  • API 16A Specification for Drill-through equipment 3rd Edition HP/HT Considerations Jan. 2014

    API 16A Chairman: John Busby Co-Chair: Jim McCabe

    1

  • API 16A Specification for Drill- through equipment - Status

    3rd Edition / June 2004 / Effective Date: December 1, 2004

    Reaffirmed: August 2010 Present Status: Under 4th Revision

    1220 L Street, NW Washington, DC 20005-4070 www.api.org 2

    http:www.api.org

  • HP/HT Considerations API 16A

    Updated Temperature chart to include three ranges and qualification testing

    Welding: defined HAZ zone Established minimum design criteria

    1220 L Street, NW Washington, DC 20005-4070 www.api.org 3

    http:www.api.org

  • HP/HT Considerations API 16A

    Removed 25k & 30k classes (ref 17TR8)

    16A Representation in 17TR8 Bolting hardness per API 20E

    BSL-2

    1220 L Street, NW Washington, DC 20005-4070 www.api.org 4

    http:www.api.org

  • HP/HT Considerations API 16A

    Five Work Groups Formed Gas testing qualification Sealing characteristics PSI-A v/s PSI-G Closure bolting Product history records

    1220 L Street, NW Washington, DC 20005-4070 www.api.org 5

    http:www.api.org

  • HP/HT Considerations API 16A

    Questions ?

    1220 L Street, NW Washington, DC 20005-4070 www.api.org 6

    http:www.api.org

    API 16A Specification for Drill-through equipment 3rd EditionHP/HT Considerations Jan. 2014API 16A Specification for Drill- through equipment - StatusHP/HT Considerations API 16AHP/HT Considerations API 16AHP/HT Considerations API 16AHP/HT Considerations API 16A