Case Study – Preparation of an EMP
Integrated Ecosystem Management of
Sunshine-Moon River Basin (SMRB) Project
![Page 2: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/2.jpg)
![Page 3: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/3.jpg)
Project Location
Mushroom Sea
Country B
Country A
Sunshine River
Moon RiverCountr
y X
Country Y
Red Nature ReserveRAMSAR siteMouth of
SunshineRiver
HPP HPP
Earth Town
Flower Town
![Page 4: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/4.jpg)
Environmental Issues
Surface and ground waters pollution due to untreated industrial and municipal wastewaters discharged directly into reservoirs/rivers;
Environmental degradation (eutrophication, habitat loss, erosion) of coastal habitats, inland surface waters and marshes;
Salt water intrusion in Sunshine Delta due to long term agricultural practices (irrigation)
![Page 5: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/5.jpg)
Project Environmental Goals
Reduction of water nutrients and other water pollution from municipal and industrial sources in selected municipalities in the Basin;
Restoring and maintaining of coastal wetland ecosystem in Sunshine River through improved flood management, conservation of wetland sites and restoration of river banks;
Reduction of salt water intrusion through a
pilot scheme implemented in Sunshine river
![Page 6: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/6.jpg)
Project Activities with possible Environmental Impacts
Component 2 – Improved management and use of wetlands eco-systems and biodiversity
Improvements in sites, services and management tools in Red Nature Reserve Ramsar site (Country A) and in two protected areas (Country B);
Restoration and improvement of small scale water existing infrastructure to maintain water flows, address the problems of saltwater intrusion, flood management and erosion (e.g., rehabilitation of river gates, wooden irrigation wheels, restoration of river banks) ;
Enhancement of HPPs and dams operational capacities to maintain environmental flow requirements and control flood management (e.g., dam safety monitoring equipment)
![Page 7: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/7.jpg)
Project Activities with possible Environmental Impacts – cont’dComponent 3 - High priority investments in water pollution control with low cost, appropriate wastewater technology improvements
1. Rehabilitation and upgrading of wastewater treatment systems in 3 municipalities in Country A and 2 in Country B including fixing leaking wastewater collection system and additional treatment infrastructure for reduction of nutrients (e.g., improvement of primary treatment and installation of small design for biological process);
2. Upgrading the industrial wastewater treatment system at a metallurgical factory in the Flower Town (Country A) (e.g., replacement of existing equipment, additional treatment equipment to reduce chromium and nickel pollution during production process)
![Page 8: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/8.jpg)
Applicable Safeguard Policies
Environmental Assessment category B (OP/BP 4.01);
Natural Habitats (OP/BP 4.04) - Ramsar
Safety of Dams (OP/BP4.37) Projects on International Waterways
(OP/BP7.50 ) – legal policy that is not included in EMP
![Page 9: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/9.jpg)
OP/BP 4.01 Environmental Assessment
Preparation of an EA and site-specific Environmental Management Plans (EMPs);
EA identified and analyzed the potential environmental impacts of the different activities (on air, groundwater, surface water, soil, flora and fauna);
EA made recommendations and options for mitigation measures
EMPs addressed mitigation measures and monitoring activities
![Page 10: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/10.jpg)
OP/BP 4.01 and public disclosure
Draft EA and site specific EMPs have been discussed during several consultations in both countries;
Final EA and site-specific EMPs were disclosed in both countries in local language and at the Bank Infoshop in English
![Page 11: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/11.jpg)
OB/BP 4.04 Natural Habitats(triggered because of positive investments in protected areas)
Flood management in SMRB can be compromised by poor operations of HPPs or needs to meet other water use demands maintenance of environmental flows is complicated
Small-scale infrastructure to regulate the water regime in the Mini River within protected Red Nature Park in order to restore natural wetlands in the park;
Improvements in sites which allows visitor access to sensitive ecosystems (promoting eco-tourism)
![Page 12: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/12.jpg)
OP 4.37 Safety of Dams (policy application)
inspect and evaluate the safety status of the existing dam and its performance history;
review and evaluate the owner’s operation and maintenance procedures; and
provide a written report of findings and recommendations for any remedial work or safety-related measures necessary to upgrade the existing dam to an acceptable standard of safety
![Page 13: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/13.jpg)
OP 4.37 Safety of Dams cont’d (Study findings and recommendations)
dam is located in a seismically active area
installation of proper equipment would allow adequate response to earthquakes
needed dam safety monitoring equipment and development of emergency and evacuation plans
![Page 14: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/14.jpg)
Other safeguard policies
Physical Cultural Resources (OP/BP 4.11) - The EMP notes that archaeological resources should be covered by chance-finds procedures’ clause incorporated in the contractors’ agreements;
Involuntary Resettlement (OP/BP 4.12) - No land acquisition or relocation of people will be necessary for proposed infrastructure improvements
![Page 15: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/15.jpg)
EMP
Mitigation Plan Monitoring Plan Proposed Environmental Training Monitoring Equipment
![Page 16: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/16.jpg)
Preparation of Mitigation Plan for a site-specific EMP
Earth Town wastewater collection and treatment infrastructure
![Page 17: Case Study – Preparation of an EMP](https://reader033.vdocuments.net/reader033/viewer/2022042822/56815c9b550346895dcaa5b1/html5/thumbnails/17.jpg)
Preparation of Mitigation Plan for a site-specific EMP cont’d
Participants will be asked to develop the Environmental Mitigation Planfor proposed municipal infrastructure investments in the Earth Town