Download - Brochure Update2
COMPANY PROFILE
WINTECO CORPORATION
Tank Service World www.winteco.com
C. I. E Solution for Storage TankComputer
Integrated Engineering
1.1. GeneralsGenerals2.2. Business Item Business Item 3.3. Engineering CapabilitiesEngineering Capabilities4.4. Features and KnowFeatures and Know--How How 5.5. Company OrganizationCompany Organization6.6. Fabrication ShopFabrication Shop7.7. ConstructionConstruction8.8. CertificatesCertificates9.9. Major PerformancesMajor Performances
INDEXINDEX
1. GENERALS
Co.Name
C. E. O Chang-Jae. Oh
Set-Up March 15, 2002
Regist.No. 127-81-72749
Turnover 50-Million USD (In 2009)
AddressBaeksang Star Tower #1301, 60-17 Gasan-Dong, Geumchon-Ku, Seoul, Korea,153-801TEL: 82-2-6111-7600~60, FAX: 82-2-6111-7670
BusinessEngineering for Storage Tank
E.P.C for Storage Tank, / Trading
WINTECO CORPORATION
2001.12 : Selected as T.B.I Business Partner of Government
2002.03 : Company Establishment
2002.06 : Development of C.I.E Solution for Storage Tank
2002.11 : First Contract of Eng’g for Refrigerated LPG Storage Tank
2003.04 : Registration for Patent of C.I.E Solution for Storage Tank
2004.10 : Acquisition of Certificate for Venture Company from Government
2005.01 : Acquisition of ISO 9001
2005.03 : Tehran Branch Office Open
2007.10 : Establishment of PT. Winteco Indonesia in Indonesia
2008.02 : Establishment of Winteco Premier in Saudi Arabia
2009.08 : Completion of DangJin Fabrication Shop
2010.03 : Establishment of Winteco LLC, Oman
2010.05 : Acquisition of ASME “U” “U2” “S” Certificate
ENGINEERINGCalculations: Strength Calculation, BOG Calculation,
Calculation for PSV and Accessories, FEM Analysis and Seismic Analysis Stability Check, Anchoring & Loading Data Calculation
Documentations: Procedures and Specifications
Drawing: Detail Fabrication Drawings and Shop Drawings
ON-LINE SERVICEProvide Engineering Service over Internet Platform between Client side and Server side located in Company
EPC SERVICEEPC (Engineering, Procurement, Fabrication & Construction) Work And Supervising for Domestic and Overseas Project
2. BUSINESS ITEM STORAGE TANKS
CONE/DOME ROOF TANKTYPETruss Support Type, Column Support TypeRafter and Girder Support Type
Self Support Type
PRODUCTHeavy Oil, Kerosene, Diesel OilWater, Volatile product etc.
FLOATING ROOF TANKTYPESingle Deck TypeDouble Deck Type
PRODUCTNaphtha, Gasoline, Crude OilCondensate, etc
TYPEWatermelon TypeFootball TypePartial Football Type
PRODUCTLPG, City Gas, Ethylene, Propylene with High Pressure
SPHERICAL TANK
CRYOGENIC TANKTYPESingle ContainmentDouble Containment Full Containment
PRODUCTLPG, Ethylene, Propylene, LNGwith Low Temperature
APPLICABLE CODE
● CRT / DRT : API 650, API 620
● FRT : API 650
● SPHERICAL TANK : ASME SEC.Ⅷ DIV.Ⅰ, DIV.Ⅱ
● CRYOGENIC / LNG TANK : API 620 “Q”, “R”, EN14620
3. ENGINEERING CAPABILITIES
COMPUTOR INTEGRATED ENGINEERINGPROGRAM RUNDATA INPUT
CALCULATIONDRAWING
Engineering Center
CONSTRUCTIONSITE
GLOBAL PARTNERS
FAB.SHOP
ClientsClients
WIN-TECOWIN-TECO
CADCAD
ACC’YACC’Y
DESIGNDESIGNINTRANET
server
•Fab.DWG.•Shop DWG.
•Piping Design•E & I Design
•Stress Analysis•Stability Check
FTP / WEB
FTP / WEB FTP / WEB FTP / WEB
ENGINEERING NETWORK
• Softwares- Tank Master 2.0 _ Computer Integrated Engineering Solution - ANSYS 8.0- STAAD.PRO, PVE5 4.005
• Upgraded Optimum Engineering Program for Storage Tank(FEM Analysis, Seismic Analysis and Updated items)
• Available Version-Up for Program at anytime by owned
Source and Original Technology
• Available Rapid Response and Practice for applied Codes
• Secure for Advanced Technology & Data
• Powerful and Rapid Engineering by On-Line Network System
4. FEATURES & KNOW-HOW
MARKETINGMARKETING ENGINEERINGENGINEERING
5. COMPANY ORGANIZATION
DESIGNDESIGN
CONSTRUCT’NCONSTRUCT’N
PROJECTMANAGEM’T
PROJECTMANAGEM’T
PRESIDENTPRESIDENT
DRAWINGDRAWINGMATERIALPROCUREMENT
MATERIALPROCUREMENT
PROJECTCONTROLPROJECTCONTROL
FABRICATIONFABRICATION
Department Staffs
Marketing
PJT Manag’t,QA/QC
Engineering
Fabrication & Construction *( )
Total
QA/QCQA/QC
* ( ) means TEMPORARY WORKING MANPOWER
IRAN BRANCH OFFICE
IRAN BRANCH OFFICE
PT. WINTECO INDONESIA
PT. WINTECO INDONESIA
WINTECO-PREMIER SAUDI
WINTECO-PREMIER SAUDI
FABRICATION SHOP (DANGJIN FACTORY)FABRICATION SHOP (DANGJIN FACTORY)
WINTECO LLC - OMAN
WINTECO LLC - OMAN
WINTECO - ABU DHABIWINTECO
- ABU DHABI
WINTECO - VIETNAMWINTECO - VIETNAM
6. FABRICATION SHOP
Location:
408-40, Hanjin-Ri, Songak-Myun, Dangjin-Gun, Chung-Nam, Korea
Total Area : 16,500 M2
Shop Area : 4,200 M2
OVERVIEW
3,000TON PRESS
30TON EOC
MATERIA
L
STO
CK
ACCESSORIES FAB
MARKINGCUTTING
GRINDING
30TON EOC
15TON EOC
BEN
DIN
G
RO
LLER
30TON GANTRY
30TON GANTRY
75,500 25,500
STORAGE TANK FAB
30TON EOC
20TON EOC
EQUIPMENT CAPACITY QTY EQUIPMENT CAPACITY QTY
HYDRAULIC PRESS 3,000 TON 1 BENDING ROLLER 45T x 3.5M 1
CUTTING POSITIONER 20 TON 3 E.O.C 30/20/15 TON 4
GAS CUTTING MACHINE 4 TORCH 6 GANTRY 30TON 3
AIR/ GAS PLASMA CUTTING M/C 150A/ 250A 4 ARC,TIG, CO2 WELDING M/C 600A/ 1000A 15
“A” Shop“A” Shop “B” Shop“B” Shop
LAYOUT
3,000TON PRESS MACHINE
BENDING ROLLER (45T X 3500W)
MAJOR FACILITIES
7. CONSTRUCTION
WELD SEAM PROCESS MATERIAL
HORIZONTAL (AGW) SAW A283-C, A285-C, A36A516-60, A516-70, A573-70
A537-CL1, A537-CL2VERTICAL (AVW) EGW
BOTTOM , CORNER (LT-7) SAW
AUTOMATIC WELDING
AIR-RAISING ARRANGEMENT
BLOWER TEMP. SEAL A FRAME
AIR-RAISING UNDER PROCESSREADY FOR ROOF AIR-RAISING COMPLETION OF ROOF AIR-RAISING
ROOF AIR-RAISING
EQUIPM’TS & TOOL SPECIFICATION Q’TY REMARKS
GENERATOR 125KVA ~ 500KVA 38
AIR COMPRESSOR 400CFM ~ 750CFM 18
AUTO. WELDING M/C AGW (100Kw), AVW(80Kw), LT-7 16/8/24
WELDING MACHINE AC 600A, AC 400A, DC 600A 350
GOUSING MACHINE DC 1200A, DC1300A 45
DRY OVEN 200KG, 300KG, 350KG, 500KG 20
HYDROLIC JACK 10TON, 50TON 32
CHAIN & LEVER BLOCK 2TON, 3TON, 5TON 120
HYDRO PUMP 150M3/HR, 250M3/HR 8 FOR HYDROTEST
BLOWER 370M3/MIN 12 FOR AIR-RAISING
CUTTING MACHINE YK-150, YK-300 26 AUTOMATIC
GRINDER ELECTRIC (9” 4”) 550
JIG, SCAFOLDING, ETC KEY PLATE, BULL PIN, BRACKET, WIRE, LIFING D/V, CRAMP, ETC
CONSTRUCTION EQUIPMENT & TOOL LIST
8. CERTIFICATES
9. MAJOR PERFORMANCESPJT NAME CLIENT TYPE Q’TY WT
(TON)SCOPE YEAR
SONGKHLA GSP #1, THAI SAMSUNG ENG’G SPT 6 1,750 EPC 2004
PPC LPG TANK, IRAN RADIRA DW 2 4,250 C 2005
LAVAN LPG PROJECT, IRAN CHAGALESH SPT 6 2,560 EPC 2006
IBN ZAHR PP-III, SAUDI DAELIM/ DOOSAN SPT/DRT 4 750 E, C 2006
ARAK REFINERY PJT, IRAN SAZEH SPT 13 5,300 EPC 2007
MA’ADEN AMMONIA, SAUDI SAMSUNG ENG’G DW 2 3,300 EPC 2008
ESFAHAN REFINERY, IRAN MAPNA SPT 19 8,580 EPC 2008
KAYAN AMINE, SAUDI KAYAN CRT 23 1,200 EPC 2008
ASU PROJECT, SAUDI SAMSUNG ENG’G DW 4 1,100 EPC 2009
LAMPUNG PJT, INDONESIA PERTAMINA SPT 2 1,300 EPC 2010
LPG TERMINAL PJT, OMAN ORPC/ DEC SPT/CRT 3 1,100 EPC 2010