Pinewood Studios Building ProposalGroup 2
07/11/2012
1
Who will use it?
• Employees of Pinewood Studios
• Directors and Actors
07/11/2012
2
How will it be used?
• Office space• Meetings• Functions on the ground floor
Initial design concepts
07/11/2012
3
07/11/2012
4
Final Design
07/11/2012
5
AHURoof garden
Glass atrium
Toilet and kitchen facilities on this side
Offices on this side
Main entrance
Ground investigation and Foundations
• 10m of made ground
▫ Could be contaminated
▫ Ground investigation
• We think we will use bore piling as long as the ground is safe
07/11/2012
6
Structure
07/11/2012
7
07/11/2012
8
07/11/2012
9
Site Layout
07/11/2012
10
Ground floor interior plan
07/11/2012
11
North
07/11/2012
12
First floor interior plan
07/11/2012
13
07/11/2012
14
Second floor interior plan
07/11/2012
15
Third floor interior plan
07/11/2012
16
Roof floor plan
07/11/2012
17
07/11/2012
18
Section
07/11/2012
19
Building services
• 550m2 of floor space
▫ 48kw of electricity
• Total u value of the building is 0.55
▫ 0.55 x 26 x 1042 = 14900
▫ Will lose maximum of 15kw of heat
▫ 1kwh costs 17p
• AHU on the roof 700 x 700 x 5000
▫ Ventilation duct runs down the corner of the building
07/11/2012
20
Facades
07/11/2012
21
Chosen Solution
How to attach glass to structure
07/11/2012
22
Facades Cut section of wall
07/11/2012
23
Materials
07/11/2012
24
Fritting
Fritting pattern idea
Sustainability & Environmental effects
• Rain water harvesting system
• Solar panels on all the south facing windows
• Install AHU and natural ventilation
• Use natural lighting
• Under floor heating using ground heat
These things will contribute to our BREEAM score.
07/11/2012
25
Healthy & Safety
• Fire safety
▫ Central stairs
▫ Lobby around stairs
▫ Plasterboard
▫ Sprinklers and alarms
• Safety of workers
07/11/2012
26
Inclusive Design
• Lifts and stair railings
• Braille on signs
• Wider doors and corridors
07/11/2012
27
What we learnt
07/11/2012
28
07/11/2012
29