Steinar Nesse (DNV) & Eduard Bukhgalter (VNIIGAZ) 9 December 2010
Working group RN07 - Regular emissions and discharges from ships and offshore units in the Barents Sea
Barents 2020 Conference Moscow 9 December 2010
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
2
Outline
Brief overview of Phase 3 scope and main results (RN07)
Mandate Phase 4 (RN07)
Approach
Status of progress
Further work and milestones
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
3
Experts RN07 Phase 4
Russian experts Norwegian/International experts
Eduard Bukhgalter, VNIIGAZ (Russian coordinator)
Elena Ilyakova, VNIIGAZ
Nicolay Valdman, Krylov institute
Vadim Kharitonov, Giprospetsgaz
Аlexander Schvyrjajev, Lomonosov MSU
Alexander Kichigin, Gazprom
Nikolay Shaplov, Rosneft
Natalia Kutaeva, FSO "State marine rescue service of Russia“ (observer)
Anna Savina, ANO "Industrial Risk Agency” (observer)
Knut Aasnes, Statoil
Svein Flornes, Transocean
Axel Kelley, Eni Norge
Haakon Hustad, DNV
Salve Dahle, Akvaplan-NIVA
Yuri Alexandrovski, SDAG
Frederic Hannon, OGP/TOTAL
Gina Ytteborg, OGP/Shell
Steinar Nesse, DNV
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
4
Scope of work for working group RN07 (phase 3)
DecommissioningDecommissioning
Onshore wastereception andinfrastructure
Onshore wastereception andinfrastructure
Tanker exportTanker export
Supply servicesSupply services
ProductionProduction
Field development
Field development
Subsea developmentSubsea development
DesignDesign
Exploration drilling,product. drilling
Exploration drilling,product. drilling
Seismic acquisition Seismic acquisition
Baselinestudies
Baselinestudies
Standards for operational
emissions and discharges to air
and water
Standards for operational
emissions and discharges to air
and water
Pipeline commissioning
Pipeline commissioning
Environmentalmonitoring
Environmentalmonitoring
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
5
Phase 3 RN07 main results: Recommended standards for reference, offshore oil & gas
ISO 14001:2004 Environmental Management System- The ISO 14001 implies that activities are planned for and executed
in a systematic manner considering relevant environmental aspects and aiming at continuous improvement.
International Finance Corporation / World bank Group Environmental, Health, and Safety Guidelines: - Offshore Oil and Gas Development (2007)
- Air Emissions- Wastewaters- Waste management- Hazardous Materials Management- Noise- Decommissioning
- Ambient Air Quality (2007)
NORSOK S-003 Environmental Care (2005)
OGP waste management guidelines with special focus on areas with limited infrastructure (2009)
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
6
Phase 3 RN07 main results: Recommended standards for reference, maritime
IMO MARPOL 73/78 Annexes with amendments- Annex I. Prevention of pollution by oil- Annex II. Control of pollution by noxious liquid substances- Annex III. Prevention of pollution by harmful substances in
packaged form - Annex IV. Prevention of pollution by sewage from ships- Annex V. Prevention of pollution by garbage from ships- Annex VI. Prevention of air pollution from ships
IMO Ballast water Convention
IMO Antifouling Convention
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
7
Phase 3 RN07 main results: Recommendation for new and stricter environmental standards
Development of regional Industry Standard to reflect MARPOL Special Area (SA) requirements on relevant issues for petroleum related ship traffic (oil, garbage)
Develop of regional Industry Standard for ships and offshore installations to work on lighter fuels, instead of heavy grade fuels
New standard for the reduction of burning of liquids in the proximity to ice covered areas
New standard for underwater noise from maritime vessels
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
8
Phase 3 RN07 main results:Recommendation for further harmonization in 2010
Harmonised standard for pollution detection
Harmonised standard for offshore environmental monitoring for the Barents Sea
Joint seminars of Russia and Norway on specific international issues of environmental monitoring
Waste Management – further development and harmonisation
Further work on harmonisation on chemicals management
Further harmonization on recommended discharge/emissions levels
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
9
Mandate RN07 Phase 4
Specify and propose a regional standard for regular emissions and discharges from ships and offshore units in the Barents Sea, including applying the MARPOL Special Area (SA) requirements
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
10
Barents 2020Phase 4Mandate
Approach RN07 Phase 4
Barents 2020Phase 3Report
− International reference standards− Suggested changes to existing standards− New standards
Technical frameworkDocuments (5)August – December 2010
Further technical harmonisationJanuary – May 2011
− Regular emissions to air− Regular discharges to sea− Waste management− MARPOL SA requirements− Environmental control and monitoring
Produce a regionalenvironmental industry standardby end 2011
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
11
Status of progress
Developed Technical framework documents (TFD):- Regular emissions to air- Regular discharges to sea- Environmental monitoring and control- Waste management- MARPOL Special Area issues
Purpose of the TFDs: To establish a common basis and scope for development of the environmental standard, i.e.- Present, discuss and agree on reference standards, issues, parameters,
levels and limits.
Draft TFDs developed by International/Norwegian experts mid October 2010
Translated to Russian language and distributed Commented on by Russian experts Discussed at RN07 meeting in Moscow 7 December
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
12
Regular emissions to air, examples
Soot/black carbon - Fuel quality
Sulphur contents in fuels (MARPOL; North Sea 0.1% from 2015, IFC/WB, NORSOK S-003)
NOX (MARPOL – NOx curve Tier II, IFC/WB; 25 ppm gas turbine)
nmVOC; loading operations (harmonization)
Emissions reduction technologies
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
13
Discharges to sea, examples
MARPOL Special Area requirements for petroleum associated maritime vessels:- Garbage (incl. food waste in areas with ice) ”0”, - Oil ”0”; SA has 0 discharge for slop and 15 ppm for bilge, Antarctica SA 0 also for bilge
Offshore oil & gas activities; - IFC/WB Environmental, Health, and Safety Guidelines for Offshore Oil and Gas
Development (2007) forms the basis, ”minimum standard”- S-003 Environmental care; design- Harmonise with new Russian environmental regulation (2010)
Parameters to be harmonised (e.g. natural components in PW and added chemicals), and aligned with environmental monitoring
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
14
Environmental measurement, monitoring and control
Definition clarification:
1. Monitor effluent streams (discharge to sea) and emission streams (emissions to air)
2. Monitor concentration and contaminant level in external environment (water column, seabed sediment, fish, ice)
3. Monitor biological effects (e.g. benthic fauna diversity)
1
1
22
2
2
3
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
15
Environmental measurement, monitoring and control (2)
Today different regimes in Russia and Norway, and different bodies responsible for execution of monitoring (industry, authorities):
Phase 3: “..the Russian monitoring standards are not in depth aligned with offshore conditions, and the Norwegian system needs some development to apply with the Barents Sea conditions (e.g. for ice covered areas). A harmonized system will ensure transparence in monitoring environmental performance (impacts) and facilitate transparence in data exchange and improve opportunity for joint problem solving.”
Establish harmonised list of parameters (pollutants), frequency and scope of monitoring
Establish harmonised methods for monitoring based on internationally approved standards for measurement, analyzes and reporting
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
16
Waste management, example
Basis;
Waste management hierarchy- Remove and reduce- Reuse- Recycling/recovery- Residue treatment- Dispose
Ships: MARPOL Annex V, waste management plans
Offshore oil & gas; OGP guidelines (2009), waste management plans, waste collection, segregation and storage
EU Hazardous waste classification list
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
17
Further work and milestones RN07 Phase 4
Work in dedicated (sub-)groups to develop the adequate technical level of standard per environmental task- Based on international/Norwegian standards and experiences- Harmonized and aligned with Russian standards and practices
- May 2011 expert meeting
Compile report and send it for review- September 2011 expert meeting
Finalise report and present results to the 2011 Barents 2020 conference
© Det Norske Veritas AS. All rights reserved.
Barents 2020 Phase 4 - Working group RN07
9 December 2010
18
Safeguarding life, property and the environment