PHAROS (606982)
Attachment to Final Report
Instrument Collaborative Project
Call / Topic FP7-SPACE-2013-1 / SPA.2013.1.2-01
Project Title Project on a Multi-Hazard Open Platform for Satellite Based Downstream Services
Project Number 606982
Project Acronym PHAROS
Project Start Date 01/12/2013
Project Duration 30 months
PHAROS (606982)
06/12/2016 i
Document History
Version Date Modifications Source
1.0 06/12/16 First Issue DLR
PHAROS (606982)
06/12/2016 ii
Table of Contents
List of Figures ........................................................................................................................ iii
1 Introduction .................................................................................................................... 5
2 Project Partners.............................................................................................................. 6
3 Project Material .............................................................................................................. 7
3.1 Project Logo ............................................................................................................ 7
3.2 Links to Project Video / Interviews / Video Presentations ........................................ 7
3.3 Diagrams, pictures and figures ................................................................................ 7
PHAROS (606982)
06/12/2016 iii
List of Figures
Figure 3-1: PHAROS Logo .................................................................................................... 7
Figure 3-2: PHAROS High Level Inputs and Outputs............................................................. 7
Figure 3-3: Consortium and User Interaction for the Service Concept Specification .............. 8
Figure 3-4: End User Interaction ............................................................................................ 8
Figure 3-5: PHAROS Long Term Architecture ....................................................................... 9
Figure 3-6: PHAROS Short Term Architecture .....................................................................10
Figure 3-7: DSS Overall Architecture ....................................................................................11
Figure 3-8: SM Overall Architecture ......................................................................................11
Figure 3-9: Implemented EO Services Technical Diagram ...................................................12
Figure 3-10: F-SIM Satellite System Integrated in PHAROS.................................................12
Figure 3-11: PHAROS Service Platform Architecture ...........................................................13
Figure 3-12: PHAROS dissemination strategy components ..................................................13
Figure 3-13: Dissemination Strategy Components Interaction ..............................................14
Figure 3-14: Standardization mission, objectives and strategy .............................................14
PHAROS (606982)
06/12/2016 iv
Intentionally blank
PHAROS (606982)
06/12/2016 5
1 Introduction This document complements the PHAROS Final Report submitted through the SESAM system and provides information about the PHAROS project partners, the project logo, diagrams and photographs illustrating and promoting the work done in the project (including links to the project website and videos published in Internet).
PHAROS (606982)
06/12/2016 6
2 Project Partners
Partner Short Name
Web Contact
Deutsches Zentrum für Luft- und Raumfahrt e.V.
DLR www.dlr.de Mr. Javier Mulero Chaves
Tecnosylva S.L.
TSYL www.tecnosylva.com/ Mr. Miguel Mendes
Avanti Communications Ltd.
AVA www.avantiplc.com/ Mr. Joseph Muna
Space Hellas SPH www.space.gr/ Mr. Georgios Gardikis
IQ Wireless GmbH
IQWIRE www.iq-wireless.com/en/ Dr. Klaus Jäckel
Fundació d’ecologia del foc i gestió d’incendis Pau Costa Alcubierre
PCF www.paucostafoundation.org/ Mr. Oriol Vilalta
Stichting Platform Mobile Messaging
SPMM www.spmm.nl/spmm/home/ Mr. Wim van Setten
Eutelsat S.A. EUT www.eutelsat.com/en/home.html Ms. Roberta Campo
PHAROS (606982)
06/12/2016 7
3 Project Material
3.1 Project Logo
Figure 3-1: PHAROS Logo
3.2 Links to Project Video / Interviews / Video Presentations http://www.pharos-fp7.eu/
https://www.youtube.com/watch?v=xQrUxDzF_jQ
http://www.ccma.cat/tv3/alacarta/telenoticies-comarques/telenoticies-barcelona-03032016/video/5587428/
http://www.ccma.cat/tv3/alacarta/espai-terra/dijous-21-dabril/video/5596368/
3.3 Diagrams, pictures and figures
Figure 3-2: PHAROS High Level Inputs and Outputs
PHAROS (606982)
06/12/2016 8
Consortium Workshop
1st AB and End usersWorkshop
Service Concept Specification(D2.1)
Figure 3-3: Consortium and User Interaction for the Service Concept Specification
Figure 3-4: End User Interaction
PHAROS (606982)
06/12/2016 9
ALERTINGCHANNELS
SERVICE PLATFORMWORKFLOW ENGINE GATEWAY
EO DATA PROCESSOR
SENSOR GATEWAY
SIMULATION SERVICES
DECISION SUPPORT SERVICES
ALERTING GATEWAYUSER INTERFACE
EO_SP SG_SP SS_SP DS_SP
UI_SPSU_SP AG_SP
PRIMARY USERS
EO SERVICE PROVIDER
SENSOR NETWORK
EXTERNALSERVICES
SECONDARY USER SERVICES
AG_AC
DA_EO SE_SG
EX_SP
SECONDARY USERS
PHAROS SYSTEM
DATA REPOSITORY GIS ENGINE
RECIPIENTS
PHAROS Web site
Receiver Application
EXTERNAL EM SYSTEMS
OTHER AUTHORITIES
ES_SP RC_SP
Figure 3-5: PHAROS Long Term Architecture
PHAROS (606982)
06/12/2016 10
SERVICE PLATFORMWORKFLOW ENGINE GATEWAY
SIMULATION SERVICES
(WildFire Analyst)
DECISION SUPPORT SERVICES
ALERTING GATEWAYUSER INTERFACE
SS_SP DS_SP
UI_SP SU_SP AG_SP
PRIMARY USERS
SECONDARY USER SERVICES
AG_AC
SECONDARY USERS
PHAROS SYSTEM
DATA REPOSITORY GIS ENGINE
EXTERNAL EM SYSTEMS
OTHER AUTHORITIES
ES_SP
EO DATA PROCESSOR
SENSOR GATEWAY
EO_SP SG_SP
EO SERVICE PROVIDER
SENSOR NETWORK
(FireWatch)DA_EO SE_SG
ALERTINGCHANNELS
RECIPIENTS
PHAROS Web site
Receiver Application
MAP SERVICE
WEATHER SERVICE
MA_SP
WE_SP
MODIS DATAMO_SP
Figure 3-6: PHAROS Short Term Architecture
PHAROS (606982)
06/12/2016 11
Figure 3-7: DSS Overall Architecture
Figure 3-8: SM Overall Architecture
PHAROS (606982)
06/12/2016 12
Figure 3-9: Implemented EO Services Technical Diagram
FIREWATCH Central
SATELLITE
C
C
C
F-SIM Terminal HubSensors
Service Platform
Figure 3-10: F-SIM Satellite System Integrated in PHAROS
PHAROS (606982)
06/12/2016 13
Figure 3-11: PHAROS Service Platform Architecture
DISSEMINATION STRATEGY
Standardisation
Liaison with relevant initiatives/projects
Dissemination To end users
To general public
To scientific community
Figure 3-12: PHAROS dissemination strategy components
PHAROS (606982)
06/12/2016 14
General Public
End Users & Relevant
Institutions
Scientific Community
Web Flyers
Newsletters New media
End user interviews Advisory Board
Dedicated workshops
End user journals End user events
Public Validation
Scientific journals
Scientific conferences
Standardisation activities
Liaison with institutional iniciatives Liaison with relevant research projects
Figure 3-13: Dissemination Strategy Components Interaction
MIS
SIO
N:
ENHA
NCE
SYS
TEM
INTE
ROPE
RABI
LITY Objective 1:
Fostering and easing system functional scalability
Objective 2:Fostering interoperability
with already existing systems
Objective 3:Contributing to
standardization bodies
Identification of relevant standards related to external interfaces towards data and service providers
Implementation of standard-compliant interfaces
Identification of relevant standards related to data/metadata formats and import/export communication protocols
Adoption of identified standards
Implementation of standard-compliant export functions
Identification of developments to be targeted as standards or contributions to standards
Performance of necessary steps to foster standardization of identified items
Figure 3-14: Standardization mission, objectives and strategy
PHAROS (606982)
06/12/2016 15
End of Document