Download - Balpara Project Highlights 2015
projecthighlights
2015
RENEWABLES
BALPARA’S INVOLVEMENT
Design of 66kV line to supply the 52 wind turbines, generating 106.6 megawatts.
THE PROJECTThe Bald Hills Wind Farm is connected to the national electricity grid by a new 27km 66kV powerline constructed on concrete poles.
POWERCORBALD HILLS WINDFARM
UNDERGROUND RESIDENTIAL DISTRIBUTION
PROJECT SCOPE Balpara successfully provided a turn-key solution on this URD project in the Geelong suburb of Marshall for UP Property. Balpara performed the electrical design, which included NBN requirements, project management, construction and detailing of the as-builts.
URDSTATION ST | MARSHALLUP PROPERTY
PUBLIC LIGHTING
PROJECT SCOPE Working closely with VicRoads, Balpara successfully completed the Dingley Bypass project in 2015.
Balpara was contracted to perform electrical design, drafting and surveying of the overhead line 22kV-66kV and undergrounding LV infrastructure as well as project management of construction by LendLease on behalf of ZNX.
DINGLEY BYPASSLEIGHTON CONTRACTORS
VEDN ACCREDITATION
VEDN AUDITING & DETAILINGBalpara continues to be involved in the undergrounding of all the pillars in the
Doncaster Donvale region through the provision of detailing and VEDN accredited auditing services, both civil and electrical.
DONCASTER PILLARSZNX
BUSHFIRE MITIGATION
PROJECT SCOPE
Balpara provided electrical design and drafting to support Powercor's
bushfire mitigation plan. Our involvement ensured the
delivery of Armor Rods and Dampers to all poles within high
risk fire regions, minimising fire risk and the likelihood of outages.
POWERCORARMOR RODS & DAMPERS
PUBLIC LIGHTING AS3000
THE PROJECTHobsons Bay City Council requested Balpara to investigate the existing lighting level along Pier Street, Altona and to provide two possible new lighting solutions for both existing and proposed pedestrian crossings, in line with AS 1158.
PIER ST, ALTONAPUBLIC LIGHTINGAS3000
SOLUTIONBalpara’s more expensive solution to add two new poles and replace existing was selected as the higher Lux rating meant that pedestrians were easier to spot by incoming and outgoing busy.
SURVEYING
PROJECT SCOPE Balpara performs the overhead electrical survey, drafting & detailing services for AusNet’s conductor replacement project which is to replace old steel conductors with new and to replace all copper conductors with aluminium. The total project covers 150km.
AUSNET SERVICESCONDUCTOR REPLACEMENT PROGRAM
SUBSTATIONS
THE PROJECTBalpara was engaged by Multipipe to GPS detail and draft 66kV related assets on the Richmond Terminal Substation (RTS).The multi-stage project required multiple site visits and substantial detailing, using GPS to ensure accuracy under challenging circumstances. Richmond Terminal Substation is owned by AusNet services and feeds both the CitiPower and United Energy networks.
RICHMONDTERMINAL SUBSTATIONMULTIPIPE
DETAILING
PROJECT SCOPE Undergrounding of two new transmission
circuits between North Melbourne - Carlton.
Some impressive figures:
length of cable for 1 circuit 5.145 km 3 cables per circuit
total length of 1 circuit 15.435kmgrand total of all circuits 30.87km
The project uses 1,600mm squared 1c 66 kV Cu XLPE Prysmian cables
DALY’S66Kv CBD SECURITY PROJECT