Construction QC/QA Acceptance 1
Quality control/quality assurance
Acceptance
Senior/GraduateHMA Course
![Page 2: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/2.jpg)
Construction QC/QA Acceptance 2
What you will learn….
• The acceptance and compliance procedures used for hot mix asphalt
![Page 3: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/3.jpg)
Construction QC/QA Acceptance 3
ACCEPTANCE AND COMPLIANCE
Did We Get What We Ordered?
![Page 4: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/4.jpg)
Construction QC/QA Acceptance 4
How do we set the spec limits
• They are set using typical industry standard deviations
• Then allowing three standard deviations from the target
• When setting the limits – the number of tests to be included in the lot are considered
• The more tests – the tighter the specification
![Page 5: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/5.jpg)
Construction QC/QA Acceptance 5
Typical Industry Standard Deviations
• Based on extraction• Asphalt binder content: + 0.25 %• % Passing 4.75 mm (No. 4) and larger
sieves: + 3 %• % Passing 2.36 (No 8) to .150 mm (No 100)
sieves: + 2 % • Passing the 0.075 mm (No 200) sieve: + 0.7
%
![Page 6: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/6.jpg)
Construction QC/QA Acceptance 6
Typical Industry Standard Deviations (cont.)
• Compacted mix
• Air voids: + 1.0 %
• Voids in Mineral Aggregate (VMA): + 1.5 %
• Voids filled with asphalt (VFA): + 5 %
![Page 7: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/7.jpg)
Construction QC/QA Acceptance 7
Equation
• The following equation is used to set limits.
• S(n) = s / n ½
• Where– S(n) = standard deviation based on
sample size n– S = standard deviation for material– n = sample size
![Page 8: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/8.jpg)
Construction QC/QA Acceptance 8
Example
• Thus for asphalt binder content where 4 samples will make up the lot size the spec limits would be:
• S = 0.25 and n = 4• S(n) = 0.25 / square root (4)• S(n) = 0.125• For three standard deviations the spec limits would
be plus/minus 0.375 %.
![Page 9: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/9.jpg)
Construction QC/QA Acceptance 9
Percent Within Limits
![Page 10: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/10.jpg)
Construction QC/QA Acceptance 10
PWL Concept
% AC
PWL
PU
PL
USL
LSL
PWL = (PU + PL) - 100
In Terms of Area of the Distribution
![Page 11: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/11.jpg)
Construction QC/QA Acceptance 11
Percent Within Limits
Lot X s PWL
1 5.0 0.20 96
2 5.0 0.40 68
Target Value 5.0
Limits ± 0.4
Lot 1
Lot 2
Asphalt Binder Content4.2 4.6 5.0 5.4 5.8
Upper limit
Lower limit
target
Spec Data
![Page 12: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/12.jpg)
Construction QC/QA Acceptance 12
Percent Within Limits
Lot X s PWL
1 5.0 0.20 96
2 4.8 0.20 84
Lot 1Lot 2
Asphalt Binder Content4.2 4.6 5.0 5.4 5.8
Target Value 5.0
Limits ± 0.4 target
Upper limitsLower limit
![Page 13: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/13.jpg)
Construction QC/QA Acceptance 13
PWL Approach
To get 100 % pay you need to pay attention to
both accuracy and precision
![Page 14: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/14.jpg)
Construction QC/QA Acceptance 14
Steps
• Sample the material using an appropriate random number system
• Determine the average for the lot• Determine the standard deviation “s” for each lot• For Air voids, VMA and binder content calculate the
upper and lower quality indices and the associated PWL
• For in-place density, calculate the lower quality index and associated PWL
![Page 15: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/15.jpg)
Construction QC/QA Acceptance 15
Percent Within Limits Using Standard Deviation
![Page 16: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/16.jpg)
EXERCISE
Calculation of
PWL and PD
![Page 17: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/17.jpg)
Construction QC/QA Acceptance 17
Equations
Q(u) =
Q(L) =
USL - x
x - LSL s
s
-
-
![Page 18: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/18.jpg)
1. Determine Random Sample Location Within Lot
2. Make Measurements at Locations or on Material Samples
3. Determine Average of Samples:
4. Determine Standard Deviation of Samples:
Acceptance Plan:Percent Within Limits (PWL) Approach
x = xi
nn
i=1
s = (xi - x)2
n-1ni=1
![Page 19: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/19.jpg)
Acceptance Plan:Percent Within Limits (PWL) Approach
5. Determine Upper Quality Index, Qu:
6. Determine Lower Quality Index, QL:
7. Estimate PU and PL From Table Using Calculated QU and QL
8. Total Percent Within Limits = (PU + PL) - 100
QL = (x - L)
s
QU = (U - x)
s
![Page 20: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/20.jpg)
Construction QC/QA Acceptance 20
Example Problem
• Percent passing 0.075 sieve– Test 1 : 4.1– Test 2: 4.5– Test 3: 4.8– Test 4: 5.0– Test 5: 5.1
• Specification Target: 5.0 %• Allowable tolerance: See next slide
![Page 21: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/21.jpg)
Construction QC/QA Acceptance 21
Set Spec Limits
• The typical standard deviation from industry is 0.7 %; therefore:– S = 0.7 and n = 5– S(n) = 0.7 / square root (5)– S(n) = 0.7/2.236 = 0.313
• For three standard deviations the spec limits would be + 0.94 %.
• Therefore:– Upper spec limit = 5.94 %– Lower spec limit = 4.06 %
![Page 22: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/22.jpg)
Construction QC/QA Acceptance 22
Compute values
• The average is: – 4.72 %
• Standard deviation for data is:– 0.43
![Page 23: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/23.jpg)
Construction QC/QA Acceptance 23
Compute QU
Q(u) = USL - x s
-
Q(u) =
Q(u) = 2.83
5.94 - 4.72 0.43
P(u) = > 1.00
![Page 24: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/24.jpg)
Construction QC/QA Acceptance 24
Compute QL
Q(L) =
Q(L) =
x - LSL
4.72 - 4.06 0.43
s
-
Q(L) = 1.53
P(L) = 0.97
![Page 25: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/25.jpg)
Construction QC/QA Acceptance 25
Percent Within Limits Using
Conformal Index
![Page 26: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/26.jpg)
Construction QC/QA Acceptance 26
Equations
Q(u) =
Q(L) =
USL - x
x - LSL
CI
CI
-
-
![Page 27: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/27.jpg)
1. Determine Random Sample Location Within Lot
2. Make Measurements at Locations or on Material Samples
3. Determine Average of Samples:
4. Determine Standard Deviation of Samples:
Acceptance Plan:Percent Within Limits (PWL) Approach
x = xi
nn
i=1
Sci = (xi – spec requirement)2
n-1ni=1
![Page 28: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/28.jpg)
Acceptance Plan:Percent Within Limits (PWL) Approach
5. Determine Upper Quality Index, Qu:
6. Determine Lower Quality Index, QL:
7. Estimate PU and PL From Table Using Calculated QU and QL
8. Total Percent Within Limits = (PU + PL) - 100
QL = (x - L)
S ci
QU = (U - x)
S ci
![Page 29: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/29.jpg)
Construction QC/QA Acceptance 29
Example Problem
• Percent passing 0.075 sieve– Test 1 : 4.1– Test 2: 4.5– Test 3: 4.8– Test 4: 5.0– Test 5: 5.1
• Specification Target: 5.0 %• Allowable tolerance: See next slide
![Page 30: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/30.jpg)
Construction QC/QA Acceptance 30
Set Spec Limits
• The typical standard deviation from industry is 0.7 %; therefore:– S = 0.7 and n = 5– S(n) = 0.7 / square root (5)– S(n) = 0.7/2.236 = 0.313
• For three standard deviations the spec limits would be + 0.94 %.
• Therefore:– Upper spec limit = 5.94 %– Lower spec limit = 4.06 %
![Page 31: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/31.jpg)
Construction QC/QA Acceptance 31
Compute values
• The average is: – 4.72 %
• Conformal Index for data is:– 0.533
![Page 32: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/32.jpg)
Construction QC/QA Acceptance 32
Compute QU
Q(u) = USL - x Sci
-
Q(u) =
Q(u) = 2.30
5.94 - 4.72 0.53
P(u) = > 1.00
![Page 33: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/33.jpg)
Construction QC/QA Acceptance 33
Compute QL
Q(L) =
Q(L) =
x - LSL
4.72 - 4.06 0.53
s
-
Q(L) = 1.24
P(L) = 0.90
![Page 34: Block 26 Acceptance 13](https://reader036.vdocuments.net/reader036/viewer/2022062419/558e46d61a28ab5d268b46c6/html5/thumbnails/34.jpg)
Construction QC/QA Acceptance 34
Questions?