BIMfrom Concept Design up to Facility
Managementsuccess story
New Giza – Neighborhoods NH04
NH07 and NH05
-
Mohamed Hashim KhaterManager, BIM Management Department ECG
Consultant ArchitectAIA International associate
Autodesk Certified, Revit and AutoCADOver 22 years’ experience in Architecture/Engineering industry
Over 12 years in BIM applications and practical experience “Revit, AutoCAD Architecture, MEP, Navisworks, Dynamo, Revit API”
Hashim graduated from Cairo University, 1997. And joined Zuhair Fayez Partnership “ZFP” for 13 Years as an architect, then Team leader, and he created
CAD and Revit Development Department for CAD and BIM automation, in 2009 he created the first BIM unit and established ZFP BIM system standards,
Then he Joined genesis Engineering Consultants “GEC” as a technical Manager and utilized his Architecture and Engineering Technical skills in integration with BIM experience and developed advanced BIM System,
In 2012 he joined ECG as a manager of Engineering software department, then he assigned as manager of BIM Management department, Now he is utilizing his experience in creating the most advanced BIM system
using API’s, Dynamo, Cloud solution, VR, and AI.
-
Topics
1. New Giza project description2. BIM uses and targets3. BIM process at Design stage4. BIM process at Construction stage5. BIM Challenges6. BIM at next stage “Facility Management”
-
1. New Giza project description
New Giza Site map Neighborhood 04
11 types211 buildings
-
NH04-Project Stakeholders• Owner and Project management
• Consultants “For Buildings”
• Architecture Consultant
• Structural and MEP Consultant
• Construction and Facility Management
• Construction Supervision
• Planning
• Suppliers “Elevators”
UBTC
SPRINT
DEVICO
MEDCOM
TALENCO
REDCON
FICC
UNIVERSAL
MODERN INTERIORS
Contractors
UBTC
SPRINT
DEVICO
MEDCOM
TALENCO
REDCON
FICC
UNIVERSAL
MODERN INTERIORS
-
Rule of thumbThe BIM Model is the source of Information
-
BIM Model Effort vs. Time
BIM
Effo
rt
Time
Cost of errors
LOD 300
LOD 100
LOD 200
LOD 350
LOD 400
LOD 500
-
2. BIM uses and targets• Modelling all “3D” Elements with the required Information “LOD 300”• Design Reviews “ Revit, Navisworks, and Dynamo”• Resolving all Coordination issues at the Design models before construction• Producing the IFC Sheets• Accurate BOQ Automatic Generation “5D”• Shop Drawings Generation from the model “LOD 350”• Construction Simulation “4D”• Record Information Modelling for Facility Management “7D”
-
3. BIM process at design stage• Paperless Process• No CAD files• Revit families with its parameters• Revit Templates including BOQ schedules• Auto Generation / Auto Formatting BOQ • Visual Validation “In-Line Review”• Interference Checks using Navisworks
-
ECG
Rev
it Sy
stem
-
Revi
t Tem
plat
es w
ith p
re-c
onfig
ured
BO
Q S
ched
ules
-
BOQ
Exp
orte
r ECG
Rev
it Ad
d-in
-
In-L
ine
Revi
ew –
Mod
el V
isual
Val
idat
ion
-
4. BIM at Construction stage• Preparing BIM Execution Plan “Prototype, and Adaptation”• Compare the IFC Model Against Shop Drawings Model “BIM 360”• Ensure extracting the PDF sheets from Revit Model “No 2D CAD Lines”• BOQ sheet from the Revit model including schedules• Coordination using Navisworks criteria• 4D Simulation for each building• Implementing the client Modifications at each type• Uploading the approved package for Site supervision Engineers
-
BIM
from
Con
sulta
nt P
oint
-of-V
iew
-
BIM
from
Con
trac
tor P
oint
-of-V
iew
-
BIM
from
QS
Surv
eyor
Poi
nt-o
f-Vie
w
-
BIM
from
Site
eng
inee
r Poi
nt-o
f-Vie
w
-
5. BIM Challenges• Paperless process• No AutoCAD• No Common Data Environment “CDE”• Each unit has different survey points• Client modifications for each unit• Most Of Contractors have no BIM Experts• Steel Reinforcement on Revit needs high Workstation configuration • AIA-BIMForum LOD include high Detailing Level• LOD 400 – Fabrication is Excluded
-
Each type has its own level and infrastructure utilities
Clients Modifications Implementation
-
BIM Violation Samples
Client Modifications
Changing in Substructure
Using Detail lines instead of Model Elements
Using AutoCAD for sheet representation and Revit for Modeling
-
SUCCESS WORKSHOP DRAWINGS SHEETS SUBMITTAL
-
6. BIM at Next Stage “Facility Management”• Preparing Asset Information Requirements “AIR”
• Parameters• Attachments “Warranty, Certificates, Operation Manuals, Technical Data,….”
• Hiring FM Software• LOD 500 preparation• Preparing the validation Criteria of “Record Models approvals”• Apply modifications for each unit
-
6. BIM at FM stage
BIM
at F
M st
age
-
Facility Management data
-
Conclusion and Recommendations
•BIM + Management is the success key•Utilize BIM as much as you can•Start BIM - End BIM
-
Please scan this QR Code
to watch or download this Presentation
Mohamed Hashim Khater [email protected]
01229781812
mailto:[email protected]
BIM� from Concept Design up to Facility Management �success storySlide Number 2Topics1.New Giza project description�NH04-Project StakeholdersRule of thumb�The BIM Model is the source of InformationBIM Model �Effort vs. Time2.BIM uses and targets3.BIM process at design stageECG Revit SystemRevit Templates with pre-configured BOQ SchedulesBOQ Exporter ECG Revit Add-inSlide Number 134.BIM at Construction stageBIM from Consultant Point-of-ViewBIM from Contractor Point-of-ViewBIM from QS Surveyor Point-of-ViewBIM from Site engineer Point-of-View5.BIM ChallengesEach type has its own level and infrastructure utilitiesBIM Violation SamplesSlide Number 226.BIM at Next Stage “Facility Management”6.BIM at FM stageSlide Number 25Conclusion and RecommendationsSlide Number 27