Download - Cargo Operation Management Team
The 8th COSCAP-NARAST
Cargo Operation Management Team
Korean Air Cargo
Cargo Loading Training & SOPs
Cargo Loading Training & SOPs
SEP 10, 2008
The 8th COSCAP-NARAST
ContentsContents
Build-up
Load Planning
Loading & Unloading Procedures
Safety Reinforcement for HEA & OHG
Special Cargo Transportation Case
The 8th COSCAP-NARAST
Build-up ProceduresBuild-up Procedures
Each stage performed according to Safety Regulations Each stage performed according to Safety Regulations
Laying a pallet on a work station
Lading cargo as a build-up plan
Covering a plastic sheet & Netting
Final Check & Weighing
The 8th COSCAP-NARAST
Load Planning Procedures (1)Load Planning Procedures (1)
Build-up Status Transimtted to Load Control System Build-up Status Transimtted to Load Control System
ULD NBR
Gross WT
Contour
SPCL Code
Web-based Integrated New Load System : WinLoads
The 8th COSCAP-NARAST
Ideal Load Planning for Safety Ideal Load Planning for Safety
Load Planning Procedures (2)Load Planning Procedures (2)
The 8th COSCAP-NARAST
All the calcuations automatically done & finally verified All the calcuations automatically done & finally verified Flight Basic Information and W&B Status displayed in real-time
Balance Grid displayed LITOW
MACTOW
LIZFW
MACTOW
Load Planning Procedures (3)Load Planning Procedures (3)
The 8th COSCAP-NARAST
Loading & Unloading according to Final Load Planning Loading & Unloading according to Final Load Planning
Loading & Unloading ProceduresLoading & Unloading Procedures
Ideal C.G. Suitable Handling for Special Cargo
The 8th COSCAP-NARAST
Preliminary Authorization System Preliminary Authorization System
Safety Reinforcement for HEA & OHG (1)Safety Reinforcement for HEA & OHG (1)
Cargoes weighing over 11,300kg or
measuring 7m in length or over among weighing over 1,500kg
must be authorized to transport in advance.
Loading possibility must be
checked : Structural Load Limitation, Contour Restriction
and handled according to safety instructions : Shoring, Tie-down & Lashing.
The 8th COSCAP-NARAST
Changing BTUs to Caster Type for New Freighters Changing BTUs to Caster Type for New Freighters All of the new type freighters are equipped with BTUs (Ball Transfer Units).
Safety Reinforcement for HEA & OHG (2)Safety Reinforcement for HEA & OHG (2)
Swivel Caster
BTU
Due to structural weakness of BTUs, those located near Nose Cargo Door
are being changed to Swivel Casters.
It is expected that A/C floor parts damage will be remarkably decreased.
The 8th COSCAP-NARAST
40ton Heavy Cargo from ICN to JFK 40ton Heavy Cargo from ICN to JFK
Special Cargo Transportation Case (1)Special Cargo Transportation Case (1)
The 8th COSCAP-NARAST
18.5m Extra-sized Cargo from SIN to FRA18.5m Extra-sized Cargo from SIN to FRA
Special Cargo Transportation Case (2)Special Cargo Transportation Case (2)
The 8th COSCAP-NARAST
Thank you for your attention
Thank you for your attention
[email protected]@koreanair.com