 05.10.2017 to 19.10.2017 and further from 24.10.2017 to20.11.2017. In all Gujarat 10 Hrs. AG Supply given from 02.12.2017 to 31.12.2017. In DGVCL area 10 Hrs. AG supplygiven to 118 feeders for paddy crops from 20.01.2018 to 28.02.2018. Single Phase supply given during rest of 16 Hrs byproviding LSTC..

    b) Jyotigram Yojana 24 hrs.

    3 Anya jaanakarI3. Any other information: NIL.K : maQya p`doSa Madhya Pradesh

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

    process HT/LT Industries M(b) Baar inayamana Load Shedding

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information1.Weekly Off2.Staggering of power supply

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector: -

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-PhaseSupply(DLF)

    01.03.2018 31.03.2018 23:35 23:14 23:25

    2.1 Three-PhaseSupply(Irrigation)

    01.03.2018 31.03.2018 23:39 23:23 23:32

    2.1 Three-PhaseSupply(Mixed)

    01.03.2018 31.03.2018 09:55 09:49 09:52

  • 3 Anya jaanakarI3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

    idnaaMk Datetk To idnaaMk

    DateAaosat pìtidna Average SupplyAapUit- GaMTo Hours per day

    Max.(Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.03.2018 31.03.2018 23:54 23:44 23:503.2 District Head Qtrs. 01.03.2018 31.03.2018 23:56 23:47 23:533.3 Tehsil Head Qtrs. 01.03.2018 31.03.2018 23:52 23:41 23:37

    ga : maharaYT/ Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    pìt idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /dayFrom To

    (a) Power Cuts/Restriction on HT/LT Industries(b) Load SheddingFrom 01.03.18 to 31.03.18

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Any other information1.Weekly Off2. Staggering of power supplyIndustrial Staggering LSwithdrawn from 03/02/2012

    SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    From To Supply Hours per Day

    Max. Min. Average

    (Date) (Date) (HRs) (HRs) (HRs)

    2.1 Three-Phase Supply 01.03.2018 31.03.2018 10 8 92.2 Single-Phase Supply 01.03.2018 31.03.2018 18 18 182.3 Remarks/Notes/Anyother information.

    3 Anya jaanakarI Any other information:There is no load shedding on industrial feeders in Maharashtra

    Ga : C%tIsagaZ, Chhattisgarh:1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samayaRestriction Time

    p`it idna kula}jaa- kTaOtI

    TotalEnergy Cut(MUs /day)

    sao From tkTo

  • (A) Scheduled(a) (i) Power Cuts/Restriction on HT Industries(ii) Power Cuts/Restrictionon LT Industries(iii) Power Cuts/Restrictionon Rural(iv) Agriculture pump*

    (v)Urban/ Sub-Urban(iv)Town feeders(C-1to C-6)

    (B) Un-Scheduled(a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)00.00 (Av)00.00(Av)00.00 (Av)

    1i) Rural: NIL2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    -

    -

    -00.00

    --

    -

    -

    -

    -00.00

    --

    -

    -

    -

    -

    -0.00

    --

    0.000

    -

    3. Industries Nil0.000

    Total Energy Cut/day 0.000( b) Any other information1.Weekly Off/staggering ofpower supply

    - - - -

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.03.2018 to 31.03.2018 18.002.2 Single-Phase Supply - - - - -2.3 Remarks/Note/ - - - - -

    3 Anya jaanakarI / Any other information: SaUnya Nil

  • Annex-2.6

    2018Details of forced unit outages during the month ofMarch2018

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPP

    मतामेगावॉटCap.MW

    सoFrom

    तकTo

    कारणReason

    Time Date Time Date

    1. बीईसीएलBECL 2 GSECL 250 16:34 22-08-2017 Still out Still out Drum level high/LigniteShortage2. डीजीबीपी DGBP 3 GSECL 375 06:00 27-10-2017 13:54 23-03-2018 Gas Shortage/RSD3. हाजीराHazira(Extn) GSECL 351 11:15 15-01-2018 16:30 09-03-2018 RSD4. जीपीपीसीGPPC 1 GSECL 351 00:01 01-03-2018 18:31 02-04-2018 Condenser Chemical cleaning5. जीपीपीसीGPPC 2 GSECL 351 00:01 01-03-2018 Still out Still out Condenser Chemical cleaning6. डीजीबीपी DGBP 1 GSECL 107 17:55 23-02-2018 12:23 12-03-2018 Non availability of Gas.7. Wanakbori 1 GSECL 210 11:51 24-02-2018 14:04 12-03-2018 Abnormal bearing vibration.

    8.GIPCL STG 2

    GSECL 165 00:00 01-03-2018 Still out Still out No schedule

    9. ओपीजीएस OPGS 2 GSECL 150 00:00 01-03-2018 Still out Still out RSD10. सूजन SUGEN 3 GSECL 382 00:54 02-03-2018 06:15 05-03-2018 RSD11. बीईसीएल BECL 1 GSECL 250 07:25 02-03-2018 02:16 26-03-2018 Raw water problem12. गांधीनगरGandhinagar 2 GSECL 120 11:00 08-03-2018 05:54 14-03-2018 Air pre-heater problem.13. जीपेकGPEC 2 GSECL 218 20:55 08-03-2018 23:37 13-03-2018 RSD14. जीपेकGPEC 3 GSECL 218 23:30 08-03-2018 10:52 12-03-2018 RSD15. जीपेकGPEC 1 GSECL 218 00:04 09-03-2018 12:00 19-03-2018 RSD16. UTRAN STG II GSECL 375 05:49 09-03-2018 10:59 15-03-2018 Non-availability of gas

    17. हाजीराHazira(Extn) GSECL 351 16:30 09-03-2018 12:13 02-04-2018 RSD, costly gas18. डीजीबीपी DGBP 1 GSECL 107 17:20 12-03-2018 14:37 19-03-2018 RSD19. उकई Ukai 3 GSECL 200 00:45 13-03-2018 16:57 16-03-2018 PA fan vibration high20. जीपेक GPEC 3 GSECL 218 08:32 14-03-2018 08:36 17-03-2018 RSD21. एसएलपीपी SLPP 3 GSECL 125 05:00 18-03-2018 22:40 21-03-2018 BTL22. जीपेक GPEC 1 GSECL 218 14:55 19-03-2018 12:46 26-03-2018 RSD23. STPS 3 GSECL 250 18:27 19-03-2018 15:12 26-03-2018 PA fan problem

    24. उकई Ukai 6 GSECL 500 11:42 19-03-2018 Still out Still out Tripped due to rotor earthfault

  • 25. जीपेक GPEC 2 GSECL 218 00:22 21-03-2018 09:08 25-03-2018 RSD26. उतरण

    UTRAN STG II 1GSECL 375 14:44 20-03-2018 01:28 27-03-2018 RSD costly gas

    27. जीपेक GPEC 3 GSECL 218 00:11 21-03-2018 09:30 25-03-2018 RSD28. डीजीबीपी DGBP 2 GSECL 112 00:26 22-03-2018 06:18 28-03-2018 RSD costly gas29. डीजीबीपी DGBP 3 GSECL 375 14:03 23-03-2018 12:07 30-03-2018 RSD30. गांधीनगरGandhinagar 3 GSECL 210 20:17 28-03-2018 01:28 02-04-2018 Flame failure31. जीपेक GPEC 3 GSECL 218 01:18 29-03-2018 09:09 02-04-2018 RSD32. जीपेक GPEC 2 GSECL 218 10:13 29-03-2018 08:28 02-04-2018 RSD33. जीपेक GPEC 1 GSECL 218 00:37 30-03-2018 10:46 02-04-2018 RSD34. डीजीबीपी DGBP 2 GSECL 112 05:45 31-03-2018 06:57 10-04-2018 RSD costly generation35. कोराडी Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out Economic shutdown36. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Economic shutdown

    37. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Economic shutdown

    38. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out RSD

    39. WPCL 2 MAHAGENCO 135 21:46 29-02-2016 Still out Still out RSD

    40. पायोनीरPIONEER(262+126) 1

    MAHAGENCO 388 17:45 07-02-2017 Still out Still out RSD

    41. Chandrapur 3 MAHAGENCO 210 01:35 03-12-2017 Still out Still out Water shortage

    42. Chandrapur 4 MAHAGENCO 210 14:17 03-12-2017 Still out Still out Water shortage

    43. Chandrapur 6 MAHAGENCO 500 13:30 04-01-2018 Still out Still out Water shortage

    44. कोराडीKoradi 7 MAHAGENCO 210 17:00 07-01-2018 Still out Still out Poor coal receipt45. वीआईपीएलVIPL MAHAGENCO 300 22:55 30-01-2018 22:26 09-03-2018 Coal shortage46. भुसावलBhusawal 3 MAHAGENCO 210 02:45 14-02-2018 01:44 15-03-2018 Poor coal receipt47. जयगडJaigad 1 MAHAGENCO 300 12:06 20-02-2018 Still out Still out Turbine vibration high48. खापरखेड़ा Khaparkheda 2 MAHAGENCO 210 17:27 21-02-2018 22:23 14-03-2018 BTL49. उरण URAN A0 1 MAHAGENCO 120 11:11 25-02-2018 22:26 12-03-2018 Gas shortage50. उरणUran 5 MAHAGENCO 108 11:11 25-02-2018 14:57 12-03-2018 Gas shortage51. खापरखेड़ा Khaparkheda 1 MAHAGENCO 210 18:00 27-02-2018 10:42 03-04-2018 Poor coal receipt52. WPCL 4 MAHAGENCO 135 18:30 01-03-2018 21:42 04-03-2018 ID fan problem

    53. Nasik 3 MAHAGENCO 210 20:40 01-03-2018 01:05 01-04-2018 Suspected BTL

    54. खापरखेड़ा Khaparkheda 3 MAHAGENCO 210 13:20 03-03-2018 10:15 07-03-2018 Coal shortage55. खापरखेड़ा Khaparkheda 4 MAHAGENCO 210 09:21 04-03-2018 09:16 07-03-2018 Coal Shortage56. कोराडी Koradi 8 MAHAGENCO 660 16:08 06-03-2018 09:34 10-03-2018 BTL57. Chandrapur 8 MAHAGENCO 500 23:05 06-03-2018 08:30 12-03-2018 BTL

    58. Chandrapur 7 MAHAGENCO 500 23:06 10-03-2018 01:55 27-03-2018 BTL

    59. खापरखेड़ा Khaparkheda 3 MAHAGENCO 210 00:27 14-03-2018 04:49 18-03-2018 Coal shortage60. PARLI 7 MAHAGENCO 250 03:35 19-03-2018 23:35 22-03-2018 BTL

    61. उरणUran 8 MAHAGENCO 108 06:25 25-03-2018 Still out Still out Thrust bearing tripped62. Chandrapur 5 MAHAGENCO 500 22:10 31-03-2018 17:25 08-04-2018 Water shortage

    63. Trombay 6 TPC 500 00:00 06-03-2016 Still out Still outUnit 6 is kept under economicshutdown since 4th May’16,00:00hrs after AOH

  • 64. आरजीपीपीएलRGPPL-1B

    RGPPL 320 23:00 31-03-2014 Still out Still outDry preservation/Gasshortage

    65. आरजीपीपीएलRGPPL-1A

    RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition

    66. आरजीपीपीएलRGPPL 2B

    RGPPL 230 19:38 18-01-2018 11:35 19-03-2018 Unit change over; Less gasavailability

    67. आरजीपीपीएलRGPPL 3B

    RGPPL 230 13:26 20-02-2018 10:23 09-03-2018 Gas shortage

    68. आरजीपीपीएलRGPPL 3A

    RGPPL 230 16:30 17-03-2018 17:27 31-03-2018 Unit change over; less gasavailability

    69. आरजीपीपीएलRGPPL 2B

    RGPPL 230 20:23 19-03-2018 15:55 26-03-2018 Unit change over; less gasavailability

    70. आरजीपीपीएलRGPPL 2A

    RGPPL 230 18:52 26-03-2018 Still out Still out Unit change over; less gasavailability

    71. आरजीपीपीएलRGPPL 2B

    RGPPL 230 19:41 31-03-2018 Still out Still out Unit change over; less gasavailability

    72. सातपुरा Satpura III 9 MPPGCL 210 21:05 24-08-2017 Still out Still outSparking on GT whilesynchronizing from AOHdeveloped into fire

    73. Singaji 2 MPPGCL 600 00:56 07-03-2018 15:58 16-03-2018Boiler circulating Pumpproblem

    74. SGTPS 4 MPPGCL 210 15:20 11-03-2018 21:29 14-03-2018 BTL

    75. एमबी पावरMB Power 2

    MPPGCL 600 00:03 16-03-2018 20:46 19-03-2018For Seal trough leakageattending work

    76. SGTPS 5 MPPGCL 500 20:41 16-03-2018 04:01 21-03-2018 Shaft vibrations high

    77. SGTPS 2 MPPGCL 210 07:23 19-03-2018 14:16 22-03-2018 Pre-heater tube leakage

    78. Singaji 1 MPPGCL 600 19:46 20-03-2018 13:25 26-03-2018 BTL

    79. अमरकंटकAmarkantak 5 MPPGCL 210 02:14 31-03-2018 19:35 04-04-2018Tripped on low vacuum, laterair preheater problemobserved

    80.Marwa TPS 1

    CSPGCL 500 16:56 02-03-2018 21:43 08-03-2018 BTL

    81. KORBA(E) 5 CSPGCL 120 21:50 02-03-2018 13:30 14-03-2018 Bearing temperature high

    82.Korba(W) 1

    CSPGCL 210 08:47 09-03-2018 23:11 15-03-2018 Water wall tube leakage

    83. एपीएल मुँदराAPL Mundra 6

    Adani Power Ltd 660 20:20 20-10-2017 Still out Still out Coal shortage

    84. एपीएल मुँदराAPL Mundra 5

    Adani Power Ltd 660 23:43 01-11-2017 Still out Still out Coal shortage

    85. एपीएल मुँदराAPL Mundra 4

    Adani Power Ltd 330 08:43 14-12-2017 Still out Still out Coal shortage

    86. एपीएल मुँदराAPL Mundra 1

    Adani Power Ltd 330 06:46 07-01-2018 Still out Still out Coal shortage

    87. एपीएमएलAPML Tiroda 2

    Adani Power Ltd 660 15:26 02-01-2018 Still out Still out HPBP Bonnet leakage

    88. एपीएल मुँदराAPL Mundra 2

    Adani Power Ltd 330 22:30 20-01-2018 Still out Still out Coal shortage

    89. एपीएल मुँदराAPL Mundra 3

    Adani Power Ltd 330 22:11 21-01-2018 14:56 10-03-2018 Coal shortage

    90. एपीएल मुँदराAPL Mundra 9

    Adani Power Ltd 660 09:15 24-01-2018 Still out Still out Coal shortage

  • 91. एपीएमएलAPML Tiroda 4

    Adani Power Ltd 660 07:24 12-02-2018 09:16 06-04-2018 Coal shortage

    92. एपीएल मुँदराAPL Mundra 7

    Adani Power Ltd 660 23:10 28-02-2018 Still out Still out Coal shortage

    93. एपीएल मुँदराAPL Mundra 8

    Adani Power Ltd 660 19:28 10-03-2018 Still out Still out Condenser tube leakage

    94.अमरावती

    AMRAVATITPP(INDIABULL)-4

    RATTANPOWER INDIA

    LTD270 16:36 10-02-2018 08:24 30-03-2018 Coal shortage

    95.अमरावती

    AMRAVATITPP(INDIABULL)-3

    RATTANPOWER INDIA

    LTD270 00:01 27-02-2018 Still out Still out Coal shortage

    96.अमरावती

    AMRAVATITPP(INDIABULL)-1

    RATTANPOWER INDIA

    LTD270 00:00 10-03-2018 10:05 17-03-2018 Coal Shortage

    97.अमरावती

    AMRAVATITPP(INDIABULL)-5

    RATTANPOWER INDIA

    LTD270 07:36 24-03-2018 06:57 05-04-2018 ID fan problem

    98.JPL Stg-I 3

    JPL 250 21:44 17-11-2017 Still out Still out Coal shortage

    99.JPL Stg-II 3

    JPL 600 00:00 28-11-2017 Still out Still out RSD100.

    JPL Stg-II 4JPL 600 21:18 05-01-2018 Still out Still out RSD

    101. JPL Stg-I- 2 JPL 250 00:00 11-02-2018 Still out Still out Coal shortage

    102. JPL Stg-II-1 JPL 600 01:00 20-02-2018 01:46 16-03-2018ESP Ash evacuationproblem

    103. JPL Stg-I- 4 JPL 250 00:00 02-03-2018 Still out Still out Coal shortage

    104. JPL Stg-II-2 JPL 600 21:46 15-03-2018 00:45 21-03-2018 BTL

    105. JPL Stg-II2

    JPL 600 06:46 23-03-2018 02:52 31-03-2018 Clinker formation in Boiler.

    106. जेपी JP Nigrie 1 JAYPEE 660 00:00 27-02-2018 20:53 18-03-2018 For boiler license renewal107. ईपीजीएलEPGL 2 ESSAR 600 20:25 24-10-2017 Still out Still out Coal shortage108. ईपीजीएल EPGL 1 ESSAR 600 18:51 23-01-2018 Still out Still out Coal shortage109. )महान(

    ESSAR(Mahan) IESSAR 172 00:03 12-03-2018 23:45 15-03-2018

    Boiler MiscellaneousProblems

    110.उनोसुजनUNOSUGEN-1 TPGL 382 21:55 04-03-2016 Still out Still out RSD111. डीजीईएन DGEN-52 TPGL 400 20:00 25-11-2016 Still out Still out No schedule112. डीजीईएन DGEN-51 TPGL 400 19:28 02-12-2016 Still out Still out No schedule113. डीजीईएन DGEN-53 TPGL 400 19:12 23-12-2016 Still out Still out Low schedule114.

    GMR_CHHATISGARH 1GMR 685 02:00 22-07-2017 Still out Still out No Schedule

    115.जीएमआर वरोराGMR WARORA(EMCO)-II

    GMR WARORA 300 10:46 21-03-2018 16:11 28-03-2018 Turbine bearing temp high

    116. जीएमआर वरोराGMR WARORA(EMCO)-I

    GMR WARORA 300 00:49 28-03-2018 11:06 02-04-2018 Failure of bottom ash system

    117.KWPCL 1

    KWPCL 600 22:12 22-05-2017 Still out Still outStator Earth fault protectionoperated/maintenance

  • 118. केएसकेKSK Mahanadi 2

    KMPCL 600 14:22 21-01-2018 01:07 22-03-2018Drum level problem (CODtest completed at 10:58hrs /21.01.18)

    119. केएसकेKSK Mahanadi 3

    KMPCL 600 12:36 04-02-2018 22:43 15-03-2018 Turbine problem.

    120. केएसकेKSK Mahanadi 4

    KMPCL 600 00:01 22-02-2018 11:30 17-03-2018 Turbine auxiliary problem.

    121.KSK Mahanadi 3

    KMPCL 600 05:20 21-03-2018 21:53 28-03-2018 Boiler side Problem

    122. केएसकेKSK Mahanadi 2

    KMPCL 600 07:20 28-03-2018 Still out Still out Boiler Auxiliary TechnicalProblem

    123. आरकेएम पावरRKM Power 2

    RKMPPL 360 19:50 21-11-2017 Still out Still out Coal Shortage

    124. आरकेएमपावरRKM Power 1

    RKMPPL 360 18:52 13-02-2018 09:45 18-03-2018 Coal shortage

    125. Dhariwal Unit-1 DIL 300 17:31 27-10-2017 22:12 15-03-2018 No schedule

    126. आईईपीएलIEPL I IEPL 270 23:58 30-12-2017 Still out Still out No schedule127. सीजीपीएल CGPL 1 CGPL 830 20:41 02-03-2018 11:23 06-03-2018 BTL

    128. सीजीपीएलCGPL 1 CGPL 830 23:45 07-03-2018 11:34 11-03-2018Final super heater metaltemperature maintaining onhigher side

    129. एसीबीआईएल ACBIL 1 ACBIL 135 07:12 01-03-2018 09:14 03-04-2018 BTL130.

    TRN Energy 1ACBIL 300 17:01 08-03-2018 11:23 22-03-2018 Coal Shortage

    131. एसीबीआईएल ACBIL 2 ACBIL 135 03:22 14-03-2018 22:21 30-03-2018 Suspected BTL132. बालकोBALCO-2 BALCO 300 23:43 06-03-2018 20:12 19-03-2018 Coal shortage133. बालकोBALCO-1 BALCO 300 16:03 08-03-2018 04:51 26-03-2018 Coal shortage134. बालकोBALCO- 2 BALCO 300 07:05 22-03-2018 06:48 05-04-2018 Low coal stock135.

    Dhariwal CTU 2DIL 300 09:00 17-03-2018 23:15 22-03-2018

    APH leakage and suspectedBTL

    136. Lanco 2 LANCO 300 00:00 18-03-2018 15:43 28-03-2018 Boiler tube leakage.

    137. KAPS 2 NPCIL 220 14:09 01-07-2015 Still out Still out Nuclear reactor side problem

    138. KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem

    139. TAPS 1 NPCIL 160 19:09 04-06-2017 03:15 01-04-2018 Refueling work

    140. TAPS 2 NPCIL 160 10:51 26-12-2017 18:49 29-03-2018

    For commissioning work ofcontainment filtered ventingsystem, containment insertingsystem.

    141. कावास Kawas GT 2B NTPC 106 15:54 06-02-2018 Still out Still out RSD142. कावास Kawas ST 2C NTPC 106 17:41 06-02-2018 Still out Still out RSD143. कावास Kawas GT 2A NTPC 106 17:46 06-02-2018 Still out Still out RSD144. मौदा MOUDA 4 NTPC 660 01:30 05-03-2018 19:25 12-03-2018 Coal Shortage145. गांधारGandhar GT ST 3 NTPC 219 20:00 08-03-2018 15:06 15-03-2018 RSD146. गांधारGandhar GT ST 3 NTPC 219 00:11 16-03-2018 Still out Still out RSD147. मौदा Mouda 2 NTPC 500 23:56 16-03-2018 19:29 21-03-2018 Coal shortage

    Note: Units out for more than 72 hrs are only included.

  • Annex-2.7

    2018Details of planned unit outages during the month of March2018

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPP

    मतामेगावॉटCap.MW

    सoFrom

    तकTo

    कारणReason

    Time Date Time Date

    1. Wanakbori 2 GSECL 210 12:49 08-01-2018 10:34 08-04-2018 AOH

    2. उरणUran 6 MAHAGENCO 108 23:43 11-02-2018 23:39 30-03-2018 AOH

    3. VSTPS 4 NTPC 210 00:40 05-03-2018 20:49 28-03-2018 AOH

  • ANNEXURE 3.1

    (MW) From To1 GUJARAT

    1.1 Gandhinagar TPS 4 210 12-May-18 30-Jun-18 COH

    1.2 Sikka TPS 3 250 20-May-18 9-Jun-18 AOH

    1.3 APL 4 330 25-May-17 24-Jun-17 COH

    2

    NIL

    3CHHATTISHGARH

    3.1 NIL

    4

    4.1 RattanIndia Power Ltd Unit 5 270MW15/05/2018 21/05/2018

    For Boiler Inspection as perstatuary complience

    5 Central Sector and IPPs

    5.1CGPL 20 800 20-May 3-Jul Capital Overhauling

    5.2JHANOR GT#2 144.3 23-Apr-18 29-Apr-18 for swirler checking/replacement asper OEM recommendation.

    5.3

    TAPS

    2 160 1-May-18 30-Jun-18 For carrying out mandatory checks,regulatory inspection and refuelingoutage related jobs

    5.4

    TAPS 4 540 1-May-18 31-May-18 Maintenance on Reactor Components5.5

    VSTPS 2 210 21-Apr-18 23-Apr-18 Boiler renewal

    5.6VSTPS 8 500 25-May-18 23-Jun-18

    (Boiler+ HP replacement + IPT rotorand inner cassingrepl;acement+LPT OH)

    MAHARASHTRA

    MADHYAPRADESH

    ReasonS. No. Unit No.

    DETAILS OF PROPOSED MAINTENANCE PROGRAM OF GENERATING UNITS DURING APRIL 2018 AND MAY 2018

    Capacity Outage Plan

  • Annexure -3.2

    Date Time Date Time1

    400 400 RAIGARH-KOTRA PS I 1-May-186:00

    1-May-1814:00

    DailyFor AMP works & Modification in arrangement of Line Terminal equipmentat Kotra end. WRTS-1 WRTS-1 R

    2765 SWITCHABLE LR_765kV_PADGHE1_AURANGABAD 1-May-18

    6:001-May-18

    18:00Daily Spare reactor charging along with existing LRs for checking healthness. WRTS-I WRTS-I C

    3 400400 Halvad-Vadavi line No. 2 1-May-18

    8:001-May-18

    18:00 DailyBay maintenance and equipment testing work at Kosamba

    GETCO GETCO

    4 400 400 MCCPL Main bay (416) at Bilaspur PS 1-May-18 8:00 1-May-18 18:00 Daily For AMP Works WRTS-I WRTS-I R5 400

    400 Kosamba Chorania-1 Line+Main+Tie Bay+Line Reactor 1-May-188:00

    1-May-1818:00 Daily

    Bay maintenance and equipment testing work at KosambaGETCO GETCO

    6 400400 APL Hadala Line 1-May-18

    8:001-May-18

    18:00 DailyBay maintenance and equipment testing work at Kosamba

    GETCO GETCO

    7 400 400 Chorania - Bhachau Line 1-May-18 8:00 1-May-18 18:00 Daily Conditioning Monitoring work at 400 Chorania. GETCO PGCIL8

    400 KWPCL Main Bus -1 1-May-188:00

    1-May-1820:00

    DailyAnnual Maintenance , Alignment ,Testing & Interlock Checking of 400Isolator . KWPCL KWPCL

    9 400 Bay No.-417 Tie Bay of 400 Magarwada-Boisar-II & Future Bay atBoisar 1-May-18

    8:301-May-18

    17:30 DailyFor Bay AMP POWERGRID WR-II R

    10 400 STATCOM-1 COUPLNG T/F MAIN BAY_431 at Solapur 1-May-18 9:00 1-May-18 11:00 DAILY CT Oil sample collection. WRTS-I WRTS-I R11 220

    220kv Itarsi #1 Bay (202) at Itarsi 1-May-189:00

    1-May-1816:00 Daily

    For Bay AMP Works. POWERGRID WR-II R12 765

    Vindhyachal Pooling- Sasan Ckt-I 1-May-189:00

    1-May-1818:00 Daily

    PMU integration POWERGRID WR-II C13 220 220kV TRANSFER BUS COUPLER BAY (206) at Seoni 1-May-18 9:00 1-May-18 18:00 Daily FOR AMP WORK WRTS-I WRTS-I R14 765

    714 Bay, 765KV V'chal-Satna Line #1 Tie Bay at Satna 1-May-1810:15

    1-May-1818:00 Daily

    AMP Work POWERGRID WR-II R15 400 SOLAPUR-1 STATCOM_COUPLNG T/F TIE BAY_432 at Solapur 1-May-18 11:00 1-May-18 14:00 DAILY CT Oil sample collection. WRTS-I WRTS-I R16 400

    Bina-Satna 2 at Bina 1-May-18

    7:12

    1-May-18

    0:00 Daily

    For rectification of shut down nature defects in line.AMP work of Line terminal equipment & Reactor also will be carried out. POWERGRID

    WR-II R

    Type

    LIST OF TRANSMISSION ELEMENTS OUTAGES PROPOSAL FOR 506TH OCC MEETING TO BE HELD ON 19.04.2018 (From 01.05.18 to 31.05.18)

    Sr. No KV Line / Element From ToBasis

    ReasonSystem Agency

    16 400

    Bina-Satna 2 at Bina 1-May-18

    7:12

    1-May-18

    0:00 Daily

    For rectification of shut down nature defects in line.AMP work of Line terminal equipment & Reactor also will be carried out. POWERGRID

    WR-II R

    17

    400 400 KOLHAPUR (GIS)-MAPUSA II 1-May-18

    6:00

    2-May-18

    18:00

    Daily

    Replacement of polymer insulators with glass insulators in TL andreplacement of support insulators of line isolator and other isolators, wavetrap, BPIs at substation. AR in Non Auto Mode for other ckt will berequired during above period WRTS-1 WRTS-I C

    18 400400 S/C Koradi I -India Bull 1-May-18

    7:002-May-18

    18:00 Daily For Stringing work of 765 D/C Gadarwara-Warora T/L ,part 2 at powerline crossing section MSETCL WR-II C

    19 400400 S/C Koradi I -Bhuswal 1-May-18

    7:002-May-18

    18:00 Daily For Stringing work of 765 D/C Gadarwara-Warora T/L ,part 2 at powerline crossing section MSETCL WR-II C

    20 400400 Bus 1 at Bhachau 1-May-18

    8:002-May-18

    18:00 DailyRTV Coating of Bus 1 Isolator POWERGRID WR-II C

    21 765SASAN-SATNA # 1 1-May-18

    8:002-May-18

    18:00 Cont. POWER LINE X-ING WORK OF 765kV D/C V-CHAL PS - Jabalpur PSTransmission line. POWERGRID WR-II C

    22 220Bus-1 at Dehgam 1-May-18

    9:002-May-18

    18:00 DailyBay stability check for new Bay POWERGRID WR-II C

    23 765765KV Bus-I at Pooling station,Jabalpur 1-May-18

    10:002-May-18

    18:00 DailyFor Vindhyachal Bay Extension work at Pooling station,Jabalpur POWERGRID WR-II C

    24400

    DGEN 404- GT 51 Bay (Bay 404) 1-May-18

    8:00

    3-May-18

    19:00ContinuousAnnual PM of Generator Transformer, Auxiliary Transformer, Excitation

    Transformer & 400 BreakerTPL - DGEN TPL - DGEN R

    25 220 220Raigarh(CSEB)-2 Main bay (202) at Raigarh 1-May-18 10:00 3-May-18 18:00 Conti.. Overhauling of CGL make CB by CGL Engineer . WRTS-I WRTS-I R26

    765 765kV Bus-1 at Pune-GIS 1-May-1800.00AM

    3-May-1818:00

    Conti.. For Bay extension works- Existing and extension Bus 1 connection WRTS-I WRTS-I C27

    765 KVSIPAT BUS REACTOR MAIN BAY-4 1-May-18

    07:30 hrs

    3-May-18

    19:00 Hrs.Continous

    For Annual maint works (Only MAIN Bay S/D is required. REACTORSHUTDOWN is not required. REACTOR will remain charged through itsTIE bay.)

    NTPC NTPC

    28 220

    Bus 1 at Navasari 1-May-18

    9:00

    5-May-18

    18:00 Cont.

    Bus Interconnection of New 209 (220kV Naasari-Bhestan line # 1 Bay) &210 (220kV Naasari-Bhestan line #2Bay) bays at Navsari GIS and bus barstability test during testing Bus bar relay will be out of service POWERGRID WR-II C

    29132

    132 KV Balaghat-Bhanegoan ( During S/D supply to Bhanegoan (20mw) feed from Dongargarh s/s of Chhatisgarh) 1-May-18

    9:005-May-18

    18:00 Continue LILO arrangement at Kirnapur 400 S/S MPPTCL MPPTCL R

    30220KV Deoli (PGCIL)- Pusad line 1-May-18

    7:007-May-18

    17:00Daily For PID Work,Shifting of auto reclose switch to non auto mode. MSETCL MSETCL

  • 31 400315 MVA ICT#02 at Betul 1-May-18

    8:007-May-18

    20:00 Cont.Replacement of Isolators of ICT#02 bays i.e. 403 & 402 POWERGRID WR-II R

    32 400

    50MVAR Shujalpur-Bina # 1 L/R ( Switchable) at Shujalpur. 1-May-18

    10:00

    7-May-18

    18:00 Cont.Commissioning of Reactor Switching 145KV NGR Bypass Circuit Breakerat Shujalpur. Line will be in service without Line Reactor at Shujalpur. POWERGRID WR-II C

    33 400 MAIN CIRCUIT BREAKER OF Jhanor DEHGAM LINE#2 1-May-18 08:00 11-May-18 18:00 Continuous

    CIRCUIT BREAKER OVERHAULING NTPC34

    400 Chandrapur 2 - Kumbhargaon (Nanded) Ckt-I 1-May-186:00

    15-May-1817:00

    Daily For PID Work, Shifting of auto reclose switch to non auto mode. MSETCL MSETCL

    35 400ICT2 Tie Bay (Bay 408) at Dehgam 1-May-18

    9:0020-May-18

    18:00 Cont.Erection,Testing & Commissioing of New ICT3 Main Bay POWERGRID WR-II C

    36 765Satna-Orai Ckt-I 1-May-18

    9:0030-May-18

    18:00 DailyOPGW Stringing work( A/R TO BE KEPT INTO N/A MODE) POWERGRID WR-II C

    37 765Indore 765-Bina 765 1-May-18

    9:0030-May-18

    18:00 DailyOPGW Stringing work( A/R TO BE KEPT INTO N/A MODE) POWERGRID WR-II C

    38 400Mundra-Jetpur Ckt-1 1-May-18

    9:0030-May-18

    18:00 DailyOPGW Stringing work( A/R TO BE KEPT INTO N/A MODE) POWERGRID WR-II C

    39 220220kV D/C [Bina (MPPTCL)-Shivapuri and Bina (PG)-Shivapuri] 1-May-18

    9:0030-May-18

    18:00 Daily OPGW Stringing work( A/R OF BOTH CIRCUIT TO BE KEPT INTO N/AMODE) MPPTCL WR-II C

    40 220Chhindwara-Seoni D/C 1-May-18

    9:0030-May-18

    18:00 Daily OPGW Stringing work( A/R OF BOTH CIRCUIT TO BE KEPT INTO N/AMODE) MPPTCL WR-II C

    41 220Seoni-Pench D/C 1-May-18

    9:0030-May-18

    18:00 Daily OPGW Stringing work( A/R OF BOTH CIRCUIT TO BE KEPT INTO N/AMODE) MPPTCL WR-II C

    42400 400 Jejuri - Lonikand 1-May-18

    7:0031-May-18

    19:00Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL

    A/Rrequired tobe Off43

    400 400 Warora -Chandrapur I& II 1-May-187:00

    31-May-1819:00

    Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCLA/Rrequired tobe Off44

    400 400 Koradi-1 -Khaperkheda I & II 1-May-187:00

    31-May-1819:00

    Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCLA/Rrequired tobe Off45

    400 Chandrapur GCR - Chandrapur -2 (Ckt-1 &2) 1-May-187:00

    31-May-1819:00

    Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCLA/Rrequired tobe Off46

    400 Chandrapur -2 Chandrapur Switch (Ckt-1 &2) 1-May-187:00

    31-May-1819:00

    Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCLA/Rrequired tobe Off

    46400 Chandrapur -2 Chandrapur Switch (Ckt-1 &2) 1-May-18

    7:0031-May-18

    19:00Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCL

    A/Rrequired tobe Off47

    400 Ektuni - Thaptithanda (Ckt-1 & ckt-2) 1-May-187:00

    31-May-1819:00

    Daily Taking Auto Reclose in Non AR Mode for stringing of OPGW work MSETCL MSETCLA/Rrequired tobe Off48 765 765kV S/C Dhule(BDTCL)-Vadodara(PG) line 1-May-18 8:00 31-May-18 18:00 Daily AR-OFF: Online rectification Work of OPGW BDTCL BDTCL R

    49 400 400 WARDHA-PARLI I 1-May-18 9:00 31-May-18 18:00 Daily A/R in Non -Auto Mode for OPGW Work. WRTS-I WRTS-I C50

    400

    400 N.Koyna-Karad Ckt 1 & 2 1-May-18

    10:00

    31-May-18

    17:00

    DailyFor PID testing work / Taking Auto Reclose