SCOPE OF WORKS BUDGET: R 3M
Tree, bed & Lawn Planting Consultant: Uys and White LA
Play equipment with rubberized matting Contractor: Top Turf
Paved Pathways Status: Complete
Fencing Site Handover Date: 1 November 2010
Irrigation system Practical Completion: 16February 2011
Seating walls and bins Final Completion Date: 18 April 2011
Park furniture and feature poles
Water feature and Synthetic grass soccer field
-
8/6/2019 Capex Tour July2011
3/59
-
8/6/2019 Capex Tour July2011
4/59
-
8/6/2019 Capex Tour July2011
5/59
-
8/6/2019 Capex Tour July2011
6/59
-
8/6/2019 Capex Tour July2011
7/59
SCOPE OF WORKS BUDGET: R 3M
Pathways Consultant: KHLA
Trees Contractor: Servest
Ablution building Status: Maintenance Phase
Play equipment, Sand soccer area. Site Handover Date: 03 March 2011
Irrigation Practical Completion: 30 May 2011
Planting Final Completion Date: 23.June 2011
Furniture and artworks.
-
8/6/2019 Capex Tour July2011
8/59
-
8/6/2019 Capex Tour July2011
9/59
-
8/6/2019 Capex Tour July2011
10/59
-
8/6/2019 Capex Tour July2011
11/59
-
8/6/2019 Capex Tour July2011
12/59
SCOPE BUDGET: R 5,1M
Construction of 2.1km road Consultant: GMH Consulting Engineers
Construction of 500m storm-water drainage withHyson cells
Contractor: Maju Mafani Construction
Construction of paved area near the ablution Status: Complete
Construction of security structure Site Handover Date: 13 August 2010
Landscaping of entrance Practical Completion: 12 January 2011
Final Completion Date: 28th January 2011
-
8/6/2019 Capex Tour July2011
13/59
-
8/6/2019 Capex Tour July2011
14/59
-
8/6/2019 Capex Tour July2011
15/59
-
8/6/2019 Capex Tour July2011
16/59
-
8/6/2019 Capex Tour July2011
17/59
SCOPE BUDGET: R 3M
Ablution facilities Green roof Consultant: Blueprint
Tree & Lawn Planting Contractor: N and H /Tswelopele JV
Playground Equipment with Ruberized matting Status: Complete
Irrigation System, Gabion basket planters and seating Site Handover Date: 14 October 2010
Laser cut Fencing, Solar lights and solar pathway lights Practical Completion: 28 February 2011
Paved Pathway & Parking Maintenance Completion Date: 31 August 2011
Soccer Field
Multi Purpose Court
-
8/6/2019 Capex Tour July2011
18/59
-
8/6/2019 Capex Tour July2011
19/59
-
8/6/2019 Capex Tour July2011
20/59
-
8/6/2019 Capex Tour July2011
21/59
-
8/6/2019 Capex Tour July2011
22/59
SCOPE OF WORKS BUDGET = R2M
Linear Park Development Consultant: Consortium -NLA
Paving with header course Contractor: Consortium Countryline
Play mounds and designed play features Status: Complete
Manual irrigation System Site Handover Date: 26th October 2010
Street Furniture Practical Completion: 21 December 2010
Hydro Seed along wetland Maintenance Completion Date: 20th January 2011
Tree & Lawn Planting
Flower beds
-
8/6/2019 Capex Tour July2011
23/59
-
8/6/2019 Capex Tour July2011
24/59
-
8/6/2019 Capex Tour July2011
25/59
-
8/6/2019 Capex Tour July2011
26/59
-
8/6/2019 Capex Tour July2011
27/59
SCOPE OF WORKS BUDGET: R 5,9M
Multipurpose Court Consultant: Petra Scapes
Change Rooms and ablution block Contractor: Uhuru construction
Rubberized Running Track Status: Construction phase
Irrigation System and drainage around track Site Handover Date: 08 October 2010
Lighting Practical Completion: 04 February 2011
Soccer field Final Completion Date: March 2011
-
8/6/2019 Capex Tour July2011
28/59
-
8/6/2019 Capex Tour July2011
29/59
-
8/6/2019 Capex Tour July2011
30/59
-
8/6/2019 Capex Tour July2011
31/59
-
8/6/2019 Capex Tour July2011
32/59
SCOPE BUDGET: R 1,331M
Site Clearance & Rubble removal Consultant: Insite
Top Soil Contractor: Classic Gardens
Cut to fill material Status: Complete
Import Fill Material Site Handover Date: 17 Sept 2011
Scarifying & Fine Grading Practical Completion: June 2011
Electrical Sleeving Maintenance Phase August 2011
Turf Valve System
Tree Planting
Grass Planting
Play Equipment
Boundary Bollards
Signage
Bins
-
8/6/2019 Capex Tour July2011
33/59
-
8/6/2019 Capex Tour July2011
34/59
-
8/6/2019 Capex Tour July2011
35/59
-
8/6/2019 Capex Tour July2011
36/59
-
8/6/2019 Capex Tour July2011
37/59
SCOPE BUDGET: R 2,851 M
Site Clearance & Rubble removal Consultant: Insite
Top Soil for flowerbed area Contractor: Classic Gardens
Planting of bed Status: CompleteTrees Site Handover Date: 17 Sept 2011
Scarifying & Fine Grading Practical Completion: 24 February 2011
Paving
Electrical Sleeving
Turf Valve System
Braai stands
5-a side Soccer
Parking Bays
Boundary Fence
Gate Boulards
Feature Artwork
Signage
Bins
-
8/6/2019 Capex Tour July2011
38/59
-
8/6/2019 Capex Tour July2011
39/59
-
8/6/2019 Capex Tour July2011
40/59
-
8/6/2019 Capex Tour July2011
41/59
-
8/6/2019 Capex Tour July2011
42/59
SCOPE BUDGET: R 1,318 M
Site Clearance, Tree & Lawn planting Consultant: Insite
Walkway & Parking bays paving Contractor: Classic Gardens
Rubbish Bins Status: Construction phase
Concrete Bollards& Benches Site Handover Date: 3 March 2011
Braai Units Practical Completion: 06 May 2011
Feature artwork
Fencing
Play Equipment & Multipurpose Court
-
8/6/2019 Capex Tour July2011
43/59
-
8/6/2019 Capex Tour July2011
44/59
-
8/6/2019 Capex Tour July2011
45/59
-
8/6/2019 Capex Tour July2011
46/59
-
8/6/2019 Capex Tour July2011
47/59
SCOPE OF WORKS BUDGET: R 3M
Tree & Lawn Planting Consultant: Marian Louw
Play equipment with rubberized matting Contractor: Amaluba
Paved Pathways and Park entrance structures Status: Construction
Fencing Site Handover Date: 22 /02/2011
Irrigation system Completion Date: 20/04/2011
Seating walls
Park furniture
Water feature
Drinking fountain
Tar surface basketball court
Benches and braai areas
Ablution
-
8/6/2019 Capex Tour July2011
48/59
-
8/6/2019 Capex Tour July2011
49/59
-
8/6/2019 Capex Tour July2011
50/59
-
8/6/2019 Capex Tour July2011
51/59
-
8/6/2019 Capex Tour July2011
52/59
SCOPE BUDGET: R 2,200 M
Earthworks & Soil improvement Site handover 20 May 2011
Trees supplied by Huddle Park Construction start 20 May 2011
Trees supplied by contractor Construction complete 21 June 201120 litre trees
Extra large trees
Specimen plants, shrubs & groundcover planting
Kikuyu Lawn
Paved Pathways
Kerbs for walkways & soccer field
Entrance feature gabion columns
Seating walls with indigenous games panels
Paving around plays areas (2)
Gabion seating walls with coping
Walls for murals & blackboard
Recycling centre
Paving for Indaba Tree Place
Recycling centre
-
8/6/2019 Capex Tour July2011
53/59
-
8/6/2019 Capex Tour July2011
54/59
-
8/6/2019 Capex Tour July2011
55/59
-
8/6/2019 Capex Tour July2011
56/59
-
8/6/2019 Capex Tour July2011
57/59
SCOPE BUDGET: R 1 007M
Forming of Berms
Grass PlantingConsultants name: Insite Landscape Architects
Lawn seeding Contractor: Bergland GardensTree Planting Status: Construction phase 90%
Construction of a safety net area Site handover date: June 2011
Irrigation System Practical Completion date: 15 July 2011
Final Completion date: 30 July 2011
-