![Page 1: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/1.jpg)
1
Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures
Student MeetingJose Luis Sirvent
PhD. Student07/07/2014
![Page 2: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/2.jpg)
1.Board ConceptFront-end Acquisiton Board for Secondaries (FABS)
2
POW
ER S
TAG
E
VTRX
IGLO
O2
Dev
.Kit
GPI
O H
eade
r
Power Connector
ADCADS5272
SMA
TX_P
SMA
TX_N
SMA
RX_P
SMA
RX_N
ICECALCH_1
ICEC
ALCH
_2P
ICEC
ALCH
_2N
Gen
era
IN_1
Gen
era
IN2
Single to
Differential
Single to
Differential
ICECALCH_2
Clock Conditioning
ICEC
ALCH
_1P
ICEC
ALCH
_1N
ICEC
AL I_
Bias
Circ
uits
![Page 3: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/3.jpg)
3
LHC_PIPELHC_PIPE BWS
pCVD
SCIN
TILL
ATO
RPM
T
Splitt
er
Power Adapters
2.Why we do this?Development of first prototype for proof-of-concept evaluation
![Page 4: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/4.jpg)
3. Our Resources for this board:Original ICECAL_V2 Test-Board schematics • I’ve been in contact with ICECAL’s main designers: Eduardo Picatoste & David Gascón• ICECAL is a serious candidate to our system since is the natural evolution of the Readout ASIC we´re using now in the surface.• The designers kindly provided 2 x ICECAL_V2 samples, schematics of their test board and many useful advices. (Thanks guys!)• Version 2 1 Channel, no multiplexer, no I_Bias Cirquits, no ADC Driver, no Delay line, but useful for our prototype.• Version 3 4 Channels with everything included (Smaller test board needed). Soon under evaluation.
• The task I’m carrying out: I’ll modify their test board to our needs.
• Lars also provided the schematics of his VTRX adapter module (Custom SFP-HSMC Adapter Board) https://indico.cern.ch/event/284352/
![Page 5: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/5.jpg)
5
4. A quick look at some modifications
![Page 6: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/6.jpg)
6
4. A quick look at some modifications
![Page 7: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/7.jpg)
7
4. A quick look at some modifications
![Page 8: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/8.jpg)
8
4. A quick look at some modifications
![Page 9: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/9.jpg)
9
ICECAL_CH2
ADC
2X Single to DifferentialI_Bi
as C
ircui
t
5. Routing Status so far:(A general overview)
Linear Regulators Bank
![Page 10: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/10.jpg)
10
5. Routing Status so far:(Linear regulators bank)
![Page 11: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/11.jpg)
11
5. Routing Status so far:(3d View)
![Page 12: Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1](https://reader036.vdocuments.net/reader036/viewer/2022062803/56649f135503460f94c2685c/html5/thumbnails/12.jpg)
12
Voltage Regulators: TL1963-KTT Qualified up to 1KGy by PSI for MOPOS [1,3]Analogue to Digital Converter : ADS5272 Total TID 88KGy for ATLAS, teted at IUCF / LANSCE WNR [2]Differential operationals (Gen. Inputs): THS4521 Qualified up to 1KGy by PSI for MOPOS [1,3]Readout ASIC: ICECAL_V2 RadHard developmentProgrammable Delay Lines: 3D3418 Total TID 5Krad [4]Rail-to-Rail Comparators LT1711 Not Qualified
(ICECAL Clock conditioning)
LVDS _CMOS Receiver DS90LV048A Tested with 60MeV p beam up. Qualified up to TID = 0.7KGy [6](ADC Clock Conditioning)
Bias Operationals (I_BIAS Circuit) OPA602 Tested up to 2.7KGy (Neutrons), but not qualified [5]Dual Current Source / Current Sink REF200 Not Qualified
There are some additional components to add to this list
[1] C. Deplano , J. Albertone, T. Bogey, J. L. Gonzalez, J. J. Savioz ∗ RADIATION RESISTANCE TESTING OF COMMERCIAL COMPONENTS FOR THE NEW SPS BEAM POSITION MEASUREMENT SYSTEM. CERN, Geneva, Switzerland[2] Helio TAKAI. Characterization of COTS ADC radiation properties for ATLAS LAr calorimeter readout upgrade. TWEPP13, 23-27 September 2013 [3] J.Albertone, T.Bogey, C.Delplano, J.L. Gonzalez. Logarithmic Amplifiers, ADC Drivers and Voltage Regulators: Radiation Test Report at PSI-PIF. 2013[4] J. Gu. EMU DAQ MotherBoard. ERS, CERN Nov. 2013.[5] F. J. Franco, Y. Zong, Juan Casas-Cubillos, M. A. Rodríguez-Ruiz, and J. A. Agapito. Neutron Effects on Short Circuit Currents of Op Amps and Consequences. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER 2005[6] G. Di Mattia Thesis. Test del funzionamento e della resistenza alle radiazioni dell’elettronica per il trigger di primo livello dell’esperimento ATLAS. Università degli Studi di Roma “La Sapienza”
6. Considering radiation: Components and Qualifications