Transcript
Page 1: Brand New Small Bay Industrial...Associate 403 571 8766 cole.westersund@colliers.com EVAN TRUMAN Vice President | Partner 403 215 7252 evan.truman@colliers.com MICHAEL MASSING Vice

Stoney Trail SE

106th Ave SE

VIEW ONLINE

Specifications

Accelerating success.

AERIAL VIEW

$14.00 PSF NET

(±25% Office Build Out Included)

*Lease rate to vary depending on size.

Starting from:

collierscanada.com/23749

Brand New Small Bay Industrial FOR LEASE | 7307 - 106th Avenue SE | Calgary | AB

Point Trotter sub-division is a new comprehensively planned 292-acre fully serviced industrial park, strategically located close to Stoney Trail making it easily accessible from any part of the city. This is a great opportunity to lease brand new “A” class industrial space with tenant fixturing starting spring 2019.

COLE WESTERSUNDAssociate 403 571 [email protected]

EVAN TRUMANVice President | Partner403 215 [email protected]

MICHAEL MASSINGVice President403 298 [email protected]

PATRICK SAILERSenior Associate 403 538 [email protected]

District Point Trotter Industrial Park

Zoning I-G (Industrial General)

Construction Type Precast Concrete

Available Area 3,200 - 22,655 square feet

Loading One (1) - 12’w x 14’h Drive-in door per bay

Ceiling Height 22’ clear

Sprinklered ESFR

Lighting LED

Sumps Yes (25 ft to underside of deck)

Power 100 Amps, 600 Volts, 120/208 (TBV)

Operating Costs TBD

Delivery Spring 2019 for tenant fixturing

Page 2: Brand New Small Bay Industrial...Associate 403 571 8766 cole.westersund@colliers.com EVAN TRUMAN Vice President | Partner 403 215 7252 evan.truman@colliers.com MICHAEL MASSING Vice

Accelerating success.

FOR LEASE 7307 - 106TH AVENUE SE

SITE PLAN - PHASE I & PHASE I I

collierscanada.com/23749

VIEW ONLINE

Contact us:

N

Phase I

Phase II

100’

30’

120’

32’

COLE WESTERSUNDAssociate 403 571 [email protected]

EVAN TRUMANVice President | Partner403 215 [email protected]

MICHAEL MASSINGVice President403 298 [email protected]

PATRICK SAILERSenior Associate 403 538 [email protected]

Page 3: Brand New Small Bay Industrial...Associate 403 571 8766 cole.westersund@colliers.com EVAN TRUMAN Vice President | Partner 403 215 7252 evan.truman@colliers.com MICHAEL MASSING Vice

VIEW ONLINE

Accelerating success.

collierscanada.com/23749

Contact us:

CLOCKWISE FROM TOP: East View: Building 1 and 2 // West View: Loading

COLE WESTERSUNDAssociate 403 571 [email protected]

EVAN TRUMANVice President | Partner403 215 [email protected]

MICHAEL MASSINGVice President403 298 [email protected]

PATRICK SAILERSenior Associate 403 538 [email protected]

Page 4: Brand New Small Bay Industrial...Associate 403 571 8766 cole.westersund@colliers.com EVAN TRUMAN Vice President | Partner 403 215 7252 evan.truman@colliers.com MICHAEL MASSING Vice

Accelerating success.

Contact us:

Stoney Trail SE

52 St SE

Glenmore Trail

Barlow Trail SE

114 Ave SE

Glenmore Trail

Deerfoot Trail

Downtown Calgary

68 St SE

Glenmore Trail and 68th Street upgrade (including bridge) to be complete by 2019.

POINT TROTTER INDUSTRIAL PARK

Deer

foot

Tra

il

Peigan Trail

Stoney Trail SE

COLE WESTERSUNDAssociate 403 571 [email protected]

EVAN TRUMANVice President | Partner403 215 [email protected]

MICHAEL MASSINGVice President403 298 [email protected]

PATRICK SAILERSenior Associate 403 538 [email protected]


Top Related